A1 General Event & Near Miss Form SAR-012-100-4-017 Issue 1 Date:30 August 2018 HAS THIS EVENT BEEN REPORTED TO THE TRAIN CONTROLLER? Y/N Type of event Station overrun Failure to call Collision Derailment Speeding Dispatch / door error Depot irregularity Platform,/train interface events Event date 15/05/2022 Event location Event time 2:51 Am Location Manager Other (describe) An alarm appeared in the Vicos system and the cause of a malfunction in the signal transmission channels. √ Between BS17 and BS19 line 1+2 Department About the location (tick, circle or highlight) Location Station, outdoors Station, indoors Trackside Depot or siding On board train Other Detail On train Platform/train interface Platform Ramp/path Stairs/steps Concourse/indoors Car park/forecourt Office Workshop/shed Walking route Yard/siding Inspection pit Lighting Daylight Dark, no artificial light Artificial light, adequate Artificial light, inadequate Handlamp Other About the person primarily involved in the event Person type SAR employee Contractor Public Other Name Muneer Hamzah Job Title Technician Home location Dammam Line manager Mohammad Bamusalam SAR ID umber Contact Number About the train (if applicable) tick or circle Passenger in service Passenger not in service Freight loaded Freight empty Dangerous goods Locomotive only Train ID Driver’s name Time Driver’s depot From Captain’s name To Captain’s depot Train number(s) Other staff name Vehicle /Wagon number(s) Other staff depot About you, the person completing this form (if you are not the person named above) Name Location S&T Maintenance Dammam Contact number / via 0138714025 Time report completed 8:30 Am Muhammad Al Wadie Job Title S&T Specialist Date this report completed 16/05/2022 Function Dept.: Form No: Health, Safety & Environment Operations Management SAR-012-100-4-017 Rev#00 A1 General Event & Near Miss Form SAR-012-100-4-017 Issue 1 Date:30 August 2018 Description of event Describe what happened in as much detail as you can remember. Concentrate on the event itself and the circumstances leading up to it, not how it was managed afterwards unless this was relevant. Use pictures, copies of social media or maps if they are relevant as it helps understand the event and / or the location. There is an alarm in the Vicos system that is in fibre optic cable cut And the Contractor technicians and line maintenance inspectors arrived at the site to found the cable cut. A contractor (Chinese company CRCC) has possession doing work. And he caused that cut. If a Safety Inspector is at your location have you notified them of the incident? Y / N / Not Applicable Date and time advised On completion please scan and email this form to the Health and Safety team: Safety - sarsafety@sar.com.sa and inform your line manager/ supervisor/team leader. For assistance contact SKAnazi@sar.com.sa or Mob: 0500155872 or +966 11 525 0000 Ext: 210298 Function Dept.: Form No: Health, Safety & Environment Operations Management SAR-012-100-4-017 Rev#00