Uploaded by Asif Imran

CRSE-SA-T-783 Rev-03 Method Statement for Erection Installation of Metallic Welded

advertisement
Savio J D'Cunha
JOEL B. YOSORES
CRITICAL LIFT SHALL BE PLANNED, APPROVED
AND SUPERVISED BY ARAMCO CERTIFIED
RIGGER 1
When and wherever safe & practicable, spool at weight manageable for manual lifting at ground level,
manual lifting is allowable. Crane shall be used at any spool of any weight to be installed at height.
Download