Quality Plan Maintenance Procedures SWMS Download Method Statements Home Privacy Support Cart Editable Documents Full Catalog SEARCH Search … Join for Latest Articles Enter your email address & Click Join: JOIN Recent Publications ACS Access Control Electronic Security System Installation & Testing Method Statement Method Statement for Piling Work using the Diesel Hammer Steel Bar Reinforcement Rebar Fabrication and Installation Method Statement Sheet Pile Installation Method Statement SWMS Safe Work Method Statement for Electrical Conduit Installation Prior to Pouring Concrete Popular Categories Civil Method Statements (81) Electrical Method Statements (45) Fire Fighting Systems (17) HVAC Method Statements (43) Occupational Health and Safety (23) Oil & Gas Systems (12) Plumbing Method Statements (36) Technical Guides (31) Testing & Commissioning (60) Popular Tags AV System block work method statement block work procedure CCTV ceramic floor tiles Clean Agent System Commissioning COMMISSIONING PROCEDURE Dampers Demolition Works Drainage piping Electric Water Heaters excavation safe work Fire Dampers Fire Fighting System Fire Suppression System HVAC Ductwork HVAC Method Statement Installation Installation Method Statement installation Procedure Lightning Protection System Method Of Statement method statement Method Statement For Testing & Commissioning Precommissioning Precommissioning & Commissioning Safe Method of Statement Safe Method Statement safe work for excavation safe work method of statement Safe Work Method Statement Sanitary Wares SMDB's Specifications swimming pool civil works SWMS Testing & Commissioning Testing & Commissioning Method Statement Testing and Commissioning Tower Crane Foundation UPS System UPS Testing Procedure Variable Frequency Drives water supply piping You May Like! Contract Master Schedule Preparation Project Management Procedure $3.49 Meta Log in Entries feed Comments feed WordPress.org Job Safety Analysis JSA for Lifting Activity – Loading unloading using Crane and Boom Truck Below is a precise Job Safety Analysis JSA for Lifting Activity that includes the loading and unloading of materials using Crane and Boom Truck. JOB STEPS Preparation and compliance to work permit requirements Preparation of working area Arrangement of rigging gears material Set-up for Loading Unloading (Crane and Boom Truck) Loading and Unloading by using Crane & Boom Truck Emergency Response Heat Stress Clean up / House keeping POTENTIAL HAZARD (What can cause harm?) CONTROL MEASURE (What can be done to prevent it from going wrong?) Missed information between supervisors and workers regarding safety factors and work instructions 1. Secure permit and all related documents prior to work. 2. Conduct tool box meeting prior to activity 3. All workers need to be trained and must have training passport. Slip, Trip Public traffic Pedestrians 1. Remove all tripping hazards from the work area. 2. Watch where you are walking. 3. Proper barricade of the working radius and install Lifting Operation signage. 4. Assign personnel to control/guide any vehicle. 5. Flagman/spotter to remain vigilant of errant pedestrians and personnel. 6. Where pedestrian crossings are within the working area either shut the pedestrian crossing or make the crossing safe for pedestrian use. Harm to personnel due to usage of Defective or Home Made Rigging gears & Tools Unsafe condition and improper position of task Improper housekeeping and arrangement of materials causing Slips, Trips, falls All Rigging gears or tools shall be kept in good condition. They must be kept clean & stored properly. Defective rigging tools shall be removed from site or disposed. Wear appropriate PPE at all times. Manual handling shall be covered in daily TBT and be implemented on site Assign a two man crew to lift heavy materials. Observe proper work ergonomics. Access and egress must be clear, no obstruction All materials must have a safe distance of 1.2 meters away from the excavation. Punch point Un-authorized entry Slip, Trip and Fall Keep hands out of pinch point while Set- up rigging gears and paid. Provide proper Barricade and Lifting Signage’s to stop unauthorized entry. Remove all unused materials and tools from working area, make sure lifting radius should be clear and clean. Un-authorized entry Slip, Trip and Fall Personnel Struck by Swinging load Personnel Struck by Falling load Hitting people or existing facility. Punch point Crane losing balance. Fire and electrocution Mechanical failure Weather Condition Poor maintenance of equipment. Ground stability. Exceeding safe working load. Unauthorized entry in working area. Work without work permit. Crossing under the suspended load. Provide proper Barricade and Lifting Signage’s to stop unauthorized entry. Remove all unused/ unwanted materials and tools from site. Make sure that the area is level and compacted. Make sure that the outriggers are fully extended. Make sure that supervisor conduct toolbox meeting before the activity. Make sure that all the workers know the hazards involve in the activity. Make sure that the slings, belts and shackles are inspected and color coded. Make sure that the Rigger and Operator is competent person and, has a valid Certification. Valid License required for Operator. Daily crane Inspection checklist must be accomplished by the Crane Operator. The crane must have valid Approved 3rd Party inspection certification sticker on it. Never access the safe working load in any condition. Make sure that the Crane/boom truck is parked away from the overhead power lines. Never allow anybody to cross under the suspended load. Minimum 2 tag lines shall be used to control suspended load Practice ergonomics I manual lifting safety. Check rigging before lifting. Make sure that area is barricaded and sign boards are placed. Serious injury, illness Equipment accident/fire Fatality Lost work day In case of emergency all work shall be stopped immediately and Emergency response plan shall be activated. Emergency telephone numbers must be posted at site. Wind speed and direction shall be monitored through wind sock with wind meter. Mobile phone available with Supervisors & Safety personnel at Site All the workers to be trained on ERP and how to evacuate. Work during hot weather, (fainting, collapse, cramps, fatality, heat stroke, heat exhaustion, and other heat related illnesses Training about heat stress management, acclimatization for workers, provide cold drinking water at site at all times; availability of approved rehydration solution when needed, sufficient rest break interval. Sharp objects Wear protective gloves Be attentive and alert. Dispose off material in appropriate manner. Close out work permit return to office daily. Previous Next All Rights Reserved. Safework Method Of Statement. Serving Construction Industry Since 10 years.