Activity Step Hazard Risk and affected Person Property damage / Bodily Injury Determine crane and track locations Vehicle get into construction site w/ installed poles Site tour and checking area post excavation Unknowledge Fall-down, Minor / of area hazards Major Bodily since Injury excavation completion Weather condition Impact of weather condition on lifting/lowering operation Fall-down, Minor / Major Bodily Injury / Equipment damage Safety instruction People unskilled or untrained in the work area. Emergency procedures not known Minor / Major Bodily Injury Electrical equipment certifications inspection Non-inspected equipment on construction site Minor / Major Bodily Injury Working w/ hand tools Pinch Point Hand or Leg Injury (L) (S) (RR) Additional Control Measures 3 2 6 Figure out proper, stable and safely both crane and truck working positions. Observe SWL as per load chart working radius / boom length. 3 4 12 Familiarity with the area in the preliminary tour accompanied by Hoffman's supervisor, verify both lifting/lowering and excavated areas are safety and barricaded. Set up additional barriers (if necessary) and warning signs to prevent any unpredictable entry of unauthorized personnel. 3 4 12 Its prohibited to work at critical weather condition - lower the arms and turn off the engines, the lifting/lowering job must be postponed 2 4 8 Provide general safety training for all of personal, verify everyone knows his own role, working location and emergency procedure. During the lifting/lowering no workers will be found in the barriered area. 2 4 8 Check up electrical equipment test validity (according to periodically inspection) by certified tester. 2 3 6 Check equipment & hand tools in good condition prior to use. Proper PPE shall be used such as hand gloves, googles safety shoes etc. when (L) (S) (RR) Check 1 2 2 1 4 4 1 4 4 1 4 4 1 4 4 1 3 3 Personal certifications, crane and truck licenses inspection Non-inspected vehicle on construction site Fatality / Damage to property / Minor / Major Bodily Injury 3 4 12 Entrance the crane and truck to the site Driving into forbidden areas Property damage / Bodily Injury / Fatal 3 4 12 Hard barriers unloading from the Truck Slipping, fall down from the truck Bodily Injury / Fatal 2 4 8 Property damage / Bodily Injury / Fatal 3 4 12 Lifting/lowering Collapse of the structure crane / lorry Truck due to poor ground working with hand tools. Foreman shall brief all workers on the potential pinch point hazards. Checkup crane assessment, ensure driver, operator and competent spotter are certified, vehicle insurance, licenses and brakes inspection are up-to-date, provide lifting equipment visual inspection. Verify all of required documents are approved. Communication w/ site personal, inserting a truck and crane (escorted by appropriate Hoffman personal) to the area where the structure is supposed be unloaded. Load (structure) shall be secured properly when its transporting in/out of work area and must be check by the driver and spotter every time when vehicle moves from one location to another. Lifting & positioning of crane and truck shall be as per approved lift plan. Training all employees, consider different types of weather conditions, ensure internal guidelines and procedures knowledge, using PPE, verify the truck is braked and ensured and the barriered area is free of irrelevant person. Site Engineer shall make preliminary check the access & lifting area in firm and compact 1 4 4 1 4 4 1 4 4 1 4 4 condition Falling or swaying of load Fatality / Damage to property 3 4 12 Entrance to the trench Fall down into the trench Bodily Injury / Fatal Working into the trench Fall down into the trench Bodily Injury / Fatal 2 3 6 COVID-19 COVID-19 exposure COVID-19 2 4 8 condition before carry out lifting operation. Certified Crane Operator, Riggers, Signalman & lifting equipment must be used for the lifting/lowering operation and according to confirmed Lift-Plan. Tag lines to be used to control load movement during lifting & swinging. Ensure no one shall place their hands or legs in-between the load at all time. Riggers to clear off the area during movement of crane. Ensure that loads are correctly positioned on the ground. The entrance and exit of the excavation will be arranged so that the slope does not exceed 1 vertical to 1.5 horizontal. Or using a ladder so that the maximum distance covered by an employee does not exceed 20 meter. Hard barriers all around, verify no potential hazard of fall down from 2m. height. A spotter will insure no person will cross a 2 meters distance from trench edges. Sharp edges supposed be safely covered along of work area. Maintain social distancing Wear face mask Wash hands often Stay at home if you have symptoms. 1 4 4 1 4 4 1 3 3 1 4 4