Degassing Heat Treatment Procedure No. : STD Degassing Ref. No.: GENERAL Item Item Number Revision Spec. Number : : : : Code/Test. Std : Base Metals Thickness : : Date 0 : Drawing Number(s) : BASE METALS & RULING THICKNESSES Group no. mm PROCEDURE TIME T3 . CR1 HR2 T2 . CR2 HR1 T1 . Temperature T1 Temperature T2 Temperature T3 : : : AMBIENT 150°C. 400 ± 10°C. Time at temperature (T3) Heating Heating Cooling Cooling : rate rate rate rate HR1 HR2 CR1 CR2 : : : : T E M P E R A T U R E 100°C/Hr Max 150°C/Hr Max 150°C/Hr Max Still air 180 Minutes Minimum HEAT TREATMENT METHOD & LOADING Method : Gas fired furnace or electrical resistance pads Loading : The components are to be supported and protected in such a way as to prevent localised hot spots, distortion and contact with the furnace walls. A minimum of 100mm free space is to be left around the components. TEMPERATURE RECORDING The temperature are to be recorded by continuous recording charts using directly attached thermocouples(attached by ceramics or resistance welding). 2 TC per Header, Top and bottom of the header on the thickest part. The frequency and method of equipment calibration shall be in accordance with standard procedures and works instructions. DOCUMENTATION & CERTIFICATION A certificate stating the item tag no., actual soak time, soak temperature, heating/cooling rates and the date of heat treatment is required. This certificate is to be signed by the responsible personnel. The original recorder chart stating the item tag no., date of heat treatment, the technicians name and signature and the scales represented by the recording. REMARKS APPROVAL Manufacturer Designation Manufacturer Quality dept. Approval Approval Signature Date Stamp A Status PWHT Procedure Page 1 of 1 B C A B C