CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
JOB
UNIT No.
HS0108
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS
Sh. 1 of 18
0
DESIGN BASIS
0
03-Dec-2020
ISSUE
G. BRUSAMONTI
D. PINNA
P. GUELI
Rev
Date
Issue
Prepared b y
Checked by
Approved by
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
JOB
UNIT No.
HS0108
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS
Sh. 2 of 18
0
SUMMARY
1.
BASIS OF DESIGN .................................................................................................................... 3
2.
BATTERY LIMITS ...................................................................................................................... 6
3.
PRODUCTS OF UREA UNIT ....................................................................................................... 7
4.
RAW MATERIAL INFORMATION AT PLANT BATTERY LIMITS ...................................................... 9
5.
CONDENSATE EXPORT FROM UREA UNIT ............................................................................... 12
6.
UTILITIES INFORMATION AT PLANT BATTERY LIMIT ................................................................ 13
7.
METEOROLOGICAL AND GEOLOGICAL CONDITIONS AT SITE ................................................... 16
8.
TRANSPORTATION CONDITIONS ............................................................................................ 17
9.
UNITS OF MEASUREMENT ..................................................................................................... 17
10.
PROJECT LANGUAGE ............................................................................................................. 18
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS
1.
Sh. 3 of 18
0
BASIS OF DESIGN
1.1. Project Description
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co. Ltd.
PLANT LOCATION
Shanxi Qingshui, P. R. CHINA
PROJECT
3300 MTPD Urea Project integrated with Melamine Units
1.2. Numbering procedure
The DOCUMENT NUMBERS will be in accordance with SAIPEM standards.
The ITEM TAGS will be in accordance with SAIPEM standards.
1.3. Plant Design Capacity
The Urea Unit shall be able to produce not less than 3300 tons per day as prilled urea.
Licensor standard overdesign will be applied. In particular, the worst scenario between the
following three cases will be considered:
•
the Urea Plant produces 3300 MTPD of prilled urea when Melamine Plants are under
shut down;
•
the Urea Plant produce about 2742 MTPD of prilled urea, provide 23.25 t/h of urea
feedstock to one of the Melamine Plant, while the other one is under shut down, as urea
melt @ 99.75% wt. The off gas from one melamine plant shall be recycled back to this
urea plant;
•
the Urea Plant produce about 2184 MTPD of prilled urea, provide a total of 46.50 t/h
of urea feedstock to both the Melamine Plants as urea melt @ 99.75% wt. The
design of Urea Unit shall be made to minimize the biuret formation in order to keep
biuret content below 1% wt. The off gas from two melamine plants shall be recycled
back to this urea plant.
The Urea Unit shall be designed on the basis of the three cases.
Material balance, steam and cooling water balance, effluent summary in PDP and expected
consumption figures etc. relevant to the three cases as above shall be included.
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS
Sh. 4 of 18
0
1.4. Product Specification
The urea prills coming from the Prilling Tower shall comply with the following product
specification:
Total Nitrogen
min. 46.4
%wt, dry basis
Biuret
max. 0.9
%wt
Moisture
max. 0.4
%wt
1.5. Gaseous Effluents
Flare system for Urea Process Unit is not foreseen; the following cold vent stacks will be
considered:
•
Blow Down
•
1st Vent Stack
•
2nd Vent Stack
Emission Requirement for the Prilling Tower:
Local regulation for Prilling Tower emission:
Dust - Particulate Matter
30 mg/m3
for Class A Enterprise
Ammonia Concentration
<40 mg/m3
for Class A Enterprise
<50 mg/m3
for Class B Enterprise
<70 mg/m3
for Class C Enterprise
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS
Sh. 5 of 18
0
The design basis for the Prilling Tower in this project is as follows:
•
Air from Prilling Tower outlet (at SAIPEM B.L.) to scrubbing system:
Flow rate
1,277,000
Nm3/h
Temperature
75
°C
Urea Dust, expected
40
mg/Nm3
Urea Dust, maximum
50
mg/Nm3
Ammonia, expected
90-100
mg/Nm3
Ammonia, maximum
120-150
mg/Nm3
•
Air from Scrubbing System outlet (outside SAIPEM B.L.):
Urea Dust – Particulate Matter
30
mg/Nm3
Ammonia
<40
mg/Nm3
SAIPEM shall verify the possibility and adequacy from safety point of view to deliver process
vents containing ammonia to the Scrubbing System of the Prilling Tower.
Notes:
•
Acidic Scrubbing for Prilling Tower will not be considered as part of PDP;
•
Water scrubbing for urea dust will be implemented by Client, through Contractor Chengda.
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS
2.
Sh. 6 of 18
0
BATTERY LIMITS
The Urea Unit battery limits for the PDP and where the guarantee figures will be checked,
are the following:
•
CO2 at discharge of CO2 compressor;
•
NH3 at the inlet connection pipe of the Urea Unit;
•
Product at Prilling Tower bottom;
•
Air at Prilling Tower top, upstream of water scrubbing;
•
Urea Solution at P-106 A/B tapping point for DEF Unit;
•
Utilities at the inlet connection pipe of the Urea Unit;
•
Off-gases from Melamine Plant(s) at the inlet connection of the Urea Unit;
•
Urea melt to Melamine Plant(s) at the outlet connection of the Urea Unit;
•
Any other Melamine Unit interconnection, if any.
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS
3.
Sh. 7 of 18
0
PRODUCTS OF UREA UNIT
3.1. Urea Prilled Product
Temperature
65
°C
Pressure at Urea B.L.
atmospheric
Mean Prill size
1.9 – 2.0
mm
Urea + Biuret
99.75
%wt
Balance Water
[-]
%wt
Composition
3.2. Urea Solution to DEF
Production of DEF (AdBlue) is foreseen with planned capacity of 300 ton/day starting from urea
solution spillage from P-106 A/B. SAIPEM shall provide typical documentation of DEF Unit for
the planned capacity.
Temperature
98-102
°C
Pressure at Urea B.L.
min. 5
bar (g)
Flowrate
4.06 – as 100% urea basis
ton/h
Ammonia
max. 0.4
%wt
Carbon Dioxide
max. 0.1
%wt
Urea
min. 82
%wt
Balance Water
[-]
%wt
Composition
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS
Sh. 8 of 18
0
3.3. Urea melt to Melamine Plant for each Melamine Unit
Temperature
136
°C
Pressure at Urea B.L.
10.5
bar (g)
Flowrate
23250
kg/h
Urea + Biuret
99.7
%wt
Water, maximum
0.3
%wt
Oil, expected
free
Composition
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS
4.
Sh. 9 of 18
0
RAW MATERIAL INFORMATION AT PLANT BATTERY LIMITS
4.1. Liquid ammonia
Warm ammonia shall be used during normal ammonia plant operation; whereas cold
ammonia from liquid ammonia storage tank, after boosting, is to be used when warm
ammonia is not available from ammonia plant.
Temperature
≤30
°C
Pressure at Urea B.L.
≥26
bar (a)
Ammonia
≥99.9
%wt
Water
≤0.1
%wt
Oil
≤5
ppm wt
Hydrogen
600
ppm vol
Nitrogen
400
ppm vol
Argon
nil
Composition
Dissolved Inerts
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
JOB
UNIT No.
HS0108
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS Sh. 10 of 18
0
4.2. Carbon Dioxide
At CO2 compressor discharge:
Temperature
120
°C
Pressure at Urea B.L.
157
bar (g)
Basis
as 100% CO2
At CO2 Compressor suction:
Temperature
30
°C
Pressure
1.50
bar (a)
Carbon Dioxide
≥98.70
%vol (dry basis)
Hydrogen
≤0.5
%vol (dry basis)
Carbon Monoxide
≤1100
ppm vol (dry basis)
Methane
≤200
ppm vol (dry basis)
Water
saturated
Sulphur
≤5
mg/Nm3
Nitrogen
0.61
%vol (dry basis)
Methanol
200
ppm
Composition
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
JOB
UNIT No.
HS0108
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS Sh. 11 of 18
0
4.3. Off-gas from each Melamine Unit
Temperature
143
°C
Design Temperature
220
°C
Pressure
22.1
bar (g)
Minimum Pressure
not available
bar (g)
Design Pressure
29.4
bar (g)
Flowrate
23978
kg/h
Design Flowrate
26570
kg/h
Ammonia
51.21
%wt
Carbon Dioxide
38.91
%wt
Water
9.57
%wt
Oxygen
0.07
%wt
Nitrogen
0.24
%wt
Composition
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
JOB
UNIT No.
HS0108
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS Sh. 12 of 18
5.
0
CONDENSATE EXPORT FROM UREA UNIT
5.1. Steam Condensate
Temperature
Design Temperature
Pressure at B.L. - minimum
Design Pressure
50
120
5
8
°C
°C
bar (g)
bar (g)
Water Quality
without process pollution
5.2. Process Condensate
Temperature
Design Temperature
Pressure at B.L. - minimum
Design Pressure
45
153
5
14
°C
°C
bar (g)
bar (g)
Ammonia expected
Urea expected
1
1
ppm
ppm
5.3. Urea-Water solution from water scrubbing system
Temperature
40
°C
Design Temperature
not available
°C
Pressure
4
bar (g)
Design Pressure
not available
bar (g)
Flowrate
3000
kg/h
Urea
5
%wt
Water
95
%wt
Composition
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS Sh. 13 of 18
6.
0
UTILITIES INFORMATION AT PLANT BATTERY LIMIT
The following utilities shall be supplied by client.
6.1. Circulating cooling water
Water Supply Temperature
Water Return Temperature, max
Design Temperature
30
40
60
°C
°C
°C
Water Supply Pressure
Water Return Pressure, output
Design Pressure
4.5
2
10
bar (g)
bar (g)
bar (g)
Chlorine Ion (Cl-)
Fouling Factor
C.S. Corrosion Rate
Flow rate available
≤400
0.000344
<0.075
not available
ppm
m2K/W
mm/a
6.2. Demi-water
Temperature
Design Temperature
Pressure at B.L. - minimum
Design Pressure
40
90
5
10
°C
°C
bar (g)
bar (g)
pH @ 25°C
Conductivity @25°C
SiO2
not available
≤0.2
≤20
µS/cm
µg/L
Quantity of demi-water during
shut down scenario
300
m3
6.3. Power Supply
Voltage
Frequency
10,000/380
50
V
Hz
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS Sh. 14 of 18
0
6.4. Emergency electric power
Voltage
Phases
Frequency
Required Power
Wires
380
3
50
500
5
V
Hz
kWh/h
Users of Urea Plant on emergency network are the following:
MP-105 A/B
MP-110 A/B
MP-111 A/B
Ammonia booster pumps
Steam condensate flushing pumps
H.P. washing pumps
CO2 Compressor and Turbine auxiliaries (1)(2)
Lighting, motorized valves, prilling tower lift
MP-116 A/B
Carbamate close drain recovery pumps
H.P. Ammonia pumps and H.P. Carbamate pumps auxiliaries (1)(2)
DCS Battery Chargers (2)
DCS (2)
(1) to be confirmed by manufacturer
(2) out of SAIPEM’s scope
6.1. Medium Pressure Nitrogen
Temperature
Temperature - design
Pressure at B.L. - minimum
Pressure - design
30
70
60
72
°C
°C
bar (g)
bar (g)
Composition
Nitrogen
Oxygen
Carbon Dioxide
Water
>99.99
<100
free
supplied dry
%vol (dry basis)
ppm vol (dry basis)
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS Sh. 15 of 18
0
6.2. Compressed Air
Temperature
Design Temperature
Pressure
Design Pressure
Ambient
70
8
10
°C
bar (a)
bar (a)
Composition
Nitrogen
Oxygen
79.1
20.9
%vol (dry basis)
%vol (dry basis)
Dew Point
-40
°C
6.3. HP Steam
HP Steam to Hydrolyzer:
Temperature
430
°C
Min/Max Temperature
not available
°C
Design Temperature
450
°C
Pressure
40
bar (g)
Min/Max Pressure
not available
bar (g)
Design Pressure
45/FV
bar (g)
HP Saturated Steam to Process:
Temperature
saturated
Design Temperature
280
°C
Pressure
40
bar (g)
Min/Max Pressure
36/44
bar (g)
Design Pressure
45/FV
bar (g)
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS Sh. 16 of 18
7.
0
METEOROLOGICAL AND GEOLOGICAL CONDITIONS AT SITE
Please refer to the following meteorological and geological conditions at site for this
project:
Temperature
Annual average
Mean Temperature of the hottest months in recent years
Mean Temperature of the coldest months in recent years
Extremely high Temperature
Extremely low Temperature
8.9
23.9
-9.9
38.9
-28.1
°C
°C
°C
°C
°C
Rainfall
Annual average
Maximum annual rainfall
Minimum annual rainfall
440.8
819.1
108.6
mm
mm
mm
Snowfall
Annual maximum
120
cm
Humidity
Annual average absolute humidity
Month Average maximum relative humidity
7.6
56
hPa
%
Atmospheric pressure
Annual average
91.01
Wind
Yearly prevailing direction
Wind load at 10 m above ground
Annual average wind velocity
NW
not available
2.1
Seismic fortification intensity
VI
Maximum Frozen earth depth
146
kPa (abs)
m/s
Mercalli
cm
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
JOB
UNIT No.
HS0108
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS Sh. 17 of 18
8.
0
TRANSPORTATION CONDITIONS
Equipment and materials will be transported to the site by railway and by road with
railway transportation preferred. The transportation limitations for single piece of equipment,
including packaging are as follows:
9.
Loading height
not available
m
Maximum Weight
300
ton
Maximum D x L
4.5 x 30.0
m
Maximum W x H x L
4.5 x 4.5 x 30.0
m
UNITS OF MEASUREMENT
All drawings and documents submitted to the BUYER by SAIPEM and his vendors shall use
the standard international unit system (SI) and additional commonly used units.
The nominal diameters of piping and fittings shall be shown in inches.
The main Units of Measurement to be used for the PDP are:
Property
Unit of measure
Temperature
Pressure, gauge
Pressure, absolute
Vacuum
Mass
Mass weight
Volume, liquids
Volume, gases (or at flow condition)
Flow rates, liquids
Flow rates, gases
Flow rates, steam
Flow rates, solids
Heat/Energy
Heat Duty
Power, electric
Heat transfer coefficient
Specific Heat
Specific Enthalpy
Thermal Conductivity
Dynamic Viscosity
Viscosity
°C
kPa(g), MPa(g), hPa(g), bar(g)
kPa(a), MPa(a), hPa(a), bar(a)
Pa(a), mmHg
kg, ton
kg-mol
m3 , L
Nm3, L
m3/h, L/min, kg/h
Nm3/h, kmol/h, kg/h
kg/h, t/h
kg/h, t/h
kJ, kWh, GJ
MW, GJ
kW, MW
W/m2K, kcal/m2°C
kJ/kgK, kcal/kg°C
kJ/kg, kcal/kg
W/mK, kcal/mh°C
mPas
cP
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
CUSTOMER
Shanxi Qingshui Yinquan Coal Industry Development Co., Ltd.
PLANT LOCATION
Shanxi Qingshui – P. R. CHINA
JOB
UNIT No.
HS0108
ZA-E-6001
PROJECT / UNIT
Rev.
3300 MTPD UREA PROJECT INTEGRATED WITH MELAMINE UNITS Sh. 18 of 18
0
kg/m3
kg/m3
kgmol/m3
mm
mm, m
inch
m2
inch
dB
N/mm2, kg/cm2
N
[-]
S
% wt
% of range
Hz
A, mA, kA
kWh
V, kV, mV
Wh, kWh
h, s
m/s
Liquid density
Vapour density
Molecular density
Equipment dimension
Length
Pipe diameter
Area
Tube sizes (ND)
Sound pressure
Stresses
Force
Flange rating
Electrical conductivity
Product concentration
Level
Frequency
Electrical current
Electric work
Voltage
Work
Time
Speed
Note: The base reference for temperature and pressure will be T= 0 °C ; P= 101.3 kPa(abs).
The following powers of 10 are to be used:
hecto
h
102
centi
c
10-2
kilo
k
103
milli
m
10-3
mega
M
106
micro
µ
10-6
giga
G
109
10.
PROJECT LANGUAGE
English shall be the language for communication between the BUYER and SAIPEM during
execution of the contract. For major written communications both Chinese and English shall be
used.
Chinese shall also be used in the SAIPEM's written descriptive technical documentation (e.g.
Operating Manual, Analytical Manual, etc.) but only English shall be used for the drawings and
tables.
CONFIDENTIAL
This document and the information herein contained are confidential and the sole property of Saipem who will safeguard its rights according to the civil and
criminal provision of the law. It shall neither be disclosed to third parties nor used for purposes other than those for which it has been disclosed.
Download