SOP of Permit to Work 1. 2. 3. 4. Pre checking All PIC’S must provide workers/vendors name list coming new factory and state the location of job (ex:1st,2nd floor). All the work must issue the PTW by (Initiator/PIC’s). Copy of PCR test attached together with PTW form. PTW valid for 1 DAY WORKING ONLY. Entering new Factory 1. All PIC’S and workers/vendors must wait at the guard house. 2. Show the PCR test to security. 3. PTW completed by initiator. 4. Safety will check and verify PTW -Safety Briefing -PPE requirement (Safety helmet, safety vest, safety shoes)-Must wear depend on job condition. -Safety Barricade- Must bring your own safety cone or any type of barricades. -Hang Up the PTW at work area Barricades for whole area Safety briefing Permit closure -Make sure doing 5S