AMPACTS INTERNATIONAL FIELD TRIP REPORT
Supervisor : Mr. Nguyen Trung Nghiep
Students :
1.Trinh Viet Anh
1531120026
2. Nguyen Quoc Thai Chau 1531120008
3. Tran Minh Tri
1831120002
Binh Duong,22th December 2020
1.Company overview
1.1 General Information
The establish history of company.
Established in 1998 in Taiwan, starting from plastic injection, been dedicating
since 2009 to audio products with specialization in design and manufacturing of
headsets, accessories, and plastic parts.

The fields company involves plastic injection design and
manufacturing of headsets.
Some products of company:

Processing productivity.
The processing productivity for each products Headsets is 450 products with 30
workers in an hours.
 Total number of employer.
Ampacs International Vietnam Co., Ltd is a Chinese (Taiwan) company led by Mr.
Huang, Wei-Wen as the legal representative of the Company cum Director.
 Salary policy.
The average salary from 10 -15 millions VN,D for the employees. Also,the
company supports to find accommodation for those who live far away, after
signing the official contract, the company will have a full range of insurance
regimes, annual leave, maternity leave, travel, ... considering annual salary
increase. , go to work on Sunday x2, salary bonus on holidays, ... PCBA
production area
1.2 Engineering department
 Organization structure.
Production manager  Production Engineer  Employees...
The percentage of engineering employee in company about 30 percent ( 30-35
persons)
The interaction closely linked, logically between engineering employee and other
department’s employee because production is in line.
 Main job of engineer in each division.
Paint Spraying Technique, Plastic Injection Technique, Wire Production Engineer
(proficient in using 2D, 3D)…
 Limitation of freshman engineers.
Normally, the issues that they have to face since beginning job,this is less
experiences in real production, and how to manager the line production.
 How to perform and manage all engineering issues.
To perform and manage all engineering problem we need a clear understanding of
the production line, each segment, the robot's behavior and the worker interaction
with the machine.
2. Manufacturing factory
 How the processing plant is constructed.
+ Work-flow from raw material to final product.
The company divide into five production area.
1.PCBA production area
2.Cable production area
3. Assembly area (Manufactoring deparment)
4. Plastic component production area
5. Lab quality management
The main source of raw material is plastic resins. Plastic particles are pushed
directly into the injection molds, depending on the details of each product, there
are different types of injection molds.
 The machines are used for each process:
 Testing Lab
Test the push button of the earphones, each press test 50,000 times
Measure the size of the details, calculate the force of the headset
Test the tension of the wire 5000 times
 Power supply
3-phase power supply
 Control system for plant? PLC-SCADA…
The control system for line production is PLC
3. Safety regulation at company (manufacturing factory)
With component assembly worker, they are equipped with uniforms such as Tshirts, hats. As for the worker in the factory, they must wear shoes.
There are many ventilation systems, fire alarm systems, exit light systems and
working light systems for each block.
There are lines on the floor to warn of danger.
4. Waste treatment system
“Not mention”
5. Field trip project (student in charge under supervisor)
Answer the student’s question about the trip ,and mention the way and time to
practice in the company. Moreover,company also show the missing works that they
need at the moment.
6. Conclusion
We experienced a lot about:
 The automatic extrusion and picking up the embryo
 Welding skills of the workers
 Layout of the conveyor system in the factory
 Assembly line was suitable-positioning
 Testing room with series of testing machines working properly using
statistics methods
 Trouble solving
 And we knew the sujects that we have to forcus on the time at EIU.