ANNEXURE 1 “Oyu Tolgoi” LLC (the 'Company') would like to invite fully competent and licensed entity to submit their price proposal to the “RFQ 6000822572_Fuel tank repair service” Please note that this is an invitation to formal tender and all proposals must be submitted via OYU Database before the tender close date. Purpose: One-off repair service of Fuel tank. Эд Ангийн Жин Ойролцоогоор: Кг/Тн Estimated Weight of Component: KG/TN Тн/TN Эд Ангийн Хэмжээс: (Агуулахын Ажилтан) Measurement of Package: (Storekeeper) (У х Өр. х Өн. см )/(L x W x H cm) 1.5tn 300х200х300 FL EX023 Serial Number Component SMR Description (SAP) QTY Manufacture TANK,FUEL;LIEBHERR;10379186 TANK,FUEL;LIEBHERR;10379186 1 LIEBHERR Major Cleaning Dye Penetrant test for all welding joint Weld cracked areas Weld extra support (2ea) on the fuel tanks regards the instruction CSI2019-CS042L2HEX Leak test by pressurized air Painting service Work needs to be performed at bidder workshop Tank is at OT UBHW. CSI 2019 - CS 042 L2 HEX - Instruction Support Plate on Fuel Tank.PDF ANNEXURE 2 Please provide your quotation as per below format: Technical 1. Proposal Please submit your proposal. Please respond in space below or attach separately. All certificates need to be provided. Cleaning Dye Penetrant test for all welding joint Weld cracked areas Weld extra support (2ea) on the fuel tanks regards the instruction CSI2019-CS042L2HEX Leak test by pressurized air Painting service Work needs to be performed at bidder workshop Tank is at OT UBHW. 2. Key Personnel Please respond in space below or attach separately. All certificates need to be provided. The Company needs to receive key personnel’s contact details. Commercial 1. Pricing Please indicate your price tabulation including breakdown of cost associated. Please respond in space below. Currency should be in MNT from Mongolian suppliers and USD from International vendors. Please provide detailed quote. Our cost for Fuel tank repair service shall be MNT 4,242,308.13 inclusive of VAT. Please find attached tabulation and cost associated. 2. Payment term acceptance Please acknowledge OT standard Payment term and accept Please respond in space below. Payment term We acknowledge OT standard Payment term as set out below. At Oyu Tolgoi we are bound by Rio Tinto Group’s standard payment term (net 45 days after the end of accumulation period). The accumulation period will run from the first day and end on the last day of the calendar month. Legal 1. Compliance with General terms and Conditions Please use below link to acknowledge OT General term and conditions: http://ot.mn/media/ot/content/suppliers/Useful%20Documents/OT_Purchase_Order_General_Con ditions_for_Services_EN.pdf General terms We New Zealand Mining Systems adknowledge OT General terms and conditions. 2. License The Company is concerned to know whether any of the Goods and Services are manufactured/ distributed/ delivered under any licensing arrangements. If so, the Company would like to understand the licensing arrangements - who is the licensor, how long is the license, etc? Please respond in space below. Licensing arrangements 3. Standards The Company is concerned to know the international Standards (Standards) under which your Company may operate relevant to your supply of goods and services, and what internal regime you have in place (or plans to put in place) to regulate and improve the supply of goods and services. Please respond in space below. Applicable Standards – Products/Services delivery Safety, health and environment The Company is committed to the highest standards of safety, health and environmental practices and expects its Suppliers to be similarly focussed. The Company will seek to establish a relationship with a Supplier that can demonstrate it has the appropriate safety, health and environmental objectives and has the management systems in place to deliver on these objectives. Please explain your safety, health and environmental objectives, and the management systems you have in operation to deliver these objectives. Include the key aspects and impacts of your business. Please respond in space below. Safety, Health and Environment health and safety management.pdf