R & R SHIPPING SERVICE MARINE SURVEYORS & CONSULTANTS SURVEY REPORT MV. BEKS NAZIK MONITORING OF UNDER WATER CLEANING OUR REF: RR / DIV / 001/ 2012 This is to certify that the undersigned surveyor did at the request of M.A. RAZAK & COMPANY LTD of No.7 , 19th Lane, Colombo 2, on behalf of their principals attend on board MV. Beks Nazik at Colombo anchorage on 12th and 13th December 2012 for the purpose of monitoring under water Hull cleaning and the findings are as follows. VESSEL PARTICULARS VESSEL MV. BEKS NAZIK P.O.R. MAJURO CALL SIGN V7WG7 OFFICIAL / IMO NO. 4296 / 9625803 G.R.T. / N.R.T. 33,277 / 18,906 D.W.T.(S) 57,347.4 L.O.A. 190.0M BUILT 2011 DELIVERED 06 01 2012 MASTER CAPT. S. S. GURTOP 60/1, School Lane, Nawala Road Rajagiriya, Sri Lanka Tel: 94 11 2876486, Mob. 94 773 400577 E-mail: ratna_gac@yahoo.com 2 OTHER SURVEYORS IN ATTENDANCE Vessel owners were represented by Surveyor from Transmarine Navigation (pvt) Ltd. OBSERVATIONS MV. Beks Nazik loaded with cargo arrived at Colombo anchorage at about 0800hrs local time on 12th December 2012 and anchored 7miles west of Colombo break water. Arrival Draught at Colombo anchorage was found as Fwd:10.8m Aft:12.0m Under water hull cleaning was to be carried by Master Divers in Colombo anchorage. Master Divers diving team arrived at 0830hrs local time on 12th December 2012 on board and met with Master of the vessel and briefed about the operation. Prior to commence the under water cleaning operation under water hull was photographed by he divers to ascertain the extent of marine growth. 2 3 Hydraulically operated Brush cart being used Marine growth on the sides were found slight and the bottom of the vessel was moderate. Due to strong current in the area ,divers were unable to operate brush cart, but polishing of propeller was done by two divers and completed the polishing by 1530hrs. BEFORE POLISHING PROPELLER BLADES Divers polishing propeller blades 3 4 On completion of polishing the propeller On completion of propeller polishing , divers returned and cleaning of hull was scheduled on 13th December. Divers reported on board at 0830hrs local time on 13th December and commenced cleaning of under water hull with hydraulically operated brush cart. Cleaning was carried out from forward to aft and hand scrapers were used to clean areas where the brush cart could not reach. 4 5 After cleaning Hull Hull was cleaned using hydraulically operated brush cart and hand scrapers. Marks of shell bases were visible at places where hand scrapers were used for cleaning. But no marine growth were left on the hull. 5 6 CLEANED HULL CLEANED HULL 6 7 REMARKS Divers commenced cleaning operation on 12 th December at 0900hs and completed at 1530hrs on 13th December 2012. No night operation was carried out. On completion of works on each day, work done was videoed and shown to Master of the vessel and to both surveyors. All parties were satisfied with the works carried out. Propeller and the underwater hull was found free of marine growth on completion of cleaning operation. I certify that I have no interest by way of ownership, agency commission, insurance or in any other manner whatsoever with respect to the contents forming the subject matter of this survey report. Issued without prejudice on this 14th Day of December 2012 at Colombo. S.P. HETTIARACHCHI ATTENDING SURVEYOR Attachments 1. Copies of work done certificates. 2. CD with video presentation of hull 7