APPENDIX ‘G’ Record of Public Consultation APPENDIX ‘G-1’ Notices & Stakeholder Mailing List TOWNSHIP OF ADJALA-TOSORONTIO SCHEDULE C’ CLASS ENVIRONMENTAL ASSESSMENT EVERETT WASTEWATER TREATMENT PLANT SURFACE WATER OUTFALL NOTICE OF STUDY COMMENCEMENT The Township of Adjala-Tosorontio is undertaking a Schedule ‘C’ Class Environmental Assessment for the design of a surface water outfall to the Pine River for the proposed Everett Wastewater Treatment Plant (WWTP). Any required upgrades to the WWTP to facilitate the surface water discharge, including activities such as capacity improvements will also fall under the scope of this Schedule ‘C’ Class EA. The Schedule ‘C’ Class EA process is to be completed in accordance with the requirements of the Municipal Class Environmental Assessment (Class EA) process (October 2000, as amended in 2012) and the Municipal Engineers Association (MEA) guidelines. As part of the Schedule ‘C’ Class EA process, the Class EA would complete Phases 3 & 4 of the process (preferred solution design concepts and Environmental Study Reporting respectively) in order to allow for implementation of the final phase discharge option for the WWTP to the Pine River. Public Consultation is vital to the success of this study. We want to ensure that anyone interested in this project has the opportunity to provide input. Therefore, various forms of public consultation will take place over the course of this study to receive public input and comments. A Public Information Centre (PIC) will be held to present alternative servicing strategies and receive public input. Notice of the PIC will be published in advance of the meeting. At the completion of the planning process, the Environmental Study Report and the project file for this Schedule ‘C’ project will be filed for public review. Project updates and notices will be posted on the Township’s website (www.townshipadjtos.on.ca) to inform the public of the Environmental Study Report’s progress. Residents and interested parties are encouraged to regularly visit the website to find out more about the Study. If you have any questions or concerns, and/or would like to be added to the study mailing list, please contact one of the study representatives listed below. Jim Hartman, P.Eng., Senior Associate Consultant Project Manager Greenland Consulting Engineers 120 Hume Street Collingwood, Ontario L9Y 1V5 Tel: 705-444-8805 Fax: 705-444-5482 Email: jhartman@grnland.com Jim Moss, Public Works Superintendent Township of Adjala-Tosorontio 7855 Sideroad 30, R.R. #1 Alliston, ON L9R1V1 Tel: (705) 434-5055 Fax: (705) 434-5051 Email: jmoss@townshipadjtos.on.ca Comments and information regarding this Municipal Class Environmental Assessment are being collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments received will become a part of the public record. For further information please contact the Township. THE CORPORATION OF THE TOWNSHIP OF ADJALA-TOSORONTIO NOTICE OF PARTICULARS AND PUBLIC ACCESS Under the Ontario Environmental Assessment (EA) Act for: SCHEDULE ‘C’ CLASS ENVIRONMENTAL ASSESSMENT (EVERETT WASTEWATER TREATMENT PLANT SURFACE WATER OUTFALL) SYNOPSIS: Public consultation for the Everett Wastewater Treatment Plant (WWTP) Surface Water Outfall Schedule ‘C’ Class EA. TAKE NOTICE that the Council of the Corporation of the Township of Adjala-Tosorontio will hold an Open House/Public Information Centre for a Schedule ‘C’ Class EA for a WWTP Surface Water Outfall to the Pine River under the Ontario Environmental Assessment Act on: THURSDAY MAY 29, 2014 The Open House/Public Information Centre is scheduled to run from 4:00 pm to 7:00 pm. in the Public Room, with a Question and Answer Period starting at 6:00 in the Council Chambers at 7855 30th Sideroad Adjala. AN EXPLANATION of the Purpose and Effect of the proposed Surface Water Outfall Class EA, and a key map showing the location of the lands to be serviced by the WWTP, accompany this notice. ANY PERSON MAY ATTEND the Open House/Public Information Centre and/or submit written or verbal comments regarding the Surface Water Outfall Schedule ‘C’ Class EA. Comments will be received at this Open House/Public Information Centre under the Class EA process. INFORMATION relating to the proposed Surface Water Outfall Schedule ‘C’ Class EA is available from the Public Works Department (Jim Moss - jmoss@townshipadjtos.on.ca) during regular office hours (8:30am to 4:30pm), 7855 Sideroad 30, R.R. #1, Alliston, Ontario, L9R 1V1, Telephone (705) 434-5055. IF YOU WISH TO MAKE COMMENTS or have any questions following the Open House, please contact the Public Works Department (as noted above) by June 5, 2014. Comments and information are being collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments received will become part of the public record. NOTICE OF FUTURE PUBLIC MEETINGS and additional information will be mailed to area property owners, advertised in the Thursday Herald, and posted on the Township website at www.townshipadjtos.on.ca. Dated at the Township of Adjala-Tosorontio this 12th day of May, 2014. In 2012, The Township of Adjala-Tosorontio completed comprehensive planning policies for future development of the lands identified in Everett as shown in the key plan below. As part of this process a Master Servicing Plan (MSP) was prepared in accordance with the requirements of the Municipal Class Environmental Assessment (Class EA) process. The MSP identified long term preferred infrastructure solutions for Water, Wastewater, Drainage and Transportation servicing for the growth anticipated in the proposed Everett Secondary Plan. The MSP was completed as a Schedule ‘B’ project under the Environmental Assessment Act which included development of phasing for infrastructure projects and associated additional studies for preferred solution as part of the MSP. The MSP identified a wastewater treatment plant (WWTP) with a surface outfall to the Pine River as the preferred strategy to service the wastewater treatment needs of Everett, now and in the future. 13 D5 TY RD N RD 6 COUN ESSIO YR CONC UNT CO CE S 13 CON SIO N Conceptual designs for the preferred solution will also be developed and summarized in the form of a comprehensive Environmental Study Report (ESR). TY RD COUN As part of the Surface Water Outfall Schedule ‘C’ Class EA process, alternative outfall locations, servicing alignments and treatment technologies will be explored and assessed on the basis of their respective impacts to the social and natural environments, technical merits and economic viability to arrive at a comprehensive preferred wastewater treatment and effluent discharge solution. RD 4 Based on the foregoing work plan, this study will meet the requirements for Schedule ‘C’ Projects, and Phases 3 and 4 of the Environmental Assessment Process. Public consultation will take place over the course of this Project to receive public input and comments. The Public Information Centre (PIC) will be held to present the evaluation of wastewater treatment and disposal design concepts. At the completion of the EA process, the project file for this Schedule ‘C’ project will be filed for public review. Public Consultation is vital to the success of this Study. We want to ensure that anyone interested in the project has the opportunity to get involved and provide input. PUBLIC NOTICE TOWNSHIP OF ADJALA-TOSORONTIO EVERETT WASTEWATER TREATMENT PLANT AND SURFACE WATER OUTFALL SCHEDULE ‘C’ CLASS ENVIRONMENTAL ASSESSMENT – ENVIRONMENTAL STUDY REPORT NOTICE OF COMPLETION BACKGROUND The Township of Adjala-Tosorontio (Township) has completed a Schedule ‘C’ Class Environmental Assessment (EA) to assess options for a new wastewater treatment plant (WWTP) and surface water outfall design in the Community of Everett. This Environmental Study Report (ESR) summarizes the work completed in support of this project and serves as the milestone for completion of Phase 4 of the Class EA process. PROBLEM AND OPPORTUNITY STATEMENT The Objective of the Everett Wastewater Treatment Plant & Surface Water Outfall Schedule ‘C’ Class Environmental Assessment (EA) is to identify and select a preferred alternative Design Concept for the proposed Everett Wastewater Treatment Plant for service to the existing community and proposed development in the Everett servicing area which minimizes impacts to both the natural and social environments, is both technically feasible and economically sensible and which can be implemented either as part of a new facility or as a retrofit to an existing sub-surface facility within the community. PROCESS This Study has been undertaken in accordance with the requirements for Schedule ‘C’ Projects under Section 4.2 of the Municipal Class EA document which is approved under the Ontario Environmental Assessment Act, and will satisfy Phases 3 and 4 of the Class EA planning process. The preferred design Concept includes a new Membrane Bioreactor WWTP located in the north east area of Everett with surface water outfall to the Pine River west of County Road 13 at the northern edge of Everett. A Public Information Centre (PIC) was held on May 29th, 2014. Phase 3 involves the identifying alternative methods for carrying out the project and public consultation for the preferred conceptual design. Phase 4 includes preparation of an Environmental Study Report that is filed for public review. If no significant impacts are identified and no requests for a Part II order are received, Schedule ‘C’ projects are then approved and may proceed to Phase 5: Implementation. PUBLIC COMMENT INVITED By this notice the Public is invited to comment on the Schedule ‘C’ Class EA to assess options for a WWTP and surface water outfall design in the Community of Everett. This Class EA, which documents the design process undertaken and the conclusions reached, will be on public record for 30 calendar days in accordance with Municipal Class EA Document. The Project Information file will be available for review between Friday September 12 and Monday October 13, 2014 at the following location: Address: Township of Adjala-Tosorontio 7855 30th Sideroad, R.R. #1 Alliston, ON L9R 1V1 Hours: 8:30 a.m. – 4:30 p.m. Monday – Friday Offices of the Township Clerk and Planning & Development Services Electronic versions of the documents will also be available on the Township website: http://www.adjtos.ca/ CONTACT INFORMATION After reading the Class EA Master Servicing Plan Study Report, interested persons with additional questions or concerns should provide written comments to the municipality within 30 calendar days of this Notice. Comments should be addressed to: Jim Moss, Public Works Superintendent, jmoss@townshipadjtos.on.ca Telephone (705) 434-5055 Township of Adjala-Tosorontio If major concerns arise regarding this project, which cannot be resolved through discussions with the municipality, a person or party may request that the Minister of the Environment make an order for the project to comply with Part II of the Environmental Assessment Act (referred to as a Part II Order), before proceeding to Phase 5, implementation. Requests must be received by the Minister at the address below within 30 calendar days of this Notice. Minister of the Environment 135 St. Clair Avenue West, 10th floor Toronto, ON M4V 1P5 In addition, a copy of the request must also be sent to the Township Clerk. If there is no “request” received by October 13, 2014, the Everett wastewater treatment plant and surface water outfall expansion Schedule ‘C’ Class Environmental Assessment will be implemented and will proceed as presented in the planning documentation. Information will be collected in accordance with the Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record. This notice issued at the Township of Adjala-Tosorontio on September 12th, 2014. Jim Moss, Public Works Superintendent Township of Adjala-Tosorontio 7855 30th Sideroad, R.R. #1 Alliston, ON L9R1V1 (705) 434-5055 Fax: (705) 434-5051 COUNTY OF SIMCOE Attn: David Parks Director of Planning Administration Building 1110 Highway 26 Midhurst, Ontario L0L 1X0 NOTTAWASAGA VALLEY CONSERVATION AUTHORITY Attn: Chris Hibberd Director of Planning 8195 Line 8 Utopia, Ontario L0M 1T0 HYDRO ONE Attention: Zone 2 Scheduling Planning 40 Olympic Drive Dundas ON L9H 7P5 Jim Arnott Planning Enbridge Distribution Asset Management 4th Floor P.O. Box 650 Scarborough ON M1K 5E3 SIMCOE MUSKOKA CATHOLIC DISTRICT SCHOOL BOARD Attn: Kristin Dibble- Pechkovsky 46 Alliance Blvd Barrie, Ontario L4M 5K3 BELL CANADA Attn: John La Chapelle Planner and Manager Right-of-Way Control Centre 100 Borough Drive, Floor 5 BLUE Toronto, ON M1P 4W2 Mr. Albert Aazouz Planning Manager Conseil scolaire de district catholique Centre-Sud 110 Drewry Avenue North York, ON M2M 1C8 Métis Consultation Unit Méis Nation of Ontario Head Office 500 Old St. Patrick Street, Unit D Ottawa, Ontario K1N 9G4 ONTARIO POWER GENERATION INC. Attn: The Executive Vice President Law and Development 700 University Avenue Toronto, Ontario M5G 1X6 Simcoe County District School Board Education Centre Attn: Holly Spacek Senior Planner 11170 Highway 26 Midhurst, Ontario L0L 1X0 Dan Bodnaruk Canada Post Delivery Planner 200 -5210 Bradco Blvd Mississauga, Ontario L4W 1G7 REGION OF PEEL Attn: Carol Ried, Regional Clerk 10 Peel Centre Drive Suite A and B Brampton, Ontario L6T 4B9 COUNTY OF DUFFERIN Attn: Pam Hillock, Clerk 51 Zina Street Orangeville, Ontario L9W 1E5 TOWN OF NEW TECUMSETH Attn: Cheryl McCarrol, Clerk/Manager of Admin 10 Welllington St. E P.O. Box 910 Allliston ON L9R 1A1 Mr. Larry Clay Regional Director Ministry of Municipal Affairs and Housing Municipal Services Office – Central Ontario 777 Bay Street, 2nd Floor Toronto ON M5G 2E5 TOWNSHIP OF MULMUR Attn: Terry Horner CAO/Clerk 758070 2ND LINE E., (TERRA NOVA) RR # 2 LISLE ON L0M 1M0 TOWN OF MONO Attn: Mark C. Early Director of Planning 347209 Mono Centre Road RR 1 Orangeville ON L9W 2Y8 Toronto and Region Conservation Authority Attn: Quentin Hanchard Senior Manager 5 Shoreham Drive Downsview ON M3N 1S4 MTO - Central Region Corridor Management Office 7th Floor, Building D 1201 Wilson Avenue Downsview ON M3M 1J8 TOWNSHIP OF ESSA Attn: Colleen Healey Manager of Planning and Development 5786 County Road 21 Utopia ON L0M 1T0 CLEARVIEW TOWNSHIP Attn: Bob Campbell Clerk 217 Gideon Street Stayner ON L0M 1S0 Mr. Harm Vandeveen Rogers Cable 1 Sperling Drive Barrie, ON L4M 6K9 CANADIAN FORCES BASE BORDEN Attn: Base Construction Engineering P.O. Box 1000 Stn Main Borden, Ontario L0M 1C0 MINISTRY OF MUNICIPAL AFFAIRS AND HOUSING Municipal Services Office – Central Ontario Attn: Alejandra Gonzalez Planner 2nd Floor , 777 Bay Street Toronto ON M5G 2E5 MRS. SANDRA KUNKEL 46 PINE PARK BLVD EVERETT ON L0M 1J0 MR. GORD HARVEY 7962 MAIN ST EVERETT ON L0M 1J0 MR. DARREN SMITH 14 COLUMBUS LANE EVERETT ON L0M 1J0 MR. DOUGLAS YEAMAN 6110 COUNTY ROAD 13 EVERETT ON L0M 1J0 MS. GLADYS JACQUES 78 MOORE AVENUE EVERETT ON L0M 1J0 MR. RICHARD STEPHENS MRS. JENNIFER STEPHENS 21 GROHAL DRIVE EVERETT ON L0M 1J0 MRS. BARB PEARCE 52 PINE PARK BLVD EVERETT ON L0M 1J0 WARREN WAYNE WARREN CINDY WARREN THOMAS 48 MOORE AVENUE EVERETT ON L0M 1J0 MR. ROB HAIDNER 22 WALES AVENUE EVERETT ON L0M 1J0 MS. ANGELA PETHERICK 6189 COUNTY ROAD 13 EVERETT ON L0M 1J0 MR. JAMES BLACKLAWS 8621 20 SIDEROAD LORETTO ON L0G 1L0 MR. KEN GILMOUR MRS. MARY-LOU GILMOUR 5 GROHAL DRIVE EVERETT ON L0M 1J0 MR. JOHN TOLLES MRS. CLAUDETTE TOLLES 46 MOORE AVENUE EVERETT ON L0M 1J0 MR. JEFF ARMSTRONG 11 BURBANK CIRCLE EVERETT ON L0M 1J0 MR. PETER KUNKEL 46 PINE PARK BLVD EVERETT ON L0M 1J0 MR. JOHN MCILRAVEY MRS. LAURA MCILRAVEY 25 WALES AVENUE NORTH EVERETT ON L0M 1J0 MR. ROB DERMOTT 221 YOUNG STREET ALLLISTON ON L9R 1V1 MR. MAURO SANTIN 6900 CON RD 4 EVERETT ON L0M 1J0 MS. ELIZABETH WADDINGTON 5445 CON RD 6 EVERETT ON L0M 1J0 MR. MICHAEL HILLMAN 15 GROHAL DRIVE EVERETT ON L0M 1J0 MS. JUDY BAZINET 10 GROHAL DRIVE EVERETT ON L0M 1J0 MR. GARY KOSTER 5639 COUNTY ROAD 13 EVERETT ON L0M 1J0 MS. B. A. HUMPHRIES 10 DEKKER STREET EVERETT ON L0M 1J0 MRS. ELEANOR INCE 13 GROHAL DRIVE EVERETT ON L0M 1J0 MRS. TRUDY MCLELLAN 5860 CON RD 4 EVERETT ON L0M 1J0 MR. DAN CHIASSON MS. MAUREEN GRAVES 6202 CON RD 4 EVERETT ON L0M 1J0 MR. G. CIESLIK 24 WOODLAND HEIGHTS DRIVE EVERETT ON L0M 1J0 MR. SCOTT THOMPSON 8236 MAIN STREET WEST EVERETT ON L0M 1J0 MR. HOLGER BROCHERT 6237 COUNTY ROAD 13 EVERETT ON L0M 1J0 MR. JAMES FORSTER 5445 CON RD 6 EVERETT ON L0M 1J0 MRS. BONNIE DERMOTT 221 YOUNG STREET ALLLISTON ON L9R 1V1 MRS. S. CIESLIK 24 WOODLAND HEIGHTS DRIVE EVERETT ON L0M 1J0 MR. BRIAN CAMIRAND 8 DEKKER STREET EVERETT ON L0M1J0 Mr. James O'Mara, Director Ministry of Environment Environmental Assessment & Approvals Branch 2 St. Clair Avenue West Floor 12A Toronto, ON M4V 1L5 Mr. Graham Findlay Ministry of Natural Resources District Office 2284 Nursery Road Midhurst, ON LOL 1XO Ms. Wendy Cornet, Manager Ministry of Aboriginal Affairs Consultation Unit 160 Bloor Street East Suite 900 Toronto. ON M7A 2E6 Mr. Mark Aitken, CAO County of Sirncoe Administration Centre 1110 Highway #26 Midhurst, ON LOL 1XO Ms Cindy Latendresse, Referrals Coordinator Department of Fisheries and Oceans Ontario Great Lakes Office, Burlington District Office P.O. Box 85060 3027 Harvester Road, Suite 304 Burlington ON L7R 4K3 Mr. David Few Simcoe County District School Board Education Centre 1170 Highway #26 Midhurst, ON LOL 1XO Ms. Debbie Korolnek General Manager of Engineering, Planning and Environment County of Simcoe Administration Centre 1110 Highway #26 Midhurst, ON LOL 1XO Mr. Andrew Jamieson, Water Management Engineer Ministry of Agriculture, Food & Rural Affairs 6484 Wellington Road Unit #10 Elora, ON N0B1S0 Mr. Gary Molnar, Ministry of Tourism & Recreation Simcoe Regional Office 2284 Nursery Road Midhurst, ON LOL lXO Ms. Sonya Pritchard, CAO County of Dufferin 51 Zina Street Orangeville, ON L9W 1E5 Ms. Cindy Hood, District Manager Ministry of Environment Barrie District Office 54 Cedar Pointe Drive Unit 1201 Barrie, ON L4N 5R7 Ms. Paula Kulpa, Team Lead Ministry of Tourism, Culture and Sport Land Use Planning 401 Bay Street Suite 1700 Toronto, ON M7A 0A7 Ms. Allison Berman, Regional Subject Expert Ministry of Indian & Northern Affairs Canada Consultation and Accommodation Unit 300 Sparks Ottawa, ON K1A 0H4 Mr. Colin Bonnell Bell Canada 136 Bayfield Street Floor 12 Barrie, ON L4M 3Bl Ms. Joanna MacDermid Hydro One West Central Zone Scheduling 40 Olympic Drive Dundas ON L9H 7P5 Tanzeel Merchant Manager; Growth Planning and Analysis Ontario Growth Secretariat Ministry of Infrastructure 777 Bay Street, 4th Floor, Suite 425 Toronto ON M5G 2E5 Dr. Charles Gardner, Chief Medical Officer Simcoe County District Health Unit 15 Sperling Drive Barrie, ON L4M 6K9 Mr. John Taylor, Senior Planner Ministry of Municipal Affairs & Housing Municipal Services Office -Central Ontario 777 Bay Street 14th floor Toronto, ON M5G 2E5 Ministry of Economic Development And Trade 2284 Nursery Road Midhurst, ON LOL 1XO Ms. Terri Caron, CAO Town of New Tecumseth 10 Wellington Street East Alliston, ON L9R 1A1 Ms. Chunmei Liu Environmental Resource Planner & EA Coordinator Ministry of Environment Central Region Office 5775 Yonge Street 9th Floor Toronto, ON M2M 4J1 Ontario Provincial Police Huronia District 1000 River Road West Wasaga Beach ON L9Z2K8 Mr. Richard Saunders, Director Corporate Policy and Management Branch, Ontario Native Affairs Secretariat 720 Bay Street 4th Floor Toronto, ON M5G 2K1 Enbridge Gas Records Department 500 Consumers Road North York, ON M2J 1P8 Mr. Wayne Wilson Nottawasaga Valley Conservation Authority 8195 Concession 8 Utopia, ON LOM 1T0 Dr. R. Griffiths, Env. Assess. Coordinator Ministry of Environment London Regional Office 733 Exeter Road London, ON N6E 1L3 Mr. Jim Ritter, Engineer Ministry of Agriculture Food & Rural Affairs R.R.#3, 95 Dundas St. Brighton, ON KOK 1HO Ms. Kathy Woeller, Dirstrict Planner Ministry of Natural Resources 2284 Nursery Road Midhurst, ON LOL 1XO Simcoe County Paramedic Services Administration Centre 1110 Highway #26 Midhurst, ON LOL 1XO Mr. John Companion Simcoe County Housing Corporation 136 Bayfield Street 4th Floor Barrie, ON L4M 3B1 Mr. David Szwarc, CAO Region of Peel 10 Peel Centre Drive Suite A, 5th Floor, Room 504 Brampton, ON L6T 4B9 Tim Haldenby, MScPIm MCIP, RPP Team Lead, Planning Projects Municipal Services Office – Central Ministry of Municipal Affairs and Housing 777 Bay Street, 2nd Floor Toronto ON M5G 2E5 Mr. Peter Dorton, Project Manager Ministry of Transportation Corridor Management (Central) 1201 Wilson Avenue 7th Floor Downsview ON M3M 1J8 Mr. Greg Murphy, CAO Township of Essa 5786 County Rd 21 Utopia ON L0M 1T0 APPENDIX ‘G-2’ Public Presentation Materials and Handouts panel title EA Process Everett Wastewater Treatment Plant Schedule “C” Class Environmental Assessment This Schedule “C” Environmental Assessment is being prepared in accordance with the requirements of the Municipal Class Environmental Assessment (Class EA) process. As part of this Schedule “C” Environmental Assessment, Design Concepts will be evaluated, selected, and recommended for implementation. Everett Community WWTP EA Schedule “A/A+” Projects Considered minor operation and maintenance activities and are selected for pre-approval without requirements for further assessment. These projects are typically limited in scale and present minimal impacts to the surrounding environment. Schedule A+ projects require that the public be advised prior to project implementation. Schedule “B” Projects Generally include improvements and minor expansions to existing facilities where there is potential for some environmental impacts. These projects require screening of alternatives for their environmental impacts and completion of Phases 1 and 2 of the Class EA planning process. Provided no significant impacts are identified, Schedule “B” projects are approved and may proceed directly to Phase 5. Schedule “C” Projects These projects have the potential for significant environmental effects and therefore must proceed under full planning and documentation procedures. Requires that an Environmental Study Report be prepared and filed for review by the public and review agencies. Generally consist of construction of new facilities and major expansions to existing facilities (e.g. new Wastewater Treatment Plant with surface water discharge). WE ARE HERE Figure 1- Municipal Class EA Planning and Design Process This study will fulfill Phases 3 and 4 of the Class EA Process, satisfying the requirements for Schedule ‘C’ projects panel title Background Review Summary of Master Servicing Plan (MSP) Recommended Preferred Alternative Population and Land-Use Projections • • • • • Existing Residential Population :1,929 Persons Projected Future Residential Population: 9,444 Persons Future Commercial Land Use Area: 10.3 ha (EP = 943 Persons) Future Institutional Land Use Area: 13.6 ha (EP = 282 Persons) Total Projected Equivalent Population (EP): 10,669 Persons Existing Sewage Systems • No sanitary trunk sewer network currently exists within the Community of Everett. The majority of Everett has individual septic systems with tile beds. • The only area in Everett with existing municipal sanitary service is the New Horizons Subdivision which includes a Subsurface Discharge Wastewater Treatment Plant (WWTP), with high operating and maintenance costs. • The proposed R&M Homes Subdivision Draft Plan includes provisions for an initial subsurface discharge WWTP with initial capacity for an Equivalent Population (EP) of approximately 800 persons (300 Units). Everett Community WWTP EA OPTION WWT-9 OPTION WWC-B Everett Sanitary Master Servicing Plan (MSP) Solution The recommended preferred Sanitary Servicing Master Plan for the Everett included the following general characteristics: • Approximately 1,400m of gravity trunk sewer as shown in OPTION WWC-B, ranging in diameter from 375mm to 525mm, with its main spine along Wales Ave. and discharging at a new SPS in the R&M Homes Subdivision. • One (1) subsurface discharge WWTP, located to the north east of the proposed R&M Homes Development with room for future expansion to a surface water discharge facility. • Future expansion of the treatment facility should also include an effluent pump and forcemain which discharges treated effluent to the Pine River, as shown in Option WWT-9 • Technical studies indicate expansion to a surface water discharge solution should occur once the serviced population exceeds 800 persons (300 units). A Master Servicing Plan for Everett was completed in 2013, which resulted in a preferred servicing strategy for transportation, stormwater, water and wastewater panel title Background Review Assimilative Capacity, Effluent Requirements & Phasing Pine River Assimilative Capacity Study • An Assimilative Capacity Study was completed by Greenland Consulting Engineers for the Pine River to determine if capacity to accept treated wastewater effluent for the proposed ultimate build-out population of Everett exists within the water course. • The Study found that a Wastewater Treatment Plant (WWTP) with treatment capacity for a population of approximately10,000 will not cause conditions downstream to exceed Provincial Water Quality Objectives under the conditions evaluated. • In spite of the apparent capacity within the Pine River for additional nutrient loading, it was recommended through the MSP that additional measures be taken to ensure effluent quality is as high as possible. As such, a phosphorous concentration objective of 0.05 mg/L for treated WWTP effluent has been used in assessment of design concepts for the proposed Surface Water Outfall WWTP. Everett Community WWTP EA • Recommended Effluent Quality Parameters for The Everett WWTP were developed as part of this EA and are presented below: Effluent Requirements Parameter Compliance Limit Design Objective TP (mg/L) 0.1 0.051 Total Ammonia (mg/L) 1.8 1.82 TSS (mg/L) 10 53 BOD (mg/L) 10 53 Total Fecal Coliform (CFU/100 mL) 200 2004 WWTP Class EA Development Phasing • WWTP to be Constructed in Four (4) Phases • Ultimate Servicing Capacity for an Equivalent Population of 10,669 persons Other Relevant Background Information • • • • • • • • • • Hydrogeological Report Archaeological Report Natural Environment Study Existing Conditions Water & Wastewater Servicing Studies Natural Hazards Study Pre-Development Drainage Study Traffic and Transportation Study Existing Draft Plans Township of Adjala-Tosorontio & County of Simcoe “As-Constructed” Drawings The Community of Everett Master Servicing Plan (MSP) Class EA Note: 1) Recommended by the Everett Secondary Plan Master Servicing Plan (November 2012) 2) Used by the Pine River Assimilative Capacity Study (December 2012) 3) Proposed by the R&M for the in-process R&M WWTP 4) ECA limit at the nearby Angus WWTP. The background information provided was used to develop and evaluate WWTP Design Concepts panel title Evaluation Criteria As part of the final solution selection process, both for the Everett MSP and the current WWTP & Surface Water Outfall Schedule ‘C’ Class EA “short listed” alternative solutions and concept designs were ranked against one another in relative terms for each of the evaluation criteria presented below. Natural Environment Impacts: • Impacts of the option to vegetation, wildlife & the Natural Environment; and • Surface/groundwater quality and quantity implications; Social / Cultural Environment Impacts: • Land Use & Archaeological Considerations; • Traffic impacts & interruption to residents; and • Visual landscape/aesthetic impacts of the option. Everett Community WWTP EA Technical/Operational Considerations: • Difficulty to construct or implement the Option relative to other alternatives; and • Operation & Maintenance Efficiency. Economic Impacts: • Capital/construction costs; • Long term/operation & maintenance cost burden; and • Payment structure, cost recovery options for Municipality, Phasing Flexibility. Design concept options were ranked using a colour coded system for each of the above criteria, where “green” represented the most preferred concept, “yellow” criteria represented less preferred concepts and criteria in “red” represented the least preferred concept. The option which received the most “green” rankings became the recommended preferred design concept for each Design Concept Category (i.e. Wastewater Treatment, Site Plan, Forcemain Alignment etc.) The criteria listed above were used to evaluate WWTP Design Concepts title Detailed panel Evaluation Everett Community WWTP EA Wastewater Treatment Plant Location As part of the Everett MSP Class EA Process, two (2) locations, shown below as Option 8 & Option 9, were shortlisted and evaluated in detail. Review of the MSP evaluation process indicates a number of advantages to Option 9: • • • Preliminary investigations and concept designs being completed as part of the draft plan process result in less cost; Less impact to the natural environment including forested areas; and, Least potential impact to the existing community and future development areas from the perspective of noise and odour due to the direction of prevailing winds relative to the plant. WWTP Locations were Evaluated as part of the MSP title Detailed panel Evaluation Everett Community WWTP EA Short Listed Wastewater Process Design Strategies – Concept WWT-1 & WWT-2 Extended Aeration + Two Stage Filtration (WWT-1) Extended Aeration + Membrane Filtration (WWT-2) Shortlisted Concepts Were Evaluated in Detail to Arrive at the Preferred Design Concept title Detailed panel Evaluation Everett Community WWTP EA Short Listed Wastewater Process Design Strategies – Concept WWT-3 & WWT-4 SBR + Two Stage Filtration (WWT-3) SBR + Membrane Filtration (WWT-4) Shortlisted Concepts Were Evaluated in Detail to Arrive at the Preferred Design Concept title Detailed panel Evaluation Everett Community WWTP EA Short Listed Wastewater Process Design Strategies – Concept WWT-5 Membrane Bio Reactor (WWT-5) Shortlisted Concepts Were Evaluated in Detail to Arrive at the Preferred Design Concept title Detailed panel Evaluation Short List Evaluation of Wastewater Process Design Strategies Liquid Treatment Strategies & Rankings Design Strategy WWP-1 Extended Aeration + Two Stage Filtration Option WWP-2 Extended Aeration + Membrane Filtration Option WWP-3 SBR + Two Stage Filtration Option WWP-4 SBR + Membrane Filtration Option WWP-5 Membrane Bioreactor (MBR) Moderate energy consumption High energy consumption due to membrane operation Moderate energy consumption High energy consumption due to membrane operation High energy consumption due to membrane operation Energy Consumption Impact on receiving water It could produce good quality effluent Membrane could provide high quality effluent It could produce good quality effluent Membrane could provide high quality effluent Membrane could provide high quality effluent Groundwater quality implications It would require high volume of excavation and dewatering It would require high volume of excavation and dewatering It would require high volume of excavation and dewatering It would require high volume of excavation and dewatering It would require low volume of excavation and dewatering Evaluation Criteria Natural Environment Impacts Natural Environment Overall Rating Social / Cultural Environment Impacts Noise and Odour Traffic impacts & interruption to residents It would create moderate level of noise and odour It would create moderate level of noise and odour It would create moderate level of noise and odour It would create moderate level of noise and odour It would create moderate level of noise and odour The main traffic resulted from liquid treatment is chemical delivery for phosphorous removal The main traffic resulted from liquid treatment is chemical delivery for phosphorous removal The main traffic resulted from liquid treatment is chemical delivery for phosphorous removal The main traffic resulted from liquid treatment is chemical delivery for phosphorous removal The main traffic resulted from liquid treatment is chemical delivery for phosphorous removal and membrane cleaning Social / Cultural Environment Overall Rating Technical/Operational Considerations Everett Community WWTP EA Performance reliability, robustness and resilience Operation & Maintenance Requirements and Complexity Future Proofing and Flexibility It would be able to produce effluent meeting the It would be able to produce effluent meeting the It would be able to produce effluent meeting the It would produce effluent with quality meeting and objectives. However, the system is sensitive to objectives. However, the system is sensitive to objectives. However, the system is sensitive to It would be able to produce effluent meeting the beyond the objectives. It is more resilient to load secondary clarifier performance. Adding septage secondary clarifier performance. Adding septage flow variations and ability to settle sludge. Adding objectives. However, the system is sensitive to variations. Flow variations could be addressed into the treatment process could significantly into the treatment process could significantly septage into the treatment process could flow variations and sludge settlability. with additional membrane units. impact the clarifier performance. impact the clarifier performance. significantly impact the clarification performance. It would require operations on secondary and tertiary processes. It would require operations on secondary and tertiary processes. It would require operations on secondary and tertiary processes. It would require operations on secondary and tertiary processes. It would be difficult to meet more stringent effluent It would be able to meet more stringent effluent It would be difficult to meet more stringent effluent It would be able to meet more stringent effluent phosphorous limits. It has moderate level of phosphorous limits. It has moderate level of phosphorous limits. It has moderate level of phosphorous limits. It has moderate level of flexibility for future expansion due to large flexibility for future expansion due to large flexibility for future expansion due to largest flexibility for future expansion due to large footprint requirements. footprint requirements. footprint requirements. footprint requirements. It would only require operations on one system (MBR) to meet the required water quality. It would be able to meet more stringent effluent phosphorous limits. It has high level of flexibility for future expansion due to moderate footprint requirements. Technical/Operational Considerations Rating Economic Impacts Capital/construction costs It has moderate capital cost It has the highest capital cost Largest Footprint - Moderate to high capital cost It has the highest capital cost It has the lowest capital cost Long term/operation & maintenance cost burden It has low long term O&M cost It has high long term O&M cost It has low long term O&M cost It has high long term O&M cost It has moderate long term O&M Cost Life Cycle Cost (including revenue potential from septage treatment) High Life Cycle Cost Highest Life Cycle Cost Similar Life Cycle Cost to WWP-1 Similar Life Cycle Cost to WWP-2 Moderate Life Cycle Costs Economic Ranking Overall Ranking: Legend Less Preferred Most Preferred Shortlisted Concepts Were Evaluated in Detail to Arrive at the Preferred Design Concept Least Preferred panel title Conclusion & Next Steps Everett Community WWTP EA Membrane Bioreactor (MBR) WWTP Cost Assessment Design Strategy WWP-5 Extended Aeration (with Tertiary Filtration) WWTP Cost Assessment Design Strategy WWP-1 Estimated Total Maintenance & Operational Costs (2014 $) $13 - $15 Million Estimated Capital Cost (2014 $) $26 - $28 Million Estimated Capital Cost (2014 $) $31 - $34 Million Estimated 20 Year Life Cycle Cost $39 - $43 Million Estimated 20 Year Life Cycle Cost $43 - $48 Million Estimated Total Maintenance & Operational $12 - $14 Million Costs (2014 $) A Final Design Concept will be Prepared Following Public and Agency Consultations title Detailed panel Evaluation Everett Community WWTP EA Short Listed WWTP Site Plan Design Concepts Concept SP-1 • Proposed Design by R&M Homes • MBR Plant Expansion to the North of Office/Blower and Solids Storage • Solids Storage Located East of Office/Blower Concept SP-2 • MBR Plant Expansion to the South of Office/Blower and Solids Storage • Solids Storage East of & Connected to Office/Blower Building Concept SP-3 • MBR Plant Expansion to the South of Office/Blower and Solids Storage • Office/Blower Building Located East of Solids Storage Building & Separated by Parking Lot / Buffer Zone Shortlisted Concepts Were Evaluated in Detail to Arrive at the Preferred Design Concept title Detailed panel Evaluation Short List Evaluation of Site Plan Design Concepts Concept SP-1 Evaluation Criteria R&M Homes Proposed WWTP Configuration Treatment Expansion to North of Admin Building Concept SP-2 Concept SP-3 Buffer Between Equipment & Admin Buildings Connected Equipment & Admin Buildings - Headworks & Treatment Train Expansion to South of Admin Headworks & Treatment Train Expansion to South of Building Admin Building Natural Environment Impacts Impacts of the option to vegetation, wildlife & the Natural Environment Shorter Ring Road than SP-3 Shorter Ring Road than SP-3 Surface/groundwater & Air quality implications Construction Dewatering could be required. Office Building downwind of Headworks Construction Dewatering could be required. More stringent indoor air quality requirements. Longer ring road, but potential to offset with additional Landscaping Construction Dewatering could be required. Best Option with respect to indoor air quality Natural Environment Overall Rating Social / Cultural Environment Impacts Land Use & Archaeological Considerations (Including First Nations) No significant Issues – Provides 100 m separation from No significant Issues – Provides 100 m separation from No significant Issues – Provides 100 m separation from nearest residential property (Barzo) nearest residential property (Barzo) nearest residential property (Barzo) Noise & Odour Considerations No Significant Impacts (with adequate mitigation) No Significant Impacts (with adequate mitigation) No Significant Impacts (with adequate mitigation) Visual landscape/Aesthetic impacts No Significant Impacts (with adequate mitigation) No Significant Impacts (with adequate mitigation) No Significant Impacts (with adequate mitigation) Social / Cultural Environment Overall Rating Everett Community WWTP EA Technical/Operational Considerations Expansion to north will require additional measures to Difficulty to construct or implement the Option relative maintain air quality due to prevailing winds. Separate to other alternatives foundations for Admin / Equipment Buildings Operation & Maintenance Efficiency Similar for all options. Single foundation for Admin / Equipment Buildings connected building will be more complicated mechanically. Similar for all options. Least difficult option to construct from an indoor air quality perspective. Multiple foundations. Similar for all options. Technical/Operational Considerations Rating Economic Impacts Capital/construction costs Higher excavation costs due to number of buildings. Lower excavation costs due to number of buildings. Higher ring road & excavation costs Long term/operation & maintenance cost burden Similar for all options. Similar for all options. Payment structure, cost recovery options for Municipality, Phasing Flexibility Expansion to south is preferable from a phasing perspective. Re-use of R&M Facilities is possible. Expansion to south is preferable from a phasing perspective. Re-use of R&M Facilities more difficult. Similar for all options. Expansion to south is preferable from a phasing perspective. Re-use of Proposed R&M Facilities is possible. Economic Ranking Overall Ranking: Less Preferred Most Preferred Shortlisted Concepts Were Evaluated in Detail to Arrive at the Preferred Design Concept Least Preferred title Detailed panel Evaluation Forcemain Routing Design Concepts & Short List Evaluation Evaluation Criteria Concept FM – 3 (A & B) Forcemain From R&M Homes WWTP via R&M Homes future subdivision & CR 13. Concept FM - 4 Forcemain From R&M Homes WWTP via Barzo Lands future subdivision & CR 13. Natural Environment Impacts Impacts of the option to vegetation, wildlife & the Natural Environment Discharge pipe would need to be constructed in existing Environmental Setback. Mitigation Same discharge pipe impacts as Concept FM 3. Measures will be required. Surface/groundwater quality implications Less dewatering as there are no watercourse crossings. Less dewatering as there are no watercourse crossings. Concept FM-3 Natural Environment Overall Rating Social / Cultural Environment Impacts Land Use & Archaeological Considerations (Including First Nations) Alignment will require a Stage 2 Archeological Alignment will require a Stage 2 Archeological Assessment. Easement required for FM. Assessment. Easement required for FM. Traffic impacts & interruption to residents Construction impacts limited to County Road 13 Construction impacts on County Road 13, slightly less than FM - 1 due to shorter length. Visual landscape/Aesthetic impacts Minimal visual impact. Minimal visual impact. Moderate Forcemain depth but requires the longest run of pipe. This option follows the approved draft plan road layout for the R&M Homes Subdivision. Moderate Forcemain depth, requires less pipe length than Concept FM – 3, but follows an unapproved subdivision plan within the Barzo Lands. Single SPS will require regular maintenance. Single SPS will require regular maintenance. Capital Costs of Forcemain is expected to be approximately $400,000 Capital Costs of Forcemain are expected to be slightly greater than $400,000. Social / Cultural Environment Overall Rating Everett Community WWTP EA Technical/Operational Considerations Difficulty to construct or implement the Option relative to other alternatives Operation & Maintenance Efficiency Concept FM-4 Technical/Operational Considerations Rating Economic Impacts Capital/construction costs Lowest maintenance cost due to single SPS Long term/operation & maintenance cost burden and shallower sewers. Flexible recovery as alignment allows for Payment structure, cost recovery options for installation in approved R&M Homes draft Municipality, Phasing Flexibility plan of subdivision lands. Similar maintenance costs as Concept FM - 3 Less flexible as alignment is located within lands without an approved draft plan of subdivision. Economic Ranking Less Preferred Most Preferred Overall Ranking: Shortlisted Concepts Were Evaluated in Detail to Arrive at the Preferred Design Concept Least Preferred panel title Conclusion & Next Steps Everett Community WWTP EA Summary of Recommended Design Concepts The recommended overall preferred design concept for the Everett WWTP and Outfall includes the following Preferred Concepts for WWTP Location, Wastewater Process Design, Site Plan Design & Forcemain Alignment & Outfall Location respectively: • WWTP to be located north-east of R&M Homes Subdivision (Option WWT-9 as per the Everett Secondary Plan MSP); • Wastewater Treatment & Process to be MBR with no primary clarification and offsite disposal of solids (Design Strategy WWP-5); • WWTP Site Plan to include buffer between Office and Equipment Room with Headworks & MBR to the South (Design Concept SP-3); • Forcemain Alignment shall go west through the R&M Homes property, Outfall Design Concept FM-3 with Mitigation Option B (effluent polishing) to be investigated at the detailed design stage. A Final Design Concept will be Prepared Following Public and Agency Consultations panel title Conclusion & Next Steps Everett Community WWTP EA Potential Impact Mitigation Strategy • Investigation of Concept FM-3B - Discharge treated effluent to a rehabilitated gravel pit west of County Road 13 Surface Water Quality & • Nutrient offsetting and downstream monitoring of nutrient loading are proposed Monitoring of Effluent • Proposed WWTP effluent objective is 0.05mg/L for Total Phosphorus, approximately From WWTP half of the allowable discharge within the Pine River Assimilative capacity • The Certificate of Approval for the WWTP will require, that effluent quality is monitored and effluent limits and objectives are achieved • Outlet pipe alignment to be located within existing road right of way until pipe reaches Infringement on northern boundary of natural areas west of County Road 13 Environmental Protection • Outlet to go through former quarry lands to minimize impacts to environmental/hazard and Hazard Setback Areas areas What is Mitigation? • Additional Considerations which help to further reduce environmental impacts • Example: Architectural design for the Creemore WWTP was made to blend into the rural landscape Creemore WWTP • Engineering & Landscape design for WWTP Site and FM Alignment to be designed to Stormwater Management match existing drainage patterns and in accordance with Township and NVCA & Drainage Requirements Removal of Trees & Vegetation Residential Impacts (Noise, Odour & Visual Impacts) • Recommended Solution minimizes impacts to existing vegetation • Restore Construction areas with native species • WWTP Architectural Design should compliment surrounding community (e.g. Creemore "Barn" WWTP) • Detailed WWTP Landscape design should include screening (i.e. berms, trees and other plantings) • Detailed WWTP Site Plan design should include adequate buffers for noise and odour Source: www.canadianconsultingengineer.com A Final Design Concept will be Prepared Following Public and Agency Consultations panel title Conclusion & Next Steps Potential Impact Mitigation Strategy Sediment & Erosion Control Disturbance to Trees & Vegetation • Sedimentation and erosion control strategies will be developed for each individual site prior to construction. Traffic Temporary Impacts (e.g. dust, noise & vibration) • Recommended Solution minimizes impacts to existing vegetation • Construction areas to be restored with native species • Consultation with Ministry of Transportation, County of Simcoe, local utilities and school boards may be required prior to or during construction. • Affected Property Owners will be notified in advance of construction schedule and duration. • Construction activities will be limited to day-light hours to minimize impacts to residents. • Dust and storm water controls to be implemented during construction. Everett Community WWTP EA Next Steps • Conduct Agency and Public Consultations on the Recommended Preferred Design Concepts (this Open House); • Incorporate PIC and Agency comments into the Final Design Concept Selection; • Develop Implement Strategy preferred Design Concept • Finalize the Environmental Study Report (ESR) and Publish Notice of Study Completion (Estimated Timing: July 2014); and, • Place the ESR and Class EA Summary Report on public review and comment for a period of 30 days. If no Part II Order Requests are received during the ESR 30 day review period , the Class EA would be concluded and the project would proceed to the implementation stage following the 30 day review period. A Final Design Concept will be Prepared Following Public and Agency Consultations The Township of Adjala-Tosorontio Everett Wastewater Treatment Plant Schedule “C” Class Environmental Assessment Public Information Centre No.1 May 29, 2014 Welcome Message from the Project Team Tonight’s event is an opportunity for you to hear about and offer input on the Everett Waste Water Treatment Plant (WWTP) Schedule “C” Class Environmental Assessment that is currently being conducted by the Township of Adjala-Tosorontio. This Public Open House handout will help you to navigate the evening’s activities. This handout contains: Project Background & Key Contacts: Evaluation Criteria Used to Develop Design Concepts; Detailed Evaluation Tables for Design Concepts; Summary of the Recommended Preferred Concepts; and, Tear-off Comments Sheets (to be returned to the Township by June 12, 2014). What are we doing this evening? Our goals for this evening are: Explain the basis and need for the study; Describe the work done to date and share our findings; Discuss our decision-making framework; Present the Recommended Preferred Design Concepts for the Study Area; and, Hear your opinions and your input on the recommended concepts. Input that is received tonight will be carefully considered as we finalize the recommended preferred design concepts for the Everett WWTP Schedule “C” Class Environmental Assessment for consideration by the Township of Adjala-Tosorontio. A final comment... Each participant brings valuable opinions, experiences and suggestions. You are not expected to be an expert on wastewater or municipal infrastructure. The project team will guide the discussions. We are interested in your perspective. We would like to hear from everyone. We hope this handout will help you to participate fully today. Thank you for your time and input! Everett WWTP EA | Greenland International Consulting Ltd. Project Background... Everett WWTP Schedule “C” Class Environmental Assessment The Schedule “C” Class Environmental Assessment is being prepared in accordance with the requirements of the Municipal Class Environmental Assessment (Class EA) process. Phases 1 and 2 of the Municipal Class EA were completed as part of the Everett Master Servicing Plan. This part of the EA process will meet the requirements for Phases 3 and 4. Schedule “C” projects identified in the Master Plan included the Everett WWTP and Surface Water Outfall to the Pine River. Schedule “C” projects must proceed with Phases 3 and 4 (ESR) of the Class EA process prior to progressing to implementation (Phase 5). Upon completion this project can proceed to Phase 5. Municipal Class EA Planning and Design Process Everett WWTP EA | Greenland International Consulting Ltd. Alternative Design Concepts for the Preferred Solution Based on Review of the MSP for the Everett Secondary Plan Area, alternative Design Concepts were developed and evaluated for the Community of Everett WWTP Class EA. The Objective of the Everett WWTP Schedule “C” Class EA is to identify and select a preferred Design Concept for the Everett WWTP and Surface Water Outfall which minimizes impacts to both the natural and social environments and is both technically feasible and economically sensible. Public Consultation The public is being consulted through one (1) public information centre (PIC). This formal PIC presents the study recommendations. The PIC is being advertised in the local media and circulated to our stakeholders list. Project Timing This study is scheduled to be completed in the summer of 2014, culminating in the filing of the Environmental Study Report (ESR) and the subsequent filing of a Notice of Completion for a 30-day public review period. Project Team… The Township of Adjala-Tosorontio: Mr. Jim Moss Public Works Superintendent jmoss@townshipadjtos.on.ca Ph: 705-434-5055 Everett WWTP EA | Engineering Consulting Firm: Mr. Jim Hartman, P.Eng., Senior Associate Greenland International Consulting Ltd. jhartman@grnland.com Ph: 705-444-8805 ext. 254 Greenland International Consulting Ltd. Recommended Design Concepts Everett WWTP EA | Greenland International Consulting Ltd. Thank you for your participation today! If you have any questions, comments or outstanding concerns as we move forward, please contact: Engineering Consulting Firm: The Township of Adjala-Tosorontio Mr. Jim Moss Public Works Superintendent 7855 Sideroad 30, R.R. #1, Alliston, Ontario, L9R 1V1, Mr. Jim Hartman, P.Eng., Greenland International Consulting Ltd. Senior Associate 120 Hume Street Collingwood, Ontario L9Y 1V5 Phone: (705) 434-5055 Fax: (705) 434-5051 Email: jmoss@townshipadjtos.on.ca Phone 705.444.8805 Fax 705.444.5482 Email: jhartman@grnland.com Copies of the presentation and poster boards from tonight’s Public Information Centre (PIC) will soon be available on the township’s website at: http://www.townshipadjtos.on.ca/ Please complete the following comment sheet and return it at the end of the event or send your comments to Jim Moss by no later than June 12, 2014. Mr. Jim Moss Public Works Superintendent 7855 Sideroad 30, R.R. #1, Alliston, Ontario, L9R 1V1, Phone: (705) 434-5055 Fax: (705) 434-5051 Email: jmoss@townshipadjtos.on.ca Personal information and opinions are collected under the authority of the Municipal Freedom of Information & Protection of Privacy Act. With the exception of personal data, information may be made available for public disclosure. Everett WWTP EA | Greenland International Consulting Ltd. Everett WWTP Schedule “C” Class Environmental Assessment Comment Sheet Return to Township of Adjala-Tosorontio, 7855 Sideroad 30, R.R. #1, Alliston, Ontario, L9R 1V1, no later than June 12, 2014. Do you have any other comments? Do you need any additional information to assist you to participate in this process? Everett WWTP EA | Greenland International Consulting Ltd. APPENDIX ‘G-3’ Received Comments & PIC Attendance Sheet November 22, 2013 Mr. Jim Hartman, P.Eng. Senior Associate Consultant Project Manager Greenland Consulting Engineers 120 Hume Street Collingwood ON L9Y 1V5 Dear Mr. Hartman, Re: Everett Wastewater Treatment Plant Surface Water Outfall Everett, Township of Adjala - Tosorontio , Ontario Region of Peel staff have reviewed your Notice of Study Commencement and related documents for the above noted project and we are pleased to advise that we have no objections to the approval of the proposed Wastewater Treatment Plant Surface Water outfall to the Pine River. Furthermore the Region of Peel does not require conditions of approval. The Region relies on the environmental expertise of the Nottawasaga Valley Conservation Authority (NVCA) staff for the review of the above noted study and their potential impacts on the natural environment. The Region of Peel planning staff therefore, request that comments from the NVCA are considered and incorporated in the study appropriately. I trust this information is of assistance. Please call me directly at 905-791-7800, ext. 4366 if you have any questions or if you require any further information from Region of Peel regarding this matter. Yours truly, Ed Amaya Planning Intern Development Services, Public Works Regional Municipality of Peel Public Works 10 Peel Centre Drive, Suite A, Brampton, ON L6T 4B9 Telephone: 905-791-7800 / www.peelregion.ca ~ Conse;~ation for The Living City' CFN 48640.15 December 16, 2013 BY E-MAIL ONLY(jmoss@townshipadjtos.on.ca) Jim Moss Township of Adjala-Tosorontio 7855 Sideroad 30, R.R. #1 Alliston, ON L9R 1V1 Dear Mr. Moss: Re: Response to Notice of Study Commencement Everett Wastewater Treatment Plant Surface Water Outfall Municipal Class Environmental Assessment - Schedule C Township of Adjala-Tosorontio; County of Simcoe Toronto and Region Conservation Authority (TRCA) staff received the Notice of Study Commencement for the above noted Environmental Assessment (EA) on November 8, 2013. The study area associated with this EA is not within TRCA's jurisdiction. Please contact the Nottawasaga Valley Conservation Authority at 705.424.1479 for further information and remove TRCA staff from the project mailing list. Should you have any questions, please contact me at extension 5717 orat slingertat@trca.on.ca. Sincerely, Sha in Senior Plan er, Environmental Assessment Planning and Development . BY E-MAIL cc: Greenland Consulting: TRCA: Jim Hartman (jhartman@grnland.com) Beth Williston, Senior Manager, Environmental Assessment .689$ Tel. Member of Consen'alion Planning On/ario . I lnfo@trca.on.ca-I www.trca.on.ca S Shoreham Planning Drive, Downsview, ON M3N 1 S4 May 29, 2014 Mr. Jim Moss Public Works Department Township of Adjala-Tosorontio 7855 Sideroad 30, R.R #1 Alliston, ON L9R 1V1 Dear Mr. Moss, Re: Everett Wastewater Treatment Plant Surface Water Outfall Everett, Township of Adjala - Tosorontio , Ontario Region of Peel staff have reviewed your related documents for the above noted project and we are pleased to advise that we have no objections to the approval of the proposed Wastewater Treatment Plant Surface Water outfall to the Pine River. Furthermore the Region of Peel does not require conditions of approval. The Region relies on the environmental expertise of the Nottawasaga Valley Conservation Authority (NVCA) staff for the review of the above noted study and their potential impacts on the natural environment. The Region of Peel planning staff therefore, request that comments from the NVCA are considered and incorporated in the study appropriately. I trust this information is of assistance. Please call me directly at 905-791-7800, ext. 4366 if you have any questions or if you require any further information from Region of Peel regarding this matter. Yours truly, Ed Amaya Planning Intern Development Services, Public Works Regional Municipality of Peel Public Works 10 Peel Centre Drive, Suite A, Brampton, ON L6T 4B9 Telephone: 905-791-7800 / www.peelregion.ca Josh Maitland To: Subject: Jim Hartman RE: Everett WWTP EA and R&M Homes WWTP From: Chris Hibberd [mailto:chibberd@nvca.on.ca] Sent: Thursday, June 12, 2014 2:32 PM To: Jim Moss Cc: ewargel@townshipadjtos.on.ca; Jim Hartman; Dave Featherstone; Tom Reeve Subject: Everett WWTP EA and R&M Homes WWTP Hi Jim: Further to our letter the we emailed this morning on the Everett WWTP EA and as per our email below , NVCA staff still have outstanding comments on the R & M Homes proposed Wastewater Treatment Plant/facility including finalizing the limits of development. In the event that the Class EA is proceeding in advance of the R & M homes the EA should look to address the pertinent matters. Regards, Chris Chris Hibberd, MCIP, RPP Director of Planning Nottawasaga Valley Conservation Authority John Hix Conservation Administrative Centre, 8195 Concession 8th Line, Utopia ON L0M 1T0 P: (705) 424-1479 Ext. 229, email: chibberd@nvca.on.ca This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or redistribution is prohibited. If you are not the intended recipient, please contact the sender and destroy all copies of the original message. From: Chris Hibberd Sent: March-11-14 8:36 AM To: Jim Moss Subject: FW: R&M Sanitary Report Compiled Jim: See below for our last comments on R& M Homes sanitary. Regards, Chris Chris Hibberd, MCIP, RPP Director of Planning Nottawasaga Valley Conservation Authority John Hix Conservation Administrative Centre, 8195 Concession 8th Line, Utopia ON L0M 1T0 P: (705) 424-1479 Ext. 229, email: chibberd@nvca.on.ca This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or redistribution is prohibited. If you are not the intended recipient, please contact the sender and destroy all copies of the original message. 1 From: Chris Hibberd Sent: January-17-14 1:01 PM To: 'Jim Hosick' Cc: Dave Featherstone; Ryan Post; Glenn Switzer; Tom Reeve; 'Brian Goodreid' Subject: FW: R&M Sanitary Report Compiled Dear Jim: In response to the Township’s request for comments, NVCA staff completed a review of Pearson Engineering Ltd.’s November 25, 2013 letter report entitled “R & M Homes ... Design Flow and STP Information” and we offer the following: Natural Hazards: 1. The drawing provided with the letter report shows the NVCA regulated line with respect to flooding. Please note that this is not an engineered floodline but a best estimation as to the extent to where flooding could potentially be a concern. Based on this information the treatment plant is located outside the estimated floodplain. We understood that that applicant would be providing further engineering details confirming this was the case. Please clarify. Natural Heritage: 2. The two easternmost beds encroach to within 15 metres (m) of the wetland boundary (even less in some areas) which is not consistent with our 30 m buffer outlined in our current guidelines. NVCA staff are concerned that seasonally high water table within the forested buffer area may force the proponent to introduce fill (and associated slopes) that may increase the proposed footprint beyond that shown in the Pearson drawings. The Pearson report does not provide any rationale in support of a lesser buffer. Since this buffer is fully forested NVCA staff requests that the proposal be designed to maintain the 30 m buffer. Typically, we have only considered a lesser buffer based on the following circumstances: averaging of the buffers within the proposal study area; where a net enhancement can be achieved such as restoration plantings within narrower buffers that are currently in non-natural cover (existing agricultural fields next to a wetland); and/or where some type of habitat offsetting can be provided. In addition to the above, even with sufficient rationale addressing the above mentioned a minmum buffer width (15 m) is required for the development. 3. NVCA staff are concerned about the encroachment of the proposed beds toward the wetland boundary and the potential impacts of the effluent plume on the nearby amphibian breeding habitat in the south trough. Please provide additional assessment of potential impacts on proximal amphibian breeding habitat for the latest proposal. Hydrogeology: 4. The design flow (litres per captia per day) is listed at 340L/c/d. Please provide clarification on how these numbers were generated. 2 5. The elevation change from the road allowance (236 m ) to the creek (232 m) is 4 m. The trough located south of the septic beds is approximately 1 m deep. No statement is provided on the depth to the water table at this site. However the water table elevation is assumed to be less than 4 m below surface (with the creek representing the water table elevation). Further, the wetland boundary is listed at the elevation of 234.0 m and is assumed to be influenced by groundwater discharge. If this is the case, the depth to water table would be shallower then 4 mbgs- most likely 2 m. The consultant should have borehole-based information on the depth to water table in this area in support of the application. In addition, please provide further details that address the overall impact/area influenced of the proposed works. 6. In addition, we expect that the local groundwater flow paths to follow the broad topography and that the groundwater flow path #1 should encapsulate the area south of the delineated southern boundary of ground water path #1. Given the close proximity of the shallow trough adjacent to the proposed tile bed locations, there may be very localized ground water movement to the south. However, the overall impact/area influenced on this is questionable and has not defined by Pearson. NVCA staff are unclear on the differentiation between the two groundwater flow paths delineated and seek additional clarification on this. In order for NVCA staff to further review the latest proposed sanitary disposal works we request that the applicant provide further details addressing the above comments. In addition to the above, please note that the sanitary treatment facility is located within an area regulated by the NVCA pursuant to Ontario Regulation 172/06. Permit approval from the NVCA is required prior to any commencing development within a regulated area. In this regard, the design details should show that proposed works are located outside of any natural hazards and environmental features (e.g. wetlands) as well as not adversely impacting on the adjacent the environmental features. Also, we wish to remind the applicant that NVCA’s review fees for the subdivision application remain outstanding and should be address at the earliest opportunity. Please feel free to contact the undersigned should you have any questions regarding the above comments. Regards, Chris Chris Hibberd, MCIP, RPP Director of Planning Nottawasaga Valley Conservation Authority John Hix Conservation Administrative Centre, 8195 Concession 8th Line, Utopia ON L0M 1T0 P: (705) 424-1479 Ext. 229, email: chibberd@nvca.on.ca This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or redistribution is prohibited. If you are not the intended recipient, please contact the sender and destroy all copies of the original message. 3 Josh Maitland To: Cc: Subject: 'Zirger, Rosi (MTCS)' 'Jim Moss'; Jim Hartman; 'Holly Martelle' RE: Everett WWTP Schedule 'C' Class EA - DRAFT ESR for Review & Comment From: Josh Maitland Sent: September‐09‐14 11:58 AM To: 'Zirger, Rosi (MTCS)' Cc: 'Jim Moss'; Jim Hartman; 'Holly Martelle' Subject: RE: Everett WWTP Schedule 'C' Class EA ‐ DRAFT ESR for Review & Comment Good morning Rosi, Please note that by way of this response we acknowledge the comments received from MTCS and updates to the ESR will be made to reflect these comments. Specifically, an Archaeological background info section will be added to the body of the ESR with other comments being addressed in the revised Archaeological update report by TMHC (including specifics with regards to Stage 2 requirements along various sections of the forcemain alignments). We note that the mapping concerns raised by MTCS stem from an incorrect study area figure used in the body of the DRAFT ESR (Figure 1‐1) – this figure has been updated to include the WWTP site and FM alignments which were in fact part of the study area for this Class EA, and will be reflected in the final ESR. Thank you for your input throughout this process. Sincerely, Josh Maitland, P.Eng. Project Engineer (705) 444 8805 Ex. 263 This communication is intended only for the party to whom it is addressed, and may contain information which is privileged or confidential. Any other delivery, distribution, copying or disclosure is strictly prohibited and is not a waiver of privilege or confidentiality. If you have received this e-mail message in error, please notify the sender immediately by return electronic mail and delete this e-mail message. Finally, the recipient should check this email and any attachments for the presence of viruses. GREENLAND accepts no liability for any damage caused by any virus transmitted by this email. 1 From: Zirger, Rosi (MTCS) [mailto:Rosi.Zirger@ontario.ca] Sent: August‐22‐14 11:31 AM To: Josh Maitland Subject: RE: Everett WWTP Schedule 'C' Class EA ‐ DRAFT ESR for Review & Comment Project: Everett WWTP – Schedule C Class EA Location: Township of Adjala-Tosorontio MTCS File: 0000440 Dear Mr. Maitland Thank you for sending us the DRAFT Environmental Assessment Report (ESR) for review and comment in advance of issuing the Final Notice of Study Completion. The Ministry of Tourism, Culture and Sport’s (MTCS) interest in this class EA project relates to its mandate of conserving, protecting and preserving Ontario’s cultural heritage, including archaeological resources, built heritage resources, and cultural heritage landscapes. MTCS has reviewed: Draft ESR dated July 2014 prepared by Greenland Appendix B to Draft ESR: Update of Status of Archaeological Concerns for Everett Secondary Plan and Master Services Class EA dated May 23, 2014 (Revised) by Timmins Martelle Heritage Consultants We have the following comments and recommendations regarding these reports as they relate to the Everett WWTP EA: Summary of EA Project The purpose of this EA is to identify and evaluate design options for a wastewater treatment plant (WWTP) and surface water outfall design in the Community of Everett. As part of the Class EA process environmental impacts of the alternatives are considered in the overall selection of the preferred solution. The preferred design concept includes: Construction of a WWTP to be located north-east of R&M Homes Subdivision (Option WWT-9 of Everett Secondary Pan MSP) Construction of Forcemain Alignment south along Concession Road 6 and west through the R&M Homes property to County Road 13, then north along County Road 13 and west to the ultimate discharge location at the Pine River. MTCS comment 1. The draft ESR states that as part of the Class EA process “environmental impacts are considered” (page 2). In regard to archaeology, Appendix B provides a summary of previously completed archaeological assessments. However, the ESR itself does not mention archaeology. Generally an ESR would include a section summarizing existing or base conditions, the studies undertaken and the outcomes of the technical studies. The ESR should also clearly articulate the measures being proposed to mitigate potential impacts. In this case, it appears that further archaeological assessment (Stage 2 etc.) is required. The archaeological assessments should be completed as early as possible, but prior to the completion of detail design, to properly inform EA planning decisions. 2. The final page of Appendix B (page 12?) is a map that illustrates the Proposed Forcemain Routes on a Map of Archeological Potential (ASI 201). a. The project area indicated on Archeological Potential map is not the same as the EA Study Area shown in Figure 1.1 of the Draft ESR. The portion of land extending to the east on which the WWTP and Sewage Pump Station are to be constructed is not included in the EA study area. Please clarify the EA study area and revised the ESR mapping as necessary. 2 b. The boundaries of the project area indicated on Archeological Potential map are also not consistent with the Stage 1 archaeological assessment report (PIF P047-374-2012) prepared by ASI and filed with this Ministry. If the portion extending east of Concession Road 6 is included in a different archaeological assessment report, please indicate the appropriate PIF number. 3. In addition we suggest that that you consider including additional mapping in the ESR. For example, Section 10 – Summary of Preferred Design Concept provides a written description of the locations and alignments chosen. However, only the map attached to Appendix B that illustrates the actual locations. Meanwhile, we would appreciate being kept informed of the manner in which the Ministry’s input has been considered, and we look forward to receiving the final ESR when it is issued. Please feel free to email or telephone me as necessary. I would be pleased to have further discussion with you. Sincerely Rosi Zirger Heritage Planner Ministry of Tourism, Culture & Sport Culture Division | Programs & Services Branch | Culture Services Unit 401 Bay Street, Suite 1700 Toronto, Ontario M7A 0A7 Tel. 416.314.7159 | Fax 416.314.7175| E‐mail: rosi.zirger@ontario.ca From: Josh Maitland [mailto:jmaitland@grnland.com] Sent: August 12, 2014 2:04 PM To: Liu, Chunmei (ENE); Brad Hoover; Chris Hibberd; Zirger, Rosi (MTCS) Cc: Jim Moss; 'Eric Wargel'; Jim Hartman Subject: Everett WWTP Schedule 'C' Class EA - DRAFT ESR for Review & Comment To all, Please find through the following link, a digital (.pdf) copy of the DRAFT Environmental Study Report (ESR) for the Everett WWTP Surface Water Outfall Schedule ‘C’ Class Environmental Assessment: https://www.dropbox.com/s/x6z1rblpplllqiq/Everett%20WWTP%20DRAFT%20ESR%20%26%20Appendices.zip Where requested, a hard‐copies of these documents have been forwarded to your attention. This DRAFT ESR document has been circulated to you in advance of the official Notice of Completion (NOC) and 30‐day public review period due to your expressed interest and involvement in the project to date. We are confident that the DRAFT ESR addresses all comments received to date via agency pre‐consultation and public consultation completed over the course of this project. It is our intention to finalize the ESR and issue the NOC on or about September 8th, 2014. We value your input and would respectfully request that any comments regarding the contents of this DRAFT ESR be provided to Jim Hartman (jhartman@grnland.com) or the undersigned at your earliest convenience and prior to September 8th, 2014. Thank‐you. 3 Sincerely, Josh Maitland, P.Eng. Project Engineer (705) 444 8805 Ex. 263 This communication is intended only for the party to whom it is addressed, and may contain information which is privileged or confidential. Any other delivery, distribution, copying or disclosure is strictly prohibited and is not a waiver of privilege or confidentiality. If you have received this e-mail message in error, please notify the sender immediately by return electronic mail and delete this e-mail message. Finally, the recipient should check this email and any attachments for the presence of viruses. GREENLAND accepts no liability for any damage caused by any virus transmitted by this email. 4 Josh Maitland To: Subject: Josh Maitland RE: adjala-Tosorontio pine river assessment From: brian camirand [mailto:debcamirand@rogers.com] Sent: Friday, November 29, 2013 3:57 PM To: Jim Hartman Subject: adjala-Tosorontio pine river assessment I would to be added to the mailing list for the Adjala‐Tosorontio environmental assessment for the pine river. Mail can be sent to this email or Brian Camirand 8 Dekker Street Everett Ont. L0M1J0 Thank you 1 Josh Maitland To: Cc: Subject: Jim Moss; Jim Hartman 'Eric Wargel'; Gail Greer RE: Everett WWTP Membrane Option Jim, We acknowledge the enclosed comments and they shall be included in the public record as part of the project file, along with this correspondence. In addition, we propose that OCWA be engaged as part of the design team/steering committee for the WWTP at the implementation stage of the process (i.e. detailed design and approvals) Sincerely, Josh Maitland, P.Eng. Project Engineer (705) 444 8805 Ex. 263 This communication is intended only for the party to whom it is addressed, and may contain information which is privileged or confidential. Any other delivery, distribution, copying or disclosure is strictly prohibited and is not a waiver of privilege or confidentiality. If you have received this e-mail message in error, please notify the sender immediately by return electronic mail and delete this e-mail message. Finally, the recipient should check this email and any attachments for the presence of viruses. GREENLAND accepts no liability for any damage caused by any virus transmitted by this email. From: Jim Moss [mailto:jmoss@adjtos.ca] Sent: July‐28‐14 11:22 AM To: Jim Hartman Cc: Josh Maitland; 'Eric Wargel'; Gail Greer Subject: FW: Everett WWTP Membrane Option Hi Jim and Josh. Brad from OCWA just sent this over to me as part of the research that he has been doing. Thanks. Jim Moss 1 Public Works Superintendent jmoss@adjtos.ca Township of Adjala-Tosorontio 7855 Sideroad 30, RR#1 Alliston,On L9R-1V1 Ph: 705-434-5055 Fx: 705-434-5051 From: Brad Hoover [mailto:BHoover@ocwa.com] Sent: Monday, July 28, 2014 10:04 AM To: Jim Moss (jmoss@adjtos.ca) Subject: FW: Everett WWTP Membrane Option Hi Jim, He is a quote that I have received from Metcon for an MBR plant in Everett. Regards, Brad From: David Howes [mailto:DavidH@metconeng.com] Sent: Monday, July 28, 2014 8:49 AM To: Brad Hoover Cc: Donald Gadsden; Prabal Ray Subject: Everett WWTP Membrane Option Good morning Brad. For your information I have attached a data sheet and preliminary layout for a Flat Plate style of membrane which is specifically designed for Watewater. The ballpark price is $4.5M including Major equipment Control Panel, Membrane units, blowers, diffusers, permeate pumps, WAS pumps, Alum dosing system and chemical dosing system, Transport and Start-up. Excluding installation, interconnecting piping & wiring and lifting devise. I realize this is expensive, however there are several advantages to using flat plate membranes over hollow fibre. As discussed earlier, using a convention plant or SBR followed by a disk filter will be much less expensive and will accomplish similar results. Sincerely, David Howes Regional Sales Manager Metcon Sales & Engineering Ltd. 15 Connie Crescent, Unit 3 Concord, Ontario L4K 1L3 T: 905.738.2355 x 243 F: 905.738.5520 E: DavidH@metconeng.com W: http://www.metconeng.com “Follow” us on Twitter 2 “Like” us on Facebook “Link” with us on Linked In This message, including any attachments, is privileged and intended only for the person(s) or entity to which it is addressed. This message may contain information which is privileged, proprietary, confidential or personal. If you are not the intended recipient, any dissemination, copying or disclosure of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and permanently delete this e-mail message, including any attachments. From: Brad Hoover [mailto:BHoover@ocwa.com] Sent: July-15-14 1:23 PM To: David Howes Subject: RE: Shelburne Thanks Dave From: David Howes [mailto:DavidH@metconeng.com] Sent: Tuesday, July 15, 2014 1:19 PM To: Brad Hoover Subject: RE: Shelburne Thanks Brad. We are working on the quote for the MBR and will have it ready soon. In addition I do have some feedback from Ashbrook as follows: They recommend an SBR followed by disk filter; it would have the best chance of meeting the tough limits for P. The key would be achieving some biological P removal coupled with good chemical precipitation and solids removal. The MBR has minimal advantage over an SBR/Iso-Disc option and would cost a lot more in capital and opex. The P concentration in the solids would be approximately 1%. The MBR would produce an effluent with nearly 0 mg/L effluent TSS and the SBR/Iso-Disc would achieve less than 4 mg/L (approximately 0.04 mg/L P). This 0.04 mg/L represents the advantage of the MBR. The Engineer/Owner/Regulator has to determine whether this minor amount of P removal is worth going to very expensive MBR option. Thanks! Dave David Howes Regional Sales Manager Metcon Sales & Engineering Ltd. 15 Connie Crescent, Unit 3 Concord, Ontario L4K 1L3 3 T: 905.738.2355 x 243 F: 905.738.5520 E: DavidH@metconeng.com W: http://www.metconeng.com “Follow” us on Twitter “Like” us on Facebook “Link” with us on Linked In This message, including any attachments, is privileged and intended only for the person(s) or entity to which it is addressed. This message may contain information which is privileged, proprietary, confidential or personal. If you are not the intended recipient, any dissemination, copying or disclosure of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and permanently delete this e-mail message, including any attachments. From: Brad Hoover [mailto:BHoover@ocwa.com] Sent: July-14-14 4:30 PM To: David Howes Subject: RE: Shelburne Hi Dave, They didn’t have a peak flow listed, but it’s usually twice the daily flow. Regards, Brad From: David Howes [mailto:DavidH@metconeng.com] Sent: Monday, July 14, 2014 3:05 PM To: Brad Hoover Subject: RE: Shelburne Hello Brad. Can you confirm an approx peak flow per below? Should I use 2x for our budget estimate? David Howes Regional Sales Manager Metcon Sales & Engineering Ltd. 15 Connie Crescent, Unit 3 Concord, Ontario L4K 1L3 T: 905.738.2355 x 243 F: 905.738.5520 E: DavidH@metconeng.com W: http://www.metconeng.com “Follow” us on Twitter “Like” us on Facebook “Link” with us on Linked In 4 This message, including any attachments, is privileged and intended only for the person(s) or entity to which it is addressed. This message may contain information which is privileged, proprietary, confidential or personal. If you are not the intended recipient, any dissemination, copying or disclosure of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and permanently delete this e-mail message, including any attachments. From: Brad Hoover [mailto:BHoover@ocwa.com] Sent: July-04-14 3:23 PM To: David Howes Subject: RE: Shelburne Thanks Dave, Here are the limits that the new plant would be looking at. Parameter Compliance Design Objective Proposed Influent Water Quality TP (mg/L) 0.1 0.05 6 Total Ammonia (mg/L) 1.8 1.8 (TKN) 36 TSS (mg/L) 10 5 204 BOD (mg/L) 10 5 284 Total e coli (CFU/100 mL) 200 200 The proposed plant will have a design flow rating of 3.63 ML/day. I know that the total phosphorous is the issues that the plant will be dealing with. The consulting engineers have recommend an MBR plant but they are stating that is it the cheapest solution to build, operate and maintain. I don’t agree with their conclusion and were hoping to see if you can let me know if disk filters would be capable of removing phosphorous to this level. Regards, Brad From: David Howes [mailto:DavidH@metconeng.com] Sent: Friday, July 04, 2014 2:08 PM To: Brad Hoover Subject: Shelburne 5 Hello Brad. Please see attached. Note that Shelburne had some pretty low influent numbers, however the disk filter demonstrated that the removal rates were very close to that of the more expensive Sand Filter. Sincerely, Dave David Howes Regional Sales Manager Metcon Sales & Engineering Ltd. 15 Connie Crescent, Unit 3 Concord, Ontario L4K 1L3 T: 905.738.2355 x 243 F: 905.738.5520 E: DavidH@metconeng.com W: http://www.metconeng.com “Follow” us on Twitter “Like” us on Facebook “Link” with us on Linked In This message, including any attachments, is privileged and intended only for the person(s) or entity to which it is addressed. This message may contain information which is privileged, proprietary, confidential or personal. If you are not the intended recipient, any dissemination, copying or disclosure of this communication is strictly prohibited. If you have received this communication in error, please notify the sender immediately and permanently delete this e-mail message, including any attachments. ______________________________________________________________________ This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com ______________________________________________________________________ ______________________________________________________________________ This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com ______________________________________________________________________ ______________________________________________________________________ This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com ______________________________________________________________________ 6 BIO-CEL ® XL World‘s largest submerged BIO-CEL ® MBR module for biological wastewater treatment MICRODYN-NADIR GmbH Kasteler Straße 45 65203 Wiesbaden / Germany Tel. + 49 611 962 6001 info@microdyn-nadir.de www.microdyn-nadir.com BIO-CEL ® XL Largest submerged BIO-CEL® MBR module for biological wastewater treatment Membrane and operation data (1) BIO-CEL ® XL Membrane area 1,900 m 2 Nom. MWCO 150 kDa Pore size 0.04 μm Permissible particle size in sludge 2 mm Maximum airflow rate (Vn) (2) 665 m 3 /h Max. content suspended solids (SS) 12 g/l Max. trans membrane pressure during filtration 400 mbar Max. trans membrane pressure during backwash 150 mbar Max. operating/ storage temperature 40° C Since 2005 MICRODYN-NADIR offers the only product for MBR processes which combines the advantages of hollow fibers and plate and frame modules without displaying their particular disadvantages – the BIO-CEL®. Up until 2014 the BIO-CEL® has been available with a membrane area of 10, 50, 100 and 400 m2. Min. operating/ storage temperature 5° C pH range 2 - 11 Chlorine resistance 500 000 ppmh Length 2800 mm The increasing acceptance of the MBR technology worldwide not only results in growth of the MBR market but also in an increase in large scale projects with more than 10,000 m3/d inflow to the MBR plant. In order to address these demands, MICRODYN-NADIR has developed the BIO-CEL® XL module especially for large scale applications with a total inflow to the MBR plant of > 2,000 m3/d of wastewater to be treated. Width 2100 mm Height (membrane- and d iffusor unit) 2650 mm Required ground clearance 750 mm Connection aeration Special flange, Adapter (DIN, ANSI; …) as required Connection permeate Special flange, Adapter (DIN, ANSI; …) as required Dry weight 2500 kg Wet weight 3500 kg Maximum load 11000 kg Submerged modules have proven to be state-of-the-art technology when talking about MBR processes. The BIO-CEL® XL module has a total membrane area of 1,900 m2. The housing and connections of the BIO-CEL® XL are made of stainless steel. The operating method is in accordance to the smaller types of the BIO-CEL® module. First successful operation experiences of the BIO-CEL® XL in a municipal plant are available since August 2013. ADVAN TA G E S Material data »cost efficient »high flux »low energy demand »simple installation »backwashable »reliable in operation »fine bubble aeration »high packing density »self-healing membrane sheets W W W . M I C R O D Y N - N A D I R . C O M BIO-CEL ® XL Housing Stainless Steel 1.4571 Piping Polyvinyl chloride (PVC) Connections Stainless Steel 1.4571 Membrane Polyether sulfone (PES) Drainage Polyester Sealings EPDM Diffusor PP/EPDM Note: (1) Nominal values. (2) Vn is the volume flow rate at standard conditions according to DIN ISO 2533:1979-12