Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 OVERVIEW OF CDM PLAN This CDM Plan must be used by the LDC in submitting a CDM Plan to the IESO under the Energy Conservation Agreement between the LDC and the IESO The CDM Plan will consist of the information provided in this document and any additional information and supporting documents provided by the LDC to the IESO in support of this CDM Plan. Capitalized terms not otherwise defined herein have the meaning ascribed to them in the Energy Conservation Agreement as may be applicable. Complete all fields within the CDM Plan that are applicable. Where additional space is required to complete a section of the CDM Plan, please append additional pages as required. The LDC should indicate that additional information has been attached in the related question field on the CDM Plan. Please refer to the CDM Plan Submission and Review Criteria Rules for further information. A. General Information 1. CDM Plan Submission Date: (DD-Mon-YYYY) CDM Plan Version 1-Apr-2015 1.2 2. LDC INFORMATION LDC 1 LDC Name: LDC 2 LDC 3 LDC 4 LDC 5 LCD 6 LCD 7 LCD 8 LCD 9 LCD 10 Hydro One Networks Inc. Company Representative: Name: Title: Email Address: Phone Number (XXX-XXX-XXXX): 3. Giuliana Rossini Director, Customer Strategy & Conservation Officer g.rossini@Hydroone.com 416-345-6035 Primary Contact for CDM Plan Name: LDC Name: Title: Email Address: Phone Number (XXX-XXX-XXXX): Sahar Mishriki Hydro One Networks Inc. Manager, Strategy & Conservation Sahar.Mishriki@HydroOne.com 416-345-4324 Estimated Start Date of CDM Plan: (DD-Mon-YYYY) 1-Apr-2015 LDC CONFIRMATION FOR CDM PLAN Each LDC to this CDM Plan has executed the Energy Conservation Agreement. A completed Cost-Effectiveness Tool is attached and forms part of the CDM Plan. A completed Achievable Potential Tool is attached and forms part of the CDM Plan. All customer segments in each LDC's service area are served by the Programs set out in this CDM Plan. The CDM Plan includes all electricity savings attributable to all Programs and pilot programs that have in-service dates between Jan 1, 2015 and December 31, 2020. The CDM Plan Budget for each LDC includes all eligible funding under the full cost recovery and pay-for-performance mechanisms for Programs under its CDM Plan. Frequency of LDC Invoicing to IESO (subsequent changes to the frequency should be notified to us by email). Yes Yes Yes Yes Yes Yes Monthly COMPLETE FOR CDM PLAN AMENDMENTS ONLY Select the reason(s) for CDM Plan amendment, as per ECA. One time each calendar year of the term LDC wishes to request an adjustment to the CDM Plan Budget The amendments to a provision of the ECA or any Rules will have a material effect on the CDM Plan LDC's actual spending under CDM Plan has exceeded (or is reasonably expected to exceed) the portion of the CDM Plan Budget allocated to the current year of the term Under a joint CDM Plan, LDCs that are parties to a joint CDM Plan reallocate any portion of their respective CDM Plan Targets and CDM Plan Budgets [Reallocation not subject to IESO approval ] IESO has triggered remedies under Article 5 of the ECA LDC seeking to change its selection of the type of funding that it wishes to receive for each Program in the CDM Plan [ECA, section 4.1] Other (Please specify reason) CDM Plan Template A. General Information Page 1 of 8 Conservation First Framework LDC Tool Kit Final v2 - January 23, 2015 B. LDC Authorization LDC DECLARATION Please complete the declaration for each LDC that is listed in this CDM Plan. A separate page with each LDC's signed declaration should be included as part of the CDM Plan submission. LDC I represent that the information contained in this CDM Plan as it relates to the LDC is complete, true, and accurate in all respects. I acknowledge and agree to the following terms and conditions: (1) if this CDM Plan is approved by the IESO and accepted by each LDC to this CDM Plan, the CDM Plan together with any conditions to that approval is incorporated by reference into the Energy Conservation Agreement between the LDC and the IESO (2) the LDC will offer the Programs set out in Table 2 of this CDM Plan to customers in its service area; and (3) the LDC of will implement this CDM Plan in accordance with the CDM Plan Budget. LDC's Legal Name: Hydro One Networks Inc. Company Representative: Giuliana Rossini, Director, Customer Strategy & Conservation Officer Signature I/We have the authority to bind the Corporation. Date (DD-Mon-YYYY) 31-Mar-2015 CDM Plan Template B. LDC Authorization Page 2 of 8 C. CDM Plan Summary TABLE 1: SUMMARY OF CDM PORTFOLIO SAVINGS AND BUDGET CDM PLAN TOTAL LDC 1 1,159,020 1,159,020.0 1,159,020 1,159,020 c. Allocated LDC CDM Plan Budget ($) Indicate total budget allocated to LDC $321,989,874 $321,989,874.00 d. Total CDM Plan Budget ($) Calculated as part of CDM Plan f. CDM Plan Cost Effectiveness $321,989,874 $321,989,874 Program Year 2015 2016 2017 2018 2019 2020 CDM Plan Total Benefits ($) $115,631,488.26 $119,364,346.90 $128,955,464.74 $94,114,689.73 $93,294,943.23 $91,668,155.88 $643,029,089 Allocated LDC CDM Plan Target (MWh) Indicate total CDM Plan Target allocated to LDC(s) CDM Plan MWh Savings b. Calculated as part of CDM Plan a. LDC 2 LDC 3 LDC 4 LDC 5 LCD 6 LCD 7 LCD 8 LCD 9 LCD 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ratio 1.5 1.4 1.4 1.3 1.4 1.5 1.4 Benefits ($) $134,857,364.59 $126,524,060.84 $133,118,572.84 $95,167,558.86 $94,401,238.29 $82,807,799.02 $666,876,594 Total Resource Cost (TRC) Indicate annual portfolio-level Cost Effectiveness for CDM Plan as determined by LDC(s) using output from Cost-Effectiveness Tool g Plan Cost Effectiveness-Exceptions Rationale Complete this section if proposed plan does not meet minimum Cost-Effectiveness Thresholds set out in CDM Plan Submission and Review Criteria Rules. Costs ($) $77,962,498.25 $85,006,935.58 $92,495,238.89 $69,851,729.26 $67,627,337.85 $61,585,397.33 $454,529,137 Levelized Cost Program Administrator Cost (PAC) Costs ($) $12,420,643.99 $57,641,999.43 $60,857,293.85 $51,354,560.07 $48,966,601.14 $45,571,299.99 $276,812,398 Ratio 10.9 2.2 2.2 1.9 1.9 1.8 2.4 ($/kWh) $0.006 $0.029 $0.031 $0.036 $0.035 $0.037 $0.027 D. CDM Plan Detailed List of Programs, Election of Funding Mechanism, and Annual Milestones NOTES 1. CDM Plan Complete Table 2 for all Programs for which will contribute towards the CDM Plan Target. 2. Program Name Province-wide LDC Program names are found in the applicable Program Rules. Regional & local Program names should be consistent with those included in approved business cases (if applicable) and consistent throughout this CDM Plan. 3. Anticipated Annual Budget Include annual budgets for each Program to be allocated against the CDM Plan Budget by funding mechanism. Note: LDC Eligible Expenses incurred in 2014 for programs delivered in 2015 (and not funded as part of the 2011-2014 Master CDM Program Agreement) should be included in 2015 Annual anticipated budget amounts. 4. Target Gap Portion of the CDM Plan Target that the LDC reasonably expects, based on qualified independent third party analysis as accepted by the IESO could only be achieved with funding in addition to the CDM Plan Budget. LDC 1: Hydro One Networks Inc. TABLE 2. PROGRAM AND MILESTONE SCHEDULE Program Implementation Schedule (Annual Anticipated Budget & Incremental Annual Milestones by Program) Coupon Program Residential New Construction Program Low Income Home Assistance Program 1-Jan-2016 1-Aug-2015 1-Jan-2016 Direct Install Lighting Retrofit Program Audit Funding Program Process and Systems Upgrades Program High Performance New Construction Program Energy Manager Program 1-Jan-2016 1-Jul-2015 1-Jul-2015 Yes Yes Yes Yes Yes 1-Jul-2015 Unassigned Target FCR TOTAL Industrial Yes Yes 1-Jan-2016 First Nations Program Social Benchmarking Program Heat Pump Water Heater Program Air Source Heat Pump Program Full Cost Recovery Programs Yes Yes 31-Oct-2015 Heating and Cooling Program 2015 Institutional Program Start Date (DD-Mon-YYYY) Agricultural Proposed Pilots or Programs Small business Approved Local, Regional, or Pilot Programs Low-income Approved Province Wide Programs Residential Funding Mechanism Commercial (inc. Multi-Fam) Customer Segments Targeted by Program Yes 1-Jul-2015 1-Jan-2016 Yes 1-Dec-2015 Yes 1-Jan-2016 Yes Yes 1-Jan-2016 Yes Yes 31-Mar-2015 Yes Yes 2016 Yes 2019 2020 Total 2015 - 2020 Energy Savings (MWh) Anticipated Annual Budget ($) Energy Savings (MWh) Anticipated Annual Budget ($) Energy Savings (MWh) Anticipated Annual Budget ($) Energy Savings (MWh) Anticipated Annual Budget ($) Energy Savings (MWh) Anticipated Annual Budget ($) Energy Savings (MWh) Total CDM Plan Budget ($) Total Persisting Energy Savings in 2020 (MWh) $0 $291,777 0.0 786.8 $4,605,000 $870,325 12,825.7 2,360.4 $4,605,000 $990,390 12,825.7 2,832.5 $4,605,000 $870,325 12,825.7 2,360.4 $4,605,000 $700,260 12,825.7 1,888.3 $4,605,000 $580,195 12,825.7 1,416.3 $23,025,000 $4,303,272 64,128.6 11,644.8 $485,435 397.0 $2,114,753 1,686.6 $2,092,223 1,665.7 $1,832,129 1,439.8 $1,635,009 1,270.6 $1,474,788 1,131.3 $9,634,337 7,590.9 $0 0.0 $5,594,139 11,116.7 $5,594,139 11,116.7 $5,594,139 11,116.7 $5,594,139 11,116.7 $5,594,139 11,116.7 $27,970,695 55,583.4 Yes Yes Yes Yes Yes Yes Yes $6,023,998 $203,120 0.0 19,179.9 215.0 $9,743,934 $406,240 14,407.6 27,746.6 430.0 $9,524,028 $406,240 14,407.6 27,746.6 430.0 $9,920,964 $406,240 14,407.6 29,909.3 430.0 $10,310,703 $406,240 10,805.7 32,005.2 430.0 $10,712,199 $406,240 10,805.7 34,167.9 430.0 $56,235,826 $2,234,320 64,834.4 170,755.4 2,365.0 Yes Yes Yes $2,551,114 8,602.3 $17,630,932 83,690.2 $17,106,932 81,061.7 $8,036,932 36,744.7 $8,036,932 36,744.7 $6,236,932 22,904.7 $59,599,774 269,748.1 Yes Yes Yes $0 0.0 $941,316 342.0 $950,952 399.0 $941,316 342.0 $941,316 342.0 $931,680 285.0 $4,706,580 1,710.0 Yes Yes $650,000 740.6 0.0 $1,300,000 1,481.2 826.8 $1,300,000 1,481.2 1,102.4 $1,300,000 1,481.2 1,102.4 $1,300,000 1,481.2 1,102.4 $1,300,000 1,481.2 826.8 $7,150,000 Yes Yes 2018 Anticipated Annual Budget ($) 0.0 Yes 2017 Yes Yes 8,146.4 4,960.8 0.0 25,781.5 6,890.2 6,897.1 8,992.4 48,561.1 0.0 60.0 4,800.0 6,000.0 6,000.0 5,400.0 22,260.0 0.0 554.9 5,432.9 5,432.9 5,432.9 5,432.9 22,286.6 Yes 50,720.4 50,720.4 50,720.4 50,720.4 50,720.4 253,601.9 $12,420,644 29,921.6 $64,723,474 208,249.0 $69,244,563 241,803.9 $60,426,504 181,203.3 $58,931,658 179,062.8 $56,243,032 167,936.9 $321,989,874 1,008,177.4 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 Pay for Performance Programs P4P TOTAL Conservation Instant Coupon Booklet Residential New Construction Program Low Income Home Assistance Program 2011-2014 CDM Framework (and 2015 extension of 2011-2014 Master CDM Agreement) (Not funded through 2015-2020 CDM Framework) 12,825.7 12,825.7 1,101.5 1,101.5 1,506.1 1,506.1 Heating and Cooling Program 11,116.7 11,116.7 Direct Install Lighting Retrofit Program Audit Funding Program Process and Systems Upgrades Program High Performance New Construction Program Energy Manager (PSUI) Aboriginal Program 18,009.6 12,825.3 215.0 18,009.6 12,825.3 215.0 91,390.3 91,390.3 285.0 285.0 740.6 826.8 740.6 826.8 2011-2014 CDM Framework (and 2015 extension) TOTAL $0 150,842.6 $12,420,644 180,764.2 0.0 TARGET GAP TOTAL CDM PLAN TOTAL MINIMUM ANNUAL SAVINGS CHECK 150,842.6 0.0 True $64,723,474 208,249.0 True $69,244,563 241,803.9 True $60,426,504 181,203.3 True $58,931,658 179,062.8 True $56,243,032 167,936.9 True $321,989,874 1,159,020.0 Conservation First Framework LDC Tool Kit Final v2 - January 23, 2015 E. Proposed Local and Regional Pilot CDM Programs Notes Complete the following Table(s) for each proposed local and regional Program or Pilot Program in the CDM Plan for which a business case has NOT previously been approved by the IESO. Please refer to the Program Development and Rule Revision Guideline and the Business Case Template for full details on requirements and submission of a business case for approval of a local or regional Program. For the process for receiving funding for a Pilot Program, refer to the LDC Program Innovation Guideline. TABLE 3a. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) c. Customer Segment(s) Served by Programs d. Participating LDCs (if applicable) Direct Install Lighting Proposed Regional Program TABLE 3b. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) 30-Jun-2015 Small Business Agricultural Hydro One Networks Inc. Other c. Customer Segment(s) Served by Programs d. Participating LDCs (if applicable) e. Overview of Proposed Program or Pilot While the existing version of DIL is due to expire at the end of 2015, development is underway for a successer program launching in 2016. This program is expected to be introduced on a Province-wide basis and may include deeper savings Provide overview of key objectives and elements of proposed measures beyond lighting, program or pilot. e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. TABLE 3c. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) c. Customer Segment(s) Served by Programs Social Benchmarking Proposed Regional Program d. Participating LDCs (if applicable) TABLE 3d. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) 1-May-2015 Residential d. Participating LDCs (if applicable) e. Overview of Proposed Program or Pilot In November 2014, Hydro One, in partnership with O-Power, launched its OPA (now IESO) funded Social Benchmarking pilot to about 50,000 of its 1,300,000 residential customers, as well as a parallel launch to an additional 50,000 customers Provide overview of key objectives and elements of proposed without OPA funding. The OPA-funded one year pilot targets customer with higher than average consumption and will provide them with a monthly Home Energy Report showing how their energy usage compares with their peers, while the program or pilot. Hydro one funded portiontargets customers with medium to low usage consumption. Hydro One expects to submit a business case for a program upon a successful pilot. Although only savings begining in 2017 will count towards Hydro One's target, Hydro One intends to offer this program as early as Q4 2015. e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. TABLE 3e. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS c. Customer Segment(s) Served by Programs First Nations Programs Proposed Pilot TABLE 3f. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) 29-May-2015 Residential d. Participating LDCs (if applicable) Low Income d. Participating LDCs (if applicable) e. Overview of Proposed Program or Pilot Hydro One will continue to work with the IESO and First Nations Engineering Services Ltd. ("FNESL") to deliver the Aboriginal Conservation Program in 2015. Hydro One will be submitting a business case in Spring 2015 for its First Nations Provide overview of key objectives and elements of proposed CDM programs. The First Nations programs will continue to provide direct installs of energy efficient appliances, lighting, and other energy efficient measures and offer community billing presentations. Hydro One intends to expand on the exisitng program or pilot. Aboriginal Conservation Program to provide more impactful measures for its customers. e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. TABLE 3g. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS c. Customer Segment(s) Served by Programs Air Source Heat Pump Proposed Regional Program d. Participating LDCs (if applicable) TABLE 3h. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) 30-Jun-2015 Residential Small Business Commercial (inc. Multi-Family) e. Overview of Proposed Program or Pilot Hydro One intends to submit a business case for an Air Source Heat Pump ("ASHP") pilot project through the Project Innovation Fund in Summer 2015. Hydro One recognizes ASHPs as vialble technology that can help some our customers Provide overview of key objectives and elements of proposed who rely on electric heat, save significantly on their electricity usage and their bill. The pilot will explore ways to increase the availability and uptake of ASHPs in the Ontario market as well as assess its effectiveness in different climates in its service program or pilot. territory before expaning as a program. c. Customer Segment(s) Served by Programs e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. TABLE 3i. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS c. Customer Segment(s) Served by Programs d. Participating LDCs (if applicable) Heat Pump Water Heater Proposed Regional Program TABLE 3j. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) 30-Jun-2015 Residential Use same "Program name" included in other worksheets d. Participating LDCs (if applicable) Hydro One Networks Inc. a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) Use same "Program name" included in other worksheets c. Customer Segment(s) Served by Programs Small Business Hydro One Networks Inc. a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) Use same "Program name" included in other worksheets c. Customer Segment(s) Served by Programs Low Income Hydro One Networks Inc. a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) Use same "Program name" included in other worksheets Low Income Use same "Program name" included in other worksheets c. Customer Segment(s) Served by Programs Small Business d. Participating LDCs (if applicable) Hydro One Networks Inc. e. Overview of Proposed Program or Pilot Hydro One intends to submit a business case for a Heat Pump Water Heater ("HPWH") pilot project through the Project Innovation Fund in Summer 2015. Hydro One has a large population of customers with electric water heaters and Provide overview of key objectives and elements of proposed recognizes HPWHs as a vialble technology that can help greatly reduce the electricity required to heat domestic water. The pilot will explore ways to increase the availability and uptake of HPWHs in the Ontario market as well as assess its program or pilot. effectiveness in different climates in its service territory before expaning as a program. CDM Plan Template e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. E. Proposed Program&Pilots Page 5 of 8 Conservation First Framework LDC Tool Kit Final v2 - January 23, 2015 F. Detailed Information on Collaboration and Regional Planning ADDITIONAL DETAILED INFORMATION Regional LDC(s) Collaboration Description of how the LDC(s) will collaborate with other LDCs. If collaboration will not occur, description of why it will not occur. Hydro One is currently participating in a number of subcommittees tasked with either the development of new initiatives or the refinement of existing programs. Each sub committee has approximately 5-6 LDCs. Most of the groups began meeting in Q4 of 2014 and will continue to do so in 2015 until program development is complete. Most groups are planning to have re-designed programs in market by Q4 2015. Hydro One is also looking into possibilities for a revised Appliance Retirement Program in collaboration with a number of other like-minded LDCs. Hydro One is also working with LDCs, such as Thunder Bay Hydro, Algoma Hydro, and Bluewater Hydro, through the Aboriginal Working Group to collaborate on efforts towards energy conservation programs for First Nations communities. Gas Collaboration Description of how the LDC(s) will collaborate with other gas utility programs delivered in service area (if applicable). If collaboration will not occur, description of why it will not occur. Hydro One has held preliminary discussions with Natural Gas Companies to propose exploring possibilities to develop new programs aimed at both electricity and gas savings. The Aboriginal Working Group, in which Hydro One participates, is exploring ways to coordinate our energy conservation programs for First Nations communities with Union Gas. The Residential Working Group has also been in communication with gas utilities with regard to coordinating and integrating low income programs (especially weatherization measures) as well as potentially collaborating on Residential New Construction projects. Further meetings are currently planned in the first quarter of 2015 to start discussions and cultivate formal plans for their development. CDM Contribution to Regional Planning Description of how the CDM Plan considers the electricity needs and investments identified in other plans or planned initiatives, completed or underway within the LDC(s)' service area or region. This may included Integrated Regional Resource Plans or Municipal Community Energy Plans. As per the CDM Requirement Guidelines for Electricity Distributers released by the Government on December 19, 2014, Hydro One’s distribution planning will incorporate its CDM plans at the outset of the planning process. Thus, distribution investments to increase the system capacity will only be implemented as the regional solution where CDM is not a viable option. Hydro One is exploring a variety of program offerings that provide customer and electricity system benefits through energy efficiency, behavioural changes, load displacement, load shifting, demand response, and energy storage. Hydro One is willing to collaborate with local electricity utilities and gas utilities to develop programs and implement projects that will be cost-effective and benefit the greater electricity system. Over the course of the 2015-2020 Conservation Framework, Hydro One’s Smart Grid initiative will be deploying a number of CDM pilots that will simultaneously help customers better manage their electricity bills and enable Hydro One to better control demand for operational and economic purposes. Through consumer research and load analytics, the Smart Grid initiative has identified two pilot streams, targeting central air conditioning and domestic water heating. Hydro One is piloting a Bring Your Own Thermostat initiative, enabling customers to participate in conservation and demand response (DR) by installing their preferred smart thermostat from amongst a list of pre-qualified models. Hydro One will also be piloting a Smart Switch for electric water heaters, which will allow customers to schedule their water heaters to avoid peak-time electricity usage and increase Hydro One’s demand response capacity. These initiatives will increase Hydro One’s DR capacity by maximizing opportunities for customers to participate in CDM programs that help to alleviate local system constraints. Hydro One has provided details of these initiatives and their funding as part of its 2015-2019 rate submission, which has recently been approved by the Ontario Energy Board. Hydro One will be taking part in many active and upcoming Integrated Regional Resource Planning (IRRP) processes. Regions with plans currently underway include: Burlington to Nanticoke, Greater Ottawa, GTA East, GTA North, GTA West, Kitchener-Waterloo-Cambridge-Guelph, Metro Toronto, Northwest Ontario, Windsor-Essex, East Lake Superior, London Area, Peterborough to Kingston, South Georgian Bay/Muskoka, and Sudbury Algoma. Upcoming IRRP processes are planned for the Chatham/Lambton/Sarnia, Greater Bruce/Huron, Niagara, North of Moosonee, North/East of Sudbury, Renfrew, and St. Lawrence regions. Energy and demand savings from the programs outlined in our CDM Plan as well as those discussed above will all be taken into account in these processes. Hydro One is committed to supporting the implementation of the IRRP through delivery of this CDM Plan. Hydro One CDM staff supporting the development and implementation of the IRRPs include Hydro One's Manager of Business Integration & Conservation and Manager of Business Development Support. CDM Plan Template F. Detailed Information Page 6 of 8 Conservation First Framework LDC Tool Kit Final v2 - January 23, 2015 G. Additional Documentation for CDM Plan (If applicable) ADDITIONAL INFORMATION AND DOCUMENTATION Programs Opportunity to provide any additional information on assumptions used for budgets and/or savings for approved 2015-2020 province-wide programs Hydro One's CDM Plan was prepared using program savings assumptions based on the best information available at the time of making this submission. Where Hydro One's historical savings differ from the IESO provincial archetypes or existing measures it the CE Tool, HONI developed its own historical archetypes. Hydro One Archetypes were created for the Audit Funding, Energy Manager and PSUI programs. Program participation is based on historical levels with consideration of changes to marketing, deliver channels, and market saturation. One LDC working groups and IESO agree on the final program enhancements and re-designs, Hydro One may revise its Plan savings assumptions to more accurately reflect the expected performance of these programs. For more information on assumptions made, please see the attached substantiation document. Hydro One does not have approved Local and/or Regional Programs or Pilot Programs included in this Plan at this point. Approved Local and/or Regional Programs and Pilot Programs Opportunity to provide any additional information on assumptions used for budgets and/or savings for approved 2015-2020 local or regional programs or pilot programs More details on Hydro One's proposed Local programs are included in the Cover Letter and Substantiation Document. Hydro One has several programs that Proposed Local and/or Regional Programs and Pilot Programs Opportunity to provide additional information on assumptions used for are either in pilot phase currently, or planned for piloting. Any of these programs may be candidates for a program should the pilot be successful. Hydro One will continue to explore the best opportunities to provide ways for our customers to save on energy. forecast budgets and/or savings for proposed programs or pilot programs Programs from 2011-2014/2015 CDM Framework Opportunity to provide any additional information on assumptions used for budgets and/or savings from existing 2011-2014/2015 CDM Programs CDM programs are expected to transition from 2011-2014 Framework extension to the 2015-2020 Framework at various times throughout 2015, as indicated in this Plan. To account for the extention of 2011-2014 programs into 2015 and savings associated with these programs before they transition to the 2015-2020 framework several assumptions were made in the the Cost Effectiveness evaluations. 2015 PAB budgets were pro-rated based on the Program Start Date. To account for incentives that would be paid for under the 2011-2014 framework budget, the incentive values in 2015 were reduced by the % of savings expected to occur prior to the transition date. Most programs assumed that the % of savings and spending expected to occur under each framework model was proportional to the % of time in 2015 before and after the program start date. Exceptions to this include Retrofit, where 60% of spending in 2015 in expected to be paid from 2015-2020 framework due to projects being backloaded in 2015 as well as BMG projects, where all 2015 in-service BMG projects were initiated prior to the program start date. This allows modelling of all the savings expeceted to be attributed to our target as well as the appropriate total spending in 2015 from our 2015-2020 CDM budget. At this time, Hydro One is not submitting any programs under Pay-for-Performance (P4P). Programs funded through Pay-for-Performance Opportunity to provide any additional information on assumptions used for budgets and/or savings for Pay for Performance Programs Other Additional assumptions used in the CDM Plan Described in cover letter and substantiation document. CDM Plan Template G. Additional Documentation Page 7 of 8 Version Control Summary of Changes Conservation First Framework LDC Tool Kit Final V2 - January 23, 2015 Summary of Changes to CDM Template Version No. 1 Date Tab 20-Jan-15 Change Summary Inclusion of "Company Name" for Primary Contact Inclusion of frequency of invoicing (monthly vs. quarterly) A. General Information Update date format to eliminate confusion Change reference to OPA Additional LDCs for joint plan B. LDC Authorization Update date format to eliminate confusion Additional line items for FRC program names Additional LDCs for joint plan Update on the program names Update date format to eliminate confusion D. CDM Plan Milestone LDC 1-10 Update column headers: - "Province Wide Program Name" - "Proposed Regional or Local CDM Program or Pilot Program Name" Change reference to OPA Update Header and Footer Additional boxes for proposed programs E.. Proposed Program&Pilots Update date format to eliminate confusion O. Detailed Information Clarity if it is primary LDC or all LDCs in a joint CDM Plan. CDM Plan Template Summary of Version Changes Page 8 of 8