EVERGREEN VILLA - TARGETED REPAIRS KIRKLAND, WASHINGTON J2 #03384 (02/13/2015 - BID SET) SECTION 01 125 DESCRIPTION OF WORK PAGE 1 SECTION 01 125 DESCRIPTION OF WORK PART 1 - GENERAL 1.1 A. B. INTRODUCTION Exterior building repairs of the following existing Project: 1. Name: Evergreen Villas Condominiums Buildings A-I 2. Address: 12004 Slater Ave NE, Kirkland, WA 9898034 3. Number of Buildings: 11 Residential Buildings 4. Existing Construction: All buildings have combination flat roofs with single layer torchdown membrane over protection board, ½” plywood, and 2” x 10” wood framing (TYP). Asphalt shingle sloped roofs at attics around perimeter. Buildings are clad in fiber cement panel and lap siding with vinyl framed windows. Owner carports are flat roofs with single layer torch-down membrane over plywood, wood roof framing system and steel nd posts. Individual storage shed are located at the back of each carport. 2 floor unit entries have wood stringer stair systems with wood treads and wood railings tied into a wood framed deck system with liquid applied membrane. Buildings are post-and-beam over concrete foundations. Condominium Repair General Notes: Washington State’s RCW 64.55 for condominium rehabilitation applies to this project. These contract documents do not contain an “as built record” nor do they detail the existing conditions. The General Contractor is responsible for reviewing all existing conditions. These preliminary documents provide anticipated weatherization details and processes one could infer from visual investigations of existing conditions. During the course of demolition and construction, additional details and quantities will be provided to facilitate appropriate repairs of conditions not described herein. Contractor is required to submit RFI’s for unforeseen conditions which necessitate additional services. If additional work is deemed necessary by the project team, the contractor shall submit cost proposal to perform work within (10) days. This project shall require a collaborative team approach to be successful. Regular project meetings, along with frequent site visits by the HOA representatives, Construction Manager, and Architect shall be critical to maintaining open lines of communication for quickly resolving decisions needed during the construction processes. 1.2 A. SCOPE OF WORK General Requirements: 1. Provide temporary security and weather protection when not actively working. 2. Per all applicable local, state and federal guidelines, conduct asbestos and lead paint testing to a sampling of residential building roofs, all-wood stair systems and carport structures. The inspector shall be a certified AHERA inspector. By Owner- not in contract. 3. Contractor shall provide on-site supervision, temporary facilities, and coordination with Owner with respect to parking, staging etc. Contractor responsible for producing and submitting any demolition site plan the City of Kirkland may require. . J2 Building Consultants, Inc. | 19730 64th Ave W, Ste 201 | Lynnwood, WA 98037 | 425.774.5600 | www.J2Consultants.com EVERGREEN VILLA - TARGETED REPAIRS KIRKLAND, WASHINGTON J2 #03384 (02/13/2015 - BID SET) 4. B. SECTION 01 125 DESCRIPTION OF WORK PAGE 2 Contractor shall provide access to all occupied units during construction or will provide alternate means of access during the course of work. Carports: The existing carports will be bid as two different systems; one system with two options. As follows; # I. Existing Carports to be restored: 1. Bid to restore existing carport systems. Includes removing and disposal of existing singlelayer asphaltic membrane. Removal of 100% of ½” plywood sheathing. Assume removal and replacement of 20% of all roof joists within carport assemblies due to water intrusion damage. 2. Detach and dispose of all current electrical wiring and fixtures (carport and storage units.) 40 Carport overhead lights, 20 exterior carport flood lights and 88 storage unit lights. Replace with new wiring- installed within conduit throughout, and energy efficient CFL or LED fixtures. Assume allowance for shed lights at $10/unit- can be simple pull chain design (See Leviton Model # R50-08827-CW4- Home Depot with R50-12200-00W white bulb guard and Ecosmart 14 Watt CFL bulb.) Carport fascia floodlighting: assume fixture allowance of $160/ea. Carport overhead lighting: assume fixture allowance of $120/ea. Refer to section ‘K.’ 3. Perform framing repairs and installation of new ½” plywood roof sheathing. Install selfadhered slip sheet, Install ½” Dens Deck over entire surface. Install 60 mil PVC membrane. Color specified is Grey for low reflectivity on buildings. (Building ‘G” carport will require detachment from the adjacent building deck system. Carefully remove all flashing components and detach deck from building. Remove curb along south edge. Trim and cut back roof eave on south elevation.) Install new perimeter drip edge flashings. Install new thruwall scupper collector boxes and 6” K-line style gutters in factory finish. Install new 3” round downspouts to tight lines at grade. Furnish tight line cap adapters for new downspout. 4. Install joist blocking between joist members. 5. Prep and paint all surfaces previously painted. Rebuild wing walls like-kind for new surfacemounted AP Florence Configurable 4C system mailbox units. See attached cut sheets. 6. Remove and replace all sheds. Assume 5’x6’ back-to-back and single shed dimension with new steel exterior end door and low-slope roof. To be painted. Door cladding and trim to remain similar to original design. Paint exterior of shed one color. Install one keyed entry lock. Install electrical from carport framing to each shed for interior lighting. Assume anchoring of sheds necessary to slab. Contractor to utilize Monroe Shed Depot.(Contact Monroe Shed Depot- Mark Dreyer @ 425-210-9036). #2 Demo original carport and replace with new pre-fabricated structures (Add Alternates 1 & 2: 1. Completely dismantle and remove existing carport structures including storage units. See notes on Building G carport above (D.1.3). 2. Install new Carports of Washington steel flat or gable metal roof system. Match existing 8 stall dimensions (minus ‘A’ building stall of 6 + 2). Total of stalls = 88. System to cover existing foot print, stall depth at 24’ 0” and width of 9’ 0”. Add/Alt in bid package to price flat or gable separately. 3. Install carport structures with the following design criteria: 25# Snow Load, 85 mph/ exp. ‘B’ wind load. 4. 7’6” clearance height minimum. Gable end total height 8’9”, Flat roof total height 8’6”. . J2 Building Consultants, Inc. | 19730 64th Ave W, Ste 201 | Lynnwood, WA 98037 | 425.774.5600 | www.J2Consultants.com EVERGREEN VILLA - TARGETED REPAIRS KIRKLAND, WASHINGTON J2 #03384 (02/13/2015 - BID SET) SECTION 01 125 DESCRIPTION OF WORK PAGE 3 5. All engineering to be provided by vendor/manufacturer. Engineering to be submitted for permit by vendor or general contractor. Include permit in Add/Alt pricing. 6. Structural tube steel posts with wide flange beams, shop primed and field finished after primary construction. Provide standard colors for Association selection. 7. Roof deck to be pre-finished, 26 gauge steel. 8. For flat roof-style carports, vendor to provide gutters to match finish. Tie into existing tight lines at grade. On gable-style carports, contractor will need to provide gutters to tie into tight lines at grade. Contractor to consult with vendor on attachment of pre-finished gutters to gable-style carports. 9. Replace all electrical and light fixtures with new throughout carport at underside and perimeters. (See Section ‘K’) 10. CWI will be the engineering firm supplying structural engineered drawings and calculations specific to this project per Carports of Washington. 11.Contractor/vendor to contact Utilities Underground Notification Center at least 48 hours prior to performing digging at all carport locations. 12. Contractor to patch original post locations in concrete as necessary. Perform concrete cutting for footings. Perform auguring as necessary for new footers as specified by engineer. 13. Contractor or vendor required to remove dig spoils and concrete from site and dispose of properly. 14. Contractor to request vendor’s/ manufacturers specifications for installation requirements to accurately price. Contact Candy Ford at Carports of Washington: 253-897-1202. Request Proposals #82932 (Gable) and #82933 (Flat). 15. Contractor to assume all carports will be replaced as one project. 16. Contractor to include price of permit(s) for work in bid price. 17. Contractor to install wood framed wing walls at same locations as original carports to mount mailbox clusters. Contractor to include $1200 allowance each location for installation of framed wall system. 18. Remove and replace all sheds. Assume 5’x6’ back-to-back and single shed dimension with new steel exterior end door and low-slope roof. To be painted. Door cladding and trim to remain similar to original design. Paint exterior of shed one color. Install one keyed entry lock. Install electrical from carport framing to each shed for interior lighting. Assume anchoring of sheds necessary to slab. Contractor to utilize Monroe Shed Depot.(Contact Monroe Shed Depot- Mark Dreyer @ 425-210-9036). E. Unit Elevated Entries and Decks: All existing deck and stair railings detached and disposed of. 1. Remove and replace all perimeter drip metals on decks. Patch top-mount deck railing flange holes as needed. Perform deck waterproofing basecoat along perimeters and integrate whole system deck coatings. Utilize BASF Conipur system. 2. Clean underside of deck system with Mold-clean solution and treat with Bora-Care or similar solution to prevent further organic growth. 3. Install all new face-mounted picket railings on all unit and entry decks. Hand rails to be bisque/tan color with white pickets and posts (to match limited existing rails (see Units A5 & B6) Railing contractor responsible for engineering to block and thru-bolt per code. Manufacturer: DuraRail Contact: Matt at Zero Deck NW at 1-800-895-5900. 4. Provide Add Alternate ‘B’ pricing for installation of swing-gates at top of unit entry stairs (to match picket-style railings.) . J2 Building Consultants, Inc. | 19730 64th Ave W, Ste 201 | Lynnwood, WA 98037 | 425.774.5600 | www.J2Consultants.com EVERGREEN VILLA - TARGETED REPAIRS KIRKLAND, WASHINGTON J2 #03384 (02/13/2015 - BID SET) SECTION 01 125 DESCRIPTION OF WORK PAGE 4 5. Provide Add Alternate ‘C’ pricing for addition of gutter along length of deck (not at ends) to collect drainage. Add one downspout at end of gutter with splash block. Gutters and downspouts to match profile and color of roof gutters and downspouts. Add flashing assembly to tuck under original deck drip edge and lap over rear vertical leg of gutter interior. This can be further discussed during bid walk for owner intent. No design or details provided or approved as of yet. 6. Clean, prep, prime and paint deck exposed fascias/beam and all 4x4 deck support posts. F. Replace elevated unit stair systems: Replace all but 6 entry stair systems (A5, B6, C6, E8, K5 & K8 with new, engineered-type stair system. Include new face-mounted metal picket railings at all entry stair systems. Treads to be concrete aggregate- match the 6 new stair systems. Correct mid-span post assemblies per engineer’s detail (to match) at C6, E8, K5 and K8 units. Install new face-mounted picket railing system, integrated with entry deck railings at all decks (detach and save existing “newer” metal railing system at stairs/decks for re-use by the Association.) G. Replacement of sixteen (16) deck support posts: Replace four (4) 4x4 deck posts with new PT. Construction Manager will verify locations. (Contractor to provide allowance.) H. Power wash all eleven (11) building elevations from grade to rooftop: Remove debris, algae buildup, moss and grime from all building elevations on site at completion of primary construction work. I. Prep and paint. All eleven buildings- Prep and paint window exterior trims. Prep and paint bottom 2 courses of siding around attics on low-slope building roofs (from separate re-roofing project.) Prep and paint trim boards. Match color like-kind. J. New Mailbox Clusters: Install 5 clusters of 16 mailboxes (with 2 parcel boxes each) and 1 cluster of 8 mailboxes with 1 parcel box (building ‘I’). Utilize AF Florence Mailbox system. Install vertical mount system at existing wing walls if existing carports are restored. Install to concrete carport slab on pedestal mount if new carports selected. Pedestal boxes to be installed at existing location, covered by carport roof. K. Renovation to existing electrical: Electrical includes grounds, unit exterior lights and carport lighting. • Post Lights: Qty. 22. Demo/removal of old post light and install new base and fixture (LED suggested.) 17 lights exist- Add up to 5 new post lights at additional locations for improved entry/pathway lighting. Provide fixture allowance for Association of $300/unit. • Pathway Light:. Qty. 16. Demo/removal of existing pathway light and install new base and fixture (LED suggested.) Provide fixture allowance for Association of $150/unit. • Carport Lighting: Qty. 40. Demo/removal of existing carport lighting (this applies to either renovation of existing carports or replacement with new), electrical wiring and conduit and install new fixture (CFL or LED suggested.) Provide fixture allowance for Association of $80/unit. Refer also to Section ‘D’. • Carport Flood Lights: Qty 20. Demo/removal of existing carport flood lights and install new fixtures (LED suggested.) Provide fixture allowance for Association of $150/unit. Refer also to Section ‘D’. . J2 Building Consultants, Inc. | 19730 64th Ave W, Ste 201 | Lynnwood, WA 98037 | 425.774.5600 | www.J2Consultants.com EVERGREEN VILLA - TARGETED REPAIRS KIRKLAND, WASHINGTON J2 #03384 (02/13/2015 - BID SET) SECTION 01 125 DESCRIPTION OF WORK PAGE 5 • Unit Entry Lights: Qty 88. Demo/removal of existing entry light and install new fixture (LED suggested.) Provide fixture allowance for Association of $100/unit. • Unit Porch/Deck Lights: Qty. 88. Demo/removal of existing Porch/Deck lights and install new fixture (LED suggested.) Provide fixture allowance for Association of $100/unit. • Electrical Allowance: Provide allowance of $3500 for miscellaneous electrical work, including encasing and re-burying exposed electrical lines in landscape. PART 2 - PRODUCTS – SEE APPENDIX A PART 3 - EXECUTION - NOT APPLICABLE END OF SECTION . J2 Building Consultants, Inc. | 19730 64th Ave W, Ste 201 | Lynnwood, WA 98037 | 425.774.5600 | www.J2Consultants.com