Appendix 7 Proposed amendments to section VI of part F (25KB, PDF)

advertisement
Appendix 7: proposed amendments to section VI of
part F
3.
Transpower to make interconnection branches and other assets
available and keep grid configuration
Style Definition: Legal 3a:
Indent: Left: 63.35 pt,
Hanging: 43.3 pt, Tabs: 100
pt, Left + Not at 90 pt
Style Definition: Legal 1a
Formatted: Font: 16 pt
Formatted: Normal
Formatted: Font: 16 pt
3.1
From 1 April 2008, Transpower must make each interconnection
circuit branch, interconnection transformer branch, the HVDC
link, and each shunt asset identified in the schedule added to this
section in accordance with rule 2.9 available for use by the system
operator for the conveyance of electricity:
Formatted: Font: 11 pt
Formatted: Paragraph,
Indent: Left: 64.35 pt
…
3.2
Formatted: Font: 11 pt
From 1 April 2008, Transpower must keep the grid in the
configuration set out in the diagram included in the schedule added to
this section in accordance with rule 2.9.
…
4.
Exceptions to rule 3
4.1
Transpower is not required to comply with rule 3.1.1 or rule 3.2 if:
Formatted: Font: 11 pt
4.1.1
permitted under the Outage Protocol made under section VII;
4.1.2
at any time on or after 28 June 2007:
4.1.2.1 an interconnection asset that forms part of an
interconnection branch or the HVDC link, or a shunt
asset, is permanently removed from service, or the
grid is reconfigured, and either:
Formatted: Font: 11 pt
Formatted: Paragraph,
Indent: Left: 106.65 pt,
Hanging: 35.1 pt
(a)
if the removal of that asset from service or the
reconfiguration of the grid is carried out before
1 April 2008, the removal or reconfiguration is
in accordance with demonstrably prudent
economic criteria including, without limitation,
maintaining the health and safety of any person
and the safety and integrity of equipment; or
Formatted: Indent: Left:
141.75 pt, Hanging: 31.65 pt
(b)
if the removal of that asset from service or
reconfiguration of the grid is carried out after 1
April 2008, the removal or reconfiguration is
carried out in accordance with rule 8;
Formatted: Indent: Left:
141.75 pt, Hanging: 31.65 pt,
Tabs: 95 pt, Left
Formatted: Font: Bold
Formatted: Font: Bold
Formatted: Font: 11 pt
4.1.2.2 a modification to an interconnection branch, the
HVDC link, a shunt asset or to the configuration of
the grid, has been made as a result of a reliability
investment or an economic investment;
Formatted: Paragraph,
Indent: Left: 106.65 pt,
Hanging: 35.1 pt
Deleted: 3
4.2
4.1.2.3 a modification to an interconnection branch, the
HVDC link, a shunt asset or to the configuration of
the grid has been made as a result of an investment
made under an investment contract entered into in
accordance with rule 8 of section III;
Deleted: 4
4.1.2.4 the voltage range specified in the AOPOs for an
interconnection asset that forms part of an
interconnection branch is modified, or any
equivalence arrangement is approved or
dispensation is granted under rule 7 of section III of
Part C in respect of such an asset; or
Deleted: 5
4.1.2.5 Transpower and a designated transmission
customer have agreed otherwise in accordance with
rule 11.
Deleted: 6
Where rules 4.1.2.2, 4.1.2.3, or 4.1.2.4 or 4.1.2.5 apply, or the grid is
reconfigured under rule 4.1.2.1, Transpower must:
Formatted: Font: 11 pt, Not
Bold
Formatted: Font: 11 pt
Deleted: 4.1.3, 4.1.4,
Formatted: Font: 11 pt
Formatted: Font: 11 pt
Formatted: Font: 11 pt
...
Formatted: Font: 11 pt
8.
Permanent removal of interconnection assets from service
Formatted: Font: 11 pt
Deleted:
8.1
8.2
From 1 April 2008, Transpower may only permanently remove
interconnection assets from service or reconfigure the grid for the
purposes of rule 4.1.2.1 if removal of the asset or the reconfiguration
results in a net benefit, as calculated under the test set out in rule 8.2.
Formatted: Font: 11 pt
The test that Transpower must apply under rules 4.1.2.1 and 8.1
involves:
Formatted: Font: 11 pt, Bold
Formatted: Font: 11 pt, Not
Bold
Formatted: Font: 11 pt
Formatted: Font: 11 pt
Formatted: Font: 11 pt
Formatted: Font: 11 pt
…
Deleted: Reporting on
10.9
Updating of availability and reliability index measures
…
10.9.1.1
are modified or replaced as permitted under
rule 4.1.2; or
…
Formatted: Font: 11 pt
Formatted: Paragraph,
Indent: Left: 106.65 pt,
Hanging: 63.45 pt
Formatted: Font: 11 pt
Formatted: Font: 12 pt
Note: Need to amend Minister’s Gazette notice of 31 May 2007 to bring rule
8 into force at the same time as the changes above.
488874-1
Formatted: Font: 11 pt
Formatted: Paragraph, Left,
Indent: Left: 28.35 pt
Download