Supporting Documents

advertisement
KING GEORGE’S GATE
KINGSTON ROAD, TOLWORTH
MEP SERVICES REPORT
MARCH 2015
Submitted to
Spenhill Developments Limited
Submitted by
AECOM
Unit 3A Clifton Court
Cambridge
CB1 7BN
MEP Services Report
Site: King George’s Gate, Kingston
Road, Tolworth
Produced for: Spenhill Developments
Limited
Produced by: Building Services Team,
AECOM, Unit 3A Clifton Court,
Cambridge, CB1 7BN
Date: 27th February 2015
Building & Places
Prepared by:
.......................................................
Neil Wylde
Senior Electrical Engineer
Approved by:
.......................................................
Paul Stannard
Regional Director
Rev No
1
2
King George’s Gate, Kingston Road, Tolworth
Checked by:
Comments
First Issue – Draft for comment
Issued for planning
..................................................................
Anthony Bailey
Senior Mechanical Engineer
Checked
by
AB
AB
Approved
by
PS
PS
Date
10/02/2015
27/02/2015
AECOM, Unit 3A Clifton Court, Cambridge, CB1 7BN
Telephone: 01223 275 730 Website: http://www.aecom.com
47071786
King George’s Gate, Kingston Road, Tolworth
February 2015
This document has been prepared by AECOM Limited for the sole use of our client (the “Client”) and in accordance
with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between
AECOM Limited and the Client. Any information provided by third parties and referred to herein has not been
checked or verified by AECOM Limited, unless otherwise expressly stated in the document. No third party may rely
upon this document without the prior and express written agreement of AECOM Limited.
Building & Places
TABLE OF CONTENTS
King George’s Gate, Kingston Road, Tolworth
1
DESIGN CRITERIA ........................................................... 3
1.1
External Design Conditions ............................................ 3
1.2
Internal Design Conditions ............................................. 3
1.3
Ventilation rates/Outside Air Provision ......................... 3
1.4
Noise Criteria .................................................................... 3
1.5
Internal Lighting ............................................................... 3
1.6
Emergency Lighting ........................................................ 4
1.7
Fire Alarm Installations ................................................... 4
1.8
Earthing and Bonding ..................................................... 4
1.9
Lightning Protection ........................................................ 4
1.10
Public Health Services .................................................... 4
1.11
Metering ............................................................................ 5
1.12
Building Environmental Performance ........................... 5
1.13
Code for Sustainable Homes .......................................... 5
1.14
BREEAM ........................................................................... 7
2
DESCRIPTION OF BUILDING SERVICES....................... 8
2.1
General .............................................................................. 8
2.1.1
Access & Maintenance .................................................... 8
2.1.2
Lifts.................................................................................... 8
2.2
Statutory Supplies and Services Provision .................. 8
2.2.1
Electrical Supplies ........................................................... 8
2.2.2
Gas Supplies .................................................................... 9
2.2.3
Water Services ................................................................. 9
2.2.4
Telecommunication Service Provider Connections..... 9
2.3
Mechanical Services ...................................................... 11
2.3.1
Ventilation ....................................................................... 11
2.3.2
Lift Shaft Ventilation ...................................................... 11
2.3.3
Lift Lobby Ventilation .................................................... 11
2.3.4
Refuse Room Extract..................................................... 11
2.3.5
Stairwell & Lobby Ventilation ....................................... 11
2.3.6
Heat Exchanger Plant Room Ventilation ..................... 11
2.3.7
Smoke Ventilation .......................................................... 11
2.3.8
Car Park Ventilation ....................................................... 11
2.3.9
LTHW/Local Heating Units ............................................ 11
2.3.10
Heating ............................................................................ 12
2.3.11
Control and Monitoring ................................................. 12
MEP SERVICES REPORT
February 2015
1
Building & Places
King George’s Gate, Kingston Road, Tolworth
2.4
Electrical Services ......................................................... 14
2.4.1
Electrical Supplies ......................................................... 14
2.4.2
Metering .......................................................................... 14
2.4.3
LV Distribution ............................................................... 15
2.4.4
External Lighting............................................................ 15
2.4.5
Telecommunications ..................................................... 16
2.4.6
Lightning Protection ...................................................... 17
2.4.7
Door Entry Telephone ................................................... 17
2.4.8
Security / CCTV .............................................................. 17
2.4.9
Fire Alarms and Smoke Detection Unit Systems ....... 17
2.4.10
Television & Radio Distribution ................................... 17
2.4.11
Lighting ........................................................................... 18
2.4.12
Emergency Lighting ...................................................... 19
2.4.13
General Power ................................................................ 19
2.4.14
Access Control and Security. ....................................... 20
2.4.15
Earthing and Bonding. .................................................. 20
2.5
Public Health Services .................................................. 21
2.5.1
Incoming Water Supplies .............................................. 21
2.5.2
Internal Building Drainage Systems ............................ 21
2.5.3
Above Ground Sanitation Systems.............................. 21
2.5.4
Above Ground Rainwater Systems .............................. 22
2.5.5
Domestic Potable Cold Water Distribution ................. 23
2.5.6
Hot Water Generation and Distribution ....................... 23
3
APARTMENT SERVICES OUTLINE SPECIFICATION . 24
3.1
Internal Services Distribution ....................................... 24
3.2
Bathrooms ...................................................................... 25
3.3
Ventilation System ......................................................... 25
3.4
Electrical Systems ......................................................... 25
3.5
Security Systems ........................................................... 26
3.6
Television and Data Systems ....................................... 27
3.7
Typical MEP Service Cupboard .................................... 27
4
5
SITEWIDE DISTRIBUTION SERVICES.......................... 29
SAMPLE ENERGY CENTRE ARRANGEMENT ............ 30
MEP SERVICES REPORT
February 2015
2
Building & Places
1 DESIGN
King George’s Gate, Kingston Road, Tolworth
CRITERIA
The design of the mechanical and electrical services shall be based upon the following design
criteria. Each of the identified criteria is in accordance with current good practice design and as
recommended by CIBSE, IEE, Building Regulations and British Standards.
1.1
External Design Conditions
Summer:
For general summer design:
29°C dry bulb/20°C wet bulb
Winter Design:
For sizing heating:
- 5°C/100% RH
For sizing protective installations:
-15°C/100% RH
(Where required e.g. trace heating, etc)
1.2
Internal Design Conditions
The internal design conditions identified below are target figures only and are subject to further
detailed design and client approval.
Residential
Summer:
Winter:
1.3
In accordance with Part L and CIBSE requirements
20± 2°C
No Humidity Control
Ventilation rates/Outside Air Provision
As detailed by governing Approved Document Part F of the Building Regulations with any additional
ventilation dictated by Criterion 3, Part L AD1A.
1.4
Noise Criteria
External Noise Criteria still to be established (Noise assessments and local authority requirements)
It is anticipated that the internal noise criteria background noise levels generated by the building
services installation for various areas will be as per CIBSE recommendations as listed below:
Residential:
1.5
NR 25-30
Internal Lighting
The lighting system will be designed and installed to provide the average maintained illuminance
levels as detailed in the CIBSE Lighting Guides. The complete lighting installation will comply with
the requirements set out in the CIBSE lighting design guidelines, with special regard to the Local
Council Technical Policy Statements.
MEP SERVICES REPORT
February 2015
3
Building & Places
1.6
King George’s Gate, Kingston Road, Tolworth
Emergency Lighting
The emergency lighting installation will be designed in compliance with BSEN 1838, (BS 5266) and
any Local Council Technical Policy Statements.
1.7
Fire Alarm Installations
The fire alarm system will comply with the requirements of BS 5839. The design and final installation
of the proposed fire alarm system will require approval from the Building Control Officer / Approved
Inspector Services.
1.8
Earthing and Bonding
A complete system of earthing and bonding arrangement will be designed to comply with BS 7671.
1.9
Lightning Protection
A lightning protection system will be required to serve the buildings. The complete installation will
include for the bonding of all new roof mounted plant as required to meet the requirements of BS
6651
1.10
Public Health Services
System
Design Criteria
Foul and surface water drainage
BS EN 12056 and BS EN 752
Foul water flows based on discharge unit method of
calculation.
Maximum hydraulic depth of flow 0.75
Velocity of flow 0.75 to 1.2m/sec
Rainwater Drainage
BS EN 12056 Part 3 Design by Contractor
Incoming domestic cold water
Sized to replenish volume of cold water storage tanks in a 3
supplies
hour period with a maximum velocity of flow of 1.5m/sec.
Residential Domestic Cold Water
Storage tank provided for ½ days supply. Based on 50% of
Storage
the recommended cold water storage figures identified in the
IOP Guidelines for dwellings:
1 Bed 210 litres per bed
2 Bed 130 litres per bed
3+ Bed 100 litres per bed
Hot and Cold Water Pipework
Distribution
BS8558:2011 and the IOP loading unit method. Maximum
velocity of flow restricted to 1.5m/sec for Hot & 2.0m/sec for
Cold within dwellings.
Above Ground Sanitation
BS EN 12056 Part 2 System 1 based on a frequency factor of
0.5 for dwellings
MEP SERVICES REPORT
February 2015
4
Building & Places
1.11
King George’s Gate, Kingston Road, Tolworth
Metering
In order to comply with the current Building Regulations (Part L), secondary meters will be installed
as required where the rated input power is significant.
Electrical meters for all apartments will located within the risers of each core.
It is proposed that each apartment shall be heated via a HIU connected to the LTHW communal
heating system. Each apartment complete with a digital pulsed output heat meter for recording
energy usage. All HIU meters shall be linked to a central system which shall enable meter data to be
collected from a central point. An energy display device is to be provided in compliance with CfSH.
Thames Water metering of supplies to Residences and Landlord areas will be provided downstream
from the buildings domestic cold water storage tank and booster pump set.
Refer to section 2.2.2 detailing natural gas metering and distribution.
1.12
Building Environmental Performance
It is intended to design the M&E services such that the building will achieve good CO2 emission per
m² per annum as classified by the Energy Efficiency Office of the Department of Environment and
the Chartered Institute of Building Services Engineers.
This will also include compliance with the criteria as set with the Local Council Policy Statement.
Detailed Energy calculations as required will be undertaken at Stage E. A preliminary energy report
is issued under separate cover from this report.
The design of the mechanical and electrical services will be considered accordingly in order to
reduce CO2 emissions in line with the requirements of the Building Regulations
1.13
Code for Sustainable Homes
The residential areas of the development are to be assessed under the Code for sustainable Homes
criteria and the following credits are to be targeted with regards to the MEP Service Design:
Ene3 – Display Devices
Each dwelling shall be provided with an energy display device to be compliant with CfSH. The meter
shall be capable of displaying information relating to electricity, heat energy and water usage. The
following information must be displayed:
• Local time
• Current mains energy consumption (kilowatts and kilowatt hours)
• Current emissions (g/kg CO2)
• Current tariff
• Current cost (in pounds and pence). For pre-payment customers this should be ‘real time’
data and for ‘credit’ paying customers cost should be displayed on a monthly basis
• Display accurate account balance information (amount in credit or debit)
• Visual presentation of data (i.e. non-numeric) to allow consumers to easily identify high and
low level of usage
• Historical consumption data so that consumers can compare their current and previous
usage in a meaningful way. This should include cumulative consumption data in any of the
following forms day/week/month/billing period.
MEP SERVICES REPORT
February 2015
5
Building & Places
King George’s Gate, Kingston Road, Tolworth
Typical Energy Display Device
Ene4 – Drying Lines
The ventilation rates specified are in accordance with Approved Document Part F and the CIBSE
recommendations. Where whole house continuous extract ventilation is specified, the minimum high
rate of ventilation in the room used for clothes drying must be 13l/s i.e. equivalent to kitchens.
Ene6 – External Lighting
Energy efficient lighting will be specified and will be controlled by a time clock or daylight sensor for
all communal lobbies, main external entrances, internal entrance porches and any external steps
and pathways associated with the apartment blocks. The lighting should be controlled by push button
time switches or PIR sensor for all hallways, landings, stairwells and internal corridors.
Where security lighting is provided, this should meet the following requirements: a maximum wattage
of 150 W; movement detecting control devices (PIR); and daylight cut-off sensors.
Ene9 – Home Office
Two double power sockets and a telephone point to be located within the suitable office space for
each dwelling.
Wat 1 – sanitary ware
The sanitary ware will be specified to achieve a functional 105 liters per person per day. An example
of one of the options for achieving this is:
• - Basin tap 4 litres/minute
• - Kitchen tap 6 litres/minute
• - Shower 8 litres/minute
• - Bath 195 litre capacity
• - WC 5 full and 3 part flush
• - Dishwasher 1.25 litres/place setting
• - Washing Machine 8.17 litres/kilogram
Total Water Consumption = 104.8 litres per person per day
The SWMP procedures that must be met are:
• • Re-use on site (in situ or for new applications);
• • Re-use on other sites;
• • Salvage/reclaim for re-use;
• • Return to the supplier via a ‘take-back’ scheme;
• • Recovery and recycling using an approved waste management contractor; or
• • Compost according to the defined waste groups (in line with the waste streams generated
by the scope of the works).
MEP SERVICES REPORT
February 2015
6
Building & Places
King George’s Gate, Kingston Road, Tolworth
Pol 2 Nox emissions
The average NOx emissions of the main heating systems will be less than 40 mg/kWh.
1.14
BREEAM
The commercial areas of the development are to be assessed under the BREEAM criteria and the
following credits are to be targeted with regards to the MEP Service Design:
Ene 3
All external lighting to have either an automatic time switch or daylight sensors, as well as presence
detectors in areas of intermittent pedestrian traffic, and that the average initial luminous efficacy of
external fittings will not be less than 60 lumens per circuit watt.
Wat 1
A mains water meter with a pulsed output will be install on the mains water supply to each unit.
Wat 3
Water Leak Detection System
A water leak detection system will be installed on the mains water supply between the unit and the
utilities water meter.
Pol 4
All external lighting will be:
• Compliant with ILP guidance (Table 2 Guidance for the Reduction of Obtrusive Light 2011);
• Able to be automatically turned off between 23:00 and 07:00 (except for safety and security
lighting); and
• Comply with lower levels of ILP Table 2 Guidance between 23:00 and 07:00 (safety and
security lighting only).
Additional items for the gym only:
Hea 1
Specification of applicable equipment fitted will be:
• All fluorescent and compact fluorescent lighting will be fitted with high frequency ballasts;
• All external lighting will comply with British Standards BS 5489-1:2013 & BS EN 124642:2014;
• All internal lighting will comply with SLL Code for Lighting 2012;
• All internal areas with computers will comply with SLL Lighting Guide 7; and
• All rooms will be appropriately zoned and have occupant controlled lighting.
Hea 4
A Temperature Control Strategy will be provided for the gym, which will address issues such as
zoning and occupant control, to be incorporated at a later stage and implimented.
Ene 2
Pulsed energy sub-meters will be installed to account for 90% of the unit’s annual consumption for
each fuel type, and for all relevant function areas.
Wat 1
All water fixtures within the gym will be specified so that they achieve a 40% improvement over the
BREEAM baseline.
Wat 3
Flow control devices will be installed within each WC area.
MEP SERVICES REPORT
February 2015
7
Building & Places
2 DESCRIPTION
King George’s Gate, Kingston Road, Tolworth
OF BUILDING SERVICES
2.1
General
2.1.1
Access & Maintenance
The access & maintenance requirements of the engineering services have been considered during
the outline scheme stage. This includes the legal requirements of modern design and construction,
good practice design methods and plant replacement strategies.
Risk assessments for any residual hazards will be completed as part of the final scheme design.
Major plant replacement access for the plant has been established in principle. Lifting equipment,
provided by a specialist lifting company, would be required for the removal of any large pieces of
equipment, due to the access available.
A preliminary Safety in Design Worksheet and Plant Replacement Schedule have been issued under
separate cover from this report.
2.1.2
Lifts
Full calculations will be completed in a later design stage to show the selected lifts perform within the
criteria set out within CIBSE Guide D for the relevant residential development.
However, being a residential scheme the waiting times and handling capacity measures are not
usually the key selection criteria but the physical size and shape of the lift cars to accommodate
large items of furniture, white goods, beds, cycles etc. Therefore within each core the favoured car is
usually a 13 person car option.
Generally, there is no adverse performance restriction in having a smaller lift size with a 630kg lift
performing within the CIBSE recommendations and also meeting any firefighting restrictions for
current or future fire fight lift requirements. The decision should purely be based on the preference of
whether a larger lift for ease of moving furniture is required.
2.2
Statutory Supplies and Services Provision
2.2.1
Electrical Supplies
Liaison with UK Power Networks is ongoing regarding the new incoming supplies to the development
and any necessary diversion works required to create availability is ongoing.
It is anticipated that the electrical supplies for this phase shall be derived from the new site electrical
infrastructure.
UKPN have provided a budget estimate for the development and indicated the capacity is, at the
time of writing this report, available.
The commercial units are to be provided with a dedicated electrical service to each with the meters
anticipated as being located within each unit. Local meter enclosures will be incorporated within the
architectural designs in full approval of UKPN. This will be verified and incorporated during the next
design stage.
MEP SERVICES REPORT
February 2015
8
Building & Places
King George’s Gate, Kingston Road, Tolworth
Individual houses are to be provided with a dedicated electrical service to each with the meters
anticipated as being located within property. Local meter enclosures will be incorporated within the
architectural designs in full approval of UKPN. This will be verified and incorporated during the next
design stage.
2.2.2
Gas Supplies
A new gas service is proposed to provide a supply to the energy centre. The meter for this service is
located at ground level with gas pipework being extended from this location to the energy centre.
From the meter room welded or screwed steel pipe work shall be distributed to serve the gas fired
boiler and CHP systems.
The commercial units, are to be provided with a dedicated gas service to each with the gas meters
anticipated being located within each unit (subject to confirmation from the gas authority which is
presently awaited). Local meter enclosures will be incorporated within the architectural designs in
full approval of the gas authority. This will be verified and incorporated during the next design stage.
No residential apartments for this development are to be provided with gas services. All apartments
are to be provided with electric cooking facility only and heating and hot water via the central energy
centre.
Houses, are to be provided with a dedicated gas service to each with the gas meters anticipated
being located within each unit. Local meter enclosures will be incorporated within the architectural
designs in full approval of the gas authority. This will be verified and incorporated during the next
design stage.
2.2.3
Water Services
Each apartment unit will be provided with a mains pulse metered cold water supply meter by TWU.
These supplies will be derived from the main incoming water service and subsequently distributed.
All works for TWU supplies shall be agreed and approved by TWU prior to installation. All
installations and locations of water meters may/ will be subject to inspection by TWU prior to “on”
date. The water supply pipe size will be based upon the apartment architectural layouts complete
with additional landlord supplies, where required.
The designer shall make an allowance for a Water Conditioning unit on the main serving the
buildings, Water Hardness for the site shall be checked by the design team prior to any of the design
work of the water system being carried out. Also UV Filtration or Chlorine Dioxide should be taken
into account as part of the water services design to provide some form of Legionella control where
large cold water storage tanks or hot water systems are being provided.
2.2.4
Telecommunication Service Provider Connections
A provision of two ducts for BT, two for a cable distribution company and two for a future or unknown
communications provider will be allowed and space planned for.
Each of the ducts will run to the data / comms rooms or the dedicated risers for the future installation
of telecommunications cabling. The ducts shall conform to the specific requirements of the
telecommunications companies with regards to construction and installation.
Draw wires are to be installed as necessary and ensure the ends of the ducts are adequately
weatherproofed at the time of the installation. Draw pits will be provided where necessary for the
installation of the telecommunication services.
MEP SERVICES REPORT
February 2015
9
Building & Places
King George’s Gate, Kingston Road, Tolworth
The commercial units are to be provided with a dedicated comms connection located within each
unit. This will be verified and incorporated during the next design stage.
Individual houses are to be provided with a dedicated comms connection to each. This will be
verified and incorporated during the next design stage.
MEP SERVICES REPORT
February 2015
10
Building & Places
2.3
Mechanical Services
2.3.1
Ventilation
2.3.2
Lift Shaft Ventilation
King George’s Gate, Kingston Road, Tolworth
At the head of each lift shaft, passive ventilation shall be provided in the form of a roof cowl or to
natural ventilation ducts to external wall to meet the requirements of the lift manufacturer.
2.3.3
Lift Lobby Ventilation
The lift lobbies to be ventilated, as required, in accordance with the guidance provided in Building
Regulations (Approved Document B). Please also refer to the Fire Engineers report.
2.3.4
Refuse Room Extract
The Refuse Room shall be provided with a mechanical extract ventilation system. Extract ductwork
shall be routed from the Refuse Room to louvres on the external façade.
2.3.5
Stairwell & Lobby Ventilation
The staircases and main core lobbies shall be ventilated via the smoke extract system featuring an
adiabatic cooler to ensure that summertime temperature conditions do not exceed those
recommended in the relevant section of the CIBSE Guide. ‘Stack’ ventilation would be achieved by
providing ‘Passive’ high and low level louvres, the mechanical smoke ventilation system shall also be
utilised to increase air changes through the mechanical risers and corridor ceiling voids to assist in
limiting the internal temperatures due to heat gains from the community heating network, especially
during the summer periods.
2.3.6
Heat Exchanger Plant Room Ventilation
An extract plant will provide ventilation to the Heat Exchanger plant room to assist in heat gain
dissipation, as required.
2.3.7
Smoke Ventilation
The residential cores and corridors shall be supplied with a mechanical smoke ventilation system as
detailed in the Fire Engineers report, under other cover. This system shall provide both emergency
ventilation for smoke exhaust and under normal conditions provide mechanical void and riser
ventilation to help minimise heat gain.
2.3.8
Car Park Ventilation
The underground car park will be ventilated via a central system consisting of a main extract duct, jet
fans through the car park with make-up air provided from the car park entrance.
The car park ventilation is controlled via combined CO2 sensors measuring the car park conditions
and increasing the ventilation rate to suit, and in the case of fire the car park ventilation is overridden
via smoke detection.
2.3.9
LTHW/Local Heating Units
The system will consist of the following:
MEP SERVICES REPORT
February 2015
11
Building & Places
•
•
•
•
•
•
•
2.3.10
King George’s Gate, Kingston Road, Tolworth
Primary distribution from the valved and capped connection(s), provided by others, to the
block(s) heat exchanger.
Secondary distribution circuits from heat exchanger plant room(s) to serve residential blocks.
All heating pipe work will be distributed from the plant room to the spaces via risers and
dedicated service voids.
Low Temperature Hot Water (LTHW) pipe work and associated accessories.
Final locations and quantity of take offs to be agreed during the design development stage.
All Low Temperature Hot Water (LTHW) pipe work to be of the pre-insulated type where
possible otherwise to traditionally installed steel pipework complete with agreed insulation
thicknesses.
Associated controls and interfaces.
Heating
The residential block(s) shall be heated via the site wide community heating system. This supply will
be metered on the primary side via the Primary control system and shall also to be sub-metered by
the heat interface unit to each residential unit. All heat meter data shall be buffered by the control
panel in the heat exchanger plant room and sent to a central collection station within the primary
energy centre. This information shall then be utilised by a third party for billing purposes.
Typical HIU
Houses shall be supplied with gas condensing boilers to fulfil heating and hot water loads.
2.3.11
Control and Monitoring
The BMS and control system will be designed to be as simple as possible consistent with providing
the required control and monitoring functions. The BMS shall also be configured to enable remote
billing for all heat customers and full fault diagnosis, interactive menu front end. This system is to be
complete with mimic/ monitoring stations as described within the aforementioned controls
specification.
Motor Control Centres in main plant rooms will be constructed to Form 2.
Control Strategy
The following systems will be controlled and monitored by the BMS:
•
•
•
Domestic hot water systems, as required
Ventilation to plant rooms
All Heat interfaces throughout the system
MEP SERVICES REPORT
February 2015
12
Building & Places
King George’s Gate, Kingston Road, Tolworth
The following systems will be monitored only by the BMS:
•
•
Mains water supply and distribution.
Leak Detection systems
MEP SERVICES REPORT
February 2015
13
Building & Places
2.4
Electrical Services
2.4.1
Electrical Supplies
King George’s Gate, Kingston Road, Tolworth
The Landlord will require electricity to be directly metered by the Regional Electricity Company so will
the individual apartments.
This requires that the electrical infrastructure will be in the responsibility of the Regional Electricity
Company and therefore full access will be provided for LV switchrooms housing REC meters
installed within each block. The apartment supplies will commence from the secondary side of the
meter point, for the final circuits from the consumer unit located within the unit.
In the services riser in each block, cabling will be installed which will be on the secondary side of the
REC meters and installed by the contractor, and so will be the responsibility of the
Landlord/owner/occupier.
Riser shafts will connect each floor back to the ground floor and incoming sub-station / electrical
distribution room.
2.4.2
Metering
All metering for the residential areas will be contained within the risers as below:
MEP SERVICES REPORT
February 2015
14
Building & Places
2.4.3
King George’s Gate, Kingston Road, Tolworth
LV Distribution
Performance Objectives
To provide a system of low voltage distribution within the areas comprising main switchgear, submain switchgear and local distribution boards giving four levels of security of supply.
Standard (Non-Essential) supplies.
Feeding those facilities, which, on loss of main electrical supply, are not critical to their operation.
Essential Supplies
Dual supplies may be provided for life safety systems as follows:Smoke Extract Systems
Car Park Smoke Ventilation
Firefighting Lifts
Sprinkler Pump sets
This shall be confirmed by the Fire Engineer and all cabling carried out to life safety systems shall be
carried out in fire resistant cabling.
Sub-main Distribution
The sub-main distribution will take the form of XLPE/SWA/LS0H multi core cables run from the main
switchboard, to distribution boards positioned in the plantrooms and electrical cupboards. From
these on-floor switchboards XLPE/SWA/LS0H multi core cables will be run to local distribution
boards.
Where an area / facility requires supplies of differing levels of integrity separate distribution boards
will be provided for each level of supply.
The distribution boards will generally be of the wall mounted distribution boards with MCCBs or
MCB’s providing protection to the outgoing circuits.
The local distribution boards will be either type “A” or “B” single or three phase as required, generally
having type ‘B’ and ‘C’ MCB’s providing protection to the outgoing circuits.
2.4.4
External Lighting
Lighting to any external walkways shall be provided to allow egress and access to the space with
emergency fittings installed as required by Building Control/ Approved Inspector Services.
Photocell operated contactor controlled final circuits from the external lighting landlords distribution
board shall control the external lighting. Photocells shall be provided for each of the elevations and
shall control those luminaires at that orientation.
The building feature lighting circuits shall be controlled by a time clock. The Contractor shall ensure
that the operation, positioning of luminaires and the hours of operation do not contravene any local
authority byelaws or regulations. Exact hours of operation shall be confirmed with the Client.
Where required, lighting to the roof areas of the building shall be controlled via local two way and
intermediate weatherproof switches. Test key switches for the emergency lighting circuits shall be
located within the building.
MEP SERVICES REPORT
February 2015
15
Building & Places
2.4.5
King George’s Gate, Kingston Road, Tolworth
Telecommunications
Incoming BT services will be terminated in a suitable location within the lowest level of each
block/riser location or in a dedicated Comms Room. From this position each basket tray is to be
installed within the services risers for wiring. Draw pits will be provided where necessary for the
installation of the telecommunication services.
A dedicated cable containment system in landlord risers will be installed for all data, telephony,
security and other extra low voltage cabling systems.
Landlord telecommunications wiring will be installed for lifts, BEMS services and other dial out
facilities. Lifts and REDCARE outlets will be provided with copper infrastructure so to maintain
function under loss of LV power to the development / service.
Subject to Client confirmation outlets will be located as follows:
• Living Room
• Bedrooms
• Service Cupboard – 1no Outlet (BT intake hub)
• The home office sockets (1No double) should be located in the lounge in studio and
one bedroom apartments, bedroom 2 in two bedroom apartments and bedroom 3 in
three bedroom apartments, or according to architects layouts.
Fibre will be provided to each individual dwelling where the fibre will terminate in an Openreach
Network Termination Box (ONT box). The ONT will contain the Customer Splice Point (CSP),
Backup Battery Unit (BBU) home wiring plate and customer provided router. A power supply is
required adjacent to the ONT box. It will be the responsibility of the tenant to obtain any necessary
subscriptions and router equipment.
Typical Openreach Network Termination Box
Fibre will enter each dwelling block in a dedicated riser and terminate in an Internal Splitter Node
(ISN). From the ISN fibres will be distributed to each individual dwelling in the block and will
terminate in the ONT box. A power supply is required adjacent to the ONT box. It will be the
responsibility of the tenant to obtain any necessary subscriptions and router equipment.
MEP SERVICES REPORT
February 2015
16
Building & Places
2.4.6
King George’s Gate, Kingston Road, Tolworth
Lightning Protection
A fully enclosing Lightning Protection system will be provided to protect each Block utilising the
building structure where possible.
2.4.7
Door Entry Telephone
A combined video door entry/porter telephone facility will be provided to each residential apartment.
Basket trays will be installed within the risers in each block to link the entry/exit points with each riser
adjacent to each apartment, i.e. conduits will be installed from each riser to each unit.
2.4.8
Security / CCTV
The landlord will provide an internal security system for the public areas of the residential blocks.
2.4.9
Fire Alarms and Smoke Detection Unit Systems
Each apartment will be provided with smoke detectors as required to meet the BS. These detectors
will be hard wired into the mains electrical supply. On actuation they will sound an evacuation signal
only in the apartment of origin of fire.
The remainder of the development will be provided with a fully addressable automatic fire detection
and alarm system to a minimum standard of L2 in accordance with BS 5839 Part 1, The system will
include detector devices and break glass call points on all escape route and vulnerable spaces.
The actuation of a common lobby detector will cause the smoke shaft vent in that lobby to open and
an audible and visual alarm to sound at the fire alarm control panel at the Management Office. No
other alarms will be given.
Break glass fire alarm call points will be located in all areas other than the residential floors. Call
points will be sited at final exits and other locations such that no one has to travel more than 30m to
a call point.
All fire alarm panels will be interfaced together.
A fully addressable multi loop automatic fire alarm control panel will be installed on the ground floor
of each block, to provide the following: The following interfaces will be provided with the fire alarm and detection system:
•
•
•
•
2.4.10
Door access control system – to release all automatic locks during a fire alarm
evacuation to a fail-safe condition as required by the Fire Officer.
Lift interface – to recall lifts to ground floor under fire alarm evacuation
Plant interface units – to allow plant to operate in accordance with the requirements of
Building Control and the Fire Officer during a fire alarm.
Hardwired interface with the fireman’s control panel – to switch mechanical ventilation
systems as required by the Fire Officer.
Television & Radio Distribution
Basket trays will be installed in each block riser to allow distribution of cables from the roof to all
apartments. A satellite system comprising of various dishes will be installed to provide the option of
terrestrial or Sky TV.
MEP SERVICES REPORT
February 2015
17
King George’s Gate, Kingston Road, Tolworth
Building & Places
Central
An IRS roof top satellite and aerial arrangement will be provided. The IRS cabling will distribute from
the head end(s) to each area via a Fibre Optic backbone due to the distances between the head end
and the dwellings.
Where necessary, the system will be boosted to maintain signal quality.
Dwellings
Each block dwelling will be provided with the facility to receive satellite via the IRS.
Subject to Client confirmation IRS outlets will be provided to Living Rooms only.
The quadplate for the confirmed room(s) will allow for:
Terrestrial TV
DAB Radio
Satellite - Sky+ or Sky+ HD
Cable TV
Typical Quadplate
Cables will be installed to each apartment to allow both systems but Sky will be available only on
subscription. It will be the responsibility of the tenant to obtain subscription to a satellite provider.
2.4.11
Lighting
Provide general lighting to the general environment and working plane considering energy efficiency,
maintenance, colour appearance, rendition and glare control.
Types and sizes of lamps will be standardised as far as practicable and energy efficient long life
lamps will be used throughout. Lamps and control gear will be selected to ensure the initial circuit
luminous efficacy will be in excess of 48 luminaire lumens/watt for fixed lighting installations. All
luminaries with fluorescent and other discharge lamps will be equipped with high frequency ballasts.
System Description – General Areas
Luminaires in areas other than residential apartments will be controlled via movement and
photoelectric sensors to provide:
General Lighting:
Normal operation
Half Lighting & Maintenance Lighting:
To enable reduced illumination to specific areas when unoccupied, thus conserving energy complete
with local PIR control to raise the lighting level upon occupation.
Security Lighting:
To facilitate security patrols within the space
MEP SERVICES REPORT
February 2015
18
Building & Places
King George’s Gate, Kingston Road, Tolworth
The system will consist of the following:
LED, Compact and Linear fluorescent luminaires.
All landlords area of each apartment block will be covered with ambient lighting with integral
emergency units and small power for cleaning.
Feature lighting may be provided to the lift lobby walls, main staircases, and the main entrance hall
and may be achieved by the use of low voltage downlighters / wall washers and wall mounted
lighting fixtures. Luminaires shall be sized and located to co-ordinate within any suspended ceiling
system.
The lift lobbies shall be illuminated by a combination of recessed LED downlighters, low voltage
downlights and feature wall mounted lighting fixtures. All luminaires shall be compatible in
appearance and provide colour rendering properties to suit the chosen wall and carpet finishes. All
luminaires shall be selected in conjunction with the Architect.
The staircases shall be illuminated by a combination of surface wall mounted luminaires. All
staircase luminaires shall be dual purpose normal and emergency means of escape, providing 3
hour battery backup. The emergency gear shall be an integral part of the luminaire.
Switching arrangements and controls shall be as described and developed further in conjunction with
the Client and the Architect.
2.4.12
Emergency Lighting
Luminaires that are normally operational are utilised to provide the emergency lighting.
Emergency lighting will be provided by integral self-contained emergency pack within normal
luminaires. This system will provide 3-hour backup for all the emergency luminaires.
Directional and emergency exit signage will be self-illuminated
2.4.13
General Power
The general LV distribution will include all the installations from the LV distribution boards to the final
outlets or fixed equipment.
Socket outlet circuits will generally be wired in standard ring circuits. Items of fixed equipment will
generally be wired in standard radial circuits. All general purpose and cleaners circuits will
incorporate RCD protection within the distribution boards. These should be based on 1 twin socket
outlet per 20m of building corridor.
All accessories will be of a common type, complete with cover plates of the same manufacturer and
having the same finishes and details (except floor box outlets that will be provided by the floor box
provider).
Accessories will be surface mounted in plant areas and flush in all other areas.
All items of fixed equipment will be provided with suitable means of isolation. This will be located
within reach of the equipment served and be accessible at all times.
MEP SERVICES REPORT
February 2015
19
Building & Places
2.4.14
King George’s Gate, Kingston Road, Tolworth
Access Control and Security.
It is anticipated that the system will control selected internal and external entrance doors and
comprise of the following: Central control equipment including:
Controlling.
Off-site transmission modem / equipment.
Access control door set comprising:
Local door controller
Entry fob readers
Electromagnetic door lock
Exit push button
The intruder detection system will monitor external emergency exit doors and selected internal doors
to protect against unauthorised usage.
2.4.15
Earthing and Bonding.
The earthing and bonding will consist of LV system earthing, equipotential bonding to incoming
services, supplementary bonding to the requirements of BS 7671, lightning protection system
bonding.
The electrical system will follow the TN-S system of earthing, i.e., having separate neutral and
earthing conductors throughout.
Main equipotential bonding will ensure that all extraneous conductive parts are bonded to the main
earth bar. This will generally consist of bonds to the main water pipes, main gas pipes, ductwork,
pipework, exposed metallic parts of building structure, thermal insulation metallic cladding, metallic
cable sheaths of all cables (except British Telecom) and the lightning protection systems.
Supplementary equipotential bonds will be made to interconnect all simultaneous accessible
conductive parts to the protective conductor system. This will generally be undertaken in bathrooms,
shower rooms, all other plantrooms, wet and damp process areas and kitchens.
MEP SERVICES REPORT
February 2015
20
Building & Places
2.5
Public Health Services
2.5.1
Incoming Water Supplies
King George’s Gate, Kingston Road, Tolworth
New incoming cold water mains will be provided from the new TWU mains apparatus located locally
to the residential block(s)
The following separate mains connections will be installed to serve the domestic water supply to
serve the residential bulk cold water storage tank.
2.5.2
Internal Building Drainage Systems
The proposed building will comprise both gravity drainage system to convey foul and surface water
discharge from the building to the external public sewerage network.
All fittings beneath ground level will discharge to local pumping stations and pumped to connect to
the gravity drainage network, this arrangement ensures that the buildings drainage systems are
effectively isolated from any surcharge conditions that may occur externally in the public sewerage
network.
All areas above ground level will discharge via gravity and connect to new sewer connections within
the external sewerage network. The new sewer connections will accept both foul and surface water
discharge prior to connection to the existing public sewerage networks.
Drainage will be provided to serve the following areas at lower levels within the building:
•
•
•
•
•
2.5.3
Surface water threshold channels at points of entry and exit to the building.
Local drainage systems to washdown/wet areas.
Plantrooms.
Air intake shafts/wells that may permit the ingress of rainwater.
At this stage no provision has been allocated for groundwater drainage systems.
Above Ground Sanitation Systems
The sanitation and rainwater systems will be designed as completely separate systems up until
connection to the proposed combined foul and surface water sewer connections. Interconnection
between the two systems will occur at the final manhole/connection point prior to connection to the
combined sewer connection. Disconnecting traps will be provided on both foul and surface water
drainage systems to prevent the egress of foul air from the public sewerage network.
The sanitation systems will operate by means of gravity serving all fittings from ground level and
above. Pumped drainage systems will be provided for all fittings located beneath ground level, thus
protecting the building from any potential surcharge conditions that may occur within the external
public sewerage network.
Soil/waste stacks with antisiphon/relief vents will collect discharges from all fittings associated with
the residential areas.
All vent pipes will terminate through roof level and discharge to atmosphere.
Foul drainage shall generally be vented to atmosphere at each roof level. Access shall be required
at each floor level on each stack.
If MDPE or UPVC is installed then fire sleeves or collars shall be installed at each floor level. Foul
drainage generally shall be routed through the building to the ground floor and connect to the below
ground drainage system (by others).
MEP SERVICES REPORT
February 2015
21
Building & Places
King George’s Gate, Kingston Road, Tolworth
Typical Fire Coller
A system of soil and waste pipework shall be provided to receive discharges from all sanitary
appliances and plantroom floor gullies, at ground and roof. The drainage system shall be a single
pipe system, (in accordance with BS 12056).
Intumescent sleeves shall be provided wherever fire compartmentation is penetrated by PVCu /
mUPVC pipework and fittings.
All exposed pipework/fittings shall be chrome plated or as architects specification.
The entire sanitation system shall be insulated to prevent noise break-out.
The system shall function quietly and efficiently in accordance with all relevant British Standards,
Codes of Practice, Statutory / Local Authority requirements and generally accepted standards of
good practice (in the consultants opinion).
Soil vent stacks shall terminate to atmosphere at roof level with a suitable cowl at roof level.
Unventilated branch limitations shall not be exceeded.
The system shall be installed in such a manner that it requires the minimum of routine maintenance.
The system shall vent to atmosphere wherever possible and shall pass vertically through the building
prior to connection with the existing drainage system.
If SVP offsets are required within apartments. The layouts are to be reviewed by the Architect to
remove or minimise the offset. No SVP should offset within the bedroom of a different dwelling.
Plantrooms, refuse stores and external wash down points shall be provided with trapped floor gullies.
Rodding eyes for cleaning and testing the entire rain water drainage systems are to be provided
throughout at all changes of direction, branches, at each floor level on the vertical stack and
immediately above the connection to the below slab drainage.
2.5.4
Above Ground Rainwater Systems
The rainwater systems will be designed as completely separate systems up until connection to the
proposed combined foul and surface water sewer connections. Disconnecting traps will be provided
on both foul and surface water drainage systems to prevent the egress of foul air from the public
sewerage network.
The rainwater systems will be designed in accordance with BS EN 12056 Part 3, By the Contractor.
Surface water drainage including rainwater outlets, hoppers, drains and gutters will be provided to
serve roof areas balconies and terraces.
MEP SERVICES REPORT
February 2015
22
Building & Places
2.5.5
King George’s Gate, Kingston Road, Tolworth
Domestic Potable Cold Water Distribution
Discreet cold water storage and pumping facilities will be provided to supply potable water to the
residential elements of the project with supplies from the TWU mains infrastructure network.
From the bulk cold water storage tank potable water supplies will be boosted via multi stage pumping
equipment to serve all residential units. Boosted potable cold water risers will be allocated within
each residential block.
TWU meters will be provided on the boosted potable cold water supply serving each individual
property such that billing for water usage will occur directly between the respective tenants and
TWU. TWU meters will be located at each floor level within each residential riser.
2.5.6
Hot Water Generation and Distribution
Primary LTHW heating mains will distribute from the community heating network to serve each
residential block. Individually heat metered branches (sub meters) will be provided to each property
such that energy usage for heating and hot water generation to each property can be apportioned
and billed to each tenant accordingly.
Hot water shall be provided instantaneously via the HIU within the Apartment. No water storage shall
be provided. Each HIU shall be provided with a heat exchanger for domestic hot water.
The Domestic Hot Water (HWS) generation for each of the houses will be provided by a combi boiler
or a hot water storage cylinder served from the system boiler.
Where it is necessary, pipework shall be provided with trace heating to ensure delivery of hot water
to outlets.
All baths shall be provided with a blending valve set to a maximum temperature of 48oC in
compliance with Building Regulations. The valve shall be located in an accessible location within 3m
of the bath.
All exposed pipework shall be chrome finish.
All pipework buried within floor screeds shall be distributed within a duct to allow for future pipework
replacement. Isolation valves shall be provided at both ends of the duct to allow pipework to be
removed.
The development is being designed to achieve CSH Level 4. To achieve this level it is a mandatory
requirement to achieve a predicted average household water consumption of 105 litres per person
per day.
All necessary flow restriction on outlets shall be provided to achieve the required flowrates for
compliance with CSH.
Pipework to have drain cocks at all low points.
Isolation valves shall be fitted to all appliances.
MEP SERVICES REPORT
February 2015
23
Building & Places
King George’s Gate, Kingston Road, Tolworth
3
APARTMENT SERVICES OUTLINE SPECIFICATION
3.1
Internal Services Distribution
All services wherever possible shall be kept independent from adjoining units. This means that
services will not be routed from one unit through to the next unit and sockets and switch plates are to
be designed in such a way, that they are not located on the party wall construction. The only
services passing through one unit to another, are to be vertical soil stacks, which are to be aligned
wherever possible to allow vertical drop and are to be built in within the bathroom and kitchen design
to provide acoustic isolation and visual impact within the space.
All stacks are to be designed to have the requisite access necessary under the Building Regulations
and the boxing in arrangements will be designed in such a manner that this code requirement is
adhered to.
Bathroom and kitchen ventilation shall be run in slim duct to the outside, to ensure that each
apartment has its own independent ventilation system.
Electricity meters and water meters are to be located outside the apartments in the dedicated riser
positions. The electricity and water meters are suitably segregated to meet the relevant code
requirements and meters are to be stacked, to minimise the impact of space take.
All electrical services wiring, within the apartments are to be run within ceiling voids and will drop
down within the partitioning to low level, to serve the socket outlets and switch positions. No cable
routes are to be run in the floor screeds, except in special circumstances.
Water services are to be run within the ceiling void space, between bathrooms and the hallway, to
supply principal bathrooms, en-suite and kitchen areas.
Ancillary services comprising of telephone data, T.V and security systems shall be routed from the
main intake points within the risers.
Space and hot water heating shall be provided via a communal system, fed from a central boiler
location within the energy centre.
Communal heating pipework shall be distributed through the car park, to serve each required riser
location. Within the riser, pipework shall distribute vertically with branches off at high level for each
floor. The pipework will distribute within the ceiling void, to a metered arrangement at each
apartment.
Heating to the apartment will be via a wet radiator system with heated dual electrical/hot water towel
rail in the bathroom. A central time clock control shall be utilised for operation of the heating.
Domestic hot water is to be served via heat exchangers within the heat sub-station at each
apartment. It is proposed to use an indirect heat sub-station which incorporates one heat exchanger.
The domestic hot water service will incorporate an indirect storage cylinder per apartment. These
units will have heat metering installed and necessary isolation with maintenance anticipated from the
corridor rather than from within each individual apartment.
The cold water supplies to each apartment are provided through dedicated water storage tanks. A
booster pump set distributes the water to the main apartment risers. A water meter is provided for
each apartment within the riser. Stop cocks, drain down valves, and double check valves will form
part of the apartment water main and be located in the riser with easy access for maintenance.
MEP SERVICES REPORT
February 2015
24
King George’s Gate, Kingston Road, Tolworth
Building & Places
3.2
Bathrooms
The standard fixtures and fittings to the bathroom areas are defined by the Architect ancillary
services and connections are provided by the Mechanical and Electrical Contractor, as defined
below.
Suitably rated outlets for shaver points are to be provided.
Private dwelling only - Electric heated towel rail with chrome finish is utilised as the source of heat
within the bathroom area, with corded flex outlet point controlled from a switch located outside the
bathroom area.
Thermostatic controls and double check valves are provided to the shower as part of the brassware
supplied by the specialist, but no power showers are installed as the booster pressure is provided by
the central water system.
Mirror lighting to be provided to the Architects specifications.
3.3
Ventilation System
Mechanical Ventilation Heat Recovery (MVHR) will be provided for supply air to all habitable rooms
and extract air from bathroom, ensuite, cloakroom and kitchen/utility areas.
3.4
Electrical Systems
Consumer units are to be installed within the MEP services cupboard and accessed from the
apartment hallway. Each consumer unit shall be equipped with a main isolator and individual Type
‘B’ MCB protection to the lighting, alarm, fire detection and alarm circuits and 30mA RCD protection
to the remaining small power circuits, as necessary. Blank plates shall be fitted to a minimum of two
spare ways. The consumer unit is to be as manufactured by MEM, Hager or similar.
Typical Layout:
12
SPARE
11
Smokes
10
Lights 2
9
8
7
Immersion
Kitchen
Ring
General
Ring 2
6
SPARE
5
SPARE
4
Lights 1
3
Boiler
2
1
Cooker
General
Ring 1
RCD 2
_
6A
6A
16A
32A
32A
RCD1
_
_
6A
16A
20A
M/SW
INCOMER
32A
All wiring for the apartments shall be in twin and earth cable, with vertical drops to wall mounted
accessories concealed within wall cavities, capped for additional mechanical protection. All wall
mounted accessories and switches shall be mounted at heights in compliance with BS 8300.
Switch socket outlets and light switches are to have metal plates finished in accordance with the
Architect’s specification. Where these are not visible they shall be in white plastic.
All white goods in the kitchen are to be wired through wall mounted flexible connection outlets,
installed below the work top surface, with remote switching from a common multi-gang grid-switch
plate above worktop, as appropriate.
Apartments shall have a single common lighting circuit and multi-storey houses shall have a
separate lighting circuit for each level.
Lighting to the main reception room(s) may be by floor standing uplights and table lamps (excluded
from this contract and supplied by others) on a 5A lighting circuit and recessed ceiling mounted LED
MEP SERVICES REPORT
February 2015
25
Building & Places
King George’s Gate, Kingston Road, Tolworth
downlights to achieve the required lighting level. Both circuits shall be individually switched from the
main multi-gang lighting switch adjacent to the entrance to the room, with the ceiling mounted
lighting dimmable.
Lighting to the main hallway shall be by recessed ceiling mounted LED downlights to achieve the
required lighting level, two way switched from switches located adjacent to the entrance to the
hallway and master bedroom,
Fixed recessed IP44 LED downlights will be provided to the kitchen, controlled from the main lighting
switch located adjacent to the entrance to the space. Pelmet lighting is to be installed to the undercupboard high level wall mounted Kitchen units also switched by the main lighting switch adjacent to
the entrance to the space.
A continuous multipoint extract fan, controlled with humidistat boost facility, shall be located within
the ceiling of the hallway cupboard on a dedicated circuit.
Ceiling mounted fixed recessed IP44 rated LED downlights are to be installed in the WC/Bathrooms,
to prevent water ingress during normal operation and cleaning, controlled from a ceiling mounted pull
cord adjacent to the entrance to the space. Mirror lighting, with an isolating transformer shaver
outlet, is to be provided to the Architects specifications.
A pendant light fitting is to be installed to the bedrooms, centrally and equally spaced around the bed
position with two way switching at the entrance and at the bedhead in the bedrooms. A batten lamp
holder shall be installed within cupboards, controlled by a switch in the hallway outside the cupboard.
Wheelchair accessible apartments are to be provided with a pendant light fitting installed in the main
reception room, hallway and bedrooms, with two-way switching as appropriate.
An impact and vandal resistant, wall mounted compact fluorescent bulkhead luminaire, on the house
lighting circuit, may be installed externally adjacent to the main entrance to the house only. It shall be
controlled from a lighting switch on the hallway lighting switch adjacent to the main entrance door
and a time-clock mounted in the consumer unit. Apartments with a balcony and houses with a
garden shall be provided with an external IP65 rated wall mounted compact fluorescent bulkhead
luminaire, switched internally from a lighting switch adjacent to the balcony/garden door, to illuminate
the area.
From the Building Regulation new Part L1A it states that fixed energy efficient fittings should either
be the greater of the following; one per 25m2 of dwelling floor area or one per four fixed lighting
fittings (note a light fitting may contain more than one lamp). A light fitting is energy efficient if the
luminous efficacy greater than 40 lumens per circuit-Watt. Fluorescent and compact fluorescent
lighting fittings would meet this standard.
Each apartment will be installed with linked, mains voltage, with battery back-up, smoke/heat
detection and sounder units to provide the required coverage to the apartments in compliance with
BS 5839:6, category LD2, Grade D, with additional detector/sounders located within bedrooms to
achieve an increased audibility of 75dB(A) at each bedhead and en suite WC/bathroom.
Mains voltage smoke/heat detectors installed within each apartment are to incorporate a 3 hour nonmaintained emergency luminaire. The apartments are connected to the district heating service and
do not have any gas service or appliances. Therefore, no Carbon Monoxide detection is to be
provided.
3.5
Security Systems
An access control system is installed to all common access points into the building, incorporating the
lift and also the main staircase.
MEP SERVICES REPORT
February 2015
26
Building & Places
King George’s Gate, Kingston Road, Tolworth
An audio door entry system is provided to each apartment via a handset in the hall and through to
the main entrance of the apartment block. Each apartment is installed with a single A/V handset unit
and this operates the door entry, through to the common entrance lobby below.
There is provision for a burglar alarm to be fitted by the purchaser.
3.6
Television and Data Systems
A satellite TV system is to be provided throughout for each apartment. Within each apartment there
is a single Sky TV package to the Living room, master and second bedroom, designated as a Sky
Ray package. This incorporates terrestrial and Sky TV, with power sockets and Telecom points to
facilitate the use of the relevant decoder boxes. As an option the purchasers may specify an
enhanced Sky system, wired throughout and to facilitate the upgrade package. A twin socket outlet
is installed within the electrical services cupboard, in order to facilitate the booster units.
The package system is provided by a Specialist Contractor, but the wiring is carried out by the
Mechanical and Electrical Sub-contractors.
The telephone system is provided by British Telecom, who wire into the building into the frame
position, designated within the Ground Level Comms Room or base of the Comms Riser. The wiring
is run through to the secondary distribution points within each riser. Wiring within the apartment and
to the secondary distribution point, is carried out to enable the developer to obtain the relevant
rebate from British Telecom, for the installation throughout each apartment.
A master socket is provided within the MEP services cupboard, with auxiliary slave sockets provided
in the living room, bedrooms and kitchen areas. The basic wiring package incorporates a single line
into the apartments utilising two of the six cables provided by British Telecom, into each apartment.
As a result the living room, bedroom and kitchen are all configured on one BT line, into the
apartment. However, the purchaser has the option to contact British Telecom and upgrade the
telephone system, by either utilising the four spare cores, to provide two further lines at any of the
configured telephone points within the apartments. The four spare cores can be utilised to provide
an ISDN line, or alternatively, all six cores can be reconfigured to provide the BT home highway
package. Initial allowance for broadband type packages to be installed from the outset to be
included.
3.7
Typical MEP Service Cupboard
A typical service cupboard is proposed for each dwelling.
This is proposed to contain:
SVP
Consumer Unit
Heat Interface Unit
MVHR
Underfloor Heating Manifold
Washer/Dryer
MEP SERVICES REPORT
February 2015
27
Building & Places
King George’s Gate, Kingston Road, Tolworth
Typical MEP Service Cupboard Detail
MEP SERVICES REPORT
February 2015
28
Building & Places
4 SITEWIDE
King George’s Gate, Kingston Road, Tolworth
DISTRIBUTION SERVICES
MEP SERVICES REPORT
February 2015
29
Building & Places
5 SAMPLE
King George’s Gate, Kingston Road, Tolworth
ENERGY CENTRE ARRANGEMENT
MEP SERVICES REPORT
February 2015
30
Building & Places
King George’s Gate, Kingston Road, Tolworth
About AECOM
AECOM (NYSE: ACM) is a global provider of professional technical and management support services to a
broad range of markets, including transportation, facilities, environmental, energy, water and government. With
approximately 45,000 employees around the world, AECOM is a leader in all of the key markets that it serves.
AECOM provides a blend of global reach, local knowledge, innovation, and collaborative technical excellence in
delivering solutions that enhance and sustain the world’s built, natural, and social environments. A Fortune 500
company, AECOM serves clients in more than 100 countries and has annual revenue in excess of $6 billion.
More information on AECOM and its services can be found at www.aecom.com.
MEP SERVICES REPORT
February 2015
1
Download