IN AWWA Conference, February 12, 2014 | Distribution Session Bradford Woods – Goes Over the Hills for a New Water Supply Indiana AWWA Conference February 12, 2014 Distribution Session Jennifer Bailey, PE, and Jeff Kaden, PE, LEED AP IN AWWA Conference, February 12, 2014 | Distribution Session Project Team • Owner – Indiana University and Bradford Woods • Engineer – American Structurepoint, Inc. • Water Supplier – Morgan County Rural Water Company • Contractor – Dave O’Mara Contractors, Inc. IN AWWA Conference, February 12, 2014 | Distribution Session Overview • • • • Background Study Design Construction IN AWWA Conference, February 12, 2014 | Distribution Session Project Location American Camp Association Well House Bradford Woods Carriage House Sycamore Creek IN AWWA Conference, February 12, 2014 | Distribution Session Background • IDEM June 2010 inspection – Failing tank, separate chemicals, provide secondary containment and eye wash • IDHS September 2011 – Violation for failing tank. Potential fine – $500/day IN AWWA Conference, February 12, 2014 | Distribution Session Background • Existing system – Two wells, 6,000-gallon hydropneumatic tank, compressor with sodium hypochlorite, and phosphate feed systems IN AWWA Conference, February 12, 2014 | Distribution Session Project Drivers • Address IDEM and IDHS issues • Provide 2 to 4 hours of storage to cover power outages • Install flow meter • Minimize disruptions during construction • Meet budget of $263,000 IN AWWA Conference, February 12, 2014 | Distribution Session Project Location Well House Bradford Woods Carriage House Sycamore Creek IN AWWA Conference, February 12, 2014 | Distribution Session Alternatives • Carriage House Basement – Unable to permanently modify openings since historic – Moisture-rich environment – Electrical and communication improvements required IN AWWA Conference, February 12, 2014 | Distribution Session Alternatives • Well House – Located in White River floodway – Reduced floor space if chemical room added – Multiple pressure tanks required—IDEM not in favor – Open-top tanks would require additional pumps IN AWWA Conference, February 12, 2014 | Distribution Session Alternatives • Morgan County Rural Water Connection – 3-inch main, ~3,285 feet long was investigated in 2008 – Elevation change from 760 feet to 600 feet • Design needed to address pressure – Camp water use could not impact MCRW customers – Creek crossing – Flow tests verified available capacity IN AWWA Conference, February 12, 2014 | Distribution Session Bradford Woods IN AWWA Conference, February 12, 2014 | Distribution Session Elevation Change Tulip Court Sycamore Creek Proposed Connection IN AWWA Conference, February 12, 2014 | Distribution Session Alternatives • Selection – MCRW Connection – Costs • Pressure Tanks • Non Pressure Tanks • MCRW Connection $423,845 $285,425 $250,450 – Camp no longer responsible for water production • Operations, maintenance, and licenses – Maintain service and minimized disruptions during construction IN AWWA Conference, February 12, 2014 | Distribution Session Design Challenges • Alignment—finding constructible path • Rock – Results were inconclusive from 3 borings – 4 hand auger borings were taken along crest IN AWWA Conference, February 12, 2014 | Distribution Session Bradford Woods Sycamore Creek Initial Alignment Tulip Court IN AWWA Conference, February 12, 2014 | Distribution Session Bradford Woods Sycamore Creek Alternate Alignment Tulip Court IN AWWA Conference, February 12, 2014 | Distribution Session Bradford Woods Sycamore Creek Design Alignment Tulip Court IN AWWA Conference, February 12, 2014 | Distribution Session Other Design Challenges • Dry hydrant – Potential endangered species • Existing distribution system information Well House Isolation Valve Dry Hydrant Bradford Woods Sycamore Creek IN AWWA Conference, February 12, 2014 | Distribution Session Design Approach • Horizontal directional drilling • Base bid + 2 alternates – Dry hydrant – Well House demolition • Engineer’s OPCC = $265,230 • Bids – 7 received, range: $178,700 to $472,157 – Low bidder: Dave O’Mara Contractors, Inc. IN AWWA Conference, February 12, 2014 | Distribution Session Construction • HDD worked for the first 660 feet • Rock problematic from station 17+00 to 23+50 – Decided to use open-cut construction – IU, American Structurepoint, and O’Mara found new alignment • Balanced constructability with minimizing tree damage IN AWWA Conference, February 12, 2014 | Distribution Session PRV & Meter Bradford Woods Sycamore Creek Open Trench HDD Installed (typical) Final Alignment MCRW Meter Tulip Court IN AWWA Conference, February 12, 2014 | Distribution Session Construction • No valve between Well House and camp – Required insert-a-valve Well House New Valve SR 67 IN AWWA Conference, February 12, 2014 | Distribution Session Construction • Dry hydrant – Design vs. HDD with underwater divers IN AWWA Conference, February 12, 2014 | Distribution Session Conclusions • Project had its ups and downs – Started in fall 2011 – Water main in service July 2013 • Flexibility contributed to success – IDEM and IDHS – MCRW – O’Mara • Construction came in under OPCC at $195,231.19 IN AWWA Conference, February 12, 2014 | Distribution Session Conclusions • Resolved IDEM and IDHS issues • Bradford Woods can focus on its true mission – Camping experience for disabled children • INCLUDING NEW ZIP LINE! – Outdoor recreational resource – Training IN AWWA Conference, February 12, 2014 | Distribution Session Questions? Jennifer Bailey, PE American Structurepoint, Inc. jbailey@structurepoint.com Jeff Kaden, PE, LEED AP Indiana University jkaden@indiana.edu