fcgkj xzkeh.k iFk fodkl ,tsalh BRRDA width and 20 mm depth by saw cutting to house the joint sealing material. No emergency joint shall be allowed in less than 2 m distance of any 5.5. 5.6 5.7 preceding or succeeding joint position. 5.4.3 Expansion Joints : These shall be provided only near the bridges and slab culverts. The expansion joint shall consist of a bitumen impregnated joint/premoulded synthetic joint filler board about 20 mm thick complying with IS:1838 and dowel bars as specified in the drawing. The dowel bars shall be passing through the holes in the board. The filler board shall be positioned vertically along the line of the joint. 5.4.4 Dowel bars : Dowel bars shall be mild steel bars of 25 mm diameter and conforming to IS:432 (Part 1) having minimum yield strength 240 N/mm2. These shall be free from oil, dirt, loose rust, scale, irregularities and burring. Dowel bars shall be positioned at mid depth of the slab within a tolerance of (±) 20 mm. All bars in a joint shall be within (±) 5 mm in length of bar, normally 500 mm long and spaced 250 mm c/c or as specified. They shall be parallel to the longitudinal axis of the pavement. 5.4.5 Premoulded Joint Filler : Bitumen impregnated filler board/premoulded synthetic joint filler board for expansion joints shall be 20 mm thick within a tolerance of (±) 1.5 mm and of a firm compressible material in conformity with the requirements of IS:1838. 5.4.6 Joint Sealing Compound : Joint sealing compound shall be hot poured sealing compound type having flexibility, resistance to age hardening and durability and shall conform IS:1834. Surface Levels : The tolerance in surface level of cement concrete pavement shall be (+) 5mm or (-) 6mm which may not exceed (-) 8mm at 0-300mm from the edges. Surface Regularity : The maxm allowable difference between the pavement surface and a 3 m straight edge/profile plate shall not exceed 6mm for the longitudinal profile/cross profile. Acceptance criteria for Cracked Concrete Slabs (One panel) (i) The length of single crack in any panel shall not be more than 750 mm, even though its depth is less than half of the slab depth. (ii) The cumulative length of cracks with depth of crack less than half the depth of slab in a panel shall not be more than 1250 mm. (iii) Slabs with cracks which are penetrating to more than half of the slab 22 fcgkj xzkeh.k iFk fodkl ,tsalh BRRDA depths shall not be accepted. Do’s 1. Back fill properly, surface trenches and soft spots in the sub-grade and compact the same. Remove all organic and extraneous material from sub grade. 2. Saw cutting of joints should be done when concrete is neither too soft nor too hard. 3. Ensure that side forms are sufficiently robust and rigid to support the weight and pressure caused by paving equipment. 4. Do make provisions to maintain sufficient supply of tarpaulin or other water proof cloth during placement of concrete when rain is expected. 5. The Coarse aggregate shall be free from dirt, flint, chalecedony or other silica. 6. Use fine aggregate free from soft particles of clay, shale, loam cemented particles, mica and other foreign matter. 7. Ensure sufficiency and accuracy of material, plant and equipment and methods of construction. 8. Measure workability of the concrete at the time of placing with slump cone Test. 9. Provide proper construction joint if concreting is suspended for more than 30 minutes. Use bulk head to retain the concrete. 23 Don’ts 1. Do not lay sub-base on a sub grade softened by rain 2. Do not expose concrete slab for a period of more than half an hour for saw cutting of joints. 3. Do not provide any vertical step between the adjacent side forms greater than 3 mm 4. Do not carry out concreting work when concrete temperature is more than 300C or less than 50 C at the point of placing and ambient temperature is greater than 350C 5. Do not use disintegrated, soft, flaky, elongated, highly angular or splintery coarse aggregate. 6. Do not vibrate concrete excessively to prevent flow of mortar to the top. 7. Do not allow concreting without approval of mix design of concrete. 8. Do not walk on freshly laid concrete to place covering for curing. 9. Do not allow any traffic, including construction vehicles on the finished surface of concrete pavement till the joints are permanently sealed. 10. Do not drop concrete into place freely from a height exceeding 1.5m.