REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION CY 2020 PROJECT DETAILED ENGINEERING PLANS FOR REHABILITATION OF STA. ROSA - CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION LOCATION: SAN JUAN, LA UNION STATION LIMITS: NET LENGTH: 824.00 LM SUBMITTED: RECOMMENDED: ALBERTO B. ESQUEJO, JR. CHIEF, PLANNING AND DESIGN DIVISION EMMANUEL W. DIAZ, CESE OIC-ASSISTANT REGIONAL DIRECTOR DATE: DATE: APPROVED: RONNEL M. TAN, CESO III REGIONAL DIRECTOR DATE: BALAOI PASALENG BAY BURAYOC PAGUDPUD PASALENG TO CAGAYAN BINDAY BADUANG BURAAN BANGUI MASINI BURGOS REGIONAL MAP of REGION I DUMALNEG ADAMS DAVILA DIVI DARISDIS AGAGA TUNGEL DILAVO PAREDES AIR STATION SHOWING NATIONAL ROADS AND DISTRICT BOUNDARIES BATO MT. PAO LIPAY KARUSQUIS ILOCOS NORTE 1st PASUQUIN AMIN ALSEM MT. AGANMATA BACARRA NABUTAS VINTAR DAM MT. MASADSADAC VINTAR LAOAG CITY LA PAZ CARASI GABU SAN NICOLAS PIDDIG SARRAT UBOG MANGITATAYU DINGRAS LUMBAO PAOAY BIDDING BATAC SOLSONA MARCOS PADONG CURRIMAO MT. SICAPDO ILOCOS NORTE 2nd QUIOM PORT CURRIMAO (BANNA) ESPIRITU QUIOM PINILI BALLAAG BINGAO STO. TOMAS BADOC ISLAND MADUPAYOS BADOC NUEVA ERA NAGREBSAN NASSADAO SULAT POINT SINAIT BALACBAC KAPAKAK DACLABANO SALAMAGUE 1 CABUGAO SALAMAGUE SAN JUAN LAPOG BAY ILOCOS SUR 1st PINGET ISLAND MAGSINGAL CASILI PATONG STO. DOMINGO SAN ILDEFONSO BANTAY SAN VICENTE SANTA CATALINA VIGAN CITY CAOAYAN TO ABRA SANTA SULVEC PT. NAGBUKEL NARVACAN STA. MARIA SAN ESTEBAN BURGOS SANTIAGO BAYANGGUI END OF PROJECT LIDLIDDA DAN-AR BANAYOYO SAN EMILIO CITY CANDON GALIMUYOD SALCEDO QUIRINO STA. LUCIA G. DEL PILAR QUINIBU STA. CRUZ SIGAY DILI ILOCOS SUR 2nd CERVANTES SUYO KIMPUSA DARDARAT BUTAC TAGUDIN CABUGAO ALILEM TO BENGUET BANGAR SUDIPEN RIMOS LUNA THIS SITE SUGPON CASTRO BALAOAN SANTOL LA UNION 1st BACNOTAN SAN GABRIEL SAN JUAN STO. ROSARIO SAN FERNANDO PORT LUBING NAGYUBUYUBAN PORO POINT BAGULIN SAN FERNANDO CITY NAGUILIAN BURGOS BAUANG BAGUIO-NAGUILIAN LA UNION 2nd CABA Santiago Island ARINGAY BOLINAO SAN ANTONIO TUBAO PUGO MARCOS HIGHWAY AGOO START OF PROJECT ANDA STO. TOMAS DAMORTIS Hundred Islands BANI RABON ARTACHO ESPERANZA MABILAO SISON BOLASI AGNO TO BAGUIO TO BAGUIO ROSARIO LABAYUG NUEVA VISCAYA ALAMINOS CITY SAN FABIAN POZZOROBIO SAN ROQUE SAN ROQUE SAN JACINTO MABINI BURGOS SUAL MANAOAG MAPANDAN BINMALEY CALASIAO DASOL STA. BARBARA SAN CARLOS CITY STO TOMAS BASISTA UMINGAN BALUNGAO ROSALES URBIZTONDO INFANTA PANGASINAN 3rd VILLASIS MALASIQUI AGUILAR NATIVIDAD TAYUG ASINGAN STA MARIA SAN QUINTIN URDANETA CITY PANGASINAN SUB BUGALLON PANGASINAN 1st SAN NICOLAS LAOAC BINALONAN MANGALDAN DAGUPAN CITY LINGAYEN LABRADOR SAN MANUEL NUEVA ECIJA ALCALA PANGASINAN 2nd BAYAMBANG BAUTISTA TO TARLAC MANGATAREM TO ZAMBALES TO TARLAC VICINITY MAP LOCATION MAP NOT DRAWN TO SCALE NOT DRAWN TO SCALE PROJECT NAME AND LOCATION: DRAFTED: SHEET CONTENTS: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION DRAFSMAN II LOCATION MAP VICINITY MAP PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. C L FILLED W/ ASPHALT SEALANT (30-40) PENETRATION BLOWN ASPHALT 6.10 16mm Ø TIE BAR BY 600 mm.SPACED AT 600 mm O.C CARRIAGEWAY 0.70 3.05 3.05 SEE DETAIL "A" 0.50 600 ITEM 311(1)c1 - PORTLAND CEMENT CONCRETE PAVEMENT t = 0.23 m. 0.70 0.50 300 300 ITEM 200(1) - AGGREGATE SUB BASE COURSE t = 0.20 m. SLOPE 2.0 % SLOPE 1.5 % SLOPE 1.5 % ITEM 105(1)a - SUBGRADE PREPARATION SLOPE 2.0 % ON FILL ITEM 311(1)c1 - PORTLAND CEMENT CONCRETE PAVEMENT t = 0.23 m.(CARRIAGEWAY) ITEM 105 - SUB-GRADE PREPARATION ITEM 311(1)c1 - PORTLAND CEMENT CONCRETE PAVEMENT t = 0.23 m. (SHOULDER) NATURAL GRADE LINE ITEM 200 - AGGREGATE SUB BASE COURSE t = 0.20 m. EXISTING PCCP DETAIL "A" CONSTRUCTION/LONGITUDINAL JOINT ON CARRIAGEWAY TYPICAL ROADWAY SECTION ON CONSTRUCTION OF PCCP W/ STONE MASONRY, 1: 15 MTS SCALE C L NATURAL GRADE LINE FILLED W/ ASPHALT SEALANT (30-40) PENETRATION BLOWN ASPHALT 6.10 CARRIAGEWAY 0.70 3.05 3.05 16mm Ø TIE BAR BY 600 mm.SPACED AT 600 mm O.C 0.70 SEE DETAIL "A" 0.50 600 ITEM 311(1)c1 - PORTLAND CEMENT CONCRETE PAVEMENT t = 0.23 m. SLOPE 2.0 % SLOPE 1.5 % SLOPE 1.5 % SLOPE 2.0 % 300 300 ITEM 200(1) - AGGREGATE SUB BASE COURSE t = 0.20 m. ITEM 105(1)a - SUBGRADE PREPARATION ITEM 311(1)c1 - PORTLAND CEMENT CONCRETE PAVEMENT t = 0.23 m.(CARRIAGEWAY) ITEM 311(1)c1 - PORTLAND CEMENT CONCRETE PAVEMENT t = 0.23 m. (SHOULDER) ITEM 200 - AGGREGATE SUB BASE COURSE t = 0.20 m. EXISTING PCCP TYPICAL ROADWAY SECTION ON CONSTRUCTION OF PCCP W/ STONE MASONRY, DETAIL "B" CONSTRUCTION/LONGITUDINAL JOINT BETWEEN CARRIAGEWAY AND SHOULDER 1: 15 MTS SCALE PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION DRAFSMAN II TYPICAL ROADWAY SECTION PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. LI = Ld PI LEGEND : W METHOD OF WIDENING TRANSITION LENGTH PI - POINT OF INTERSECTION I - INTERSECTION ANGLE T - TANGENT DISTANCE R - CIRCULAR CURVE RADIUS WIDENING ( W ) OF TWO LANES PAVEMENT ON CURVES ( BASED ON SINGLE - UNIT TRUCK - SU - VEHICLE TYPE ) LENGTH OF FULL WIDENING 1/3 LC - LENGTH OF CIRCULAR CURVE 2/3 E - EXTERNAL DISTANCE PW Lc Lc o UT +L NO UT RU NO RU d /L /L 2/3 d+ RU NO RU NO 90 100 1.50 1.50 70 1.35 1.50 80 1.20 1.35 1.50 90 1.05 1.20 1.35 100 1.05 1.20 1.20 125 0.90 1.05 1.05 1.20 150 0.90 0.90 1.05 1.05 1.20 DR - OFFSET OF THE CIRCULAR CURVE 175 0.75 0.90 0.90 1.05 1.05 XM - SHIFT OF THE POINT OF TANGENCY 200 0.75 0.75 0.90 0.90 1.05 TL - LONG TANGENT OF THE TRASITION 225 0.75 0.75 0.90 0.90 0.90 1.05 250 0.60 0.75 0.75 0.90 0.90 1.05 275 0.60 0.75 0.75 0.90 0.90 0.90 300 0.60 0.60 0.75 0.75 0.90 0.90 1.05 350 0.60 0.60 0.75 0.75 0.75 0.90 0.90 400 0.60 0.60 0.60 0.75 0.75 0.75 0.90 0.90 0.60 0.60 0.75 0.75 0.75 0.90 0.90 500 0.60 0.60 0.75 0.75 0.75 0.90 600 0.60 0.60 0.60 0.75 0.75 0.75 0.60 0.60 0.60 0.75 0.75 800 0.60 0.60 0.60 0.75 900 0.60 0.60 0.60 0.75 1000 0.60 0.60 0.60 1500 0.60 0.60 0.60 T PI W E - EXTERNAL DISTANCE BETWEEN MIDDLE OR CURVE AND PI 450 LENGTH OF FULL WIDENING LC - LENGTH OF CIRCULAR CURVE L - TOTAL LENGTH 700 PW AY D OA SC CS - CIRCULAR TO SPIRAL W L/ R SC - SPIRAL TO CIRCULAR W - WIDENING C - CENTERLINE L TS 1.0 NO HORIZONTAL CURVE IS REQUIRED WHERE THE INTERSECTION ANGLE IS LESS THAN ONE DEGREE ( 1° 0` 0" ) Ld WIDENING WHEN TRANSITION ARE USED 2000 ST NOTES : CL L/ LI CS TS - TANGENT TO SPIRAL ST - SPIRAL TO TANGENT NOTES : 2.0 PARAMETER " A " SHALL BE GREATER OR EQUAL THAN THE THIRD OF THE RADIUS OF THE CONNECTED CIRCULAR CURVE. I PI 80 1.50 T, T, T, - TANGENT LENGTH OF THE CURVE HORIZONTAL CURVE ( CIRCULAR ) 70 1.50 PC R 60 60 TS - SHORT TANGENT OF THE TRANSITION I - DEFLECTION ANGLE Ø - ANGLE OF THE CLOTHOID AT R O - ANGLE AT THE CENTER OF THE CIRCULAR CURVE I 50 1.50 UT WIDENING WHEN TRANSITION IS NOT USED Y - ORDINATE OF THE TRASITION END PT 40 50 RO UT A - CLOTHOID PARAMETER R - RADIUS OF CIRCULAR CURVE LT - LENGTH OF TRASITION X - ABSCISSA OF THE TRANSITION END PC 30 40 AY W AD PT - POINT OF TANGENCY LC DESIGN SPEED ( Km / h ) R Lo 1.50 CL HORIZONTAL CURVE WITH TRANSITION ( CLOTHOID ) R Lo Lo 30 PC - POINT OF CURVATURE E 1/3 PT I PI WLn LI or Ld I= Ln HORIZONTAL CURVE ( CIRCULAR ) THE ABOVE IS BASED ON NORMAL PAVEMENT WIDTH ( Pw ) = 6.70 m. FOR PW = 6.70 m. REDUCED THE ABOVE VALUES BY 0.30 m. FOR PW = 7.30 m. REDUCED THE ABOVE VALUES BY 0.60 m. VALUES LESS THAN 0.60 m. MAY BE DISREGARDED. ON FOUR - LANE UNDIVIDED HIGHWAYS , THE DESIGN VALUE INDICATED IN THE TABLE SHOULD BE DOUBLED. WIDENING ON CURVE 3.0 WHEN REQUIRED UNSYMMETRICAL SPIRAL OR COMPOUND CURVE MAY BE ADOPTED. CIRCULAR CURVE. NOT TO SCALE LEGEND : Lo / Li = SUPERELEVATION RUNOFF / TRANSITION LENGTH OF WIDENING ( INCREASING SECTION ) Lo / Ld = SUPERELEVATION RUNOFF / TRANSITION LENGTH OF WIDENING ( DECREASING SECTION ) W = WIDENING FOR TWO LANE PAVEMENT Pw = NORMAL PAVEMENT WIDTH T2 I PI E T O TC MO X ST Y PVC O CS Ø VC / 2 LT LC R X X SC Y= ST TS A XM A XM MO = ( g2 - g1 )x 2 LVC LVC - LENGTH OF VERTICAL CURVE g , g - GRADIENT IN PERCENT 1 2 MO - MIDDLE ORDINATE ( UNSYMMETRICAL FORM ) TO PROJECT NAME AND LOCATION: REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION MO = PVT - POINT OF VERTICAL TANGENT HORIZONTAL CURVE WITH TRANSITION ( CURVE ) NOT FORMULA : PVC - POINT OF VERTICAL CURVE DR ( SYMMETRICAL FORM ) UNSYMMETRICAL DEFINITION : PVI - POINT OF VERTICAL INTERSECTION VC ( g2 - g1 ) 8 TS DR L2 LVC FORMULA : Ø A Ø L1 VC / 2 SYMMETRICAL TL R LT TL LT Ø PVC LVC O O R +g PVT CS R SC 1 - g2 + g1 TI TS Ø Y = 1 MO ( X1 ) 2 2 L1 Y = 2 MO ( X2 ) 2 2 L2 X, X , X -DISTANCE FROM PVC / PVT / OR TO ANY 1 2 POINT OF CURVE NOTES : Y, Y , Y - VERTICAL OFFSET WITH RESPECT 1 2 TO DISTANCE X NO VERTICAL CURVE IS REQUIRED IF THE ALGEBRAIC DIFFERENCE IS LESS THAN 0.5 %. NOT DRAFTED: REVIEWED: SUBMITTED: TO SCALE RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN GEOMETRIC DESIGN STANDARD (HORIZONTAL AND VERTICAL) GEOMETRIC DESIGN STANDARD (SUPER ELEVATION AND PAVEMENT WIDENING L1 L2 ( g2 - g1 ) 2VC VERTICAL PARABOLIC CURVE SCALE SHEET CONTENTS: PVT MO Y Ø TS TC Y2 - g2 YI PVI LC X2 PVI XI TC Y DRAFSMAN II PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. 2 e max. 3 AXIS OF ROTATION SUPERELEVATION RUNOFF ( Lo2 ) 2 / 3 Lo 1 1 / 3 Lo 1 RIGHT EDGE OF PAVEMENT 3 e = 2.0% SUPERELEVATION RUNOFF ( Lo1 ) RIGHT EDGE OF PAVEMENT 30% 1 AS = 0.30 % 2 / 3 Lo 2 AS >- 0.3 0% e1 max. NORMAL CROSSFALL 1 LEFT EDGE OF PAVEMENT 3 e1 max. 30% AS >- 0. 1 2000 RIGHT EDGE OF PAVEMENT 0 AS < 0.30% 3 30% AS >- 0. e = 2.0 % 12 e2 max. AXIS OF ROTATION ROADWAY LC 3 0 10 GN , SI DE EED SP H KP MINIMUM TANGENT BETWEEN CURVES 2 / 3 ( Lo 1min. + Lo min. ) 2 R1 1000 e = 2.0 % LEFT EDGE OF PAVEMENT e2 max. NOTES : 800 % .30 = 0 1 AS = 0 .30 1 % PT 1. FOR EFFECTIVE DRAINAGE , S HAS BE - 0.30 % BETWEEN e + 2.0 % AND - 2.0 %. 2. WHERE S 0.30 % , A SPECIAL METHOD OF SUPERELEVATION TRANSITION HAS TO BE USED AS INDICATED. 3. ROUNDING OFF IS ONLY NECESSARY IF S 0.60 % RADII FOR ROUNDING 80 600 PC R2 70 CASE 2 60 50 80 kph 1000 m. 80 kph 2000 m. 200 x. ma e 1 max . e2 ROADWAY C L 50 kph 500 m. 4. A " BROKEN RACK " SHOULD BE A VOIDED IF THIS IS IMPOSSIBLE , SUPERELEVATION TRANSITION MUST BE ATTAINED USING CASE 4 , IF LENGTH OF STRAIGTH IS - ( 40 + 20e ),. WHERE THE THE LENGTH OF THE STRAIGTH IS ( 40 + 20e) , NORMAL SUPERELEVATION TRANSITION CASE 1 SHOULD BE USED. 5. WHERE REQUIRED SUPERELEVATION RUNOFF LENGTH CANNOT BE ACCOMODATED , REQUIRED RUNOFF SHALL BE DISTRIBUTED WITHIN THE CURVE. 6. SUPERELEVATION DIMENSIONS SHOWN IN THE PLAN AND SHEET PROFILE ARE BASED ON VARYING LANE WIDTH DUE TO WIDENING. 7. SUPERELEVATION RATE CAN BE TAKEN FROM SUPERELEVATION CHART. 8. SUPERELEVATION IS ATTAINED BY RESOLVING THE PAVEMENT ABOUT THE ROAD CENTERLINE. 300 TRANSITION : CIRCULAR CURVE - MINIMUM STRAIGHT CIRCULAR CURVE V R 500 AS 400 e1 max. 3 ROADWAY C L 2 AS < 0.30% e1 max. R2 1 / 3 Lo 2 L2 2 PC 3000 x. ma 0% e1 max . e2 2 / 3 Lo 2 L1 ( 40 + 20 e ) LEFT EDGE OF PAVEMENT CASE 4 TRANSITION : CIRCULAR CURVE - STRAIGHT - CIRCULAR CURVE SUPERELEVATION RUNOFF ( Lo2 ) 2 / 3 Lo 1 e2 max. AS >- 0.3 0% R1 R SUPERELEVATION RUNOFF ( Lo1 ) AXIS OF ROTATION PT CASE 1 TRANSITION : STRAIGHT - CIRCULAR CURVE LEFT EDGE OF PAVEMENT e2 max. ROADWAY CL 3 <MAXIMUM TANGENT RIGHT EDGE OF PAVEMENT 1 e = NORMAL CROSSFALL LEFT EDGE OF PAVEMENT 3 e max. PT PC 1 / 3 Lo 2 30% AS >- 0. 3 ROADWAY C L AS > 0. - 30% RIGHT EDGE OF PAVEMENT ax. em 1 / 3 Lo 2 AS >- 0. AS > 0. - 30% % % 2 / 3 Lo 2 AS = 0.30 % 3 ROADWAY LC SUPERELEVATION RUNOFF ( Lo2 ) L1 1 / 3 Lo 1 2.0 2.0 % NC ax. em ax. em 20 0% NC NC TANGENT RUNOUT ROADWAY C L 3 AS > 0. - 30% e 1 max. 3 30% AS >- 0. RIGHT EDGE OF PAVEMENT e2 max. AXIS OF ROTATION ROADWAY C L e 1 max. 3 3 30 LEFT EDGE OF PAVEMENT e2 max. 70 80 RIGHT EDGE OF PAVEMENT 100 LEFT EDGE OF PAVEMENT SUPERELEVATION RUNOFF ( Lo2 ) 60 PT PC SUPERELEVATIONRATE, SE % SCALE SUPERELEVATION CHART PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION 40 0.70 S 50 0.65 60 0.60 70 0.55 REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION 80 0.50 90 0.45 100 0.40 REVIEWED: METHODS OF APPLYING SUPERELEVATION NOT SUBMITTED: TO SCALE RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 30 0.75 2.5 25 3.0 4.0 5.0 6.0 7.0 8.0 SUPERELEVATION OF CIRCULAR CURVE TO VALUE OF DESIGN SPEED ( km / h ) MAXIMUM S % 30 CASE 3 TRANSITION : CIRCULAR CURVE - CIRCULAR CURVE NOT S - SLOPE AT EDGE OF PAVEMENT IN % , INDEPENDENT OF DESIGN GRADIENT Lo - LENGTH OF SUPERELEVATION RUNOFF L1 , L 2 - LENGTH BETWEEN SUPERELEVATION , 0 % AND 2 % NC - NORMAL CROSSFALL e - SUPERELEVATION V - DESIGN SPEED R , R 1, R 2 - CURVE RADIUS C L - CENTERLINE 40 R2 LEGENDS : PC - POINT OF CURVATURE PT - POINT OF TANGENCY 50 R1 RADIOUS OF CURVE, METERS 40 SUPERELEVATION RUNOFF ( Lo1 ) DRAFSMAN II GEOMETRIC DESIGN STANDARD (SUPER ELEVATION DETAIL) PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. BTC BCC LK L1 ECC ETC LK L1 L1 BCC ECC BCC BCC ECC ECC L1 1/2 L1 1/2 L1 INNER EDGE INNER EDGE OUTER EDGE GE R ED OUTE s Wc s Wc OUT l ER E DGE WcL l CENTERLINE WNc Wc INNE WcL 2 1 R1 3 R2L3R2L LENGTH & SUPERELEVATION OF TRANSITION CURVES ( CLOTHOID CURVES ) R1 TAN RUNOUT CROWN BCC L2 LENGTH OF RUNOFF = R 2 L1 (M) 30 S Wcs 1 2 2 1 3R2L3 R2L 3 R2S 3R2S ECC NOT TO 50 0.65 60 0.60 70 0.55 80 0.50 2 3 R2 R1 R1 1 3R2S 1 3 R2S 2 3 R2 R1 LENGTH & SUPERELEVATION OF SIMPLE CURVE NOT SCALE TO FULL SUPERELEVATION R1 TAN RUNOUT LENGTH OF RUNOFF = R 2 NORMAL CROWN LENGTH OF NORMAL TAN RUNOFF FULL SUPERELEVATION CROWN RUNOUT LENGTH OF RUNOFF LENGTH OF RUNOFF TAN FULL SUPERELEVATION SCALE LENGTH OF RUNOFF NORMAL NORMAL RUNOUT CROWN TAN FULL SUPERELEVATION NORMAL RUNOUT CROWN CENTERLINE - PROFILE CONTROL CENTERLINE - PROFILE CONTROL LEGEND : DIAGRAMMATIC PROFILE : PAVEMENT REVOLVED ABOUT CENTERLINE NOT LENGTH OF RUNOFF TAN CROWN RUNOUT TO L K - LENGTH OF CLOTHOID L 2 - LENGTH OF CLOTHOID ( FOR AASHTO ) W - LANE WIDTH S - REQUIRED DESIGN SLOPE OF PAVEMENT SCALE 0.67 - 0.75 0.66 WNc S Wc ETC L2 S (%) 40 Wc OUTER EDGE 1 2 3 R2S 3 R 2S LENGTH & SUPERELEVATION OF REVERSE CURVES CENTERLINE - PROFILE CONTROL DESIGN SPEED ( km / h ) 1 1 SCALE TO BTC S 1 OUTER EDGE L1 NOT WNc Wc 1 INNER EDGE 1 / 2 WNc L1 NORMAL Wcs GE R ED GE 1 / 2 WNc WcL s Wc Wc S WNc l s INNE R ED Wcs WNc WNc l Wcs WcL c - FULL SUPERELEVATION SLOPE Nc - NORMAL CROWN SLOPE A - CLOTHOID PARAMETER R - RADIUS OF CIRCULAR CURVE L1= WNc S R1 WNc S , R2 Wc S BTC - BEGINNING OF TRANSITION CURVE BCC - BEGINNING OF CIRCULAR CURVE ECC - END OF CIRCULAR CURVE S AND L , ( INTERPOLATED ON AASHTO ) V = 30 kph ETC - END OF TRANSITION CURVE L 2= R1 + R 2 = W S ( Nc + c ) LK= L 1 + L 2 = W S ( 2Nc + c ) 2 FOR DESIGN , ROUND OFF " A " IN A = RL KTHEN RECOMPUTE L K NOTE : 30 40 50 100 200 500 1000 R = RADIUS OF CURVE ( meters ) h PER AASHTO POLICY L1 AT BEGINNING AND END ARE NOT CONSIDERED. = 80 kp 0.060 V e = SUPERELEVATION RATE 0.080 V = 70 h ph 0k h kp =6 50 V= kp V 0.040 V= 40 k THUS , L K = L 2 ph V= h 30 kp SHOULDER 0.020 3 TRAVEL WAY 3 TRAVEL WAY 0.000 0 5 10 15 20 25 30 35 SLOPE 3.0 % 40 3 TRAVEL WAY 1.5 % Nc 1.5 % Nc 1.5 % Nc 3 TRAVEL WAY 1.5 % Nc SHOULDER SLOPE 3.0 % D = DEGREE OF CURVE Nc = NORMAL CROWN SLOPE PROFILE GRADE & AXIS OF ROTATION FOR ATTAINING SUPERELEVATION Rc = REMOVE ADVERSE CROWN , SUPERELEVATE R= 1145.916 D e max = 0.10 DESIGN SUPERELEVATION RATES NOT TO PROJECT NAME AND LOCATION: ROADWAY TANGENT SECTION SCALE SHEET CONTENTS: SCALE DRAFTED: REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION SUBMITTED: MTS. RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REVIEWED: 1 : 80 REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION DRAFSMAN II GEOMETRIC DESIGN STANDARD (SUPER ELEVATION DETAIL) PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. 1500 "T" C B WIDTH AS SHOWN ON PLANS NOTE: TRANSVERSE CONSTRUCTION (CONTACT) JOINT SHALL BE PROVIDED AT THE END OF ANY RUN WHERE LAYING OF CONCRETE HAS BEEN STOPPED FOR THIRTY (30) MINUTES OR LONGER. ALL TRANSVERSE CONSTRUCTION JOINTS SHOULD BE BUTT JOINTS WITH DOWELS. PLAIN DOWEL BARS (SEE DETAILS) SPACING. (S1 AND S2) VARIES DEPENDING ON THE DISTANCE OF PAVEMENT TO CLOSET FREE EDGE. LINE SHOWING TRANSVERSE CONSTRUCTION JOINT AT LOCATION OF WEAKENED PLAIN JOINT A BEG. OF FLARING MINIMUM 400 4500 EDGE OF EXISTING CONCRETE PAVEMENT 12MM.Ø X 600MM. @ 600MM O.C. TIE BARS FLARING OF NEW CONC. PAVEMENT 25 S S S 400 400 S S S S S 400 400 S S D E EXISTING CONCRETE PAVEMENT T/3 S EXISTING CONCRETE PAVEMENT 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 T/3 S 11 400 400 LANE SHOWING TRANSVERSE CONSTRUCTION JOINT AT MIDDLE THIRD OF NORMAL JOINT INTERVAL 11 T/3 TRANSVERSE CONSTRUCTION JOINT WITHIN THE MIDDLE THIRD OF THE SLAB VARIABLE METAL SIDE FORM (KEYED JOINT) DETAIL OF SIDE FORMS SCALE: 90 M. ANCHOR AT EVERY ADJACENT EXISTING STRUCTURES 1:20 MTS 25 FORMED GROOVE WITH KEYWAYS FILL WITH POURED JOINT FILLER 75 25 SLIDING 12MM. Ø X 600MM @ 600MM O.C. TIE BARS 12 T FIXED FORMED GROOVE WITH KEY WAYS FILL WITH HOT POURED JOINT FILLER METAL DOWEL CAP GAUGE NO.18 TO PLACED ON EACH DOWEL BAR ON ALTERNATE END (SEE DETAIL "F") 25MM PRE-MOLDED EXPANSION FILLER T T/3 T/3 FIRST SLAB 300 C DETAIL "A" (LONGITUDINAL CONSTRUCTION JOINT) SCALE: SCALE: 300 WHERE: Te = THICKNESS OF EXISTING PAVEMENT Tn = THICKNESS OF NEW PAVEMENT METAL DOWEL CAP GAUGE NO.18 TO PLACED ON EACH DOWEL BAR ON ALTERNATE END T SCALE: TABLE FOR SPACING OF TIE BARS(L=600mm) SLAB THICKNESS (mm) 230 240 250 260 270 280 290 300 310 320 330 340 FORMED GROOVE FILLED WITH POURED JOINT FILLER 12 T T/4 FIRST SLAB 300 300 600 D DETAIL "D" (BUTT TRANSVERSE CONSTRUCTION JOINTS) SCALE: SPACING, S1 (mm) 12mm Ø 16mm Ø 600 750 600 750 600 750 500 750 500 750 500 750 500 750 500 750 400 750 400 750 400 750 400 750 PROJECT NAME AND LOCATION: REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION TABLE FOR SPACING OF PLAIN DOWEL BARS(L=600mm) 3. DIAMETER, D SPACING, S1 (mm) (mm) 28 30 32 32 34 38 6. 7. 8. NOTE: DIAMETER AND SPACING OF PLAIN DOWEL BARS MAY BE MODIFIED AS LONG AS THE EQUIVALENT STEEL AREA IS SUSTAINED. SCALE: 9. 10. 11. 12. 13. MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE "DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, 2013". CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE JOINT IS POURED AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE. NO CONSTRUCTION JOINT SHALL BE PLACED WITHIN 1.50 M. FROM THE WEAKENED PLANE JOINT. AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN THAT NO CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE FIRST SLAB. TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BARS SHALL BE SMOOTH ROUND STEEL BARS FREE FROM RUST AND OTHER DEFECTS WHICH MIGHT RESTRICT THEIR MOVEMENT. TYPE OF WEAKENED PLANE JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY ONE TYPE SHALL BE USED FOR THE WHOLE PROJECT. MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18 OF BLACK IRON FREE FROM RUST AND LINKS. AT LEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS AT NORMAL JOINT SPACING SHALL BE PROVIDED BEFORE OR AFTER AN EXPANSION JOINT. THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE SEALED WITH 30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER THE CONCRETE HAD BEEN CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC. PENETRATION ASPHALT SEAL ON CONCRETE PAVEMENT JOINTS SHALL BE POURED IN SUCH A MANNER THAT SPILLING WILL BE PREVENTED THUS, PROVIDING A SMOOTH LEVELING/RIDING SURFACE. ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT SHALL BE CONTINUOUS FORM EDGE TO EDGE ALL LONGITUDINAL JOINTS SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSET. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. AVOID STOPPAGE OF FORM WORKS ALONG CURVES. CONSTRUCT EXPANSION JOINT AT EVERY 60 METERS ANCHOR AT EVERY ADJACENT EXISTING STRUCTURES. AS SHOWN DRAFTED: SHEET CONTENTS: 4. 5. 300 300 300 300 300 300 STANDARD PORTLAND CEMENT CONCRETE PAVEMENT JOINTS REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 1. BASED ON AASHTO GUIDE FOR DESIGN OF PAVEMENT STRUCTURES 1993. 1:20 MTS 1:20 MTS GENERAL NOTES: 1:20 MTS SLAB THICKNESS (mm) 230 240 250 260 270 280 CONSTRUCTION JOINT TO USED FOR FLARING EXISTING CONCRETE PAVEMENT SCALE: 2. 5 PLAIN DOWEL BAR ( SEE TABLE) ONE HALF OF LENGTH SHALL BE PAINTED WITH APPROVED RED LEAD AND THEN GREASED. E D+1.56 T/4 5 DETAIL "E" DETAIL "F" ON METAL DOWEL CAP 1:20 MTS Te/2 16MMØ DRILLED HOLES FILLED WITH EPOXY RESIN 1:20 MTS PLAIN DOWEL BAR DETAIL "B" B (WEAKENED PLANE JOINT OR CONTRACTION JOINT) SCALE: NEW PAVEMENT EXISTING CONCRETE PAVEMENT SAWED GROOVE WITH POURED JOINT FILLER (@4.5M. INTERVAL OR AS DIRECTED BY THE ENGINEER 6 300 600 75 1:20 MTS T SEE DETAIL "F" ON METAL CAP DETAIL "C" (EXPANSION JOINT) 300 600 A HALF OF THE BAR ON THE SIDE OF THE METAL DOWEL CAP SHALL BE PAINTED W/ RED LEAD AND THEN GREASED T/3 T/4 25 5 DEFORMED TIE BAR 1:100 MTS PLAIN DOWEL BAR 1:100 MTS 12 SCALE: 30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER BASE SEALING COMPOUND TYPICAL PLAN OF A TWO- LANE UNDOWELED PAVEMENT SCALE: P L A N FLARING OF EXISTING CONCRETE PAVEMENT REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION STANDARD PORTLAND CEMENT CONCRETE PAVEMENT JOINTS (PLAIN) DRAFSMAN II PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. 4500 1500 MINIMUM DOWELED BARS "T" LINE SHOWING TRANSVERSE CONSTRUCTION JOINT AT LOCATION OF WEAKENED PLAIN JOINT LANE SHOWING TRANSVERSE CONSTRUCTION JOINT AT MIDDLE THIRD OF NORMAL JOINT INTERVAL S S S S S S (TIE BARS) DOWEL BARS D SPACING OF DOWEL BARS (DIAMETER=36mm / LENGTH=600mm) T/3 400 400 400 400 400 400 SAWED GROOVE TYPE 90 M. ANCHOR AT EVERY ADJACENT EXISTING STRUCTURES SCALE: SCALE: 1:100 MTS 25 1:20 MTS 6 mm RADIUS PREMOLDED JT. FILLER (mm) 300 290 PREMOLDED STRIP TYPE DETAIL "M" ON WEAKENED GROOVE METAL SIDE FORM (KEYED JOINT) DETAIL OF SIDE FORMS TYPICAL PLAN OF A TWO- LANE DOWELED PAVEMENT DEFORMED TIE BAR POURED ASPHALT SEAL 30 TO 50 PENETRATION SPACING, S SLAB DEPTH, T (mm) 280 11 DOWEL BARS 25 T/4 S 6 S T/4 S (TIE BARS) 6 5 S DOWELED BARS S 5 300 300 ) C T/3 LONGITUDINAL JOINT BAR SUPPORT 280 290 300 310 320 330 340 ALL TRANSVERSE CONSTRUCTION JOINTS SHOULD BE BUTT JOINTS WITH DOWELS. SPACING FOR SPACING FOR SPACING FOR SPACING FOR 36mmØ DOWEL BAR 32mmØ DOWEL BAR 28mmØ DOWEL BAR 25mmØ DOWEL BAR (mm) (mm) (mm) (mm) 300 250 190 150 290 230 170 140 270 210 160 130 250 200 150 120 230 190 140 110 220 180 130 110 200 170 130 100 T/3 A SLAB DEPTH,(T) (mm) 11 B TABLE FOR SPACING OF PLAIN DOWEL BARS (L=600mm) NOTE: TRANSVERSE CONSTRUCTION JOINT SHALL BE PROVIDED AT THE END OF ANY RUN WHERE LAYING OF CONCRETE HAS BEEN STOPPED FOR THIRTY (30) MINUTES OR LONGER. DOWELED BARS (SEE DETAILS) SCALE: 1:20 MTS 295 300 274 310 255 320 238 330 223 340 209 30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER BASE SEALING COMPOUND 25 25 METAL DOWEL CAP WITH INSIDE DIAMETER SAME AS DOWEL BAR DIAMETER + 1.56mm TO BE PLACED ON EACH DOWEL BAR ON ALTERNATE END (SEE DETAIL "F") SLIDING DETAIL "A" (LONGITUDINAL CONSTRUCTION JOINT) SCALE: 1:20 MTS C 600 300 0.200 150 SCALE: D+1.56 SCALE: 1. 2. 3. 4. KEEP EXISTING TIE BARS T 300 EXISTING CONCRETE PAVEMENT 5. T T/3 T/3 6 T/4 5 T/3 1:20 MTS 6. 7. 300 8. NEW PAVEMENT 600 FIRST SLAB CONSTRUCTION JOINT 300 ( TO BE USED FOR WIDENING EXISTING CONCRETE PAVEMENT) 600 D DETAIL "D" (BUTT TRANSVERSE CONSTRUCTION OR CONTACT JOINTS) SCALE: SCALE: REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION 10. 11. 12. 13. STANDARD PORTLAND CEMENT CONCRETE PAVEMENT JOINTS SCALE: 1:20 MTS PROJECT NAME AND LOCATION: 9. 1:20 MTS AS SHOWN DRAFTED: SHEET CONTENTS: 1:20 MTS REVIEWED: MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE "DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, 2013". CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE JOINT IS POURED AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE. NO CONSTRUCTION JOINT SHALL BE PLACED WITHIN 1.50 M. FROM THE WEAKENED PLANE JOINT. AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN THAT NO CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE FIRST SLAB. TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BARS SHALL BE SMOOTH ROUND STEEL BARS FREE FROM RUST AND OTHER DEFECTS (REFER TO CLAUSE 3, 1, 3, AND 12 THE STANDARD SPECIFICATION FOR ROADS AND BRIDGES 1995) TYPE OF WEAKENED PLANE JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY ONE TYPE SHALL BE USED FOR THE WHOLE PROJECT. MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18 OF BLACK IRON FREE FROM RUST AND LINKS. AT LEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS AT NORMAL JOINT SPACING SHALL BE PROVIDED BEFORE OR AFTER AN EXPANSION JOINT. THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE SEALED WITH 30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER THE CONCRETE HAD BEEN CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC. PENETRATION ASPHALT SEAL ON CONCRETE PAVEMENT JOINTS SHALL BE POURED IN SUCH A MANNER THAT SPILLING WILL BE PREVENTED THUS, PROVIDING A SMOOTH LEVELING/RIDING SURFACE. ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT SHALL BE CONTINUOUS FORM EDGE TO EDGE ALL LONGITUDINAL JOINTS SHALL MEET AT INTERSECTIONS WITH NO GAPS OR OFFSET. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. AVOID STOPPAGE OF FORM WORKS ALONG CURVES. CONSTRUCT EXPANSION JOINT AT EVERY 60 METERS ANCHOR AT EVERY ADJACENT EXISTING STRUCTURES. SUBMITTED: RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 16MMØ DRILLED HOLES FILLED WITH EPOXY RESIN/ HARDER GROUT GENERAL NOTES: 1:20 MTS CONST. JOINT TO BE MOPPED W/ ASPHALT STEEL BASKET FOR SETTING DOWELS 300 NEW PAVEMENT CONSTRUCTION JOINT DETAIL "F" ON METAL DOWEL CAP DETAIL "B" CONTRACTION JOINT DOWEL BARS (PLAIN BARS) PAINTED WITH RED LEAD THEN GREASED. 300 WHERE: Te = THICKNESS OF EXISTING PAVEMENT Tn = THICKNESS OF NEW PAVEMENT SCALE: DOWEL BARS (PLAIN BAR) RED LEAD AND GREASED OR BITUMEN COATED SCALE: 300 ( TO BE USED FOR WIDENING EXISTING CONCRETE PAVEMENT) T=SLAB DEPTH T T T/4 B PLAIN DOWEL BAR SAWED CUT DEPTH =T/4 20 600 METAL DOWEL CAP GAUGE NO.18 TO PLACED ON EACH DOWEL BAR ON ALTERNATE END 75 12mmØ CHAIR (BASKET) FOR EVERY DOWEL BARS 12mmØ PLAIN L= 300mm FOR EVERY OTHER DOWEL BARS 1:20 MTS 50 SEE DETAIL "M" ON WEAKENED GROOVE EXISTING CONCRETE PAVEMENT DETAIL "C" (DOWELED EXPANSION JOINT) 300 150 SEE DETAIL "F" ON METAL CAP n HALF OF THE BAR ON THE SIDE OF THE METAL DOWEL CAP SHALL BE PAINTED W/ RED LEAD AND THEN GREASED 25 25MM PRE-MOLDED EXPANSION FILLER (TO BE USED FOR ONE LANE CONSTRUCTION) 50 Te/2 300 600 A TIE BARS T FIXED SEE NOTE ABOVE n 300 75 T T/3 T/3 T/3 PLAIN DOWEL BAR REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION STANDARD PORTLAND CEMENT CONCRETE PAVEMENT JOINTS (DOWELED) DRAFSMAN II PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. 3mm 9mm TOP OF PIPE TO BE MARKED "TOP" 9mm 3mm PAY LENGTH E C B I.D. SIZE OF PIPE I.D . I.D . I.D . P O.D. A B I.D.=SIZE OF PIPE P 32 mm A 32mm 3mm C E W W W B ONE LINE OF CIRCULAR REINFORCEMENT 3mm 3mm TONGUE END TWO LINES OF CIRCULAR REINFORCEMENT B SECTION 9mm 3mm C P ONE LINE OF ELLIPTICAL REINFORCEMENT 3mm 3mm TWO LINES OF CIRCULAR REINFORCEMENT 9mm 32 mm ONE LINE OF CIRCULAR REINFORCEMENT GROOVE END D DETAIL OF R.C.P. ENDS C SECTION 5 A LONGITUDINAL SECTION CONCRETE COLLAR c 1 DEPTH (mm) MINIMUM REINFORCEMENT 2 cm /m OF PIPE WALL THICKNESS (mm) CIRCULAR ELLIPTICAL REINFORCEMENT REINFORCEMENT TONGUE (mm) GROOVE (mm) DEPTH (mm) W A B C E P MINIMUM REINFORCEMENT 2 cm /m OF PIPE 0.00025mCRACK CIRCULAR ELLIPTICAL REINFORCEMENT REINFORCEMENT LOAD I.D. I.D. W A B C E P 12 300 57 344 363 351 370 44 1 LINE 1.48 51 495 514 502 521 44 1 LINE 1.69 15 380 57 344 363 351 370 44 1 LINE 1.90 51 495 514 502 521 44 1 LINE 2.33 WALL THICKNESS (mm) THREE-EDGE-BEARING METHOD TONGUE (mm) GROOVE (mm) ULTIMATE LOAD W A B C E 3.355 5.218 - - - - - 3.914 6.060 - - - - - 4.473 6.709 - - - - - DEPTH (mm) P t STRENGTH TEST REQUIREMENTS 2 kg/m OF PIPE MINIMUM REINFORCEMENT 2 cm /m OF PIPE THREE-EDGE-BEARING METHOD CIRCULAR ELLIPTICAL 0.00025mCRACK REINFORCEMENT REINFORCEMENT LOAD LOAD ULTIMATE 460 64 508 527 514 534 44 1 LINE 2.54 1 LINE 2.12 51 495 514 502 521 44 1 LINE 2.96 24 610 76 673 692 680 699 44 1 LINE 3.60 1 LINE 2.75 64 660 680 667 686 44 1 LINE 4.23 1 LINE 3.60 4.473 7.454 76 673 692 680 699 44 1 LINE 5.50 1 LINE 4.23 5.964 8.945 30 760 89 858 857 845 864 51 1 LINE 4.66 1 LINE 3.60 76 825 845 832 851 51 1 LINE 5.92 1 LINE 4.44 5.032 8.573 89 838 857 845 864 51 1 LINE 6.56 1 LINE 5.08 7.454 11.182 910 102 1003 1022 1010 1029 64 1 LINE 3.81 86 988 1007 994 1013 64 2 LINES EACH 4.66 1 LINE 4.66 6.038 9.840 102 1003 1022 1010 1029 64 2 LINES EACH 5.92 1 LINE 5.92 8.945 13.418 42 1070 114 1168 1187 1175 1194 64 2 LINES EACH 4.44 1 LINE 4.44 95 1150 1165 1156 1175 64 2 LINES EACH 5.29 1 LINE 5.29 7.045 10.958 114 1168 1187 1175 1194 64 2 LINES EACH 6.98 1 LINE 6.98 10.436 15.655 48 1220 127 1334 1353 1340 1359 64 2 LINES EACH 5.29 1 LINE 5.29 108 1315 1334 1321 1340 64 2 LINES EACH 6.56 1 LINE 6.56 8.051 11.927 127 1334 1353 1340 1359 64 2 LINES EACH 8.04 1 LINE 8.04 11.927 17.891 64 2 LINES EACH 6.98 64 2 LINES EACH 8.68 64 2 LINES EACH 10.58 152 1664 1683 1670 1690 1 LINE 6.98 127 1639 1658 1645 1664 1 LINE 8.68 8.945 14.909 152 1664 1683 1670 1690 THE DISTANCE FROM CENTERLINE OF THE REINFORCEMENT TO THE NEAREST SURFACE OF THE CONCRETE HAS BEEN ASSUMED AS 32mm FOR PIPES WITH A SHELL THICKNESS OF 64mm OR MORE. t c t c I.D. t c 36 2 LINES EACH 3.81 1520 GRAVEL BEDDING E DETAIL OF R.C.P. JOINT 18 60 c GROOVE (mm) 2 CONCRETE 317 kg/cm (4,500 lb/in ) kg/m OF PIPE I.D. TONGUE (mm) STRENGTH TEST REQUIREMENTS 2 t WALL THICKNESS (mm) CONCRETE 317 kg/cm2 (4,500 lb/in ) 1 LINE 10.58 13.418 22.364 NOTE : THIS DRAWING WAS COPIED FROM THE PREVIOUSLY APPROVED CARMONA TERNATE - NASUGBU - LOOC PROJECT. MACHINE MADE 610 64 90 130 760 76 102 130 HAND MADE 910 86 114 150 1220 110 - 150 1520 127 - 150 c t TEST LOADS FOR SAND-BEARING TEST SHALL BE ONE AND ONE - HALF TIMES THOSE SPECIFIED IN THIS TABLE FOR THE THREE - EDGE BEARING TEST. c I.D. t SIZE OF PIPE (in) (mm) 2 100 CONCRETE 247 kg/cm2 (3,500 lb/in ) EXTRA STRENGTH REINFORCED CONCRETE PIPE CULVERTS I.D. STANDARD STRENGTH REINFORCED CONCRETE PIPE CULVERTS FINISHED GRADE df = be + 15cm FOR PIPES > 760mm Ø df = be + 75cm FOR PIPES > 760mm Ø df = DEPTH OF FILL bc = OUTSIDE DIAMETER OF PIPE FINISHED GRADE ROLLER-COMPACTED EMBANKMENT df STEP 1 - CONSTRUCT COMPACTED EMBANKMENT TO AN ELEVATION ABOVE TOP OF PROPOSED PIPE. STEP 2 - TRENCH THROUGH THIS COMPACTED EMBANKMENT AND INSTALL PIPE BACKFILL WITH COMPACTED GRANULAR MATERIAL. STEP 3 - COMPLETE EMBANKMENT IN USUAL MANNER. ROLLER-COMPACTED EMBANKMENT STEP 1 - CONSTRUCT COMPACTED EMBANKMENT TO A TOTAL DEPTH EQUAL TO TWICE THE OUTSIDE DIAMETER OF THE PIPE. STEP 2 - TRENCH THROUGH THIS COMPACTED EMBANKMENT AND INSTALL PIPE BACKFILL WITH COMPACTED GRANULAR MATERIALS TO TOP OF PIPE. SHEET CONTENTS: AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION bc+10cm bc 10 pbc GRANULAR BACKFILL STEP 3 - FILL REMAINDER OF TRENCH WITH BACKFILL PLACED IN LOOSEST POSSIBLE CONDITION. ROCK CONCRETE CRADLE BEDDING DRAFTED: EARTH CUSHION 2cm PER METER OF H WHEN H<5m 4cm WHEN H > 5m H=HEIGHT OF FILL FROM TOP OF CULVERT bc 10 MIN= 3bc 10 pbc MAX.p=0.7 MIN= STEP 4 - COMPLETE EMBANKMENT IN NORMAL MANNER. REVIEWED: FIRST CLASS BEDDING SUBMITTED: ORDINARY BEDDINGS RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES REGIONAL OFFICE NO. 1 MIN= THOROUGHLY TAMPED EARTH CONCRETE OR SETTER CALIFORNIA METHOD B PROJECT NAME AND LOCATION: EARTH EARTH ACCURATELY SHAPED TO FIT PIPE MIN=bc/4 EARTH OR ROCK GROUND CALIFORNIA METHOD A DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MIN= bc 10 MIN=1/4 INSIDE DIAMETER VERY LOOSE FILL ROLLER-COMPACTED EMBANKMENT bc bc df GROUND FINISHED GRADE COMPACTED GRANULAR MATERIAL df = 2bc COMPACTED GRANULAR FILL ROLLER-COMPACTED EMBANKMENT FINISHED GRADE bc FINISHED GRADE bc FINISHED GRADE REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION DRAFSMAN II STANDARD REINFORCED CONCRETE PIPE CULVERT (RCPC) DETAILS PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. 300 A3 75 :1 S PE NOT t TO I.D. NOT TO 200 SCALE t t t A4 t I.D. I.D. CL CL t 0 19 15 SECTION A3 E- CL NOT TO GROUND LINE 12mmØ BARS @ 300 MEASURED ALONG AXIS OF WINGS SEE DISTANCE OF BAR SECTION h H VARIES BATTE 12mmØ BARS @ 300 2-16mmØ BARS EXTEND INTO BACKWALL 150 ELEVATION A2b SCALE VARIES TO SUIT LOCAL CONDITION ELEVATION A1b 600 150 75 G.L. t G.L. 12mmØ BARS @ 300 R 1:4 150 t 100 I.D. 300 I.D.+150 I.D. 150 t I.D. 150 t G.L. 200 2-16mmØ BARS LO 75 G.L. EXTEND 300 INTO BACKWALL 12mmØ BARS @ 300 200 1.5 ACCORDING TO SIZE OF PIPE E-19 460(MIN) 300 2-16mmØ BARS SECTION A4 SCALE NOT TO DETAIL A5 SCALE NOT TO SCALE 2 3 200 12mmØ BARS @ 300 O.C. L F F 1-2/3 I.D. L TABLE B ( ONE FLARED TYPE HEADWALL 1.5:1 ) 12mmØ BARS @ 300 O.C. 12mmØ BARS @ 300 O.C. A1a W/2 SCALE TO SCALE E NOT A1 95 20 PLAN A2a TYPE "HW ( C ) - B" FLARED TYPE HEADWALL (SINGLE PIPE) NOT W TO 0 INTERNAL DIAMETER (I.D.) MIN.THK. SHELL(t) 460 610 910 1070 1220 1520 50 60 80 90 110 130 SCALE FLARED TYPE HEADWALL (DOUBLE PIPE) NOT SCALE TO DIMENSIONS (mm) L E 690 960 1510 1100 1370 1920 380 530 840 610 760 1070 SINGLE PIPE F h 570 800 1260 910 1140 1600 AREA OF WATERWAY m3 0 0 600 600 600 600 DOUBLE PIPE EST. OF QUANTITIES W (mm) 0.17 0.29 0.65 0.90 1.17 1.81 REINF. STEEL kg. 12.70 15.87 24.94 61.22 83.45 133.79 CONC. m3 610 760 1070 1220 1370 1680 0.55 0.82 1.55 1.45 1.88 2.86 TRIPLE PIPE EST. OF QUANTITIES AREA OF WATERWAY m2 W (mm) 0.33 0.58 1.30 1.80 2.34 3.63 1370 1780 2590 3000 3400 4220 CONC. m3 0.78 1.16 2.22 2.41 3.10 4.71 REINF. STEEL kg. 21.77 24.94 47.62 97.50 130.61 200.45 EST. OF QUANTITIES AREA OF WATERWAY m2 W (mm) 0.50 0.88 1.95 2.70 3.51 5.44 2100 2770 4110 4820 5510 6850 CONC. m3 1.05 1.55 3.26 4.16 5.15 7.40 REINF. STEEL kg. 46.55 69.19 140.32 177.11 218.26 305.72 TABLE A ( ONE STRAIGHT TYPE HEADWALL ) DIA. & THICKNESS(mm) DIMENSIONS (mm) SINGLE PIPE INTERNAL DIAMETER (I.D.) MIN.THK. SHELL(t) A B H W (mm) AREA OF WATERWAY m2 460 610 910 1070 1220 1520 50 64 86 95 108 127 310 410 610 710 810 1010 350 430 600 780 870 980 1070 1320 1820 2080 2330 2830 1800 2400 3800 4300 4800 6000 0.17 0.29 0.65 0.90 1.17 1.81 DOUBLE PIPE CONCRETE m3 REINF. STEEL kg. W (mm) AREA OF WATERWAY m2 3.20 4.26 6.75 7.64 8.52 10.66 2600 3500 5200 6050 6900 8600 0.33 0.58 1.30 1.80 2.34 3.63 CONCRETE m3 M.M. W (mm) AREA OF WATERWAY m2 0.63 1.19 3.15 5.09 6.69 11.93 4.62 6.22 9.24 10.74 12.25 15.27 3400 4600 6700 7900 9000 11200 0.45 0.87 1.95 2.70 3.51 5.43 300 REINF. STEEL kg. 0.80 1.52 3.92 6.43 8.45 15.05 6.04 8.17 11.90 14.03 15.98 19.89 W E LOP :1 S 12mmØ BARS t ID H t ID H t ID 100 t 1.5 CONCRETE m3 M.M. 200 2-12mmØ BARS 12mmØ BARS REINF. STEEL kg. 300 W TRIPLE PIPE M.M. 0.46 0.87 2.46 3.84 4.93 8.80 ID SOLID PLAIN CONCRETE B A7a SINGLE PIPE NOT TO A7b SCALE A7 1-2/3 I.D. SECTION NOT TO A7c SCALE REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION TO SCALE SCALE STANDARD REINFORCED CONCRETE HEADWALL FOR RCPC SHEET CONTENTS: AS DRAFTED: SHOWN REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NOT TO SCALE PROJECT NAME AND LOCATION: DOUBLE PIPE STRAIGHT-TYPE HEADWALL "HW ( C ) - A" NOT A ID A A A1 TO 95 0 20 E PLAN NOT DIA. & THICKNES(mm) REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION DRAFSMAN II STANDARD REINFORCED CONCRETE HEADWALL FOR RCPC PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. 1.00 20.0 MTS RROW 1.55 1.00 1.00 0.50 S =1 : 24 ITEM 200 - AGGREGATE SUB BASE COURSE 1.00 M A S O N R Y Ht = VARIABLE H 1.00 Ht = VARIABLE H S =1 : 24 Ht = VARIES S T O N E ITEM 104 - EMBANKMENT (FROM ROADWAY EXCAVATION) SELECTED BORROW MIXED SAND & GRAVEL RIVER MIXED 0.60 ITEM 200 - AGGREGATE SUB BASE COURSE B = 0.65 CLOTH TIED AT THE INNER END OF THE WEEPHOLES AND 120MM MEDIUM GRAVEL AND 120MM FINE GRAVEL SPACED AT 2.0M. ON CENTER HORIZONTAL AND 1.0 M. VERTICAL STAGGERED NATURAL GRADE LINE H B = 0.65 H E (RICE FIELD) ELEVATION CLOTH OR TIED AT THE INNER END OF THE WEEPHOLES AND 120MM MEDIUM GRAVEL AND 120MM FINE GRAVEL SPACED AT 2.0M. ON CENTER HORIZONTAL AND 1.0 M. VERTICAL STAGGERED SEE DETAIL ON WEEPHOLES BOTTOM BASE OF STONE MASONRY STONE MASONRY PERSPECTIVE MIN. MIN. 0.60 MIN. NATURAL GRADE LINE 0.60 AT THE INNER END OF THE WEEPHOLES AND 120MM MEDIUM GRAVEL AND 120MM FINE GRAVEL SPACED AT 2.0M. ON CENTER HORIZONTAL AND 1.0 M. VERTICAL STAGGERED SECTION "E" DETAIL "D" ON STONE MASONRY SCALE FINE GRAVEL, t=120MM 1: 60 MTS MEDIUM GRAVEL, t=120MM MASONRY = .............23.55 kN/ Cu.m. SOIL = .......................15.70 kN/ Cu.m. Ø = .................................35.70° ANGLE OF INTERVAL REPOSE Qa = ..............................196 kPa (TO BE VERIFIED DURING CONSTRUCTION) =................................. 0.50 ASSUMED COEFFICIENT OF FRICTION Qs = ...............................22.52 kPa FSo =..............................2.00 FS =..............................1.5 NOTE: ( STONE MASONRY) FILTER CLOTH TIED AT THE INNER END OF THE WEEPHOLES PRIOR TO CONSTRUCTION, CONDUCT SOIL INVESTIGATION IN ACCORDANCE WITH THE STANDARD TESTING REQUIREMENT ALONG THE ALIGNMENT OF STONE MASONRY WALL TO VERIFY THE REQUIRED DESIGN SOIL BEARING CAPACITY OF THE FOUNDATION BED. 6.000 6.000 MORTAR BOULDERS NOTE: 6.000 6.000 DESIGN CRITERIA OF STONE MASONRY ON CENTER HORIZONTAL AND 1.0 M. VERTICAL, STAGGERED ALLOWABLE SOIL BEARING CAPACITY = 196 Kn/m CL S =1 : 24 H 10 SLOPE 0.0 % 6.10 CARRIAGEWAY 0.70 3.05 3.05 0.70 SEE DETAIL "A" 0.50 SLOPE 2.0 % 0.50 SLOPE 1.5 % SLOPE 1.5 % SLOPE 2.0 % ON FILL NATURAL GRADE LINE ITEM 311(1)c1 - PORTLAND CEMENT CONCRETE PAVEMENT t = 0.23 m.(CARRIAGEWAY) ITEM 105 - SUB-GRADE PREPARATION ITEM 311(1)c1 - PORTLAND CEMENT CONCRETE PAVEMENT t = 0.23 m. (SHOULDER) TYPICAL DETAIL ON WEEPHOLES ON STONE MASONRY ITEM 200 - AGGREGATE SUB BASE COURSE t = 0.20 m. SCALE EXISTING PCCP 1: 20 MTS NOTES: 1. TYPICAL ROADWAY SECTION ON CONSTRUCTION OF PCCP W/ STONE MASONRY, 2. 1: 10 MTS SCALE 0 THE COST OF FINE MEDIUM GRAVEL, WEEPHOLES, (BURLAP[ CLOTH) USED FOR THE WEEPHOLES SHALL BE CONSIDERED SUBSIDIARY TO COMPLETION OF PAY ITEM WHERE IT IS USED. ALL WEEPHOLES SHALL HAVE A SLOPE OF 0.5%. 1 2 4 SCALE 1:2 MTS PROJECT NAME AND LOCATION: REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SHEET CONTENTS: REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION TYPICAL ROADWAY SECTION ON CONSTRUCTION OF PCCP DETAIL OF STONE MASONRY AND NOTES DRAFSMAN II PREPARED: DESIGN CRITERIA OF STONE MASONRY DETAIL OF WEEPHOLES ON STONE MASONRY ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO. SUMMARY OF QUANTITIES A) HOOKS AND BENDS III. STATIONINGS HOOKS AND BENDS SHALL BE AS SHOWN IN THE FOLLOWING TABLE a) THE ROAD STATIONING AND ELEMENTS OF CURVES ARE RELATIVE TO THE ULTIMATE CENTERLINE OF THE ROAD. b) EQUATION OF STATIONS WHEN USED (BACK STATION/AHEAD STATION) ARE PROVIDED AT THE BEGINNING OR END OF THE CURVE AND/OR AT FULL STATION. SIZE OF BARS 10 12 16 IV. HORIZONTAL CONTROL STIRRUP & TIE 90° 135° 100 100 113 113 150 138 END HOOKS 180° 90° 150 125 200 150 250 175 a) BASIC TRAVERSE STATIONS WERE ESTABLISHED BASED ON EXISTING PERMANENT STRUCTURES AT THE PROJECT SITE. STIRRUP TIE 135° 125 163 200 A A Do db Do db A END HOOK ELEVATIONS WERE ASSUMED AT THE FIRST BENCH MARK AT THE BEGINNING OF EACH SECTION OF THE PROJECT BENCH MARKS WERE ESTABLISHED AT EXISTING UNDISTURBED STRUCTURES AT DIFFERENT INTERVALS ALONG THE PROJECT. db db D a) b) D V. VERTICAL CONTROL db STIRRUP & TIE HOOK STIRRUP TIE D = 4 db for db < 20 D = 6 db for db > 30 Do = 6 db for db < 30 Do = 8.7 db for db > 30 VI. HORIZONTAL ALIGNMENT a) THE HORIZONTAL ALIGNMENT SHOWN IN THESE DRAWINGS FOLLOWS THE LONGITUDINAL JOINT OF THE PCC PAVEMENT (WHICH IS DEFINED AS THE EXISTING CENTERLINE) WITH MINOR DEVIATION DUE MAINLY TO SOME CONSTRUCTION ERRORS DURING ORIGINAL CONSTRUCTION STAGE. MINOR ADJUSTMENT OF THE HORIZONTAL ALIGNMENT MAY BE MADE AS DIRECTED BY THE ENGINEER TO SUIT THE ACTUAL FIELD CONDITION. VII. REMOVAL OF EXISTING STRUCTURES & OBSTRUCTIONS NOTE: 1. ALL WORKS SHALL COMPLY WITH THE STANDARD SPECIFICATION FOR PUBLIC WORKS AND HIGHWAYS, 2013. 2. PORTIONS OF EXISTING UTILITIES, SUCH AS WATER MAINS. IRRIGATION CHANNELS, TELEPHONE POST AND TRUNKLINES, ETC. THAT MAY CAUSE OBSTRUCTION TO THE CONSTRUCTION OF THIS PROJECT SHALL BE RELOCATED BY THE ENTITY OR OWNER CONCERNED, EXTREME PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE ANY SECTION OF THE EXISTING PUBLIC UTILITIES DURING CONSTRUCTION. ANY REPAIR OF DAMAGE THEREOF SHALL BE ON THE ACCOUNT OF THE CONTRACTOR,ANY REMOVAL OF MISCELLANEOUS STRUCTURES THAT MAY BE REQUIRED SHALL BE CONSIDERED SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT ITEM. NO DIRECT PAYMENT SHALL BE MADE FOR THIS WORK EXCEPT FOR SPECIFIC ITEMS EXPLICITLY FOR PAYMENT IN THE BID SCHEDULE. QUANTITY OF VARIOUS WORK ITEMS ARE SUBJECT TO DECREASE OR INCREASE DEPENDING ON THE ACTUAL FIELD CONDITION BEFORE THE START OF ACTUAL CONSTRUCTION, THE AS- STAKED PLAN SHALL BE SUBMITTED TO THE REGIONAL OFFICE IN ORDER THAT IMMEDIATE STEPS MAY BE UNDERTAKEN TO CORRECT OR ADJUST WHATEVER APPRECIABLE DEVIATION THERE MAY BE FROM THE ORIGINAL PLAN. THE REFERENCE FOR IMPLEMENTATION SHALL BE THE AS- STAKED PLAN. X. SLOPE/EMBANKMENT PROTECTION WORKS (GROUTED RIPRAP/STONE MASONRY) 1. FOUNDATION OF EMBANKMENT PROTECTION WORKS SHALL SIT ON A FIRM AND STABLE FOUNDATION. ALLOWABLE SOIL BEARING CAPACITY SHALL NOT LESS THAN 196 KPa. SOIL BORING TEST SHALL BE CONDUCTED DURING CONSTRUCTION TO VERIFY THE ACTUAL SOIL BEARING CAPACITY OF SOIL SPOTS UNDER IF THE RESULT IF SOIL TEST REVEALS THAT BEARING CAPACITY IS BELOW WHAT IS REQUIRED.THE FOUNDATION SHALL BE REMOVED AND REPLACED WITH SUITABLE BEDDING MATERIALS OR CONCRETE CLASS "B". 2. SOFT SPOTS BETWEEN THE CUT FACE AND SLOPE/ EMBANKMENT PROTECTION WALLS MUST BE FILLED WITH ROCKS OR SUITABLE MATERIALS SUCH BACKFILL MATERIALS PLACED BEHIND THE WALL SHALL BE FREE DRAINING AND NON EXPANSIVE AND WATER SHALL BE DRAINED BY WEEPHOLES PLACES AT SUITABLE INTERVALS AND ELEVATIONS. 3. THE DEPTH OF PENETRATION SHALL BE MEASURED FROM THE LEVEL OF THE ORIGINAL GROUND SURFACE AND SHALL NOT INCLUDE EXCAVATED MATERIALS 4. THE THICKNESS OR DIAMETER OF STONES FOR STONE MASONRY SHALL NOT BE LESS THAN 150mm. XI. PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) 1. VIII. DRAINAGE STRUCTURES CONSTRUCTION (CONTACT) JOINTS ARE FORMED WHEN CONCRETE ON ONE SIDE OF THE JOINT IS POURED AHEAD AND ALLOWED TO SET BEFORE POURING ON THE OTHER SIDE. AT CONSTRUCTION JOINTS (LONGITUDINAL OR TRANSVERSE) CARE SHOULD BE TAKEN THAT NO CONCRETE FROM THE LAST SLAB PLACED OVERHANGS ANY PORTION OF THE FIRST SLAB. 3. TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BAR SHALL BE SMOOTH ROUND STEEL BAR FREE FROM RUST AND OTHER DEFECTS WHICH MIGHT RESTRICT THEIR MOVEMENT. 4. TYPE OF WEAKENED JOINT TO BE USED SHALL BE AS SPECIFIED IN THE PLANS AND ONLY ONE TYPE SHALL BE USED FOR THE WHOLE PROJECT. 5. MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET METAL GAUGE NO. 18OF BLACK IRON FREE FROM RUST AND LINKS. 6. AT LEAST SIX (6) SUCCESSIVE DOWELED BUTT JOINTS AS NORMAL JOINT SPACING SHALL BE PROVIDE BEFORE OR AFTER AN EXPANSION JOINT. 7. THE GROOVE OR CRACK ABOVE JOINTS (LONGITUDINAL OR TRANSVERSE) SHALL BE SEALED WITH 30-50 PENETRATION ASPHALT SEAL OR COLD APPLIED LIQUID RUBBER COMPOUND AFTER THE CONCRETE HAD BEEN CURED AND BEFORE OPENING PAVEMENT TO TRAFFIC. 8. ALL TRANSVERSE JOINTS, EXCEPT CONSTRUCTION JOINT, SHALL BE CONTINUOUS FROM EDGE TO EDGE. 9. ALL LONGITUDINAL JOINT SHALL MEET AT INTERSECTION WITH NO GAPS OR OFFSET. 10. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 11. AVOID STOPPAGE OF FRAMEWORKS ALONG CURVES. 12. TRANSVERSE CONSTRUCTION (CONTACT) JOINT SHALL BE PROVIDE AT THE END OF ANY RUN WHERE LAYING OF CONCRETE HAS BEEN STOPPED FOR THIRTY (30) MINUTES OR LONGER. 13. TRANSVERSE CONSTRUCTION JOINTS WHICH OCCUR LOCATION OF WEAKENED PLANE JOINTS WITH DOWELS IF JOINT OCCURS IN THE MIDDLE THIRD OF THE WEAKENED JOINT INTERVAL (1500-300mm) IT SHOULD BE KEYED JOINTS WITH THE BARS. 2. C E R T I F I C A T I O N This is to certify that the Detailed Engineering Surveys and Designs for the project REHABILITATION OF STA. ROSA - CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION with Project ID No._______________ had been conducted in accordance with the DPWH Standards and Specifications, 2013 edition. This Certification is being issued for all legal intents and purposes. 1. EXACT LOCATIONS, SLOPES, OUTFALLS, AND INVERT ELEVATIONS OF DRAINAGE STRUCTURES SHALL BE CHECKED IN THE FIELD BY THE ENGINEER. MINOR ADJUSTMENT MAY BE MADE WITH THE APPROVAL OF THE ENGINEER TO SUIT ACTUAL FIELD CONDITIONS. 2. ANY REVISIONS REMOVAL AND /OR RELAYING OF DRAINAGE STRUCTURE AS DIRECTED BY THE ENGINEER TO SUIT EXISTING FIELD CONDITIONS SHALL BE CONSIDERED AS SUBSIDIARY WORK PERTAINING TO OTHER CONTRACT ITEMS NO DIRECT PAYMENT SHALL BE MADE FOR THIS WORK UNLESS OTHERWISE SPECIFICALLY IDENTIFIED FOR PAYMENT IN THE BID SCHEDULE. 3. EXISTING DRAINAGE STRUCTURES OR PART THEREOF REMOVED BY THE CONTRACTOR THAT ARE STILL SERVICEABLE SHALL BE TURNED OVER TO THE GOVERNMENT AND SHALL BE DEPOSITED AT A PLACE WITHIN THE PROJECT SITE DESIGNATED BY THE ENGINEER WITHOUT ANY EXTRA COMPENSATION. EXTREME PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE THESE MATERIALS DURING THE REMOVAL AND HANDLING. Given this ____ day of ____________, year ______. ALBERTO B. ESQUEJO, JR. Chief, Planning and Design Division IX. STRUCTURAL CONCRETE STRUCTURES IX.1) CONCRETE a) UNLESS OTHERWISE INDICATED ON THE PLANS. THE MINIMUM CYLINDER STRENGTH OF STRUCTURAL CONCRETE AT 28 DAYS SHALL BE 21.00 MPa. GENERAL NOTES b) THE MINIMUM COVERING FOR SURFACE OF CONCRETE TO THE FACE OF THE NEAREST BAR SHALL BE 50mm. ALL CONCRETE SHALL BE POURED WHERE THERE IS A PERMISSIBLE WEATHER CONDITION AND NO OTHER ENVIRONMENT HAZARD WILL AFFECT THE POURING. I. STANDARD SPECIFICATIONS IX.2) REINFORCING STEEL a) REINFORCING BARS FOR ALL STRUCTURES SHALL BE GRADE 60 (FY=414 MPa) FOR BARS LARGER THAN 16 MM DIAMETER . GRADE 40 ( Fy=275.8 MPa) FOR BARS 16 MM. DIAMETER OR SMALLER. ALL REBARS SHALL BE FREE OF MILL SCALES, OIL OR ANY SUBSTANCE THAT MAY IMPAIR/WEAKER BOND WITH CONCRETE. a) ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES, AND AIRPORTS, VOLUME II, REVISED 2013 AND DESIGN GUIDELINES, CRITERIA AND STANDARDS 2015 EDITION. SPECIAL PROVISIONS AND SUPPLEMENTAL SPECIFICATIONS PERTAINING TO THE PROJECT. IX.3) REINFORCING BAR SPLICING II. DIMENSIONS WHERE SPLICING IS PERMITTED THE MINIMUM LAP LENGTH OF BARS SHALL BE AS PER AASHTO ARTICLE 8.32 ALL SPLICES SHALL BE STAGGERED AT LEAST 40 BAR DIAMETER. WHERE BUTT WELD IS USED INLIEU OF LAPPED CONNECTIONS, THIS SHALL DEVELOP AT LEAST 125% OF THE SPECIFIED YIELD STRENGTH OF THE REINFORCING STEEL BAR. REINFORCING BARS SHALL BE ACCURATELY FORMED TO THE SHAPES AND DIMENSIONS INDICATED ON THE PLAN UNLESS OTHERWISE PERMITTED. ALL REINFORCING BARS REQUIRING BENDING SHALL BE BENT COLD. WHEN REINFORCING BARS ARE BENT BY HEATING THE ENTIRE OPERATION SHALL BE APPROVED BY THE ENGINEER. a) UNLESS OTHERWISE SPECIFIED ALL DIMENSIONS WHICH INCLUDES STATIONING, DISTANCE BETWEEN CONTROL POINTS AND ARE IN DIMENSIONS MILLIMETERS.OF PIPES AND BOX CULVERTS AS SHOWN IN THE PLAN PROFILE,AND CROSS SECTION ARE IN METER AND THE UNIT OF MEASURE AS SHOWN IN THE DETAILS OF STRUCTURES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REGIONAL OFFICE NO. 1 AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REVIEWED: FOR EFFECTIVE DRAINAGE, THE SLOPE OF EDGE OF PAVEMENT (S) SHALL BE 3% GRADE. FOR GRAVEL SHOULDER AND 1.5% FOR CONCRETE SHOULDER. 2. e=s max. CAN BE TAKEN FROM TABLE OF DESIGN VALUE FOR SUPERELEVATION. 3. THE SLOPE OF SHOULDER SHALL ALWAYS FILL IN THE DIRECTION OF THE OUTSIDE EDGE OF THE TRAVELLED WAY. 4. WHEN THE SUPER ELEVATION IS GREATER THAN 3% THEN THE SLOPE OF LOWER SHOULDER SHALL BE THE SAME AS FOR THE TRAVELLED WAY. 5. WHEN SUPER ELEVATION IS 4% OR LESSER, THEN THE LOWER SHOULDER SHALL HAVE A SLOPE OF 3%. 6. IF THE SUPER ELEVATION IS 5% THEN THE CROSS SLOPE OF THE HIGHER SHOULDER IS 2%. BUT FOR A MAXIMUM SUPER ELEVATION OF 8%. THE SLOPE OF THE HIGHER SHOULDER WILL BE -1%. 7. SUPER ELEVATION SHOWN ON THE PROFILE ARE BASED ON CONSTANT 6.10 PAVEMENT WIDTH AND NOT ON VARYING PAVEMENT WIDTH DUE WIDENING. 8. THE CROSS SLOPE OF SUB BASE IS ALWAYS FALLING. 9. ALGEBRAIC DIFFERENCE OF CROSSOVER SHOULD NOT EXCEED 7%. 10. FOR e> 7% SHOULDER SHOULD BE PAVED. SUBMITTED: RECOMMENDED: APPROVED: CATHERINE R. BANGAYAN REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS XII. CROSS SLOPE 1. REHABILITATION OF STA. ROSA-CALINGCAMASAN ROAD, BRGYS. STA. ROSA AND CALINGCAMASAN, SAN JUAN, LA UNION DRAFSMAN II SUMMARY OF QUANTITIES GENERAL NOTES PREPARED: ABRELAINE L. HIPOL ENGINEER II JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO, JR. CHIEF, HIGHWAYS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC- ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR DATE: DATE: EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III DATE: SET NO. SHEET NO.