BIDDING DOCUMENT For Supply, Installation and Services of

advertisement
Government of the People’s Republic of Bangladesh
Deepening MTBF and Strengthening Financial Accountability Project
Finance Division, Ministry of Finance
UCEP Cheyne Tower (2nd floor), 25 Segunbagicha, Dhaka-1000
Bangladesh
BIDDING DOCUMENT
For Supply, Installation and Services of Servers, Fabric Switches,
Load Balancer, Oracle and Windows Software
Lot-A: Database Servers Infrastructure and Oracle Software
Lot-B: Application Servers, Load Balancer, Fabric Switches and Windows
Software
Single-Stage Bidding
Grant No: TF 095283-BD
Project ID: P117248
Invitation for Bid No: DMTBF/Server/368/12-13/1988
Issued on: September 12, 2013
Bidding Package No: G-81
BIDDING DOCUMENT (SINGLE-STAGE)
Issued on: September 12, 2013
for the
Procurement of
: Supply, Installation and Services of Servers, Fabric
Switches, Load Balancer, Oracle and Windows
Software
IFB No: DMTBF/Server/368/12-13/1988 Date: September 12, 2013
Project: Deepening Medium Term Budget Framework (DMTBF)
and Strengthening Financial Accountability Project (Project-A) under
Strengthening Public Expenditure Management Program
Purchaser: Finance Division, Ministry of Finance represented by the
Project Director, Deepening Medium Term Budget Framework
(DMTBF) and Strengthening Financial Accountability Project
(Project-A) under Strengthening Public Expenditure Management
Program
v
CONTENTS
Section I. Instructions to Bidders (ITB)................................................................................5
Table of Clauses ...................................................................................................................6
Section II. Bid Data Sheet (BDS) .........................................................................................43
Section III. Eligible Countries for the Provision of Goods, Works, and Services in
Bank-Financed Procurement ................................................................................................59
Section IV. General Conditions of Contract.......................................................................61
Table of Clauses .................................................................................................................62
Section V. Special Conditions of Contract (SCC) ............................................................137
Notes on preparing the Special Conditions of Contract (SCC) .......................................137
Table of Clauses ...............................................................................................................139
Section VI. Technical Requirements (including Implementation Schedule) .................157
Servers Infrastructure and Windows solution ..................................................................161
Background ..........................................................................................................................162
1.
2.
3.
4.
The Purchaser..........................................................................................................162
Business Objectives of the Purchaser .....................................................................162
Scope of the Procurement .......................................................................................163
Acronyms Used in These Technical Requirements ................................................163
Existing Scenario..................................................................................................................165
5.
6.
Introduction .............................................................................................................165
Current Systems ......................................................................................................165
Overview ...............................................................................................................................167
7.
8.
Developmental Analysis .........................................................................................167
General Summary of Requirement..........................................................................173
LOT-A Database Servers ....................................................................................................176
9.
10.
11.
12.
General Requirements:............................................................................................176
Technical Qualification criteria ..............................................................................177
DATABASE INFRASTRUCTURE SOLUTION (OPTION – 1 OR OPTION – 2)178
OPTION – 1 ............................................................................................................178
12.1.
12.2.
12.3.
12.4.
12.5.
12.5.1.
Database Machine for Production Data Centre (DC)................................................................178
Database Machine for Disaster Data Center (DR) ....................................................................181
Additional Database Machine for Production Data Centre (For DC) .......................................184
RDBMS Specification for DC & DR :.........................................................................................187
Summary of Hardware and Software License ............................................................................194
Database Machine at DC.......................................................................................................194
12.5.2.
12.5.3.
12.6.
12.7.
12.8.
12.9.
12.10.
13.
OPTION – 2 ............................................................................................................205
13.1.
13.2.
13.3.
13.4.
13.4.1.
13.4.2.
13.4.3.
13.5.
13.6.
13.7.
13.8.
13.9.
14.
Database Machine at DR ...................................................................................................... 194
Additional Database Machine at DC .................................................................................... 195
Management Servers (1 unit at DC and 1 unit at DR)............................................................... 195
Backup/Media Servers (1 unit at DC and 1 unit at DR) ............................................................ 196
Backup Storage Appliance (1 unit at DC) ................................................................................. 198
Backup Storage Appliance: (1 unit at DR) ............................................................................... 201
Training and Training Material ............................................................................................ 204
Number of Core Analysis for option-2 DB Machines: ............................................................... 205
Database Servers for Production site [1 unit cluster solution at DC] ...................................... 206
Database Server for Disaster recovery site [ 1 Unit at DR ]..................................................... 209
RDBMS Specification for DC & DR : ........................................................................................ 212
Summary of Hardware and Software License ....................................................................... 218
Database Machine hardware & software at DC ................................................................... 219
Database Machine at DR ...................................................................................................... 220
Management Servers (1 unit at DC and 1 unit at DR)............................................................... 220
Backup/Media Servers (1 unit at DC and 1 unit at DR) ............................................................ 221
Backup Storage Appliance (1 unit at DC) ................................................................................. 222
Backup Storage Appliance: (1 unit at DR) ............................................................................... 226
Training and Training Material ................................................................................................ 229
Resource Allocation ................................................................................................230
LOT-B Application Servers ..............................................................................................231
15.
16.
17.
18.
19.
General Requirements:............................................................................................231
Technical Qualification criteria ..............................................................................231
SCOPE OF WORK .................................................................................................233
Resource Allocation ................................................................................................233
Documentation Requirements .................................................................................234
19.1.
19.2.
20.
END-User documents: ............................................................................................................... 234
Technical Documents: ............................................................................................................... 234
Production Datacentre (At Secretariat) ...................................................................235
20.1.
20.2.
20.3.
20.4.
20.5.
20.6.
20.7.
20.8.
20.9.
20.10.
20.11.
20.12.
20.13.
20.14.
21.
21.1.
21.2.
21.3.
21.4.
21.5.
21.6.
Application server (4 Unit for DC) ............................................................................................ 235
Report Server (1 Unit for DC) ................................................................................................... 236
Test and Development (1 Unit for DC) ...................................................................................... 238
Data Centre Management Server (1 Unit for DC)..................................................................... 240
Primary Domain Controller (1 Unit for DC) ............................................................................. 241
Additional Domain Controller (1 Unit for DC) ......................................................................... 243
Patch Management Server: (1 Unit for DC) .............................................................................. 245
Mail Server: (1 Unit for DC) ..................................................................................................... 246
Backup Tape System: ( 1 Unit for DC) ...................................................................................... 248
Blade Chassis for DC (if blade solution) .............................................................................. 249
InfiniBand switch: ( 1 Unit for DC) ...................................................................................... 250
Existaing SAN Switches Extended ( At DC) .......................................................................... 251
Load Balancer & Application Delivery Controllers (1 Unit for DC).................................... 252
Power Strip (5 Units at DC).................................................................................................. 256
Disaster Recovery Datacentre ( At CGA) ...............................................................256
Application Server (4 Unit for DR) ............................................................................................ 256
Report Server (1 Unit for DR) ................................................................................................... 258
Additional Domain Controller (1 Unit for DR) ......................................................................... 260
Mail Server(1 Unit for DR) ........................................................................................................ 262
Test and Development (1 Unit for DR) ...................................................................................... 263
Data Centre Management Server (1 Unit for DR) ..................................................................... 265
Preface
vii
21.7.
21.8.
21.9.
21.10.
22.
22.1.
22.2.
23.
24.
24.1.
24.2.
25.
25.1.
26.
26.1.
26.2.
26.3.
InfiniBand switch (1 Unit for DR) ..............................................................................................266
Blade Chassis for DR (if blade solution) ....................................................................................267
Load Balancer & Application Delivery Controllers (1 Unit for DR) .........................................268
Power Strip (5 Units at DR)...................................................................................................276
Microsoft Enterprise Agreement for Windows Licenses including Software
Assurance ................................................................................................................276
Windows Software Licenses requirement calculation.................................................................278
Windows Licenses including Software Assurance ......................................................................278
Disaster Recovery Solution for Application server (Hyper-V). ..............................279
Training on Microsoft Solution. .............................................................................281
Local Training: ...........................................................................................................................282
Foreign Training: .......................................................................................................................293
Microsoft Premier Support: ....................................................................................302
Details of Microsoft Services Premier Support ..........................................................................302
Implementation service for Installation and commissioning: .................................304
Microsoft Exchange Solution (DC & DR): .................................................................................305
Unified Communication Solution with Microsoft Lync Server (DC & DR) ................................310
System Management Solution with Microsoft System Center .....................................................318
Service Level Agreement for Lot-A and Lot-B .................................................................329
1.
1.1
1.2
1.3
1.4
1.5
2.
3.
4.
5.
6.
7.
8.
9.
Introduction .............................................................................................................331
Formal Definition of this Document .......................................................................331
Readership...............................................................................................................331
Applicable and Reference Documents ....................................................................331
Period of validity.....................................................................................................331
Changes to the Service ............................................................................................331
Delivery Requirements ...........................................................................................331
SERVICE REQUIREMENTS ................................................................................332
SUPPORT REQUIREMENTS ...............................................................................332
SECURITY REQUIREMENTS .............................................................................337
MONITORING REQUIREMENTS .......................................................................338
REPORTING REQUIREMENTS ..........................................................................338
DISPUTE RESOLUTION ......................................................................................338
GLOSSARY OF DEFINITIONS ............................................................................339
AGREEMENT .....................................................................................................................340
Appendix-A .........................................................................................................................341
APPENDIX B .......................................................................................................................341
Scope of Agreement .............................................................................................................342
Services and Requests Covered Under This Agreement ..................................................342
1.
Technical Support: ............................................................................................345
2.
CHANGES TO SERVICE LEVEL AGREEMENT (SLA) ...............................346
3.
PROCESSES AND PROCEDURES RELATING TO THIS AGREEMENT 347
4.
METRICS...............................................................................................................348
The Organization will provide designated Organization resources to act as devicespecific points of contact for each device deployed. Duties will include: .................... 351
E. Implementation Schedule ...........................................................................................352
Section VII. Sample Forms ................................................................................................377
Notes to Bidders on working with the Sample Forms .....................................................378
Table of Sample Forms ....................................................................................................381
1
Government of the People’s Republic of Bangladesh
Deepening MTBF and Strengthening Financial Accountability Project
Finance Division, Ministry of Finance
UCEP Cheyne Tower (2nd floor)
25 Segunbagicha, Dhaka 1000
Bangladesh
International Competitive Bidding
Invitation for Bids (IFB)
Date: September 12, 2013
BANGLADESH
Deepening Medium Term Budget Framework and Strengthening Financial Accountability
Project (Project A) under Strengthening Public Expenditure Management Program
Grant Number: TF 095283-BD, Project ID: P117248
IFB Title: Supply, Installation and Services for Servers, Fabric Switches, Load Balancer,
Oracle and Windows Software (Lot-A: Database Servers Infrastructure and
Oracle Software; and Lot-B: Application Servers, Load Balancer, Fabric
Switches and Windows Software)
IFB Number: DMTBF/Server/368/12-13/1988
Date: September 12, 2013
Contract: Supply, Installation and Services for Servers, Fabric Switches, Load Balancer,
Oracle and Windows Software (Lot-A: Database Servers Infrastructure and
Oracle Software; Lot-B: Application Servers, Load Balancer, Fabric Switches
and Windows Software)
Contract Package No.: G-81
1.
This Invitation for Bids (IFB) follows the General Procurement Notice (GPN) for this
project that appeared in UNDB online on 09 June 2010.
2.
The People’s Republic of Bangladesh has received a Multi-Donor Trust Fund Grant
from UKaid, European Union (EU), Embassy of the Kingdom of the Netherlands
(KEN), Danish International Development Agency (DANIDA), Canadian International
Development Agency (CIDA) which is being administered by International
Development Association (IDA) toward the cost of Deepening Medium Term Budget
Framework and Strengthening Financial Accountability Project (Project-A) under
Strengthening Public Expenditure Management Program (SPEMP) and it intends to
apply part of the proceeds of this Grant to payments under the agreement(s) resulting
from this IFB: Supply, Installation and Services for Servers, Fabric Switches, Load
Balancer, Oracle and Windows Software (Lot-A: Database Servers Infrastructure and
Oracle Software; Lot-B: Application Servers, Load Balancer, Fabric Switches and
Windows Software), IFB Number: DMTBF/Server/368/12-13/1988, Date: September
12, 2013.
2
Invitation for Bids
3.
The Finance Division, Ministry of Finance serves as the implementing agency for the
project and now invites sealed bids from eligible Bidders for Supply, Installation and
Services for Servers, Fabric Switches, Load Balancer, Oracle and Windows Software
(Lot-A: Database Servers Infrastructure and Oracle Software; Lot-B: Application
Servers, Load Balancer, Fabric Switches and Windows Software).
4.
Bidding will be conducted using the International Competitive Bidding (ICB)
procedures specified in the World Bank’s Guidelines: Procurement under IBRD
Loans and IDA Credits, edition of May 2004 and Revised in October 2006, and is open
to all Bidders eligible as defined in these Guidelines, that meet the following
minimum qualification criteria:
(a) The Bidder for each lot must have been in business for the last three (03) years to be
substantiated by submission of copies of Trade License or membership certificate
from statutory institution or trade-body;
(b) The Bidder must have completed minimum one (01) successful contract for Lot-A and
two (02) for Lot-B involving supply, installation and technical support for
Information System and installation of servers and fabric switches in last three (03)
years to be substantiated by submission of completion certificate from the relevant
authority;
(c) The Bidder must demonstrate present minimum average annual turnover of US$80,00,000
equivalent calculated as total certified payments received for contracts in progress or
completed within last three (03) years for Lot-A and US$37,00,000 for Lot-B.
Documentary evidence shall include payment certificates from relevant authorities,
certified financial statements/audit reports for the concerned years;
(d) The Bidder must demonstrate minimum US$32,00,000 equivalent present liquid asset
and/or line of credit for Lot-A and US$15,00,000 for Lot-B, net of current
commitments. Documentary evidence shall be certified Bank Statement, audit
reports/financial statements, banker’s certificate for specific credit lines available for
this contract, if awarded;
(e) For each Lot the Bidder or local agent of the Bidder must have at least three (03) years
proven experience in providing warranty support services;
(f) For each Lot the local agent’s relationship with the Principal/Manufacturer shall be at least
three (03) years to be evidenced by notarized copy of the Agreement;
(g) The Bidder must enclose location/addresses of existing service centers and help desks
together with service facilities the centers have; and
(h) The Bidder shall furnish documentary evidence to demonstrate that the Goods it offers
meet usage requirement.
5.
Interested eligible Bidders may obtain further information from Project Director,
Deepening MTBF and Strengthening Financial Accountability Project, Finance
Division, Ministry of Finance, UCEP Cheyne Tower (2nd floor), 25 Segunbagicha,
Dhaka 1000, Bangladesh, Email: ekramahmed1458@gmail.com and inspect the
bidding documents at the address given below from 10:00AM to 03:00PM Bangladesh
Invitation for Bids
3
Standard Time. A pre-bid meeting which potential bidders may attend will be held on
October 9, 2013 at 11:00AM Bangladesh Standard Time.
6.
A complete set of bidding documents in English may be purchased by interested
Bidders on submission of a written application to the address below and upon
payment of a nonrefundable fee of Bangladesh Taka 7,000 or in US Dollar 100. The
method of payment will be Bank Draft/ Pay Order from a scheduled Bank located in
Dhaka for Bangladesh Taka and Cashier's Check or Bank Draft drawn on a local
scheduled Bank. The Bidding Documents will have to be collected by authorized
representative only.
7.
Bids must be delivered to the address below at or before 02:00PM Bangladesh
Standard Time on November 7, 2013. The amount of Bid Security required is
Bangladesh Taka Six Million Three Hundred Thousand (BDT6,300,000) or in US
Dollar Eighty Thousand (US$80,000) for Lot-A and Bangladesh Taka Three Million
(BDT3,000,000) or in US Dollar Thirty Six Thousand and Five Hundrerd
(US$36,500) for Lot-B (or equivalent amount in a freely convertible currency).
Electronic bidding will not be permitted. Late bids will be rejected. Bids will be
opened in the presence of Bidders’ representatives who choose to attend at the address
below at 02:30PM Bangladesh Standard Time on November 7, 2013.
8.
The attention of prospective Bidders is drawn to (i) the fact that they will be required
to certify in their bids that all goods and software are either covered by a valid license
or was produced by the Bidder and (ii) that violations are considered fraud, which can
result in ineligibility to be awarded World Bank-financed contracts.
Ekram Ahmed
Project Director
Deepening MTBF and Strengthening Financial Accountability Project
Finance Division, Ministry of Finance
UCEP Cheyne Tower (2nd floor)
25 Segunbagicha, Dhaka 1000
Bangladesh
Telephone No. +88 02 8391131-3, Fax No. +88 02 8391136
e-mail: ekramahmed1458@ gmail.com
5
SECTION I. INSTRUCTIONS TO BIDDERS (ITB)
(Single-Stage Bidding)
6
Section I. Instructions to Bidders
Table of Clauses
A. General ................................................................................................................................8
1.
2.
3.
4.
5.
6.
7.
8.
Scope of Bid and Bidding Process ..............................................................................8
Source of Funds ..........................................................................................................8
Fraud and Corruption ..................................................................................................9
Eligible Bidders ........................................................................................................11
Eligible Goods and Services .....................................................................................12
Qualifications of the Bidder ......................................................................................13
Cost of Bidding .........................................................................................................16
Site Visit ...................................................................................................................16
B. The Bidding Documents ..................................................................................................16
9.
10.
11.
Content of Bidding Documents ................................................................................16
Clarification of Bidding Documents and Pre-bid Meeting .......................................17
Amendment of Bidding Documents .........................................................................18
C. Preparation of Bids ..........................................................................................................18
12.
13.
14.
15.
16.
17.
18.
19.
Language of Bid ........................................................................................................18
Documents Comprising the Bid ................................................................................18
Bid Prices ..................................................................................................................20
Bid Currencies ..........................................................................................................23
Documents Establishing the Conformity of the Information System to the Bidding
Documents ................................................................................................................23
Securing the Bid ........................................................................................................24
Period of Validity of Bids .........................................................................................26
Format and Signing of Bid ........................................................................................27
D. Submission of Bids ...........................................................................................................28
20.
21.
22.
23.
Sealing and Marking of Bids ....................................................................................28
Deadline for Submission of Bids ..............................................................................28
Late Bids ...................................................................................................................28
Withdrawal, Substitution, and Modification of Bids ................................................28
E. Bid Opening and Evaluation ...........................................................................................30
24.
25.
26.
27.
28.
29.
30.
Opening of Bids by Purchaser...................................................................................30
Clarification of Bids ..................................................................................................31
Preliminary Examination of Bids ..............................................................................31
Conversion to Single Currency .................................................................................32
Evaluation and Comparison of Bids .........................................................................32
Domestic Preference .................................................................................................38
Contacting the Purchaser ..........................................................................................38
F. Postqualification and Award of Contract ......................................................................38
31.
Postqualification .......................................................................................................38
Section I. Instructions to Bidders
32.
33.
34.
35.
36.
37.
38.
7
Award Criteria ..........................................................................................................39
Purchaser’s Right to Vary Quantities at Time of Award ..........................................39
Purchaser’s Right to Accept Any Bid and to Reject Any or All Bids.......................39
Notification of Award ...............................................................................................39
Signing of Contract ...................................................................................................40
Performance Security ................................................................................................40
Adjudicator ...............................................................................................................40
8
Section I. Instructions to Bidders
Instructions to Bidders
A. GENERAL
1. Scope of Bid
and Bidding
Process
2. Source of
Funds
1.1
The Purchaser named in the BDS and the SCC for GCC Clause
1.1 (b) (i), or its duly authorized Purchasing Agent if so
specified in the BDS (interchangeably referred to as “the
Purchaser” in these Bidding Documents), invites bids for the
supply and installation of the Information System (IS), as briefly
described in the BDS and specified in greater detail in these
Bidding Documents.
1.2
The title and identification number of the Invitation for Bids
(IFB) and resulting Contract(s) are provided in the BDS.
1.3
Throughout the Bidding Documents, the term "in writing" means
communicated in written form (e.g. by mail, e-mail, fax, telex)
with proof of receipt, and the term "days" means calendar days
unless a different meaning is evident from the context.
1.4
If the BDS so provides, alternative procedures forming part or all
of what is commonly known as e-Tendering are available to the
extent specified in, or referred to by, the BDS.
2.1
The Borrower named in the BDS has applied for or received a
loan or credit (as identified in the BDS, and called a “loan” in
these Bidding Documents) from the International Bank for
Reconstruction and Development or the International
Development Association (called “the Bank” in these Bidding
Documents) equivalent to the amount indicated in the BDS
toward the cost of the Project specified in the BDS. The
Borrower intends to apply a portion of the proceeds of this loan
to eligible payments under the Contract for which these Bidding
Documents are issued.
2.2
Payment by the Bank will be made only at the request of the
Borrower, or the Borrower’s executing agency, and upon
approval by the Bank in accordance with the terms and
conditions of the Loan Agreement, and will be subject in all
respects to the terms and conditions of that agreement. The
Loan Agreement prohibits a withdrawal from the loan account
for the purpose of any payment to persons or entities, or for any
import of goods, if such payment or import, to the knowledge of
the Bank, is prohibited by a decision of the United Nations
Security Council taken under Chapter VII of the Charter of the
United Nations. No party other than the Borrower shall derive
Section I. Instructions to Bidders
9
any rights from the Loan Agreement or have any claim to the
loan proceeds.
3. Fraud and
Corruption
3.1
It is the Bank’s policy to require that Borrowers (including
beneficiaries of Bank loans), as well as bidders, suppliers, and
contractors and their subcontractors under Bank-financed
contracts, observe the highest standard of ethics during the
procurement and execution of such contracts.1 In pursuance of
this policy, the Bank:
(a)
defines, for the purposes of this provision, the terms set
forth below as follows:
(i)
“corrupt practice”2 is the offering, giving, receiving
or soliciting, directly or indirectly, of anything of
value to influence improperly the actions of another
party;
(ii)
“fraudulent practice”3 is any act or omission,
including a misrepresentation, that knowingly or
recklessly misleads, or attempts to mislead, a party
to obtain a financial or other benefit or to avoid an
obligation;
(iii) “collusive practice”4 is an arrangement between two
or more parties designed to achieve an improper
purpose, including to influence improperly the
actions of another party;
(iv) “coercive practice”5 is impairing or harming, or
threatening to impair or harm, directly or indirectly,
any party or the property of the party to influence
improperly the actions of a party;
(v)
“obstructive practice” is
(aa) deliberately destroying, falsifying, altering or
1
In this context, any action taken by a bidder, supplier, contractor, or a sub-contractor to influence the
procurement process or contract execution for undue advantage is improper.
2
“Another party” refers to a public official acting in relation to the procurement process or contract
execution]. In this context, “public official” includes World Bank staff and employees of other
organizations taking or reviewing procurement decisions.
3
A “party” refers to a public official; the terms “benefit” and “obligation” relate to the procurement process
or contract execution; and the “act or omission” is intended to influence the procurement process or contract
execution.
4
“Parties” refers to participants in the procurement process (including public officials) attempting to
establish bid prices at artificial, non competitive levels.
5
A “party” refers to a participant in the procurement process or contract execution.
10
Section I. Instructions to Bidders
concealing of evidence material to the
investigation or making false statements to
investigators in order to materially impede a
Bank investigation into allegations of a corrupt,
fraudulent, coercive or collusive practice;
and/or threatening, harassing or intimidating
any party to prevent it from disclosing its
knowledge of matters relevant to the
investigation
or
from
pursuing
the
investigation; or
(bb) acts intended to materially impede the exercise
of the Bank’s inspection and audit rights
provided for under sub-clause 3.1 (e) below.
3.2
(b)
will reject a proposal for award if it determines that the
bidder recommended for award has, directly or through an
agent, engaged in corrupt, fraudulent, collusive, coercive
or obstructive practices in competing for the contract in
question;
(c)
will cancel the portion of the loan allocated to a contract if
it determines at any time that representatives of the
Borrower or of a beneficiary of the loan engaged in
corrupt, fraudulent, collusive, or coercive practices during
the procurement or the execution of that contract, without
the Borrower having taken timely and appropriate action
satisfactory to the Bank to address such practices when
they occur;
(d)
will sanction a firm or individual, including declaring
ineligible, either indefinitely or for a stated period of time,
to be awarded a Bank-financed contract if it at any time
determines that the firm has, directly or through an agent,
engaged in corrupt, fraudulent, collusive, coercive or
obstructive practices in competing for, or in executing, a
Bank-financed contract; and
(e)
will have the right to require that a provision be included
in bidding documents and in contracts financed by a Bank
loan, requiring bidders, suppliers, and contractors and
their sub-contractors to permit the Bank to inspect their
accounts and records and other documents relating to the
bid submission and contract performance and to have
them audited by auditors appointed by the Bank.
Furthermore, Bidders shall be aware of the provision stated in
Clause 9.8 and Clause 41.2 of the General Conditions of Contract.
Section I. Instructions to Bidders
4. Eligible
Bidders
11
3.3
Any communications between the Bidder and the Purchaser
related to matters of alleged fraud or corruption must be made in
writing.
3.4
By signing the Bid Submission Form, the Bidder represents that
it either is the owner of the Intellectual Property Rights in the
hardware, software or materials offered, or that it has proper
authorization and/or license to offer them from the owner of
such rights. For the purpose of this Clause, Intellectual Property
Rights shall be as defined in GCC Clause 1.1 (c) (xvii). Willful
misrepresentation of these facts shall be considered a fraudulent
practice subject to the provisions of Clauses 3.1 through 3.4
above, without prejudice of other remedies that the Purchaser
may take.
4.1
A Bidder, and all parties constituting the Bidder, may have the
nationality of any country, subject to the restrictions specified in
Section III, Eligible Countries. A Bidder shall be deemed to
have the nationality of a country if the Bidder is a citizen or is
constituted, incorporated, or registered and operates in
conformity with the provisions of the laws of that country.
4.2
If a prequalification process has been undertaken for the
Contract(s) for which these Bidding Documents have been
issued, only those Bidders may participate that had been
prequalified and continue to meet the eligibility criteria of this
Clause. A prequalified Joint Venture may not change partners or
its structure when submitting a bid.
4.3
A firm may be excluded from bidding if:
4.4
(a)
it was engaged by the Purchaser to provide consulting
services for the preparation of the design, specifications, or
other documents to be used for the procurement of the
Information System described in these Bidding
Documents; or
(b)
it is a government-owned enterprise in the Borrower’s
country, unless it can establish that it (i) is legally and
financially autonomous and (ii) operates under commercial
law. No dependent agency of the Borrower or SubBorrower shall be permitted to bid.
A firm that has been determined to be ineligible by the Bank in
relation to the Bank Guidelines On Preventing and Combating
Fraud and Corruption in Projects Financed by IBRD Loans and IDA
12
Section I. Instructions to Bidders
Credits and Grants shall be not be eligible to be awarded a contract.
4.5
5. Eligible Goods
and Services
A firm or individual is or will be disqualified from participation
in this bidding if, at any time from advertisement of the bidding
until and including contract award, the firm or individual is
under:
(a)
a suspension by the Purchaser agreed by the Bank as a
result of execution of a Bid-Securing Declaration pursuant
to ITB Clause 17.6 in another Bank-financed procurement,
or under a suspension by the Purchaser for other reasons
that have been agreed by the Bank; or
(b)
a declaration of ineligibility by the Bank in accordance
with ITB Clause 3.1 (d). The list of individuals and firms
debarred from participating in World Bank projects is
available at http://www.worldbank.org/debarr/, or
(c)
a sanction imposed by the United Nations Security
Council, as mentioned in ITB Clause 2.2.
4.6
A firm or other entity that is ineligible according to any of the
above provisions of this Clause, may also not participate as a
Joint Venture partner, or as Subcontractor for or supplier of
goods, works or services.
If a bid becomes materially
incomplete after removing ineligible entities, the bid may be
disqualified.
4.7
Bidders shall provide such evidence of their continued eligibility
satisfactory to the Purchaser, as the Purchaser shall reasonably
request.
5.1
For the purposes of these Bidding Documents, the Information
System means all:
(a)
the required information technologies, including all
information processing and communications-related
hardware, software, supplies, and consumable items that
the Supplier is required to supply and install under the
Contract, plus all associated documentation, and all other
materials and goods to be supplied, installed, integrated,
and made operational (collectively called “the Goods” in
some clauses of the ITB); and
(b)
the related software development, transportation,
insurance,
installation,
customization,
integration,
commissioning, training, technical support, maintenance,
repair, and other services necessary for proper operation of
Section I. Instructions to Bidders
13
the Information System to be provided by the selected
Bidder and as specified in the Contract.
6. Qualifications
of the Bidder
5.2
Funds from Bank loans are disbursed only for expenditures for
an Information System made up of goods and services provided
by nationals of, and produced in or supplied from, eligible
source countries as defined in Section III, Eligible Countries. An
Information System is deemed to be produced in a certain
country when, in the territory of that country, through software
development, manufacturing, or substantial and major assembly
or integration of components, a commercially recognized
product results that is substantially different in basic
characteristics or in purpose or utility from its components.
5.3
For purposes of this clause, the nationality of the Bidder is
distinct from the country in which the Information System and
its goods components are produced or from which the related
services are supplied.
6.1
By submission of documentary evidence in its bid, the Bidder
must establish to the Purchaser’s satisfaction:
(a)
that it has the financial, technical, and production
capability necessary to perform the Contract, meets the
qualification criteria specified in the BDS, and has a
successful performance history. If a prequalification
process has been undertaken for the Contract(s) for which
these Bidding Documents have been issued, the Bidder
shall, as part of its bid, update any information submitted
with its application for prequalification;
(For the purposes of establishing a Bidder’s qualifications,
and unless stated to the contrary in the BDS, the
experience and / or resources of any Subcontractor will
not contribute to the Bidder’s qualifications; only those of
a Joint Venture partner will be considered.)
(b)
that, in the case of a Bidder offering to supply key goods
components of the Information System, as identified in
the BDS, that the Bidder does not itself produce, the
Bidder is duly authorized by the producer to supply those
components in the Purchaser’s country under the
Contract(s) that may result from this bidding; (This will be
accomplished by including Manufacturer’s Authorizations
in the bid, based on the sample found in Section VII.)
14
Section I. Instructions to Bidders
6.2
(c)
that, if a Bidder proposes Subcontractors for key services
if and as identified in the BDS, these Subcontractors have
agreed in writing to serve for the Bidder under the
Contract(s) that may result from this bidding; and
(d)
that, in the case of a Bidder not doing business within the
Purchaser’s country, the Bidder is or will be (if awarded
the Contract) represented by an Agent in that country who
is equipped and able to carry out the Bidder’s
maintenance, technical support, training, and repair
obligations prescribed in the General and Special
Conditions of Contract, and/or Technical Requirements.
Bids submitted by a Joint Venture of two or more firms as
partners shall also comply with the following requirements:
(a)
the bid shall be signed so as to be legally binding on all
partners;
(b)
one of the partners shall be nominated as being in charge,
and this nomination shall be evidenced by submitting a
power of attorney signed by legally authorized signatories
of all the partners;
(c)
the partner in charge shall be authorized to incur liabilities
and receive instructions for and on behalf of any and all
partners of the Joint Venture, and the entire execution of
the Contract, including payment, shall be done exclusively
with the partner in charge;
(d)
the partner or combination of partners that is responsible
for a specific component of the Information System must
meet the relevant minimum qualification criteria for that
component;
(e)
a firm may submit bids either as a single Bidder on its
own, or as partner in one, and only one, Joint Venture. If,
as a result of the bid opening pursuant to ITB Clause 24,
this requirement is not met, all bids involving the firm as a
single Bidder or Joint Venture partner will be disqualified;
(f)
all partners of the Joint Venture shall be liable jointly and
severally for the execution of the Contract in accordance
with the Contract terms, and a statement to this effect shall
be included in the authorization mentioned under ITB
Clause 6.2 (b) above, in the bid as well as in the Contract
(in case of a successful bid).
Section I. Instructions to Bidders
6.3
15
If a Bidder intends to subcontract major items of supply or
services, it shall include in the bid details of the name and
nationality of the proposed Subcontractor for each of those items
and shall be responsible for ensuring that any Subcontractor
proposed complies with the requirements of ITB Clause 4, and
that any Goods or Services components of the Information
System to be provided by the Subcontractor comply with the
requirements of ITB Clause 5 and the related evidence required
by ITB Clause 13.1 (e) (iii) is submitted. Bidders are free to list
more than one Subcontractor against each item. Quoted rates
and prices will be deemed to apply, whichever Subcontractor is
appointed, and no adjustment of the rates or prices will be
permitted. The Purchaser reserves the right to delete any
proposed Subcontractor from the list. This shall be done prior to
Contract signature, by deleting such unacceptable Subcontractors
from Appendix 3 to the Contract Agreement, which shall list the
approved Subcontractors for each item prior to Contract
signature. Subsequent additions and deletions from the list of
approved Subcontractors shall be performed in accordance with
GCC Clause 20 (as revised in the SCC, if applicable) and
Appendix 3 to the Contract Agreement.
For the purposes of these Bidding Documents, a Subcontractor is
any vendor or service provider with whom the Bidder contracts
for the supply or execution of any part of the Information System
to be provided by the Bidder under the Contract (such as the
supply of major hardware, software, or other components of the
required Information Technologies specified, or the performance
of related Services, e.g., software development, transportation,
installation, customization, integration, commissioning, training,
technical support, maintenance, repair, etc.).
6.4
A firm which is a Bidder, whether as a single Bidder or as a
partner in a Joint Venture, cannot be a Subcontractor in other
bids, except for the supply of commercially available hardware
or software by the firm, as well as purely incidental services such
as installation/configuration, routine training, and ongoing
maintenance/support. If the BDS for ITB Clause 6.1 (a) allows
the qualification of Subcontractors nominated for certain
components to be taken into account in assessing the Bidder’s
overall qualifications, any Subcontractor so nominated by any
Bidder is automatically disqualified from being a Bidder itself or
a partner in a Joint Venture. The same will normally apply to
firms that have provided Subcontractor agreements for certain
services pursuant to ITB Clause 6.1 (c). Non-compliance may
result in the rejection of all bids in which the affected firm
16
Section I. Instructions to Bidders
participates as Bidder or as partner in a Joint Venture. As long
as in compliance with these provisions, or as long as unaffected
by them due to not participating as Bidder or as partner in a Joint
Venture, a firm may be proposed as a Subcontractor in any
number of bids. If the BDS for ITB 28.1 permits the submission
of bids for Subsystems, lots, or slices, then the provisions of this
Clause 6.4 apply only to bids for the same Subsystem(s), lot(s),
or slice(s);
7. Cost of
Bidding
7.1
The Bidder shall bear all costs associated with the preparation
and submission of its bid, and the Purchaser will in no case be
responsible or liable for those costs.
8. Site Visit
8.1
The Bidder may wish to visit and examine the site or sites of the
Information System and obtain for itself, at its own
responsibility and risk, all information that may be necessary for
preparing the bid and entering into the Contract. The costs of
visiting the site or sites shall be at the Bidder’s own expense.
8.2
The Purchaser will arrange for the Bidder and any of its
personnel or agents to gain access to the relevant site or sites,
provided that the Bidder gives the Purchaser adequate notice of a
proposed visit of at least fourteen (14) days. Alternatively, the
Purchaser may organize a site visit or visits concurrently with the
pre-bid meeting, as specified in the BDS for ITB Clause 10.2.
Failure of a Bidder to make a site visit will not be a cause for its
disqualification.
8.3
No site visits shall be arranged or scheduled after the deadline
for the submission of the Bids and prior to the award of
Contract.
B. THE BIDDING DOCUMENTS
9. Content of
Bidding
Documents
9.1
The contents of the Bidding Documents are listed below and
should be read in conjunction with any addenda issued in
accordance with ITB Clause 11:
Section I
Instructions to Bidders (ITB)
Section II
Bid Data Sheet (BDS)
Section III
Eligible Countries for the Provision of Goods,
Works, and Services in Bank-Financed
Procurement
Section IV
General Conditions of Contract (GCC)
Section I. Instructions to Bidders
17
Section V
Special Conditions of Contract (SCC)
Section VI
Technical Requirements (including
Implementation Schedule)
Section VII
Sample Forms
9.2
Bidders are expected to examine all instructions, forms, terms,
specifications, and other information in the Bidding Documents.
Failure to furnish all information required by the Bidding
Documents or to submit a bid not substantially responsive to the
Bidding Documents in every respect will be at the Bidder’s risk
and may result in the rejection of its bid.
9.3
The Invitation for Bids is not formally part of the Bidding
Documents and is included for reference only. In case of
inconsistencies, the actual Bidding Documents shall prevail.
10. Clarification of 10.1 A prospective Bidder requiring any clarification of the Bidding
Documents may notify the Purchaser in writing at the
Bidding
Documents
Purchaser’s address and by one of the means indicated in the
and Pre-bid
BDS. Similarly, if a Bidder feels that any important provision in
Meeting
the documents will be unacceptable, such an issue should be
raised as soon as possible. The Purchaser will respond in writing
to any request for clarification or modification of the Bidding
Documents that it receives no later than twenty-one (21) days
prior to the deadline for submission of bids prescribed by the
Purchaser. Copies of the Purchaser’s response (including an
explanation of the query but not identifying its source) will be
sent to all prospective Bidders that received the Bidding
Documents from the Purchaser.
10.2 When specified in the BDS, the Purchaser will organize and
Bidders are welcome to attend a pre-bid meeting at the time and
place indicated in the BDS. The purpose of the meeting will be
to clarify issues and answer questions on any matter that may be
raised at this stage, with particular attention to issues related to
the Technical Requirements. Bidders are requested to submit
any questions in writing to reach the Purchaser not later than one
week before the meeting. Questions and answers will be
transmitted in accordance with ITB Clause 10.1. Minutes of the
meeting, including the questions raised and responses given,
together with any responses prepared after the meeting, will be
transmitted without delay to all those that received the Bidding
Documents from the Purchaser. Any modification to the
Bidding Documents listed in ITB Clause 9.1, which may become
necessary as a result of the pre-bid meeting, shall be made by the
18
Section I. Instructions to Bidders
Purchaser exclusively by issuing an Addendum pursuant to ITB
Clause 11 and not through the minutes of the pre-bid meeting.
11. Amendment of
Bidding
Documents
11.1 At any time prior to the deadline for submission of bids, the
Purchaser may, for any reason, whether at its own initiative or in
response to a clarification requested by a prospective Bidder,
amend the Bidding Documents. Later amendments on the same
subject modify or replace earlier ones.
11.2 Amendments will be provided in the form of Addenda to the
Bidding Documents, which will be sent in writing to all
prospective Bidders that received the Bidding Documents from
the Purchaser. Addenda will be binding on Bidders. Bidders are
required to immediately acknowledge receipt of any such
Addenda. It will be assumed that the amendments contained in
such Addenda will have been taken into account by the Bidder in
its bid.
11.3 In order to afford prospective Bidders reasonable time in which
to take the amendment into account in preparing their bids, the
Purchaser may, at its discretion, extend the deadline for the
submission of bids, in which case, the Purchaser will notify all
Bidders in writing of the extended deadline.
C. PREPARATION OF BIDS
12. Language of
Bid
12.1 The bid prepared by the Bidder and all correspondence and
documents related to the bid exchanged by the Bidder and the
Purchaser shall be written in the language specified in the BDS,
or, if the BDS so provides, in either one of two languages
specified there. Any printed literature furnished by the Bidder as
part of its bid may be in a language not specified in the BDS, as
long as such literature is accompanied by a translation of its
pertinent passages into the language of the bid, in which case, for
purposes of interpretation of the bid, the translation shall govern.
13. Documents
Comprising
the Bid
13.1 The bid submitted by the Bidder shall comprise:
(a)
Bid Submission Form completed and signed by a person or
persons duly authorized to bind the Bidder to the Contract;
(b)
all Price Schedules duly completed in accordance with ITB
Clauses 14, 15, and 18 and signed by a person or persons
duly authorized to bind the Bidder to the Contract;
(c)
if required, Bid-securing Declaration or Bid Security
Section I. Instructions to Bidders
19
furnished in accordance with ITB Clause 17;
(d)
written confirmation authorizing the signatory of the bid to
commit the Bidder, in accordance with ITB Clause 19.2;
(e)
Attachments:
(i)
Attachment 1: Bidder’s Eligibility
In the absence of prequalification, documents
establishing to the Purchaser’s satisfaction the
Bidder’s eligibility to bid, including but not limited to
documentary evidence that the Bidder is legally
incorporated in a territory of an eligible source
country as defined under ITB Clause 4;
(ii)
Attachment 2: Bidder’s Qualifications
Documentary evidence establishing to the
Purchaser’s satisfaction, and in accordance with ITB
Clause 6, that the Bidder is qualified to perform the
Contract if its bid is accepted. In the case where
prequalification of Bidders has been undertaken, and
pursuant to ITB Clause 6.1 (a), the Bidder must
provide evidence on any changes in the information
submitted as the basis for prequalification or, if there
has been no change at all in said information, a
statement to this effect;
Any Manufacturer’s Authorizations and Subcontractor
agreements specified as required in the BDS for ITB
Clauses 6.1 (b) and 6.1 (c);
(iii) Attachment 3: Eligibility of Goods and Services
Documents establishing, to the Purchaser’s
satisfaction, that the Goods and Services components
of the Information System to be supplied, installed,
and/or performed by the Bidder are eligible Goods
and Services as defined under ITB Clause 5. If
awarded the Contract, the Bidder shall submit for
such components of the Information System evidence
of eligibility, which shall be confirmed by a
certificate of origin issued at the time of shipment;
(iv) Attachment 4: Conformity of the Information System
to the Bidding Documents
Documentary evidence establishing to the
Purchaser’s satisfaction, and in accordance with ITB
20
Section I. Instructions to Bidders
Clause 16, that the Goods and Services components
of the Information System to be supplied, installed,
and/or performed by the Bidder conform to the
Bidding Documents;
(v)
Attachment 5: Proposed Subcontractors
A list of all major items of Goods or Services that the
Bidder proposes to purchase or subcontract from
others, and the name and nationality of the proposed
Subcontractor, including vendors, for each of those
items;
(vi) Attachment 6: Intellectual Property
A list of:
(1)
all Software included in the Bidder’s bid,
assigning each item to one of the software
categories defined in GCC Clause 1.1 (c):
(A) System, General Purpose, and Application
Software; and
(B) Standard and Custom Software.
(2)
all Custom Materials, as defined in GCC Clause
1.1 (c), included in the Bidder’s bid.
All Materials not identified as Custom Materials shall
be deemed Standard Materials, as defined in GCC
Clause 1.1 (c).
Re-assignments among the Software and Materials
categories, if necessary, will be made during the
implementation of the Contract according to GCC
Clause 39 (Changes to the System).
14. Bid Prices
14.1 All Goods and Services identified in the Supply and Installation
Cost Sub-Table and the Recurrent Cost Sub-Table in Section VII
(Forms 2.5 and 2.6), and all other Goods and Services proposed
by the Bidder to fulfill the requirements of the Information
System, must be priced separately in the format of the same
tables and summarized in the corresponding Cost Summary
Tables in the same Section. Prices must be quoted in accordance
with the instructions provided in Section VII for the various cost
tables, in the manner specified below.
Section I. Instructions to Bidders
21
14.2 The price of items that the Bidder has left blank in the cost
tables provided in Section VII shall be assumed to be included
in the price of other items. Items omitted altogether from the
cost tables shall be assumed to be omitted from the bid and,
provided that the bid is substantially responsive, an adjustment
to the bid price will be made during evaluation in accordance
with ITB Clause 28.6 (c) (iii).
14.3 Unit prices must be quoted at a level of detail appropriate for
calculation of any partial deliveries or partial payments under the
contract, in accordance with the Implementation Schedule in
Section VI, and with GCC and SCC Clause 12 – Terms of
Payment. Bidders may be required to provide a breakdown of
any composite or lump-sum items included in the Cost Tables.
14.4 The prices for Goods components of the System are to be
expressed and shall be defined and governed in accordance with
the rules prescribed in the edition of Incoterms specified in the
BDS, and quoted in the appropriate columns of the cost tables of
Section VII as follows:
(a)
Goods supplied from outside the Purchaser’s country:
Unless otherwise specified in the BDS, the prices shall be
quoted on a CIP (named place of destination) basis,
exclusive of all taxes, stamps, duties, levies, and fees
imposed in the Purchaser’s country. The named place of
destination and special instructions for the contract of
carriage are as specified in the BDS. In quoting the price,
the Bidder shall be free to use transportation through
carriers registered in any eligible countries. Similarly, the
Bidder may obtain insurance services from any eligible
source country.
(b)
Locally supplied Goods:
Unit prices of Goods offered from within the Purchaser’s
Country, shall be quoted on an EXW (ex factory, ex works,
ex warehouse or off-the-shelf, as applicable) basis,
including all customs duties, levies, fees, sales and other
taxes incurred until delivery of the Goods, but excluding all
VAT or sales and other taxes and duties/fees incurred for
the Goods at the time of invoicing or sales transaction, if
the Contract is awarded.
(c)
Inland transportation:
Unless otherwise stated in the BDS, inland transportation,
22
Section I. Instructions to Bidders
insurance and related local costs incidental to the delivery
of the Goods to the designated Project Sites must be quoted
separately as a Service item in accordance with ITB Clause
14.5, whether the Goods are to be supplied locally or from
outside the Purchaser’s country, except when these costs
are already included in the price of the Goods, as is, e.g.,
the case, when ITB Clause 14.4 (a) specifies CIP, and the
named places of destination are the Project Sites.
14.5 The price of Services shall be quoted in total for each service
(where appropriate, broken down into unit prices), separated into
their local and foreign currency components. Prices must
include all taxes, duties, levies and fees whatsoever, except only
VAT or other indirect taxes, or stamp duties, that may be
assessed and/or apply in the Purchaser’s country on/to the price
of the Services invoiced to the Purchaser, if the Contract is
awarded. Unless otherwise specified in the BDS, the prices
must include all costs incidental to the performance of the
Services, as incurred by the Supplier, such as travel, subsistence,
office support, communications, translation, printing of
materials, etc. Costs incidental to the delivery of the Services
but incurred by the Purchaser or its staff, or by third parties, must
be included in the price only to the extent such obligations are
made explicit in these Bidding Documents (as, e.g., a
requirement for the Bidder to include the travel and subsistence
costs of trainees).
14.6 Prices for Recurrent Costs beyond the scope of warranty services
to be incurred during the Warranty Period, defined in SCC
Clause 29.4 and prices for Recurrent Costs to be incurred during
the Post-Warranty Period, defined in SCC Clause 1.1. (e) (xii),
shall be quoted as Service prices in accordance with ITB Clause
14.5 on the Recurrent Cost Sub-Table in detail, and on the
Recurrent Cost Summary Table in currency totals. Recurrent
costs are all-inclusive of the costs of necessary Goods such as
spare parts, software license renewals, labor, etc., needed for the
continued and proper operation of the System and, if appropriate,
of the Bidder’s own allowance for price increases.
14.7 Unless otherwise specified in the BDS, prices quoted by the
Bidder shall be fixed during the Bidder’s performance of the
Contract and not subject to increases on any account. Bids
submitted that are subject to price adjustment will be rejected.
Section I. Instructions to Bidders
15. Bid Currencies
23
15.1 Prices shall be quoted in the following currencies:
(a)
The Bidder may quote its prices for all Information
Technologies, associated Goods, and Services to be
supplied from outside the Purchaser’s Country in the
currencies of countries eligible according to Section III. If
the Bidder wishes to be paid in a combination of different
currencies, it must quote unit prices accordingly, but no
more than three foreign currencies may be used.
(b)
Unless otherwise specified in the BDS, the Bidder shall
express its prices for such Information Technologies,
associated Goods, and Services to be supplied locally (i.e.,
from within the Purchaser’s Country) in the currency of the
Purchaser’s Country.
16.1 Pursuant to ITB Clause 13.1 (e) (iv), the Bidder shall furnish, as
16. Documents
part of its bid, documents establishing the conformity to the
Establishing
Bidding Documents of the Information System that the Bidder
the Conformity
proposes to supply and install under the Contract.
of the
Information
16.2 The documentary evidence of conformity of the Information
System to the
System to the Bidding Documents shall be in the form of written
Bidding
descriptions, literature, diagrams, certifications, and client
Documents
references, including:
(a)
the Bidder’s technical bid, i.e., a detailed description of the
Bidder’s proposed technical solution conforming in all
material aspects with the Technical Requirements (Section
VI) and other parts of these Bidding Documents, overall as
well as in regard to the essential technical and performance
characteristics of each component making up the proposed
Information System;
(b)
an item-by-item commentary on the Purchaser’s Technical
Requirements,
demonstrating
the
substantial
responsiveness of the Information System offered to those
requirements. In demonstrating responsiveness, the
commentary shall include explicit cross references to the
relevant pages in the supporting materials included in the
bid. Whenever a discrepancy arises between the item-byitem commentary and any catalogs, technical
specifications, or other preprinted materials submitted with
the bid, the item-by-item commentary shall prevail;
(c)
a Preliminary Project Plan describing, among other things,
the methods by which the Bidder will carry out its overall
24
Section I. Instructions to Bidders
management and coordination responsibilities if awarded
the Contract, and the human and other resources the Bidder
proposes to use. The Plan should include a detailed
Contract Implementation Schedule in bar chart form,
showing the estimated duration, sequence, and
interrelationship of all key activities needed to complete
the Contract. The Preliminary Project Plan must also
address any other topics specified in the BDS. In addition,
the Preliminary Project Plan should state the Bidder’s
assessment of what it expects the Purchaser and any other
party involved in the implementation of the Information
System to provide during implementation and how the
Bidder proposes to coordinate the activities of all involved
parties;
(d)
a written confirmation that the Bidder accepts
responsibility for the successful integration and interoperability of all components of the Information System as
required by the Bidding Documents.
16.3 For purposes of the commentary to be furnished pursuant to ITB
Clause 16.2 (b), the Bidder shall note that references to brand
names or model numbers or national or proprietary standards
designated by the Purchaser in its Technical Requirements are
intended to be descriptive and not restrictive. Except where
explicitly prohibited in the BDS for specific items or standards,
the Bidder may substitute alternative brand/model names or
standards in its bid, provided that it demonstrates to the
Purchaser’s satisfaction that the use of the substitute(s) will
result in the Information System being able to perform
substantially equivalent to or better than that specified in the
Technical Requirements.
17. Securing the
Bid
17.1 The BDS for this Clause specifies whether bids must be secured,
and if so, whether by a Bid-Securing Declaration or by a Bid
Security. If a Bid Security is required or optional, the BDS also
specifies the amount.
17.2 Securing the bids shall be substantially in accordance with the
related sample forms included in Section VII or other forms
approved by the Purchaser prior to bid submission. Bids must
remain secured for a period of 28 days beyond the validity period
of the bids, as extended, if applicable, in accordance with ITB
Clause 18.2. In case of a Bid Security, it shall also:
(a)
at the Bidder’s option, be in the form of either a certified
check, letter of credit, or a bank guarantee from a banking
Section I. Instructions to Bidders
25
institution, or a bond issued by a surety;
(b)
be issued by a reputable institution selected by the Bidder
and located in any eligible country; if the institution issuing
the security is located outside the Purchaser’s Country, it
shall have a correspondent financial institution located in
the Purchaser’s Country to make the security enforceable;
(c)
be payable promptly upon written demand by the Purchaser
in case any of the conditions listed in ITB Clause 17.6
is/are invoked;
(d)
be submitted in its original form; copies will not be
accepted.
17.3 The Bid-Securing Declaration or the Bid Security of a Joint
Venture shall be issued in the name of the Joint Venture
submitting the bid provided the Joint Venture has legally been
constituted, or else it shall be issued in the name of all partners
proposed for the Joint Venture in the bid. Sanctions due to a
breach of the terms of a Bid-Securing Declaration pursuant to
ITB Clause 17.6 will apply to all partners to the Joint Venture.
17.4 If a Bid-Securing Declaration or Bid Security is required in
accordance with ITB Clause 17.1, any bid not accompanied by a
substantially acceptable Bid-Securing Declaration or Bid
Security in accordance with ITB Clauses 17.2 and 17.3, shall be
rejected by the Purchaser as non-responsive.
17.5 Unless executed or forfeited pursuant to ITB Clause 17.6, BidSecuring Declarations, if any, will expire for, or Bid Securities,
if any, will be returned as promptly as possible to,
(a)
all Bidders upon annulment of the bidding pursuant to ITB
Clause 34;
(b)
Bidders refusing a request to extend the period of validity
of their bids pursuant to ITB Clause 18.2;
(c)
the successful Bidder once it has signed the Contract
Agreement and furnished a valid Performance Security as
required;
(d)
the unsuccessful Bidders at the same time as in (c), that is,
when they are informed about the successful establishment
of the contract with the successful Bidder.
26
Section I. Instructions to Bidders
17.6 The Bid-Securing Declaration, if any, may be executed, or the
Bid Security, if any, may be forfeited:
(a)
if a Bidder withdraws its bid during the period of bid
validity specified by the Bidder on the Bid Submission
Form or any extension of validity the Bidder has agreed to
pursuant to ITB Clause 18.2; or
(b)
in the case of the successful Bidder, if the Bidder fails to:
(i)
(ii)
sign the Contract Agreement in accordance with ITB
Clause 36; or
furnish the Performance Security in accordance with ITB Clause
37.
17.7 If a bid security is not required in the BDS, and
(a)
if a Bidder withdraws its bid during the period of bid
validity specified by the Bidder on the Letter of Bid Form,
except as provided in ITB 18.2, or
(b)
if the successful Bidder fails to: sign the Contract in
accordance with ITB 36; or furnish a performance security
in accordance with ITB 37;
the Borrower may, if provided for in the BDS, declare the
Bidder disqualified to be awarded a contract by the Employer
for a period of time as stated in the BDS.
18. Period of
Validity of
Bids
18.1 Bids shall remain valid, at a minimum, for the period specified
in the BDS after the deadline date for bid submission prescribed
by the Purchaser, pursuant to ITB Clause 21. A bid valid for a
shorter period shall be rejected by the Purchaser as nonresponsive. For the convenience of Bidders, the BDS spells out
the minimal original expiration dates for the validity of the bid
and, if applicable pursuant to ITB Clause 17.1, for securing the
bid. However, Bidders are responsible for adjusting the dates in
the BDS in accordance with any extensions to the deadline date
of bid submission pursuant to ITB Clause 21.2.
18.2 In exceptional circumstances, prior to expiry of the bid validity
period, the Purchaser may request that the Bidders extend the
period of validity for a specified additional period. The request
and the responses to the request shall be made in writing. A
Bidder may refuse the request without risking execution of the
Bid-Securing Declaration or forfeiting the Bid Security, but in
this case the bid will be out of the competition for the award.
Section I. Instructions to Bidders
27
Except as provided in ITB Clause 18.3, a Bidder agreeing to the
request will not be required or permitted to modify its bid, but
will be required to ensure that the bid remains secured for a
correspondingly longer period, pursuant to ITB Clause 17.2.
18.3 In the case of fixed price contracts, if the award is delayed by a
period exceeding fifty-six (56) days beyond the expiry of the
initial bid validity, the contract price will be adjusted as
specified in the request for extension. Bid evaluation will be
based on the bid prices without taking into consideration the
above correction.
19. Format and
Signing of Bid
19.1 The Bidder shall prepare an original and the number of
copies/sets of the bid specified in the BDS, clearly marking
each one as “ORIGINAL BID,” “COPY NO. 1,” “COPY
NO. 2,” etc., as appropriate. In the event of any discrepancy
between them, the original shall govern.
19.2 The original and all copies of the bid, each consisting of the
documents listed in ITB Clause 13.1, shall be typed or written in
indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the Bidder. The authorization
must be in writing and included in the bid pursuant to ITB
Clause 13.1 (d). The name and position held by each person
signing the authorization must be typed or printed below the
signature. All pages of the bid, except for unamended printed
literature, shall be initialed by the person or persons signing the
bid.
19.3 The bid shall contain no interlineations, erasures, or overwriting,
except to correct errors made by the Bidder, in which case such
corrections shall be initialed by the person or persons signing the
bid.
19.4 The Bidder shall furnish in the Bid Submission Form (a sample
of which is provided in the Sample Forms Section of the Bidding
Documents) information regarding commissions or gratuities, if
any, paid or to be paid to agents relating to this procurement and
to the execution of the Contract should the Bidder be successful.
28
Section I. Instructions to Bidders
D. SUBMISSION OF BIDS
20. Sealing and
Marking of
Bids
20.1 The Bidder shall seal the original and each copy of the bid in
separate envelopes, duly marking the envelopes as “ORIGINAL
BID” and “COPY NO. [number].” The envelopes shall then be
sealed in an outer envelope.
20.2 The inner and outer envelopes shall
(a)
be addressed to the Purchaser at the address given in the
BDS, and
(b)
bear the loan/Project name indicated in the BDS for ITB
Clause 2.1, the Invitation for Bids title and number, and the
Contract name(s), as indicated in the BDS for ITB
Clause 1.2, and the statement “DO NOT OPEN BEFORE
[ time and date],” to be completed with the time and date
specified in the BDS for ITB Clause 24.1.
20.3 The inner envelopes shall also indicate the name and address of
the Bidder so that the bid can be returned unopened in case it is
declared “late.”
20.4 If the outer envelope is not sealed and marked as required by
ITB Clause 20.2 above, the Purchaser will assume no
responsibility for the bid’s misplacement or premature opening.
If the outer envelope discloses the Bidder’s identity, the
Purchaser will not guarantee the anonymity of the bid
submission, but this disclosure will not constitute grounds for
bid rejection.
21. Deadline for
Submission of
Bids
21.1 Bids must be received by the Purchaser at the address specified
in the BDS for ITB Clause 20.2 no later than the time and date
stated in the BDS.
21.2 The Purchaser may, at its discretion, extend this deadline for
submission of bids by amending the Bidding Documents in
accordance with ITB Clause 11.3, in which case all rights and
obligations of the Purchaser and Bidders will thereafter be
subject to the deadline as extended.
22. Late Bids
22.1 Any bid received by the Purchaser after the bid submission
deadline prescribed by the Purchaser in the BDS for ITB Clause
21, will be rejected and returned unopened to the Bidder.
23. Withdrawal,
Substitution,
and
23.1 The Bidder may withdraw, substitute, or modify its bid after
submission, provided that written notice of the withdrawal,
substitution, or modification is received by the Purchaser prior to
Section I. Instructions to Bidders
Modification of
Bids
29
the deadline prescribed for bid submission. All notices must be
duly signed by an authorized representative and shall include a
copy of the authorization (the power of attorney) in accordance
with ITB Sub-Clause 19.2.
23.2 All notices of withdrawal, substitution, or modification shall
(a)
be addressed to the Purchaser at the address named in the
BDS for ITB Clause 20.2 (a), and
(b)
bear the Contract name, the IFB Title and IFB Number,
and the words “BID WITHDRAWAL NOTICE”, BID
SUBSTITUTION NOTICE”, or “BID MODIFICATION NOTICE”.
23.3 A notice may also be sent by electronic means such as fax or email, but in this case must include a scan of the mailing receipt
showing both the sender's and receiver's addresses for the signed
hardcopy of the notice, and a scan of the power of attorney.
23.4 Bids requested to be withdrawn in accordance with ITB 23.1
shall be returned unopened to the Bidders. Bid withdrawal
notices received after the bid submission deadline will be
ignored, and the submitted bid will be deemed to be a validly
submitted bid.
23.5 The substitution or modification of the bid shall be prepared,
sealed, marked, and dispatched as follows:
(a)
The Bidders shall provide an original and the number of
copies specified in the BDS for ITB Clause 19.1 of any
substitution or modification to its bid, clearly identified as
such, in two inner envelopes duly marked “BID
SUBSTITUTION -- ORIGINAL” or “BID MODIFICATION -ORIGINAL” and “BID SUBSTITUTION -- COPIES” or “BID
MODIFICATION -- COPIES.” The inner envelopes shall be
sealed in an outer envelope, which shall be duly marked
“BID SUBSTITUTION” or “BID MODIFICATION”.
(b)
Other provisions concerning the marking and dispatch of a
bid substitution or modification shall be in accordance with
ITB Clauses 20.2, 20.3, and 20.4.
23.6 No bid may be withdrawn, substituted, or modified in the
interval between the bid submission deadline and the expiration
of the bid validity period specified by the Bidder in the Bid
Submission Form, or any extension thereof agreed to by the
Bidder. Withdrawal of a bid during this interval may result in
the execution of the Bid-Securing Declaration, if any, or
30
Section I. Instructions to Bidders
forfeiture of the Bid Security, if any, pursuant to ITB Clause
17.6.
E. BID OPENING AND EVALUATION
24. Opening of
Bids by
Purchaser
24.1 The Purchaser will open all bids, including withdrawals,
substitutions, and modifications, in public, in the presence of
Bidders’ representatives who choose to attend, at the time, on
the date and at the place specified in the BDS. Bidders’
representatives shall sign a register as proof of their attendance.
24.2 First, envelopes marked “BID WITHDRAWAL NOTICE” shall be
opened and read out and the envelope with the corresponding
bid shall not be opened, but returned to the Bidder. No bid
withdrawal shall be permitted unless the corresponding
withdrawal notice contains a valid authorization to request the
withdrawal and is read out at bid opening. Next, envelopes
marked “BID SUBSTITUTION NOTICE” shall be opened and read
out and exchanged with the corresponding bid being substituted,
and the substituted bid shall not be opened, but returned to the
Bidder. No bid substitution shall be permitted unless the
corresponding substitution notice contains a valid authorization
to request the substitution and is read out at bid opening.
Envelopes marked “BID MODIFICATION NOTICE” shall be opened
and read out with the corresponding bid. No bid modification
shall be permitted unless the corresponding modification notice
contains a valid authorization to request the modification and is
read out at bid opening. Only bids that are opened and read out
at bid opening shall be considered further.
24.3 Bids shall be opened one at a time, reading out: the name of the
Bidder and whether there is a modification; the total bid price
including any unconditional discounts, and, if applicable, the
prices and unconditional discounts for Subsystems, lots, or
slices; the presence or absence of a Bid-Securing Declaration or
a Bid Security if one was required; any conditional discounts
offered for the award of more than one Subsystem, lot, or slice,
if the BDS for ITB Clause 28.1 permits such discounts to be
considered in the bid evaluation; and any other such details as
the Purchaser may consider appropriate.
24.4 Bids and modifications that are not opened and read out at bid
opening shall not be considered for further evaluation,
irrespective of the circumstances. These bids, including any bids
validly withdrawn in accordance with ITB Clause 24.2, will
Section I. Instructions to Bidders
31
promptly be returned, unopened, to their Bidders.
24.5 The Purchaser will prepare minutes of the bid opening, including
the information disclosed to those present in accordance with
ITB Clause 24.3. The minutes will promptly be distributed to all
Bidders that met the deadline for submitting bids.
25. Clarification of 25.1 During the bid evaluation, the Purchaser may, at its discretion,
ask the Bidder for a clarification of its bid. The request for
Bids
clarification and the response shall be in writing, and no change
in the price or substance of the bid shall be sought, offered, or
permitted.
26. Preliminary
Examination
of Bids
26.1 The Purchaser will examine the bids to determine whether they
are complete, whether any computational errors have been made,
whether required sureties have been furnished, whether the
documents have been properly signed, and whether the bids are
generally in order. In the case where a prequalification process
has been undertaken for the Contract(s) for which these Bidding
Documents have been issued, the Purchaser will ensure that each
bid is from a prequalified Bidder, and in the case of a Joint
Venture, that partners and structure of the Joint Venture are
unchanged from those in the prequalification.
26.2 Arithmetical errors will be rectified on the following basis. If
there is a discrepancy between the unit price and the total price,
which is obtained by multiplying the unit price and quantity, or
between added or subtracted subtotals and totals, the unit or
subtotal price shall prevail and the total price shall be corrected,
unless in the opinion of the Purchaser there is an obvious
misplacement of the decimal point in the unit or subtotal prices,
in which case the line item total as quoted shall govern and the
unit price or sub-total shall be corrected. If there is a
discrepancy between words and figures, the amount in words
will prevail, unless the discrepancy is the result of a typo/error
for which the correction is self-evident to the Purchaser. If the
Bidder with the Lowest Evaluated Bid does not accept the
correction of errors, the bid shall be rejected.
26.3 The Purchaser may waive any minor informality, nonconformity,
or irregularity in a bid that does not constitute a material
deviation, provided such waiver does not prejudice or affect the
relative ranking of any Bidder.
26.4 Prior to the detailed evaluation, the Purchaser will determine
whether each bid is of acceptable quality, is complete, and is
substantially responsive to the Bidding Documents.
For
32
Section I. Instructions to Bidders
purposes of this determination, a substantially responsive bid is
one that conforms to all the terms, conditions, and specifications
of the Bidding Documents without material deviations,
exceptions, objections, conditionalities, or reservations. A
material deviation, exception, objection, conditionality, or
reservation is one: (i) that limits in any substantial way the
scope, quality, or performance of the Information System; or
(ii) that limits, in any substantial way that is inconsistent with
the Bidding Documents, the Purchaser’s rights or the successful
Bidder’s obligations under the Contract; or (iii) the acceptance
of which would unfairly affect the competitive position of other
Bidders who have submitted substantially responsive bids.
26.5 If a bid is not substantially responsive, it will be rejected by the
Purchaser and may not subsequently be made responsive by the
Bidder by correction of the nonconformity. The Purchaser’s
determination of bid responsiveness will be based on the
contents of the bid itself.
27. Conversion to
Single
Currency
27.1 For evaluation and comparison purposes, the Purchaser shall
convert all bid prices expressed in various currencies and
amounts into a single currency specified in the BDS, using the
selling exchange rate established by the source and on the date
also specified in the BDS.
28. Evaluation
and
Comparison of
Bids
28.1 The Purchaser will evaluate and compare the bids that have been
determined to be substantially responsive, pursuant to ITB
Clause 26. The evaluation will be performed assuming either
that:
(a)
the Contract will be awarded to the lowest evaluated
Bidder for the entire Information System; or
(b)
if specified in the BDS, Contracts will be awarded to the
Bidders for each individual Subsystem, lot, or slice defined
in the Technical Requirements whose bids result in the
lowest combined evaluated price for the entire System.
In the latter case, discounts that are conditional on the award of
more than one Subsystem, lot, or slice may be offered in bids.
However, such discounts will only be considered in the price
evaluation if so confirmed in the BDS.
28.2 To be considered for Contract award, Bidders must have
submitted bids
(a)
for which detailed bid evaluation using the same standards
Section I. Instructions to Bidders
33
for compliance determination as listed in ITB Clauses 26.3
and 26.4 confirms that the bids are commercially and
technically responsive, and include the hardware,
Software, related equipment, products, Materials, and other
Goods and Services components of the Information System
in, substantially, the full required quantities for the entire
Information System or, if allowed in the BDS for ITB
Clause 28.1, the individual Subsystem, lot or slice bid on;
and
(b)
that offer Information Technologies that are proven to
perform up to the standards promised in the bid by having
successfully passed the performance, benchmark, and/or
functionality tests the Purchaser may require, pursuant to
ITB Clause 31.2.
28.3 The Purchaser’s evaluation of a bid will be made on the basis of
prices quoted in accordance with ITB Clause 14 (Bid Prices).
28.4 If indicated by the BDS, the Purchaser’s evaluation of
responsive bids will take into account technical factors, in
addition to cost factors. An Evaluated Bid Score (B) will be
calculated for each responsive bid using the following formula,
which permits a comprehensive assessment of the bid price and
the technical merits of each bid:
B≡
Clow
T
(1 − X )
X +
C
Thigh
where
C
= Evaluated Bid Price
C low = the lowest of all Evaluated Bid Prices among
responsive bids
T
= the total Technical Score awarded to the bid
Thigh = the Technical Score achieved by the bid that was
scored highest among all responsive bids
X
= weight for the Price as specified in the BDS
The bid with the highest Evaluated Bid Score (B) among
responsive bids shall be termed the Lowest Evaluated Bid and is
eligible for Contract award, provided the Bidder was
prequalified and/or it was found to be qualified to perform the
Contract in accordance with ITB Clause 31 (Postqualification).
34
Section I. Instructions to Bidders
28.5 If, in addition to the cost factors, the Purchaser has chosen to
give weight to important technical factors (i.e., the price weight,
X, is less than 1 in the evaluation), that cannot be reduced to
life-cycle costs or pass/fail criteria, the Total Technical Points
assigned to each bid in the Evaluated Bid Formula will be
determined by adding and weighting the scores assigned by an
evaluation committee to technical features of the bid in
accordance with the criteria set forth below.
(a)
The technical features to be evaluated are generally defined
below and specifically identified in the BDS:
(i)
Performance, capacity, or functionality features that
either exceed levels specified as mandatory in the
Technical Requirements; and/or influence the lifecycle cost and effectiveness of the Information
System.
(ii)
Usability features, such as ease of use, ease of
administration, or ease of expansion, which
influence the life-cycle cost and effectiveness of the
Information System.
(iii) The quality of the Bidder’s Preliminary Project Plan
as evidenced by the thoroughness, reasonableness,
and responsiveness of: (a) the task and resource
schedules, both general and specific, and (b) the
proposed arrangements for management and
coordination, training, quality assurance, technical
support, logistics, problem resolution, and transfer of
knowledge, and other such activities as specified by
the Purchaser in Section VI (Technical
Requirements) or proposed by the Bidder based on
the Bidder’s experience.
(b)
Feature scores will be grouped into a small number of
evaluation categories, generally defined below and
specifically identified in the BDS, namely:
(i)
The technical features that reflect how well the
Information System meets the Purchaser’s Business
Requirements (including quality assurance and riskcontainment measures associated with the
implementation of the Information System).
(ii)
The technical features that reflect how well the
Information System meets the System’s Functional
Section I. Instructions to Bidders
35
Performance Standards.
(iii) The technical features that reflect how well the
Information System meets the General Technical
Requirements
for
hardware,
network
and
communications, Software, and Services.
(c)
As specified in the BDS, each category will be given a
weight and within each category each feature may also be
given a weight.
(d)
During the evaluation process, the evaluation committee
will assign each desirable/preferred feature a whole
number score from 0 to 4, where 0 means that the feature
is absent, and 1 to 4 either represent predefined values for
desirable features amenable to an objective way of rating
(as is the case for, e.g., extra memory, or extra mass
storage capacity, etc., if these extras would be conducive
for the utility of the system), or if the feature represents a
desirable functionality (e.g., of a software package) or a
quality improving the prospects for a successful
implementation (such as the strengths of the proposed
project staff, the methodology, the elaboration of the
project plan, etc., in the bid), the scoring will be 1 for the
feature being present but showing deficiencies; 2 for
meeting the requirements; 3 for marginally exceeding the
requirements; and 4 for significantly exceeding the
requirements.
(e)
The score for each feature (i) within a category (j) will be
combined with the scores of features in the same category
as a weighted sum to form the Category Technical Score
using the following formula:
k
S j ≡ ∑ t ji ∗ w ji
i =1
where:
tji
= the technical score for feature “i” in category “j”
wji
= the weight of feature “i” in category “j”
k
= the number of scored features in category “j”
k
and
∑w
ji
=1
i =1
(f)
The Category Technical Scores will be combined in a
36
Section I. Instructions to Bidders
weighted sum to form the total Technical Bid Score using
the following formula:
n
T ≡ ∑ S j ∗Wj
j =1
where:
Sj
= the Category Technical Score of category “j”
Wj
= the weight of category “j” as specified in the BDS
n
= the number of categories
n
and
∑W
j
=1
j =1
28.6 The Evaluated Bid Price (C) for each responsive bid will be
determined as the sum of the Adjusted Supply and Installation
Costs (P) plus the Recurrent Costs (R);
where the Adjusted Supply and Installation Costs (P) are
determined as:
(a)
The price of the hardware, Software, related equipment,
products, Materials and other Goods offered from within or
from outside the Purchaser’s Country, in accordance with
ITB 14.4; plus
(b)
The total price for all software development,
transportation, insurance, installation, customization,
integration, Commissioning, testing, training, technical
support, repair, and other Services, in accordance with ITB
14.5;
(c)
with adjustments for:
(i)
Deviations proposed to the Implementation Schedule
in the Technical Requirements resulting in delayed
completion of the entire Information System, if
permitted in the BDS and provided they do not
exceed the maximum permissible delay period
specified in the BDS. For evaluation purposes, a pro
rata increase of the total Supply and Installation
Costs will be added using the percentage(s) specified
in the BDS for each week of delay. Bids offering
deliveries beyond the maximum permissible delay
specified may be rejected.
Section I. Instructions to Bidders
37
(ii)
Deviations taken to the Contract payment schedule
specified in the SCC. If deviations are permitted in
the BDS, for evaluation purposes the total Supply
and Installation Costs will be increased pro rata by
the amount of interest that could otherwise be earned
on the amount of any payments that would fall due
under the proposed schedule earlier than the schedule
stipulated in the SCC, at the interest rate specified in
the BDS.
(iii) Goods and Services that are required for the
Information System but have been left out or are
necessary to correct minor deviations of the bid will
be added to the total Supply and Installation Costs
using costs taken from the highest prices from other
responsive bids for the same Goods and Services, or
in the absence of such information, the cost will be
estimated at prevailing list prices. If the missing
Goods and Services are a scored technical feature, the
relevant score will be set at zero.
(iv) Corrections to errors in arithmetic, in accordance
with ITB Clause 26.2.
(v)
(d)
Any discounts offered for the award of more than one
Subsystem, lot, or slice, if the BDS for ITB Clause
28.1 permits the consideration of discounts in the
price evaluation.
The Recurrent Costs (R) are reduced to net present value
and determined using the following formula:
R≡
N+M R
x
∑
x
x = 1 (1 + I )
where
N = number of years of the Warranty Period, defined in
SCC Clause 29.4
M = number of years of the Post-Warranty Services
Period, as defined in SCC Clause 1.1.(e) (xii)
x
= an index number 1, 2, 3, ... N + M representing
each year of the combined Warranty Service and
Post-Warranty Service Periods.
Rx = total Recurrent Costs for year “x,” as recorded in
38
Section I. Instructions to Bidders
the Recurrent Cost Sub-Table.
I
= discount rate to be used for the Net Present Value
calculation, as specified in the BDS.
29. Domestic
Preference
29.1 No margin of domestic preference will apply.
30. Contacting the
Purchaser
30.1 From the time of bid opening to the time of Contract award, if
any Bidder wishes to contact the Purchaser on any matter related
to the bid, it should do so in writing.
30.2 If a Bidder tries to directly influence the Purchaser or otherwise
interfere in the bid evaluation process and the Contract award
decision, its bid may be rejected.
F. POSTQUALIFICATION AND AWARD OF CONTRACT
31. Postqualification
31.1 The Purchaser will determine at its own cost and to its
satisfaction whether the Bidder (including Joint Venture
Partners, and any Subcontractors for which the BDS for ITB
Clause 6.1 (a) permits that their qualifications count towards the
required Bidder qualifications) that is selected as having
submitted the Lowest Evaluated Bid is qualified to perform the
Contract satisfactorily, in accordance with ITB Clause 6. If a
prequalification process was undertaken for the Contract(s) for
which these Bidding Documents were issued, the Purchaser will
determine in the manner described above that no material
changes have occurred after the prequalification that negatively
affect the ability of the Bidder that has submitted the Lowest
Evaluated Bid to perform the Contract.
31.2 Pursuant to ITB Clauses 6 and 16, and as additionally may be
specified in the BDS, the determination will evaluate the
Bidder’s financial, technical, design, integration, customization,
production, management, and support capabilities and will be
based on an examination of the documentary evidence of the
Bidder’s qualifications, as well as other information the
Purchaser deems necessary and appropriate. This determination
may include visits or interviews with the Bidder’s clients
referenced in its bid, site inspections, and any other measures. If
so specified in the BDS, at the time of postqualification the
Purchaser may also carry out tests to determine that the
performance or functionality of the Information System offered
meets those stated in the Technical Requirements.
Section I. Instructions to Bidders
39
31.3 An affirmative postqualification determination will be a
prerequisite for award of the Contract to the Lowest Evaluated
Bidder. A negative determination will result in rejection of the
Bidder’s bid, in which event the Purchaser will proceed to the
next lowest evaluated Bidder to make a similar determination of
that Bidder’s capabilities to perform satisfactorily.
32. Award
Criteria
32.1 Subject to ITB Clause 34, the Purchaser will award the Contract
to the Bidder whose bid has been determined to be substantially
responsive and the Lowest Evaluated Bid, provided further that
the Bidder has been determined to be qualified to perform the
Contract satisfactorily, pursuant to ITB Clause 31.
33. Purchaser’s
Right to Vary
Quantities at
Time of Award
33.1 The Purchaser reserves the right at the time of Contract award to
increase or decrease, by the percentage(s) indicated in the BDS,
any of the following:
(a)
the quantity of substantially identical Subsystems; or
(b)
the quantity of individual hardware, Software, related
equipment, Materials, products, and other Goods
components of the Information System; or
(c)
the quantity of Installation or other Services to be
performed,
from that originally specified in the Technical Requirements (as
amended by any Addenda issued pursuant to ITB Clause 11),
without any change in unit prices or other terms and conditions.
34. Purchaser’s
Right to
Accept Any
Bid and to
Reject Any or
All Bids
34.1 The Purchaser reserves the right to accept or reject any bid or to
annul the bidding process and reject all bids at any time prior to
Contract award, without thereby incurring any liability to the
Bidders.
35. Notification of
Award
35.1 Prior to the expiration of the period of bid validity, the Purchaser
shall notify the successful Bidder, in writing, that its bid has
been accepted.
35.2 Until a formal Contract is prepared and executed, the
notification of award shall constitute a binding Contract.
35.3 The Purchaser shall promptly publish in UNDB online and in
dgMarket the results, identifying the bid and lot numbers and the
following information: (i) name of each Bidder who submitted a
bid; (ii) bid prices as read out at bid opening; (iii) name,
40
Section I. Instructions to Bidders
evaluated price and, if the bidding conditions included scoring
for technical quality, the technical score of each bid that was
evaluated; (iv) name of Bidders whose bids were rejected and
the reasons for their rejection; and (v) name of the winning
Bidder, the price it offered, as well as the duration and summary
scope of the contract awarded. After publication of the award,
unsuccessful Bidders may make a request in writing to the
Purchaser for a debriefing seeking explanations on the grounds
on which their bids were not selected. The Purchaser shall
promptly respond in writing to any unsuccessful Bidder who,
after publication of contract award, requests a debriefing.
35.4 Upon the successful Bidder furnishing the signed Contract
Agreement and the Performance Security pursuant to ITB Clause
37, the Purchaser will promptly notify each unsuccessful Bidder,
and will discharge all remaining Bid Securities, if any, as
provided in ITB Clause 17.5 (c) and (d).
36. Signing of
Contract
36.1 At the same time as the Purchaser notifies the successful Bidder
that its bid has been accepted, the Purchaser will send the Bidder
the Contract Agreement provided in the Bidding Documents,
incorporating all agreements between the parties.
36.2 As soon as practically possible, but no more than twenty-eight
(28) days following receipt of the Contract Agreement, the
successful Bidder shall sign and date it, and return it to the
Purchaser.
37. Performance
Security
37.1 As soon as practically possible, but no more than twenty-eight
(28) days following receipt of notification of award from the
Purchaser, the successful Bidder shall furnish the Performance
Security in accordance with the GCC, using the Performance
Security form provided in the Bidding Documents or another
form acceptable to the Purchaser.
37.2 Failure of the successful Bidder to comply with the requirements
of ITB Clause 36 or ITB Clause 37.1 shall constitute sufficient
grounds for the annulment of the award and, if and as applicable,
execution of the Bid-Securing Declaration or forfeiture of the
Bid Security, in which event the Purchaser may make the award
to the next lowest evaluated bid submitted by a qualified Bidder
or call for new bids.
38. Adjudicator
38.1 Unless otherwise stated in the BDS, the Purchaser proposes that
the person named in the BDS be appointed as Adjudicator under
the Contract to assume the role of informal Contract dispute
mediator, as described in GCC Clause 6. In this case, a résumé
Section I. Instructions to Bidders
41
of the named person is attached to the BDS. The proposed
hourly fee for the Adjudicator is specified in the BDS. The
expenses that would be considered reimbursable to the
Adjudicator are also specified in the BDS. If a Bidder does not
accept the Adjudicator proposed by the Purchaser, it should state
its non-acceptance in its Bid Submission Form and make a
counterproposal of an Adjudicator and an hourly fee, attaching a
résumé of the alternative. If the successful Bidder and the
Adjudicator nominated in the BDS happen to be from the same
country, and this is not the country of the Purchaser too, the
Purchaser reserves the right to cancel the Adjudicator nominated
in the BDS and propose a new one. If by the day the Contract is
signed, the Purchaser and the successful Bidder have not agreed
on the appointment of the Adjudicator, the Adjudicator shall be
appointed, at the request of either party, by the Appointing
Authority specified in the SCC clause relating to GCC Clause
6.1.4, or if no Appointing Authority is specified there, the
Contract will be implemented without an Adjudicator.
43
SECTION II. BID DATA SHEET (BDS)
44
Section II. Bid Data Sheet
Bid Data Sheet
The following specific information relating to the System to be procured and the procurement
procedures that will be used shall complement, supplement, or amend the provisions in the
Instructions to Bidders (ITB). Whenever there is a conflict, the provisions in the Bid Data
Sheet (BDS) shall prevail over those in the ITB.
A. GENERAL
ITB 1.1
Name of Purchaser: Finance Division, Ministry of Finance
represented by the Project Director, Deepening Medium
Term Budget Framework (DMTBF) and Strengthening
Financial Accountability Project (Project-A) under
Strengthening Public Expenditure Management Program
Name of authorized Purchasing Agent: “none”
Description of the System for which bids are invited: Supply,
Installation and Services for Servers, Fabric Switches,
Load Balancer, Oracle and Windows Software (Lot-A:
Database Servers Infrastructure and Oracle Software; LotB: Application Servers, Load Balancer, Fabric Switches
and Windows Software)
ITB 1.2
Title of IFB: Supply, Installation and Services for Servers, Fabric
Switches, Load Balancer, Oracle and Windows Software
(Lot-A: Database Servers Infrastructure and Oracle
Software; Lot-B: Application Servers, Load Balancer,
Fabric Switches and Windows Software)
Number of IFB: DMTBF/Server/368/12-13/1988 Date: September
12, 2013
Name of resulting Contract(s): Package No. 81
Supply, Installation and Services for Servers, Fabric Switches,
Load Balancer, Oracle and Windows Software (Lot-A:
Database Servers Infrastructure and Oracle Software; LotB: Application Servers, Load Balancer, Fabric Switches
and Windows Software)
ITB 1.4
Alternative e-Tendering procedures: are not available in this
procurement.
ITB 2.1
Name of the Borrower: The People’s Republic of Bangladesh
Loan or credit number: TF 095283-BD
Loan or credit amount: US$67.1666 million
Section II. Bid Data Sheet
45
Name of Project: Deepening MTBF and Strengthening Financial
Accountability Project (Project-A) under Strengthening
Public Expenditure Management Program (SPEMP)
ITB 6.1 (a)
Qualification requirements for Bidders are:
(a) The Bidder for each lot must have been in business for the last
three (03) years to be substantiated by submission of copies
of Trade License or membership certificate from statutory
institution or trade-body;
(b) The Bidder must have completed minimum one (01) successful
contract for Lot-A and two (02) for Lot-B involving supply,
installation and technical support for Information System
and installation of servers and fabric switches in last three
(03) years to be substantiated by submission of completion
certificate from the relevant authority;
(c) The Bidder must demonstrate present minimum average
annual turnover of US$80,00,000 equivalent calculated as
total certified payments received for contracts in progress
or completed within last three (03) years for Lot-A and
US$37,00,000 for Lot-B. Documentary evidence shall
include payment certificates from relevant authorities,
certified financial statements/audit reports for the
concerned years;
(d) The Bidder must demonstrate minimum US$32,00,000
equivalent present liquid asset and/or line of credit for LotA and US$15,00,000 for Lot-B, net of current
commitments. Documentary evidence shall be certified
Bank Statement, audit reports/financial statements,
banker’s certificate for specific credit lines available for
this contract, if awarded;
(e) For each Lot the Bidder or local agent of the Bidder must
have at least three (03) years proven experience in
providing warranty support services;
(f) For each Lot the local agent’s relationship with the
Principal/Manufacturer shall be at least three (03) year to
be evidenced by notarized copy of the Agreement;
(g) The Bidder must enclose location/addresses of existing service
centers and help desks together with service facilities the
centers have; and
(h) The Bidder shall furnish documentary evidence to demonstrate
that the Goods it offers meet usage requirement.
46
ITB 6.1 (b)
Section II. Bid Data Sheet
Manufacturer's Authorizations for Information Technologies - except
for those technologies which the Bidder itself manufactures are required for the following types/categories:
all active (i.e. powered) equipment and all software
ITB 6.1 (c)
If the Bidder proposes to use Subcontractors for the provision of
certain key services, written agreements by the proposed
firms to provide these services in case of contract(s) resulting
from this bidding are required for the following
types/categories of services: none
B. THE BIDDING DOCUMENTS
ITB 10.1
Purchaser’s / duly authorized Purchasing Agent’s address:
Ekram Ahmed
Project Director
Deepening Medium Term Budget Framework and Strengthening
Financial Accountability Project (Project-A)
UCEP Cheyne Tower (2nd floor)
25 Segunbagicha, Dhaka 1000
Bangladesh
Telephone No. 8391131-3, Fax No. 8391136
e-mail: ekramahmed1458@ gmail.com
ITB 10.2
Dates, times, and places for the pre-bid meeting:
Date: October 9, 2013 Time: 11.00AM Bangladesh
Standard Time
Place: Deepening Medium Term Budget Framework and
Strengthening Financial Accountability Project Office
UCEP Cheyne Tower (2nd floor)
25 Segunbagicha, Dhaka 1000
Bangladesh
C. PREPARATION OF BIDS
ITB 12.1
The language of the bid and of all correspondence and documents
related to it is: English
ITB 14.1
Depending on whether recurrent cost items are required or not,
state the following: Recurrent cost items are required.
ITB 14.4
The Incoterms edition is Incoterms 2010 by the International
Chamber of Commerce (ICC) — ICC rules for the use of
domestic and international trade terms published in
Section II. Bid Data Sheet
47
January 1, 2011 by the International Chamber of
Commerce, 38 Cours Albert 1er, 75008 Paris, France.
ITB 14.4 (a)
For foreign goods priced on a CIP (named place of destination)
basis:
(i) The contract of carriage shall include the cost of
unloading the goods at destination, as well as payment
by the Supplier of the cost of custom formalities, duties,
taxes or other charges payable on the foreign Goods for
their transit through any country other than the
Purchaser's country.
(ii) The named place of destination shall be the Finance
Division, Ministry of Finance, Bangladesh Secretariat,
Dhaka and Office of the Controller General of
Accounts, Dhaka.
ITB 14.4 (c)
Not Applicable
ITB 14.5
Not Applicable
ITB 14.7
Prices quoted by the Bidder shall be: fixed
ITB 15.1 (b)
The currency to be used for quoting prices of the Goods and
Services components of the System offered locally (i.e., from
within the Purchaser’s Country), as well as local currency
expenditures for local technical support, training,
maintenance, transportation, insurance, and other local
services incidental to delivery, installation and operation of
the System, is: Bangladesh Taka
ITB 16.2 (c)
In addition to the topics described in ITB Clause 16.2 (c), the
Preliminary Project Plan must address the following topics:
(a) Project Organization and Management Plan
(b) Delivery and Installation Plan
(c) Knowledge Transfer Plan
(d) Training Plan
(e) Pre-Commissioning and Operational Acceptance Plan
(f) Warranty Service Plan
(g) Task, Time and Resource Schedules
(h) Post-Warranty Service Plan
48
Section II. Bid Data Sheet
(i) Technical Support Plan
(j) Detailed Site Survey Repots
(k) Detailed Local Area Network Design
(l) Detailed Wide Area Network Design
Further details regarding the required contents of each of the
above chapters are contained in Section VI Technical
Requirements
ITB 16.3
In the interest of effective integration, cost-effective technical
support, and reduced re-training and staffing costs, Bidders
are required to offer specific brand names and models for the
following limited number of specific items: none.
ITB 17.1
Bids need to be secured by a Bid Security.
For Local Bidders: Bid shall include a Bid Security in the form of
Bank Guarantee issued by a Scheduled Bank located in
Dhaka, Bangladesh.
For foreign Bidders: Bank Guarantee may be issued by a Bank
located outside Bangladesh through a correspondent
Scheduled Bank located in Dhaka, Bangladesh. The format
of Bank Guarantee is included in Section VII Sample
Forms (Form 4A).
The amount of Bid Security required is:
For Lot-A: Bangladesh Taka six million and three hundred
thousand (BDT6,300,000) or US Dollar eighty thousand
(US$80,000) or equivalent amount in a freely convertible
currency.
For Lot-B: Bangladesh Taka two million and nine hundred
thousand (BDT3,000,000)
or US Dollar thirty six
thousand and five hundred (US$36,500) or equivalent
amount in a freely convertible currency.
ITB 17.7
If the Bidder incurs any of the actions prescribed in ITB Clause 17.7
(a) or (b), the Borrower will declare the Bidder ineligible to
be awarded contracts by the Employer for a period of: Not
Applicable.
ITB 18.1
The bid validity period shall be: One hundred and twenty (120)
days after the deadline for bid submission, as specified below
in reference to ITB Clause 21. Accordingly, each bid shall
be valid through: the actual date of the expiration of the bid
Section II. Bid Data Sheet
49
validity period: March 7, 2014.
If Bidders have to secure bids pursuant to ITB Clause 17.1, add:
Accordingly, a bid with a Bid Security that expires before: the
actual date of the expiration of the Bid-Securing
Declaration or Bid Security, i.e., twenty-eight (28) days
after the end of the bid validity period shall be rejected as
non-responsive.
ITB 19.1
Required number of bid copies, besides the original: one electronic
copy in Compact Disc will be required
D. SUBMISSION OF BIDS
ITB 20.2 (a)
The address for bid submission is:
Deepening Medium Term Budget Framework and Strengthening
Financial Accountability Project Office
UCEP Cheyne Tower (2nd floor)
25 Segunbagicha, Dhaka 1000
Bangladesh
ITB 21.1
Deadline for bid submission is: November 7, 2013 at 2.00PM
Bangladesh Standard Time
E. BID OPENING AND EVALUATION
ITB 24.1
Time, date, and place for bid opening are:
Time: 2.30PM Bangladesh Standard Time Date: November 7, 2013
Place: Deepening Medium Term Budget Framework and Strengthening
Financial Accountability Project Office
UCEP Cheyne Tower (2nd floor)
25 Segunbagicha, Dhaka 1000
Bangladesh
ITB 27.1
The currency chosen for the purpose of converting to a common currency is:
Bangladesh Taka
The source of exchange rate is:
Selling rate (BC) at Sonali Bank Limited, Principal Branch, Dhaka,
Bangladesh on the date of submission of the bid. For the currency
that is not quoted by Sonali Bank Limited, that shall be first
converted to US Dollar using Exchange Rate quoted by Wall Street
Journal of the same date then that US Dollar will be converted to
50
Section II. Bid Data Sheet
Bangladesh Taka using Sonali Bank’s Exchange Rate. In case
Wall Street Journal is not available on that date, Exchange Rate of
next available date of the same journal shall be used.
The date of exchange rate determination is: the date of submission of the
bid. In case that no exchange rates are available on this date from the
source indicated above, the latest available exchange rates from the
same source prior to this date will be used.
ITB 28.1
Bids for Subsystems, lots, or slices of the overall Information System: will
be accepted.
Bids are being invited on a lot-by-lot basis.
Lot-A: Database Servers Infrastructure and Oracle Software
Lot-B: Application Servers, Load Balancer, Fabric Switches and Windows
Software
Discounts for the award of multiple Subsystems, lots, or slices: will be
considered in bid evaluation.
ITB 28.4
The bid evaluation will take into account technical factors in addition to cost
factors.
The weight of the Price (“X” multiplied by 100 in the Evaluated Bid Score
formula) = 0.70 (seventy percentage)
ITB 28.5
(a),(b) The technical evaluation categories and the features to be
evaluated within each category are as follows:
1. Servers
i.
Experience in similar work
ii.
Deployment plan
iii.
Certified professionals
iv.
Database administration
v.
Virtualization and Clustering Expert
2. Warranty
3.Support Service Plan
Section II. Bid Data Sheet
51
(c),(e),(f) The evaluation weights for categories and technical
features within categories are:
Lot-A
Sl.
Technical Criteria of participating bidder
1.
Software Certified Expert:
Bidder must have at least one ORACLE certified
Professional from each category in below.
a) Oracle Certified Professional (OCP) Database
Administrator on Oracle 9i or 10g or 11g
b) Oracle Database 10g or 11g Certified Expert on
Real Application Clusters (RAC)
c) Oracle Database 10g or 11g Performance Tuning
Certified Expert
Copy of relevant certificate must be provided as proof of
their experience.
Experts for Implementation and Operation:
i. The participating bidder shall have at least one
Certified Implementation Specialist who has
significant experience on the proposed
Hardware in the provision of server partitioning,
RAC clustering, diagnostics and tuning.
ii. The participating bidder shall assign at least two
(2) Engineers during the contract period where
at least one Certified Hardware engineer for the
proposed hardware solution and a certified oracle
11g expert. The participating bidder shall
provide relevant document and certificate with
the proposal.
Support Service:
The participating bidder has the capability of providing
support 24/7 support including parts replacement along
with the certified engineers. Bidder shall provide
similar type of customer experience record with the
proposal for the support service and submit details of
support steps.
Storage Experience:
The bidder must have Data replication and Database
migration experience of High volume of storage. At
least one implementation experiences of Data
replication and Database migration in Active/Active
2.
3.
4.
Total
Weighting
factor
100%
5%
5%
2.5%
2.5%
52
Section II. Bid Data Sheet
5.
6.
mode or Active/Passive mode of database servers
between two datacenters.
Oracle Backup Management:
The bidder must have dedicated Backup & Recovery
management team consisting of at least one person with
at least 2 years of experience in similar type of solution.
Also Bidder should have sufficient experience in
“Active Data Guard” and “Oracle Secure Backup” in
DC/DR environment.
If the participating bidder is Sole Distributor or
Distributor or Highest level of partnership of the
proposed Hardware manufacturer; relevant certificate
and contact details should be provided with proposal
shall carry the weight.
Lot-A
2.5%
2.5%
Option 1 or Option 2
Hardware
7.
DATABASE SERVER
20%
8.
Management Servers (1 unit at DC)
5%
9.
Backup/Media Servers (1 unit at DC )
5%
10. Backup Storage Appliance (1 unit at DC )
11. Management Servers (1 unit at DR)
5%
12. Backup/Media Servers (1 unit at DR)
13. Backup Storage Appliance (1 unit at DR)
5%
5%
5%
Oracle Software’s
14. Oracle Enterprise Database Enterprise Edition
15%
15. Real Application Clusters
3%
16. Partitioning
2%
17. OEM Diagnostic Pack
2%
18. OEM Turning Pack
2%
19. Oracle Secure Backuup
2%
20. Oracle Active Data Guard
3%
Training Expert
21. Training
Lot-B
1%
Section II. Bid Data Sheet
53
Sl.
Technical Criteria of participating bidder
1.
Windows Software Certified Expert:
Bidder must have at least one Windows certified
Professional from each category in below.
d) Certified Professional of Private Cloud
deployment
e) Certified Professional of SCVMM deployment
f) Certified Professional of SCCM & SCOM
deployment
g) Certified Expert on Real Application Clusters
(RAC) deployment
Copy of relevant certificate must be provided as proof
of their experience.
Experts for Implementation and Operation:
i. The participating bidder shall have at least one
Certified Implementation Specialist who
has significant experience on the proposed
Hardwares in the provision of server
installation and partitioning, diagnostics
and tuning.
2.
3.
4.
5.
ii. The participating bidder shall assign at least
two (2) Engineers during the contract
period where at least one Certified
Hardware engineer for the proposed
hardware solution and a certified Microsoft
solution expert. The participating bidder
shall provide relevant document and
certificate with the proposal.
Stock Experience:
The participating bidder must have sufficient spares of
similar product kept for the other customers as
suggested by Manufacturer.
The record of
documentation carries the weight and evidence shall
provide with the proposal.
Support Service:
The participating bidder has the capability of
providing support 24/7 support including parts
replacement along with the certified engineers. Bidder
shall provide similar type of customer experience
record with the proposal for the support service and
submit details of support delivery steps.
Virtualization & Communication:
Total
Weighting
factor 100%
5%
5%
5%
5%
5%
54
Section II. Bid Data Sheet
The participating bidder should have expertise on
i. Hyper-V
replication,
Private
Cloud,
Synchronization and Windows live migration,
System center 2012
ii. Exchange Server and Lync Servers planning
implementation & operation experience.
Certificates and the record of documentation of above
expertise carry the weight and evidence shall be
provided with the proposal.
6. If the participating bidder is Sole Distributor or
Distributor or Highest level of partnership of the
proposed Hardware manufacturer; relevant certificate
and contact details should be provided with proposal
shall carry the weight.
2.5%
Hardware
7.
Application server (4 Unit for DC & 4 Unit for DR )
20%
8.
Report Server (1 Unit for DC & 1 Unit for DR )
Test and Development Server (1 Unit for DC & 1 Unit
for DR)
Data Centre Management Server (1 Unit for DC & 1
Unit for DR)
Primary Domain Controller (1 Unit for DC)
Additional Domain Controller (1 Unit for DC & 1
Unit for DR)
Patch Management Server: (1 Unit for DC)
10%
9.
10.
11.
12.
13.
14. Mail Server: (1 Unit for DC & 1 Unit for DR)
15. Backup Tape System: (1 Unit for DC)
16. Blade Chassis (if blade solution - 1 Unit for DC & 1
Unit for DR)
17. Fabric switches: ( 2 Unit for DC & 1 Unit for DR)
18. Load Balancer & Application Delivery Controllers (1
Unit for DC &1 Unit for DR)
Software
19. Experience on Double-Take Solution
20. Microsoft Premier Support service experience.
2.5%
2.5%
2.5%
2.5%
2.5%
5%
5%
2.5%
2.5%
5%
5%
5%
Scores will be awarded only after the minimum requirement is met and the
relative technical scores will be based on the
qualities/performances/values of each technical criterion. If the
Section II. Bid Data Sheet
55
bidder provides highest or best products or services, the maximum
score will be given to the bidder and the remaining bidder(s) will be
given scores in proportion.
ITB 28.6 (c) (i)
The Purchaser will not accept deviations in the schedule of installation and
commissioning specified in the Implementation Schedule.
ITB 28.6 (c) (ii)
The Purchaser: will not accept deviations in the payment schedule in the
SCC.
ITB 28.6 (d)
If the BDS for ITB 14.1 above indicates that recurrent cost items are not
required, delete this BDS entry for ITB Clause 28.6 (d); otherwise:
Interest Rate (I) for net present value calculations of recurrent costs =
ten (10%) percent per annum.
F. POSTQUALIFICATION AND AWARD OF CONTRACT
ITB 31.2
As additional postqualification measures, the Information System
(or components/parts of it) offered by the Lowest Evaluated
Bidder may be subjected to the following tests and
performance benchmarks prior to Contract award:
the Purchaser will examine documentary evidence including visits
and interviews with the Bidder’s client referenced in its bid,
site
inspection,
witnessing
performances
and
functionalities of the installed systems and verification of
other relevant information that the Purchaser deems
necessary and reasonable.
ITB 33.1
Percentage for quantity increase or decrease: 20% (twenty percent)
ITB 38.1
The proposed Adjudicator is: Mr. Naim Islam Mohammad
Alamgir, IT professional.
The proposed hourly fee is Bangladesh Taka Five Thousand
(BDT5,000) only.
The expenses that would be considered reimbursable to the
Adjudicator are: all dispute-related telephone, fax, and
other communications costs, as well as all costs associated
with trips to the site(s).
56
Section II. Bid Data Sheet
Résumé of the proposed Adjudicator.
Section II. Bid Data Sheet
57
59
SECTION III. ELIGIBLE COUNTRIES FOR THE PROVISION OF
GOODS, WORKS, AND SERVICES IN BANK-FINANCED
PROCUREMENT
60
Section III. Countries Eligible for Bank-Financed Procurement
Eligible Countries for the Provision of Goods, Works, and Services in
Bank-Financed Procurement
1.
Eligible for this procurement are firms of, and goods manufactured in, all countries
except countries, if any, listed in the following restrictions.
2.
In accordance with para. 1.8 (a) of the Guidelines: Procurement under IBRD Loans
and IDA Credits, firms of a Country or goods manufactured in a Country may be excluded if
(i)
as a matter of law or official regulation, the Borrower’s Country prohibits
commercial relations with that Country, provided that the Bank is satisfied that
such exclusion does not preclude effective competition for the supply of the
goods or works required, or
(ii)
by an Act of Compliance with a Decision of the United Nations Security
Council taken under Chapter VII of the Charter of the United Nations, the
Borrower’s Country prohibits any import of goods from that Country or any
payments to persons or entities in that Country.
3.
For the information of borrowers and bidders, at the present time firms, goods and
services from the following countries are excluded from this bidding:
With reference to paragraph (i) above: the State of Israel
With reference to paragraph (ii) above: the State of Israel
61
SECTION IV. GENERAL CONDITIONS OF CONTRACT
62
Section IV. General Conditions of Contract
Table of Clauses
A. Contract and Interpretation ...........................................................................................64
1.
2.
3.
4.
5.
6.
Definitions.................................................................................................................64
Contract Documents..................................................................................................72
Interpretation .............................................................................................................72
Notices ......................................................................................................................75
Governing Law .........................................................................................................76
Settlement of Disputes ..............................................................................................76
B. Subject Matter of Contract .............................................................................................78
7.
8.
9.
10.
Scope of the System ..................................................................................................78
Time for Commencement and Operational Acceptance ...........................................79
Supplier’s Responsibilities .......................................................................................79
Purchaser’s Responsibilities .....................................................................................81
C. Payment.............................................................................................................................83
11.
12.
13.
14.
Contract Price............................................................................................................83
Terms of Payment .....................................................................................................83
Securities ...................................................................................................................84
Taxes and Duties .......................................................................................................85
D. Intellectual Property ........................................................................................................86
15.
16.
17.
Copyright ..................................................................................................................86
Software License Agreements...................................................................................87
Confidential Information...........................................................................................89
E. Supply, Installation, Testing, Commissioning, and Acceptance of the System ..........91
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
Representatives .........................................................................................................91
Project Plan ...............................................................................................................93
Subcontracting ..........................................................................................................93
Design and Engineering ............................................................................................94
Procurement, Delivery, and Transport ......................................................................97
Product Upgrades ....................................................................................................100
Implementation, Installation, and Other Services ...................................................101
Inspections and Tests ..............................................................................................101
Installation of the System ........................................................................................102
Commissioning and Operational Acceptance .........................................................103
F. Guarantees and Liabilities .............................................................................................107
28.
29.
30.
31.
32.
Operational Acceptance Time Guarantee ...............................................................107
Defect Liability .......................................................................................................108
Functional Guarantees.............................................................................................111
Intellectual Property Rights Warranty.....................................................................111
Intellectual Property Rights Indemnity ...................................................................112
Section IV. General Conditions of Contract
33.
63
Limitation of Liability .............................................................................................115
G. Risk Distribution ............................................................................................................115
34.
35.
36.
37.
38.
Transfer of Ownership ............................................................................................115
Care of the System ..................................................................................................115
Loss of or Damage to Property; Accident or Injury to Workers; Indemnification..117
Insurances................................................................................................................118
Force Majeure .........................................................................................................120
H. Change in Contract Elements .......................................................................................122
39.
40.
41.
42.
Changes to the System ............................................................................................122
Extension of Time for Achieving Operational Acceptance ....................................126
Termination .............................................................................................................127
Assignment .............................................................................................................136
64
Section IV. General Conditions of Contract
General Conditions of Contract
A. CONTRACT AND INTERPRETATION
1. Definitions
1.1
In this Contract, the following terms shall be interpreted as
indicated below.
(a)
contract elements
(i)
“Contract” means the Contract Agreement
entered into between the Purchaser and the
Supplier, together with the Contract Documents
referred to therein. The Contract Agreement and
the Contract Documents shall constitute the
Contract, and the term “the Contract” shall in all
such documents be construed accordingly.
(ii)
“Contract Documents” means the documents
specified in Article 1.1 (Contract Documents) of
the Contract Agreement (including any
amendments to these Documents).
(iii) “Contract Agreement” means the agreement
entered into between the Purchaser and the
Supplier using the form of Contract Agreement
contained in the Sample Forms Section of the
Bidding Documents and any modifications to
this form agreed to by the Purchaser and the
Supplier. The date of the Contract Agreement
shall be recorded in the signed form.
(iv) “GCC” means the General Conditions of
Contract.
(v)
“SCC” means the Special Conditions of
Contract.
(vi) “Technical Requirements” means the Technical
Requirements Section of the Bidding
Documents.
(vii) “Implementation
Schedule”
means
the
Implementation Schedule Sub-section of the
Technical Requirements.
viii) “Contract Price” means the price or prices
defined in Article 2 (Contract Price and Terms
Section IV. General Conditions of Contract
65
of Payment) of the Contract Agreement.
(ix) “Procurement Guidelines” refers to the edition
specified in the SCC of the World Bank
Guidelines: Procurement under IBRD Loans and
IDA Credits.
(x)
(b)
“Bidding Documents” refers to the collection of
documents issued by the Purchaser to instruct
and inform potential suppliers of the processes
for bidding, selection of the winning bid, and
Contract formation, as well as the contractual
conditions governing the relationship between
the Purchaser and the Supplier. The General and
Special Conditions of Contract, the Technical
Requirements, and all other documents included
in the Bidding Documents reflect the
Procurement Guidelines that the Purchaser is
obligated to follow during procurement and
administration of this Contract.
entities
(i)
“Purchaser” means the entity purchasing the
Information System, as specified in the SCC.
(ii)
“Project Manager” means the person named as
such in the SCC or otherwise appointed by the
Purchaser in the manner provided in GCC
Clause 18.1 (Project Manager) to perform the
duties delegated by the Purchaser.
(iii) “Supplier” means the firm or Joint Venture
whose bid to perform the Contract has been
accepted by the Purchaser and is named as such
in the Contract Agreement.
(iv) “Supplier’s Representative” means any person
nominated by the Supplier and named as such in
the Contract Agreement or otherwise approved
by the Purchaser in the manner provided in GCC
Clause 18.2 (Supplier’s Representative) to
perform the duties delegated by the Supplier.
(v)
“Subcontractor” means any firm to whom any of
the obligations of the Supplier, including
preparation of any design or supply of any
66
Section IV. General Conditions of Contract
Information Technologies or other Goods or
Services, is subcontracted directly or indirectly
by the Supplier.
(vi) “Adjudicator” means the person named in
Appendix 2 of the Contract Agreement,
appointed by agreement between the Purchaser
and the Supplier to make a decision on or to
settle any dispute between the Purchaser and the
Supplier referred to him or her by the parties,
pursuant to GCC Clause 6.1 (Adjudication).
(vii) “The World Bank” (also called “The Bank”)
means the International Bank for Reconstruction
and Development (IBRD) or the International
Development Association (IDA).
(c)
scope
(i)
“Information System,” also called “the System,”
means all the Information Technologies,
Materials, and other Goods to be supplied,
installed, integrated, and made operational
(exclusive of the Supplier’s Equipment),
together with the Services to be carried out by
the Supplier under the Contract.
(ii)
“Subsystem” means any subset of the System
identified as such in the Contract that may be
supplied, installed, tested, and commissioned
individually before Commissioning of the entire
System.
(iii)
“Information
Technologies”
means
all
information processing and communicationsrelated hardware, Software, supplies, and
consumable items that the Supplier is required
to supply and install under the Contract.
(iv)
“Goods” means all equipment, machinery,
furnishings, Materials, and other tangible items
that the Supplier is required to supply or supply
and install under the Contract, including,
without
limitation,
the
Information
Technologies and Materials, but excluding the
Supplier’s Equipment.
Section IV. General Conditions of Contract
67
(v)
“Services” means all technical, logistical,
management, and any other Services to be
provided by the Supplier under the Contract to
supply, install, customize, integrate, and make
operational the System. Such Services may
include, but are not restricted to, activity
management and quality assurance, design,
development, customization, documentation,
transportation,
insurance,
inspection,
expediting, site preparation, installation,
integration, training, data migration, Precommissioning, Commissioning, maintenance,
and technical support.
(vi)
“The Project Plan” means the document to be
developed by the Supplier and approved by the
Purchaser, pursuant to GCC Clause 19, based
on the requirements of the Contract and the
Preliminary Project Plan included in the
Supplier’s bid. The “Agreed and Finalized
Project Plan” is the version of the Project Plan
approved by the Purchaser, in accordance with
GCC Clause 19.2. Should the Project Plan
conflict with the Contract in any way, the
relevant provisions of the Contract, including
any amendments, shall prevail.
(vii) “Software” means that part of the System which
are instructions that cause information
processing Subsystems to perform in a specific
manner or execute specific operations.
(viii) “System Software” means Software that provides
the operating and management instructions for the
underlying hardware and other components, and is
identified as such in Appendix 4 of the Contract
Agreement and such other Software as the parties
may agree in writing to be Systems Software.
Such System Software includes, but is not
restricted to, micro-code embedded in hardware
(i.e.,
“firmware”),
operating
systems,
communications,
system
and
network
management, and utility software.
(ix)
“General-Purpose Software” means Software
that supports general-purpose office and
68
Section IV. General Conditions of Contract
software development activities and is
identified as such in Appendix 4 of the Contract
Agreement and such other Software as the
parties may agree in writing to be GeneralPurpose Software.
Such General-Purpose
Software may include, but is not restricted to,
word processing, spreadsheet, generic database
management, and application development
software.
(x)
“Application Software” means Software
formulated to perform specific business or
technical functions and interface with the
business or technical users of the System and is
identified as such in Appendix 4 of the Contract
Agreement and such other Software as the
parties may agree in writing to be Application
Software.
(xi)
“Standard Software” means Software identified
as such in Appendix 4 of the Contract
Agreement and such other Software as the
parties may agree in writing to be Standard
Software.
(xii) “Custom Software” means Software identified as
such in Appendix 4 of the Contract Agreement
and such other Software as the parties may agree
in writing to be Custom Software.
(xiii) “Source Code” means the database structures,
dictionaries, definitions, program source files,
and any other symbolic representations
necessary for the compilation, execution, and
subsequent maintenance of the Software
(typically, but not exclusively, required for
Custom Software).
(xiv) “Materials” means all documentation in printed
or printable form and all instructional and
informational aides in any form (including
audio, video, and text) and on any medium,
provided to the Purchaser under the Contract.
(xv) “Standard Materials” means all Materials not
specified as Custom Materials.
Section IV. General Conditions of Contract
69
(xvi) “Custom Materials” means Materials developed
by the Supplier at the Purchaser’s expense under
the Contract and identified as such in Appendix 5
of the Contract Agreement and such other
Materials as the parties may agree in writing to be
Custom Materials. Custom Materials includes
Materials created from Standard Materials.
(xvii) “Intellectual Property Rights” means any and all
copyright, moral rights, trademark, patent, and
other intellectual and proprietary rights, title
and interests worldwide, whether vested,
contingent, or future, including without
limitation all economic rights and all exclusive
rights to reproduce, fix, adapt, modify,
translate, create derivative works from, extract
or re-utilize data from, manufacture, introduce
into circulation, publish, distribute, sell, license,
sublicense, transfer, rent, lease, transmit or
provide access electronically, broadcast,
display, enter into computer memory, or
otherwise use any portion or copy, in whole or
in part, in any form, directly or indirectly, or to
authorize or assign others to do so.
(xviii) “Supplier’s Equipment” means all equipment,
tools, apparatus, or things of every kind
required in or for installation, completion and
maintenance of the System that are to be
provided by the Supplier, but excluding the
Information Technologies, or other items
forming part of the System.
(d)
activities
(i)
“Delivery” means the transfer of the Goods from
the Supplier to the Purchaser in accordance with
the current edition Incoterms specified in the
Contract.
(ii)
“Installation” means that the System or a
Subsystem as specified in the Contract is ready
for Commissioning as provided in GCC Clause
26 (Installation).
(iii) “Pre-commissioning” means the testing, checking,
and any other required activity that may be
70
Section IV. General Conditions of Contract
specified in the Technical Requirements that are to
be carried out by the Supplier in preparation for
Commissioning of the System as provided in GCC
Clause 26 (Installation).
(iv) “Commissioning” means operation of the
System or any Subsystem by the Supplier
following Installation, which operation is to be
carried out by the Supplier as provided in GCC
Clause 27.1 (Commissioning), for the purpose of
carrying out Operational Acceptance Test(s).
(v)
“Operational Acceptance Tests” means the tests
specified in the Technical Requirements and
Agreed and Finalized Project Plan to be carried
out to ascertain whether the System, or a
specified Subsystem, is able to attain the
functional and performance requirements
specified in the Technical Requirements and
Agreed and Finalized Project Plan, in
accordance with the provisions of GCC Clause
27.2 (Operational Acceptance Test).
(vi) “Operational Acceptance” means the acceptance
by the Purchaser of the System (or any
Subsystem(s) where the Contract provides for
acceptance of the System in parts), in accordance
with
GCC
Clause 27.3
(Operational
Acceptance).
(e)
place and time
(i)
“Purchaser’s Country” is the country named in
the SCC.
(ii)
“Supplier’s Country” is the country in which the
Supplier is legally organized, as named in the
Contract Agreement.
(iii)
“Project Site(s)” means the place(s) specified in
the SCC for the supply and installation of the
System.
(iv) “Eligible Country” means the countries and
territories eligible for participation in
procurements financed by the World Bank as
defined in the Procurement Guidelines. (Note:
Section IV. General Conditions of Contract
71
The World Bank maintains a list of countries
from which Bidders, Goods, and Services are not
eligible to participate in procurement financed
by the Bank. The list is regularly updated and
can be obtained from the Public Information
Center of the Bank or its web site on
procurement. A copy of the list is contained in
the Section of the Bidding Documents entitled
“Eligible Countries for the Provision of Goods,
Works, and Services in Bank-Financed
Procurement”).
(v)
“Day” means calendar day of the Gregorian
Calendar.
(vi) “Week” means seven (7) consecutive Days,
beginning the day of the week as is customary in
the Purchaser’s Country.
(vii) “Month” means calendar month of the Gregorian
Calendar.
(viii) “Year” means twelve (12) consecutive Months.
(ix) “Effective Date” means the date of fulfillment of
all conditions specified in Article 3 (Effective
Date for Determining Time for Achieving
Operational Acceptance) of the Contract
Agreement, for the purpose of determining the
Delivery,
Installation,
and
Operational
Acceptance dates for the System or
Subsystem(s).
(x)
“Contract Period” is the time period during
which this Contract governs the relations and
obligations of the Purchaser and Supplier in
relation to the System, as specified in the SCC.
(xi) “Defect Liability Period” (also referred to as the
“Warranty Period”) means the period of validity
of the warranties given by the Supplier
commencing at date of the Operational
Acceptance Certificate of the System or
Subsystem(s), during which the Supplier is
responsible for defects with respect to the
System (or the relevant Subsystem[s]) as
72
Section IV. General Conditions of Contract
provided in GCC Clause 29 (Defect Liability).
(xii) “The Post-Warranty Services Period” means the
number of years defined in the SCC (if any),
following the expiration of the Warranty Period
during which the Supplier may be obligated to
provide Software licenses, maintenance, and/or
technical support services for the System, either
under this Contract or under separate contract(s).
(xiii) “The Coverage Period” means the Days of the
Week and the hours of those Days during which
maintenance, operational, and/or technical
support services (if any) must be available.
2. Contract
Documents
2.1
Subject to Article 1.2 (Order of Precedence) of the Contract
Agreement, all documents forming part of the Contract (and
all parts of these documents) are intended to be correlative,
complementary, and mutually explanatory. The Contract
shall be read as a whole.
3. Interpretation
3.1
Governing Language
3.1.1 All Contract Documents and related correspondence
exchanged between Purchaser and Supplier shall be
written in the language specified in the SCC, and the
Contract shall be construed and interpreted in
accordance with that language.
3.1.2 If any of the Contract Documents or related
correspondence are prepared in a language other than
the governing language under GCC Clause 3.1.1
above, the translation of such documents into the
governing language shall prevail in matters of
interpretation. The originating party, with respect to
such documents shall bear the costs and risks of such
translation.
3.2
Singular and Plural
The singular shall include the plural and the plural the
singular, except where the context otherwise requires.
3.3
Headings
The headings and marginal notes in the GCC are included
for ease of reference and shall neither constitute a part of the
Section IV. General Conditions of Contract
73
Contract nor affect its interpretation.
3.4
Persons
Words importing persons or parties shall include firms,
corporations, and government entities.
3.5
Incoterms
Unless inconsistent with any provision of the Contract, the
meaning of any trade term and the rights and obligations of
parties thereunder shall be as prescribed by the current
Incoterms (“Incoterms 2000” or a more recent version if and
as published). Incoterms are the international rules for
interpreting trade terms published by the International
Chamber of Commerce, 38 Cours Albert 1er, 75008 Paris,
France.
3.6
Entire Agreement
The Contract constitutes the entire agreement between the
Purchaser and Supplier with respect to the subject matter of
Contract and supersedes all communications, negotiations,
and agreements (whether written or oral) of parties with
respect to the subject matter of the Contract made prior to
the date of Contract.
3.7
Amendment
No amendment or other variation of the Contract shall be
effective unless it is in writing, is dated, expressly refers to
the Contract, and is signed by a duly authorized
representative of each party to the Contract.
3.8
Independent Supplier
The Supplier shall be an independent contractor performing
the Contract. The Contract does not create any agency,
partnership, joint venture, or other joint relationship
between the parties to the Contract.
Subject to the provisions of the Contract, the Supplier shall
be solely responsible for the manner in which the Contract
is performed.
All employees, representatives, or
Subcontractors engaged by the Supplier in connection with
the performance of the Contract shall be under the complete
control of the Supplier and shall not be deemed to be
employees of the Purchaser, and nothing contained in the
74
Section IV. General Conditions of Contract
Contract or in any subcontract awarded by the Supplier
shall be construed to create any contractual relationship
between any such employees, representatives, or
Subcontractors and the Purchaser.
3.9
Joint Venture
If the Supplier is a Joint Venture of two or more firms, all
such firms shall be jointly and severally bound to the
Purchaser for the fulfillment of the provisions of the
Contract and shall designate one of such firms to act as a
leader with authority to bind the Joint Venture. The
composition or constitution of the Joint Venture shall not be
altered without the prior consent of the Purchaser.
3.10 Nonwaiver
3.10.1 Subject to GCC Clause 3.10.2 below, no relaxation,
forbearance, delay, or indulgence by either party in
enforcing any of the terms and conditions of the
Contract or the granting of time by either party to
the other shall prejudice, affect, or restrict the rights
of that party under the Contract, nor shall any waiver
by either party of any breach of Contract operate as
waiver of any subsequent or continuing breach of
Contract.
3.10.2 Any waiver of a party’s rights, powers, or remedies
under the Contract must be in writing, must be dated
and signed by an authorized representative of the
party granting such waiver, and must specify the
right and the extent to which it is being waived.
3.11 Severability
If any provision or condition of the Contract is prohibited or
rendered invalid or unenforceable, such prohibition,
invalidity, or unenforceability shall not affect the validity or
enforceability of any other provisions and conditions of the
Contract.
3.12 Country of Origin
“Origin” means the place where the Information
Technologies, Materials, and other Goods for the System
were produced or from which the Services are supplied.
Goods are produced when, through manufacturing,
processing, Software development, or substantial and major
Section IV. General Conditions of Contract
75
assembly or integration of components, a commercially
recognized product results that is substantially different in
basic characteristics or in purpose or utility from its
components. The Origin of Goods and Services is distinct
from the nationality of the Supplier and may be different.
4. Notices
4.1
Unless otherwise stated in the Contract, all notices to be
given under the Contract shall be in writing and shall be
sent, pursuant to GCC Clause 4.3 below, by personal
delivery, airmail post, special courier, cable, telegraph,
telex, facsimile, electronic mail, or Electronic Data
Interchange (EDI), with the following provisions.
4.1.1 Any notice sent by cable, telegraph, telex, facsimile,
electronic mail, or EDI shall be confirmed within two
(2) days after dispatch by notice sent by airmail post
or special courier, except as otherwise specified in the
Contract.
4.1.2 Any notice sent by airmail post or special courier shall
be deemed (in the absence of evidence of earlier
receipt) to have been delivered ten (10) days after
dispatch. In proving the fact of dispatch, it shall be
sufficient to show that the envelope containing such
notice was properly addressed, stamped, and conveyed
to the postal authorities or courier service for
transmission by airmail or special courier.
4.1.3 Any notice delivered personally or sent by cable,
telegraph, telex, facsimile, electronic mail, or EDI
shall be deemed to have been delivered on the date of
its dispatch.
4.1.4 Either party may change its postal, cable, telex,
facsimile, electronic mail, or EDI addresses for receipt
of such notices by ten (10) days’ notice to the other
party in writing.
4.2
Notices shall be deemed to include any approvals, consents,
instructions, orders, certificates, information and other
communication to be given under the Contract.
4.3
Pursuant to GCC Clause 18, notices from/to the Purchaser
are normally given by, or addressed to, the Project Manager,
while notices from/to the Supplier are normally given by, or
addressed to, the Supplier's Representative, or in its absence
its deputy if any. If there is no appointed Project Manager
76
Section IV. General Conditions of Contract
or Supplier's Representative (or deputy), or if their related
authority is limited by the SCC for GCC Clauses 18.1 or
18.2.2, or for any other reason, the Purchaser or Supplier
may give and receive notices at their fallback addresses.
The address of the Project Manager and the fallback address
of the Purchaser are as specified in the SCC or as
subsequently established/amended. The address of the
Supplier's Representative and the fallback address of the
Supplier are as specified in Appendix 1 of the Contract
Agreement or as subsequently established/amended.
5. Governing Law
5.1
The Contract shall be governed by and interpreted in
accordance with the laws of the country specified in the
SCC.
6. Settlement of
Disputes
6.1
Adjudication
6.1.1 If any dispute of any kind whatsoever shall arise
between the Purchaser and the Supplier in connection
with or arising out of the Contract, including without
prejudice to the generality of the foregoing, any
question regarding its existence, validity, or
termination, or the operation of the System (whether
during the progress of implementation or after its
achieving Operational Acceptance and whether before
or after the termination, abandonment, or breach of
the Contract), the parties shall seek to resolve any
such dispute by mutual consultation. If the parties fail
to resolve such a dispute by mutual consultation
within fourteen (14) days after one party has notified
the other in writing of the dispute, then, if the Contract
Agreement in Appendix 2 includes and names an
Adjudicator, the dispute shall, within another fourteen
(14) days, be referred in writing by either party to the
Adjudicator, with a copy to the other party. If there is
no Adjudicator specified in the Contract Agreement,
the mutual consultation period stated above shall last
twenty-eight (28) days (instead of fourteen), upon
expiry of which either party may move to the
notification of arbitration pursuant to GCC Clause
6.2.1.
6.1.2 The Adjudicator shall give his or her decision in
writing to both parties within twenty-eight (28) days
of the dispute being referred to the Adjudicator. If the
Adjudicator has done so, and no notice of intention to
Section IV. General Conditions of Contract
77
commence arbitration has been given by either the
Purchaser or the Supplier within fifty-six (56) days of
such reference, the decision shall become final and
binding upon the Purchaser and the Supplier. Any
decision that has become final and binding shall be
implemented by the parties forthwith.
6.1.3 The Adjudicator shall be paid an hourly fee at the rate
specified in the Contract Agreement plus reasonable
expenditures incurred in the execution of duties as
Adjudicator, and these costs shall be divided equally
between the Purchaser and the Supplier.
6.1.4 Should the Adjudicator resign or die, or should the
Purchaser and the Supplier agree that the Adjudicator
is not fulfilling his or her functions in accordance with
the provisions of the Contract, a new Adjudicator
shall be jointly appointed by the Purchaser and the
Supplier. Failing agreement between the two within
twenty-eight (28) days, the new Adjudicator shall be
appointed at the request of either party by the
Appointing Authority specified in the SCC, or, if no
Appointing Authority is specified in SCC, the
Contract shall, from this point onward and until the
parties may otherwise agree on an Adjudicator or an
Appointing Authority, be implemented as if there is
no Adjudicator.
6.2
Arbitration
6.2.1 If
(a) the Purchaser or the Supplier is dissatisfied with
the Adjudicator’s decision and acts before this
decision has become final and binding pursuant
to GCC Clause 6.1.2, or
(b) the Adjudicator fails to give a decision within the
allotted time from referral of the dispute pursuant
to GCC Clause 6.1.2, and the Purchaser or the
Supplier acts within the following fourteen (14)
days, or
(c) in the absence of an Adjudicator from the
Contract Agreement, the mutual consultation
pursuant to GCC Clause 6.1.1 expires without
resolution of the dispute and the Purchaser or the
78
Section IV. General Conditions of Contract
Supplier acts within the following fourteen (14)
days,
then either the Purchaser or the Supplier may act to
give notice to the other party, with a copy for
information to the Adjudicator in case an Adjudicator
had been involved, of its intention to commence
arbitration, as provided below, as to the matter in
dispute, and no arbitration in respect of this matter
may be commenced unless such notice is given.
6.2.2 Any dispute in respect of which a notice of intention
to commence arbitration has been given, in
accordance with GCC Clause 6.2.1, shall be finally
settled by arbitration. Arbitration may be commenced
prior to or after Installation of the Information System.
6.2.3 Arbitration proceedings shall be conducted in
accordance with the rules of procedure specified in
the SCC.
6.3
Notwithstanding any reference to the Adjudicator or
arbitration in this clause,
(a)
the parties shall continue to perform their respective
obligations under the Contract unless they otherwise
agree;
(b)
the Purchaser shall pay the Supplier any monies due
the Supplier.
B. SUBJECT MATTER OF CONTRACT
7. Scope of the
System
7.1
Unless otherwise expressly limited in the SCC or Technical
Requirements, the Supplier’s obligations cover the provision
of all Information Technologies, Materials and other Goods
as well as the performance of all Services required for the
design, development, and implementation (including
procurement, quality assurance, assembly, associated site
preparation, Delivery, Pre-commissioning, Installation,
Testing, and Commissioning) of the System, in accordance
with the plans, procedures, specifications, drawings, codes,
and any other documents specified in the Contract and the
Agreed and Finalized Project Plan.
Section IV. General Conditions of Contract
8. Time for
Commencement
and Operational
Acceptance
9. Supplier’s
Responsibilities
79
7.2
The Supplier shall, unless specifically excluded in the
Contract, perform all such work and / or supply all such
items and Materials not specifically mentioned in the
Contract but that can be reasonably inferred from the
Contract as being required for attaining Operational
Acceptance of the System as if such work and / or items and
Materials were expressly mentioned in the Contract.
7.3
The Supplier’s obligations (if any) to provide Goods and
Services as implied by the Recurrent Cost tables of the
Supplier’s bid, such as consumables, spare parts, and
technical services (e.g., maintenance, technical assistance,
and operational support), are as specified in the SCC,
including the relevant terms, characteristics, and timings.
8.1
The Supplier shall commence work on the System within the
period specified in the SCC, and without prejudice to GCC
Clause 28.2, the Supplier shall thereafter proceed with the
System in accordance with the time schedule specified in the
Implementation Schedule in the Technical Requirements
Section and any refinements made in the Agreed and
Finalized Project Plan.
8.2
The Supplier shall achieve Operational Acceptance of the
System (or Subsystem(s) where a separate time for
Operational Acceptance of such Subsystem(s) is specified in
the Contract) within the time specified in the SCC and in
accordance with the time schedule specified in the
Implementation Schedule in the Technical Requirements
Section and any refinements made in the Agreed and
Finalized Project Plan, or within such extended time to
which the Supplier shall be entitled under GCC Clause 40
(Extension of Time for Achieving Operational Acceptance).
9.1
The Supplier shall conduct all activities with due care and
diligence, in accordance with the Contract and with the skill
and care expected of a competent provider of information
technologies, information systems, support, maintenance,
training, and other related services, or in accordance with
best industry practices. In particular, the Supplier shall
provide and employ only technical personnel who are skilled
and experienced in their respective callings and supervisory
staff who are competent to adequately supervise the work at
hand.
80
Section IV. General Conditions of Contract
9.2
The Supplier confirms that it has entered into this Contract
on the basis of a proper examination of the data relating to
the System provided by the Purchaser and on the basis of
information that the Supplier could have obtained from a
visual inspection of the site (if access to the site was
available) and of other data readily available to the Supplier
relating to the System as at the date twenty-eight (28) days
prior to bid submission. The Supplier acknowledges that any
failure to acquaint itself with all such data and information
shall not relieve its responsibility for properly estimating the
difficulty or cost of successfully performing the Contract.
9.3
The Supplier shall be responsible for timely provision of all
resources, information, and decision making under its control
that are necessary to reach a mutually Agreed and Finalized
Project Plan (pursuant to GCC Clause 19.2) within the time
schedule specified in the Implementation Schedule in the
Technical Requirements Section. Failure to provide such
resources, information, and decision making may constitute
grounds for termination pursuant to GCC Clause 41.2.
9.4
The Supplier shall acquire in its name all permits, approvals,
and/or licenses from all local, state, or national government
authorities or public service undertakings in the Purchaser’s
Country that are necessary for the performance of the
Contract, including, without limitation, visas for the
Supplier’s and Subcontractor’s personnel and entry permits
for all imported Supplier’s Equipment. The Supplier shall
acquire all other permits, approvals, and/or licenses that are
not the responsibility of the Purchaser under GCC
Clause 10.4 and that are necessary for the performance of the
Contract.
9.5
The Supplier shall comply with all laws in force in the
Purchaser’s Country. The laws will include all national,
provincial, municipal, or other laws that affect the
performance of the Contract and are binding upon the
Supplier. The Supplier shall indemnify and hold harmless
the Purchaser from and against any and all liabilities,
damages, claims, fines, penalties, and expenses of whatever
nature arising or resulting from the violation of such laws by
the Supplier or its personnel, including the Subcontractors
and their personnel, but without prejudice to GCC
Clause 10.1. The Supplier shall not indemnify the Purchaser
to the extent that such liability, damage, claims, fines,
penalties, and expenses were caused or contributed to by a
Section IV. General Conditions of Contract
81
fault of the Purchaser.
10. Purchaser’s
Responsibilities
9.6
The Supplier shall, in all dealings with its labor and the labor
of its Subcontractors currently employed on or connected
with the Contract, pay due regard to all recognized festivals,
official holidays, religious or other customs, and all local
laws and regulations pertaining to the employment of labor.
9.7
Any Information Technologies or other Goods and Services
that will be incorporated in or be required for the System and
other supplies shall have their Origin, as defined in GCC
Clause 3.12, in a country that shall be an Eligible Country, as
defined in GCC Clause 1.1 (e) (iv).
9.8
The Supplier shall permit the Bank and/or persons appointed
by the Bank to inspect the Supplier’s offices and/or the
accounts and records of the Supplier and its sub-contractors
relating to the performance of the Contract, and to have such
accounts and records audited by auditors appointed by the
Bank if required by the Bank. The Supplier’s attention is
drawn to Sub-Clause 41.2.1(c), which provides, inter alia,
that acts intended to materially impede the exercise of the
Bank’s inspection and audit rights provided for under SubClause 9.8 constitute a prohibited practice subject to contract
termination (as well as to a determination of ineligibility
under the Procurement Guidelines)
9.9
Other Supplier responsibilities, if any, are as stated in the
SCC.
10.1 The Purchaser shall ensure the accuracy of all information
and/or data to be supplied by the Purchaser to the Supplier,
except when otherwise expressly stated in the Contract.
10.2 The Purchaser shall be responsible for timely provision of all
resources, information, and decision making under its control
that are necessary to reach an Agreed and Finalized Project
Plan (pursuant to GCC Clause 19.2) within the time schedule
specified in the Implementation Schedule in the Technical
Requirements Section. Failure to provide such resources,
information, and decision making may constitute grounds for
Termination pursuant to GCC Clause 41.3.1 (b).
10.3 The Purchaser shall be responsible for acquiring and providing
legal and physical possession of the site and access to it, and for
providing possession of and access to all other areas reasonably
82
Section IV. General Conditions of Contract
required for the proper execution of the Contract.
10.4 If requested by the Supplier, the Purchaser shall use its best
endeavors to assist the Supplier in obtaining in a timely and
expeditious manner all permits, approvals, and/or licenses
necessary for the execution of the Contract from all local,
state, or national government authorities or public service
undertakings that such authorities or undertakings require the
Supplier or Subcontractors or the personnel of the Supplier
or Subcontractors, as the case may be, to obtain.
10.5 In such cases where the responsibilities of specifying and
acquiring or upgrading telecommunications and/or electric
power services falls to the Supplier, as specified in the
Technical Requirements, SCC, Agreed and Finalized Project
Plan, or other parts of the Contract, the Purchaser shall use
its best endeavors to assist the Supplier in obtaining such
services in a timely and expeditious manner.
10.6 The Purchaser shall be responsible for timely provision of all
resources, access, and information necessary for the
Installation and Operational Acceptance of the System
(including,
but
not
limited
to,
any required
telecommunications or electric power services), as identified
in the Agreed and Finalized Project Plan, except where
provision of such items is explicitly identified in the Contract
as being the responsibility of the Supplier. Delay by the
Purchaser may result in an appropriate extension of the Time
for Operational Acceptance, at the Supplier’s discretion.
10.7 Unless otherwise specified in the Contract or agreed upon by
the Purchaser and the Supplier, the Purchaser shall provide
sufficient, properly qualified operating and technical
personnel, as required by the Supplier to properly carry out
Delivery, Pre-commissioning, Installation, Commissioning,
and Operational Acceptance, at or before the time specified
in the Technical Requirements Section’s Implementation
Schedule and the Agreed and Finalized Project Plan.
10.8 The Purchaser will designate appropriate staff for the training
courses to be given by the Supplier and shall make all
appropriate logistical arrangements for such training as
specified in the Technical Requirements, SCC, the Agreed
and Finalized Project Plan, or other parts of the Contract.
10.9 The Purchaser assumes primary responsibility for the
Operational Acceptance Test(s) for the System, in
Section IV. General Conditions of Contract
83
accordance with GCC Clause 27.2, and shall be responsible
for the continued operation of the System after Operational
Acceptance. However, this shall not limit in any way the
Supplier’s responsibilities after the date of Operational
Acceptance otherwise specified in the Contract.
10.10 The Purchaser is responsible for performing and safely
storing timely and regular backups of its data and Software in
accordance with accepted data management principles,
except where such responsibility is clearly assigned to the
Supplier elsewhere in the Contract.
10.11 All costs and expenses involved in the performance of the
obligations under this GCC Clause 10 shall be the
responsibility of the Purchaser, save those to be incurred by
the Supplier with respect to the performance of the
Operational Acceptance Test(s), in accordance with GCC
Clause 27.2.
10.12 Other Purchaser responsibilities, if any, are as stated in the
SCC.
C. PAYMENT
11. Contract Price
11.1 The Contract Price shall be as specified in Article 2
(Contract Price and Terms of Payment) of the Contract
Agreement.
11.2 The Contract Price shall be a firm lump sum not subject to
any alteration, except:
(a)
in the event of a Change in the System pursuant to
GCC Clause 39 or to other clauses in the Contract;
(b)
in accordance with the price adjustment formula (if
any) specified in the SCC.
11.3 The Supplier shall be deemed to have satisfied itself as to the
correctness and sufficiency of the Contract Price, which
shall, except as otherwise provided for in the Contract, cover
all its obligations under the Contract.
12. Terms of
Payment
12.1 The Supplier’s request for payment shall be made to the
Purchaser in writing, accompanied by an invoice describing,
as appropriate, the System or Subsystem(s), Delivered, Precommissioned, Installed, and Operationally Accepted, and by
documents submitted pursuant to GCC Clause 22.5 and upon
84
Section IV. General Conditions of Contract
fulfillment of other obligations stipulated in the Contract.
The Contract Price shall be paid as specified in the SCC.
12.2 No payment made by the Purchaser herein shall be deemed
to constitute acceptance by the Purchaser of the System or
any Subsystem(s).
12.3 Payments shall be made promptly by the Purchaser, but in no
case later than forty five (45) days after submission of a valid
invoice by the Supplier. In the event that the Purchaser fails
to make any payment by its respective due date or within the
period set forth in the Contract, the Purchaser shall pay to the
Supplier interest on the amount of such delayed payment at
the rate(s) specified in the SCC for the period of delay until
payment has been made in full, whether before or after
judgment or arbitration award.
12.4 All payments shall be made in the currency(ies) specified in
the Contract Agreement, pursuant to GCC Clause 11. For
Goods and Services supplied locally, payments shall be made
in the currency of the Purchaser’s Country, unless otherwise
specified in the SCC.
12.5 Unless otherwise specified in the SCC, payment of the
foreign currency portion of the Contract Price for Goods
supplied from outside the Purchaser’s Country shall be made
to the Supplier through an irrevocable letter of credit opened
by an authorized bank in the Supplier’s Country and will be
payable on presentation of the appropriate documents. It is
agreed that the letter of credit will be subject to Article 10 of
the latest revision of Uniform Customs and Practice for
Documentary Credits, published by the International
Chamber of Commerce, Paris.
13. Securities
13.1 Issuance of Securities
The Supplier shall provide the securities specified below in
favor of the Purchaser at the times and in the amount,
manner, and form specified below.
13.2 Advance Payment Security
13.2.1 As specified in the SCC, the Supplier shall provide a
security equal in amount and currency to the advance
payment, and valid until the System is Operationally
Accepted.
Section IV. General Conditions of Contract
85
13.2.2 The security shall be in the form provided in the
Bidding Documents or in another form acceptable to
the Purchaser. The amount of the security shall be
reduced in proportion to the value of the System
executed by and paid to the Supplier from time to time
and shall automatically become null and void when
the full amount of the advance payment has been
recovered by the Purchaser. The way the value of the
security is deemed to become reduced and, eventually,
voided is as specified in the SCC. The security shall
be returned to the Supplier immediately after its
expiration.
13.3 Performance Security
13.3.1 The Supplier shall, within twenty-eight (28) days of
the notification of Contract award, provide a security
for the due performance of the Contract in the amount
and currency specified in the SCC.
13.3.2 The security shall be a bank guarantee in the form
provided in the Sample Forms Section of the Bidding
Documents, or it shall be in another form acceptable to
the Purchaser.
13.3.3 The security shall automatically become null and void
once all the obligations of the Supplier under the
Contract have been fulfilled, including, but not limited
to, any obligations during the Warranty Period and any
extensions to the period. The security shall be returned
to the Supplier no later than twenty-eight (28) days
after its expiration.
13.3.4 Upon Operational Acceptance of the entire System,
the security shall be reduced to the amount specified
in the SCC, on the date of such Operational
Acceptance, so that the reduced security would only
cover the remaining warranty obligations of the
Supplier.
14. Taxes and Duties
14.1 For Goods or Services supplied from outside the Purchaser’s
country, the Supplier shall be entirely responsible for all
taxes, stamp duties, license fees, and other such levies
imposed outside the Purchaser’s country. Any duties, such
as importation or customs duties, and taxes and other levies,
payable in the Purchaser’s country for the supply of Goods
and Services from outside the Purchaser’s country are the
86
Section IV. General Conditions of Contract
responsibility of the Purchaser unless these duties or taxes
have been made part of the Contract Price in Article 2 of the
Contract Agreement and the Price Schedule it refers to, in
which case the duties and taxes will be the Supplier’s
responsibility.
14.2 For Goods or Services supplied locally, the Supplier shall be
entirely responsible for all taxes, duties, license fees, etc.,
incurred until delivery of the contracted Goods or Services to
the Purchaser. The only exception are taxes or duties, such
as value-added or sales tax or stamp duty as apply to, or are
clearly identifiable, on the invoices and provided they apply
in the Purchaser’s country, and only if these taxes, levies
and/or duties are also excluded from the Contract Price in
Article 2 of the Contract Agreement and the Price Schedule
it refers to.
14.3 If any tax exemptions, reductions, allowances, or privileges
may be available to the Supplier in the Purchaser’s Country,
the Purchaser shall use its best efforts to enable the Supplier
to benefit from any such tax savings to the maximum
allowable extent.
14.4 For the purpose of the Contract, it is agreed that the Contract
Price specified in Article 2 (Contract Price and Terms of
Payment) of the Contract Agreement is based on the taxes,
duties, levies, and charges prevailing at the date twenty-eight
(28) days prior to the date of bid submission in the
Purchaser’s Country (also called “Tax” in this GCC Clause
14.4). If any Tax rates are increased or decreased, a new Tax
is introduced, an existing Tax is abolished, or any change in
interpretation or application of any Tax occurs in the course
of the performance of the Contract, which was or will be
assessed on the Supplier, its Subcontractors, or their
employees in connection with performance of the Contract,
an equitable adjustment to the Contract Price shall be made
to fully take into account any such change by addition to or
reduction from the Contract Price, as the case may be.
D. INTELLECTUAL PROPERTY
15. Copyright
15.1 The Intellectual Property Rights in all Standard Software and
Standard Materials shall remain vested in the owner of such
rights.
Section IV. General Conditions of Contract
87
15.2 The Purchaser agrees to restrict use, copying, or duplication
of the Standard Software and Standard Materials in
accordance with GCC Clause 16, except that additional
copies of Standard Materials may be made by the Purchaser
for use within the scope of the project of which the System is
a part, in the event that the Supplier does not deliver copies
within thirty (30) days from receipt of a request for such
Standard Materials.
15.3 The Purchaser’s contractual rights to use the Standard
Software or elements of the Standard Software may not be
assigned, licensed, or otherwise transferred voluntarily
except in accordance with the relevant license agreement or
as may be otherwise specified in the SCC.
15.4 As applicable, the Purchaser’s and Supplier’s rights and
obligations with respect to Custom Software or elements of
the Custom Software, including any license agreements, and
with respect to Custom Materials or elements of the Custom
Materials, are specified in the SCC. Subject to the SCC,
the Intellectual Property Rights in all Custom Software and
Custom Materials specified in Appendices 4 and 5 of the
Contract Agreement (if any) shall, at the date of this Contract
or on creation of the rights (if later than the date of this
Contract), vest in the Purchaser. The Supplier shall do and
execute or arrange for the doing and executing of each
necessary act, document, and thing that the Purchaser may
consider necessary or desirable to perfect the right, title, and
interest of the Purchaser in and to those rights. In respect of
such Custom Software and Custom Materials, the Supplier
shall ensure that the holder of a moral right in such an item
does not assert it, and the Supplier shall, if requested to do so
by the Purchaser and where permitted by applicable law,
ensure that the holder of such a moral right waives it.
15.5 The parties shall enter into such (if any) escrow arrangements
in relation to the Source Code to some or all of the Software
as are specified in the SCC and in accordance with the
SCC.
16. Software License
Agreements
16.1 Except to the extent that the Intellectual Property Rights in
the Software vest in the Purchaser, the Supplier hereby grants
to the Purchaser license to access and use the Software,
including all inventions, designs, and marks embodied in the
Software.
88
Section IV. General Conditions of Contract
Such license to access and use the Software shall:
(a)
be:
(i)
nonexclusive;
(ii)
fully paid up and irrevocable (except that it shall
terminate if the Contract terminates under GCC
Clauses 41.1 or 41.3);
(iii) valid throughout the territory of the Purchaser’s
Country (or such other territory as specified in
the SCC); and
(iv) subject to additional restrictions (if any) as
specified in the SCC.
(b)
permit the Software to be:
(i)
used or copied for use on or with the computer(s)
for which it was acquired (if specified in the
Technical Requirements and/or the Supplier’s
bid), plus a backup computer(s) of the same or
similar capacity, if the primary is(are) inoperative,
and during a reasonable transitional period when
use is being transferred between primary and
backup;
(ii)
as specified in the SCC, used or copied for use
on or transferred to a replacement computer(s),
(and use on the original and replacement
computer(s) may be simultaneous during a
reasonable transitional period) provided that, if
the Technical Requirements and/or the Supplier’s
bid specifies a class of computer to which the
license is restricted and unless the Supplier agrees
otherwise in writing, the replacement computer(s)
is(are) within that class;
(iii) if the nature of the System is such as to permit
such access, accessed from other computers
connected to the primary and/or backup
computer(s) by means of a local or wide-area
network or similar arrangement, and used on or
copied for use on those other computers to the
extent necessary to that access;
Section IV. General Conditions of Contract
89
(iv) reproduced for safekeeping or backup purposes;
(v)
customized, adapted, or combined with other
computer software for use by the Purchaser,
provided that derivative software incorporating
any substantial part of the delivered, restricted
Software shall be subject to same restrictions as
are set forth in this Contract;
(vi) as specified in the SCC, disclosed to, and
reproduced for use by, support service suppliers
and their subcontractors, (and the Purchaser may
sublicense such persons to use and copy for use
the Software) to the extent reasonably necessary
to the performance of their support service
contracts, subject to the same restrictions as are
set forth in this Contract; and
(vii) disclosed to, and reproduced for use by, the
Purchaser and by such other persons as are
specified in the SCC (and the Purchaser may
sublicense such persons to use and copy for use
the Software), subject to the same restrictions as
are set forth in this Contract.
16.2 The Standard Software may be subject to audit by the
Supplier, in accordance with the terms specified in the SCC,
to verify compliance with the above license agreements.
17. Confidential
Information
17.1 Except if otherwise specified in the SCC, the "Receiving
Party" (either the Purchaser or the Supplier) shall keep
confidential and shall not, without the written consent of the
other party to this Contract (“the Disclosing Party”), divulge
to any third party any documents, data, or other information
of a confidential nature (“Confidential Information”)
connected with this Contract, and furnished directly or
indirectly by the Disclosing Party prior to or during
performance, or following termination, of this Contract.
17.2 For the purposes of GCC Clause 17.1, the Supplier is also
deemed to be the Receiving Party of Confidential
Information generated by the Supplier itself in the course of
the performance of its obligations under the Contract and
relating to the businesses, finances, suppliers, employees, or
other contacts of the Purchaser or the Purchaser’s use of the
System.
90
Section IV. General Conditions of Contract
17.3 Notwithstanding GCC Clauses 17.1 and 17.2:
(a)
the Supplier may furnish to its Subcontractor
Confidential Information of the Purchaser to the extent
reasonably required for the Subcontractor to perform its
work under the Contract; and
(b)
the Purchaser may furnish Confidential Information of
the Supplier: (i) to its support service suppliers and
their subcontractors to the extent reasonably required
for them to perform their work under their support
service contracts; and (ii) to its affiliates and
subsidiaries,
in which event the Receiving Party shall ensure that the
person to whom it furnishes Confidential Information of the
Disclosing Party is aware of and abides by the Receiving
Party’s obligations under this GCC Clause 17 as if that
person were party to the Contract in place of the Receiving
Party.
17.4 The Purchaser shall not, without the Supplier’s prior written
consent, use any Confidential Information received from the
Supplier for any purpose other than the operation,
maintenance and further development of the System.
Similarly, the Supplier shall not, without the Purchaser’s
prior written consent, use any Confidential Information
received from the Purchaser for any purpose other than those
that are required for the performance of the Contract.
17.5 The obligation of a party under GCC Clauses 17.1 through
17.4 above, however, shall not apply to that information
which:
(a)
now or hereafter enters the public domain through no
fault of the Receiving Party;
(b)
can be proven to have been possessed by the Receiving
Party at the time of disclosure and that was not
previously obtained, directly or indirectly, from the
Disclosing Party;
(c)
otherwise lawfully becomes available to the Receiving
Party from a third party that has no obligation of
confidentiality.
17.6 The above provisions of this GCC Clause 17 shall not in any
way modify any undertaking of confidentiality given by
Section IV. General Conditions of Contract
91
either of the parties to this Contract prior to the date of the
Contract in respect of the System or any part thereof.
17.7 The provisions of this GCC Clause 17 shall survive the
termination, for whatever reason, of the Contract for three (3)
years or such longer period as may be specified in the SCC.
E. SUPPLY, INSTALLATION, TESTING,
COMMISSIONING, AND ACCEPTANCE OF THE SYSTEM
18.
Representatives
18.1 Project Manager
If the Project Manager is not named in the Contract, then
within fourteen (14) days of the Effective Date, the Purchaser
shall appoint and notify the Supplier in writing of the name
of the Project Manager. The Purchaser may from time to
time appoint some other person as the Project Manager in
place of the person previously so appointed and shall give a
notice of the name of such other person to the Supplier
without delay. No such appointment shall be made at such a
time or in such a manner as to impede the progress of work
on the System. Such appointment shall take effect only upon
receipt of such notice by the Supplier. Subject to the
extensions and/or limitations specified in the SCC (if any),
the Project Manager shall have the authority to represent the
Purchaser on all day-to-day matters relating to the System or
arising from the Contract, and shall normally be the person
giving or receiving notices on behalf of the Purchaser
pursuant to GCC Clause 4.
18.2 Supplier’s Representative
18.2.1 If the Supplier’s Representative is not named in the
Contract, then within fourteen (14) days of the
Effective Date, the Supplier shall appoint the
Supplier’s Representative and shall request the
Purchaser in writing to approve the person so
appointed. The request must be accompanied by a
detailed curriculum vitae for the nominee, as well as a
description of any other System or non-System
responsibilities the nominee would retain while
performing the duties of the Supplier’s Representative.
If the Purchaser does not object to the appointment
within fourteen (14) days, the Supplier’s
Representative shall be deemed to have been
92
Section IV. General Conditions of Contract
approved. If the Purchaser objects to the appointment
within fourteen (14) days giving the reason therefor,
then the Supplier shall appoint a replacement within
fourteen (14) days of such objection in accordance
with this GCC Clause 18.2.1.
18.2.2 Subject to the extensions and/or limitations specified
in the SCC (if any), the Supplier’s Representative
shall have the authority to represent the Supplier on all
day-to-day matters relating to the System or arising
from the Contract, and shall normally be the person
giving or receiving notices on behalf of the Supplier
pursuant to GCC Clause 4.
18.2.3 The Supplier shall not revoke the appointment of the
Supplier’s Representative without the Purchaser’s
prior written consent, which shall not be unreasonably
withheld. If the Purchaser consents to such an action,
the Supplier shall appoint another person of equal or
superior
qualifications
as
the
Supplier’s
Representative, pursuant to the procedure set out in
GCC Clause 18.2.1.
18.2.4 The Supplier’s Representative and staff are obliged to
work closely with the Purchaser’s Project Manager
and staff, act within their own authority, and abide by
directives issued by the Purchaser that are consistent
with the terms of the Contract. The Supplier’s
Representative is responsible for managing the
activities of its personnel and any subcontracted
personnel.
18.2.5 The Supplier’s Representative may, subject to the
approval of the Purchaser (which shall not be
unreasonably withheld), at any time delegate to any
person any of the powers, functions, and authorities
vested in him or her. Any such delegation may be
revoked at any time.
Any such delegation or
revocation shall be subject to a prior notice signed by
the Supplier’s Representative and shall specify the
powers, functions, and authorities thereby delegated or
revoked. No such delegation or revocation shall take
effect unless and until the notice of it has been
delivered.
18.2.6 Any act or exercise by any person of powers, functions
Section IV. General Conditions of Contract
93
and authorities so delegated to him or her in
accordance with GCC Clause 18.2.5 shall be deemed
to be an act or exercise by the Supplier’s
Representative.
18.3 Objections and Removals
18.3.1 The Purchaser may by notice to the Supplier object to
any representative or person employed by the Supplier
in the execution of the Contract who, in the reasonable
opinion of the Purchaser, may have behaved
inappropriately, be incompetent, or be negligent. The
Purchaser shall provide evidence of the same,
whereupon the Supplier shall remove such person
from work on the System.
18.3.2 If any representative or person employed by the
Supplier is removed in accordance with GCC Clause
18.3.1, the Supplier shall, where required, promptly
appoint a replacement.
19. Project Plan
19.1 In close cooperation with the Purchaser and based on the
Preliminary Project Plan included in the Supplier’s bid, the
Supplier shall develop a Project Plan encompassing the
activities specified in the Contract. The contents of the
Project Plan shall be as specified in the SCC and/or
Technical Requirements.
19.2 The Supplier shall formally present to the Purchaser the
Project Plan in accordance with the procedure specified in
the SCC.
19.3 If required, the impact on the Implementation Schedule of
modifications agreed during finalization of the Agreed and
Finalized Project Plan shall be incorporated in the Contract
by amendment, in accordance with GCC Clauses 39 and 40.
19.4 The Supplier shall undertake to supply, install, test, and
commission the System in accordance with the Agreed and
Finalized Project Plan and the Contract.
19.5 The Progress and other reports specified in the SCC shall be
prepared by the Supplier and submitted to the Purchaser in
the format and frequency specified in the Technical
Requirements.
20. Subcontracting
20.1 Appendix 3 (List of Approved Subcontractors) to the
Contract Agreement specifies critical items of supply or
94
Section IV. General Conditions of Contract
services and a list of Subcontractors for each item that are
considered acceptable by the Purchaser. If no Subcontractors
are listed for an item, the Supplier shall prepare a list of
Subcontractors it considers qualified and wishes to be added
to the list for such items. The Supplier may from time to time
propose additions to or deletions from any such list. The
Supplier shall submit any such list or any modification to the
list to the Purchaser for its approval in sufficient time so as
not to impede the progress of work on the System. The
Purchaser shall not withhold such approval unreasonably.
Such approval by the Purchaser of a Subcontractor(s) shall
not relieve the Supplier from any of its obligations, duties, or
responsibilities under the Contract.
20.2 The Supplier may, at its discretion, select and employ
Subcontractors for such critical items from those
Subcontractors listed pursuant to GCC Clause 20.1. If the
Supplier wishes to employ a Subcontractor not so listed, or
subcontract an item not so listed, it must seek the Purchaser’s
prior approval under GCC Clause 20.3.
20.3 For items for which pre-approved Subcontractor lists have
not been specified in Appendix 3 to the Contract Agreement,
the Supplier may employ such Subcontractors as it may
select, provided: (i) the Supplier notifies the Purchaser in
writing at least twenty-eight (28) days prior to the proposed
mobilization date for such Subcontractor; and (ii) by the end
of this period either the Purchaser has granted its approval in
writing or fails to respond. The Supplier shall not engage
any Subcontractor to which the Purchaser has objected in
writing prior to the end of the notice period. The absence of
a written objection by the Purchaser during the above
specified period shall constitute formal acceptance of the
proposed Subcontractor. Except to the extent that it permits
the deemed approval of the Purchaser of Subcontractors not
listed in the Contract Agreement, nothing in this Clause,
however, shall limit the rights and obligations of either the
Purchaser or Supplier as they are specified in GCC
Clauses 20.1 and 20.2, in the SCC, or in Appendix 3 of the
Contract Agreement.
21. Design and
Engineering
21.1 Technical Specifications and Drawings
21.1.1 The Supplier shall execute the basic and detailed
design and the implementation activities necessary for
successful installation of the System in compliance
Section IV. General Conditions of Contract
95
with the provisions of the Contract or, where not so
specified, in accordance with good industry practice.
The Supplier shall be responsible for any
discrepancies, errors or omissions in the
specifications, drawings, and other technical
documents that it has prepared, whether such
specifications, drawings, and other documents have
been approved by the Project Manager or not,
provided that such discrepancies, errors, or omissions
are not because of inaccurate information furnished in
writing to the Supplier by or on behalf of the
Purchaser.
21.1.2 The Supplier shall be entitled to disclaim
responsibility for any design, data, drawing,
specification, or other document, or any modification
of such design, drawings, specification, or other
documents provided or designated by or on behalf of
the Purchaser, by giving a notice of such disclaimer to
the Project Manager.
21.2 Codes and Standards
Wherever references are made in the Contract to codes and
standards in accordance with which the Contract shall be
executed, the edition or the revised version of such codes and
standards current at the date twenty-eight (28) days prior to
date of bid submission shall apply unless otherwise specified
in the SCC. During Contract execution, any changes in such
codes and standards shall be applied after approval by the
Purchaser and shall be treated in accordance with GCC
Clause 39.3.
21.3 Approval/Review of Technical Documents by the Project
Manager
21.3.1 The Supplier shall prepare and furnish to the Project
Manager the documents as specified in the SCC for
the Project Manager’s approval or review.
Any part of the System covered by or related to the
documents to be approved by the Project Manager
shall be executed only after the Project Manager’s
approval of these documents.
GCC Clauses 21.3.2 through 21.3.7 shall apply to
96
Section IV. General Conditions of Contract
those documents requiring the Project Manager’s
approval, but not to those furnished to the Project
Manager for its review only.
21.3.2 Within fourteen (14) days after receipt by the Project
Manager of any document requiring the Project
Manager’s approval in accordance with GCC Clause
21.3.1, the Project Manager shall either return one
copy of the document to the Supplier with its approval
endorsed on the document or shall notify the Supplier
in writing of its disapproval of the document and the
reasons for disapproval and the modifications that the
Project Manager proposes. If the Project Manager fails
to take such action within the fourteen (14) days, then
the document shall be deemed to have been approved
by the Project Manager.
21.3.3 The Project Manager shall not disapprove any
document except on the grounds that the document
does not comply with some specified provision of the
Contract or that it is contrary to good industry practice.
21.3.4 If the Project Manager disapproves the document, the
Supplier shall modify the document and resubmit it for
the Project Manager’s approval in accordance with
GCC Clause 21.3.2. If the Project Manager approves
the document subject to modification(s), the Supplier
shall make the required modification(s), and the
document shall then be deemed to have been
approved, subject to GCC Clause 21.3.5.
The
procedure set out in GCC Clauses 21.3.2 through
21.3.4 shall be repeated, as appropriate, until the
Project Manager approves such documents.
21.3.5 If any dispute occurs between the Purchaser and the
Supplier in connection with or arising out of the
disapproval by the Project Manager of any document
and/or any modification(s) to a document that cannot
be settled between the parties within a reasonable
period, then, in case the Contract Agreement includes
and names an Adjudicator, such dispute may be
referred to the Adjudicator for determination in
accordance with GCC Clause 6.1 (Adjudicator). If
such dispute is referred to an Adjudicator, the Project
Manager shall give instructions as to whether and if
so, how, performance of the Contract is to proceed.
Section IV. General Conditions of Contract
97
The Supplier shall proceed with the Contract in
accordance with the Project Manager’s instructions,
provided that if the Adjudicator upholds the Supplier’s
view on the dispute and if the Purchaser has not given
notice under GCC Clause 6.1.2, then the Supplier
shall be reimbursed by the Purchaser for any
additional costs incurred by reason of such
instructions and shall be relieved of such
responsibility or liability in connection with the
dispute and the execution of the instructions as the
Adjudicator shall decide, and the Time for Achieving
Operational
Acceptance
shall
be
extended
accordingly.
21.3.6 The Project Manager’s approval, with or without
modification of the document furnished by the
Supplier, shall not relieve the Supplier of any
responsibility or liability imposed upon it by any
provisions of the Contract except to the extent that any
subsequent failure results from modifications required
by the Project Manager or inaccurate information
furnished in writing to the Supplier by or on behalf of
the Purchaser.
21.3.7 The Supplier shall not depart from any approved
document unless the Supplier has first submitted to
the Project Manager an amended document and
obtained the Project Manager’s approval of the
document, pursuant to the provisions of this GCC
Clause 21.3. If the Project Manager requests any
change in any already approved document and/or in
any document based on such an approved document,
the provisions of GCC Clause 39 (Changes to the
System) shall apply to such request.
22. Procurement,
Delivery, and
Transport
22.1 Subject to related Purchaser's responsibilities pursuant to
GCC Clauses 10 and 14, the Supplier shall manufacture or
procure and transport all the Information Technologies,
Materials, and other Goods in an expeditious and orderly
manner to the Project Site.
22.2 Delivery of the Information Technologies, Materials, and
other Goods shall be made by the Supplier in accordance
with the Technical Requirements.
22.3 Early or partial deliveries require the explicit written consent
98
Section IV. General Conditions of Contract
of the Purchaser, which consent shall not be unreasonably
withheld.
22.4 Transportation
22.4.1 The Supplier shall provide such packing of the Goods
as is required to prevent their damage or deterioration
during shipment.
The packing, marking, and
documentation within and outside the packages shall
comply strictly with the Purchaser’s instructions to the
Supplier.
22.4.2 The Supplier will bear responsibility for and cost of
transport to the Project Sites in accordance with the
terms and conditions used in the specification of
prices in the Price Schedules, including the terms and
conditions of the associated Incoterms.
22.4.3 Unless otherwise specified in the SCC, the Supplier
shall be free to use transportation through carriers
registered in any eligible country and to obtain
insurance from any eligible source country.
22.5 Unless otherwise specified in the SCC, the Supplier will
provide the Purchaser with shipping and other documents, as
specified below:
22.5.1 For Goods supplied from outside the Purchaser’s
Country:
Upon shipment, the Supplier shall notify the Purchaser
and the insurance company contracted by the Supplier
to provide cargo insurance by telex, cable, facsimile,
electronic mail, or EDI with the full details of the
shipment. The Supplier shall promptly send the
following documents to the Purchaser by mail or
courier, as appropriate, with a copy to the cargo
insurance company:
(a)
two copies of the Supplier’s invoice showing the
description of the Goods, quantity, unit price, and
total amount;
(b)
usual transportation documents;
(c)
insurance certificate;
(d)
certificate(s) of origin; and
Section IV. General Conditions of Contract
99
(e)
estimated time and point of arrival in the
Purchaser’s Country and at the site.
22.5.2 For Goods supplied locally (i.e., from within the
Purchaser’s country):
Upon shipment, the Supplier shall notify the Purchaser
by telex, cable, facsimile, electronic mail, or EDI with
the full details of the shipment. The Supplier shall
promptly send the following documents to the
Purchaser by mail or courier, as appropriate:
(a)
two copies of the Supplier’s invoice showing the
Goods’ description, quantity, unit price, and total
amount;
(b)
delivery note, railway receipt, or truck receipt;
(c)
certificate of insurance;
(d)
certificate(s) of origin; and
(e)
estimated time of arrival at the site.
22.6 Customs Clearance
(a)
The Purchaser will bear responsibility for, and cost of,
customs clearance into the Purchaser's country in
accordance the particular Incoterm(s) used for Goods
supplied from outside the Purchaser’s country in the
Price Schedules referred to by Article 2 of the Contract
Agreement.
(b)
At the request of the Purchaser, the Supplier will make
available a representative or agent during the process of
customs clearance in the Purchaser's country for goods
supplied from outside the Purchaser's country. In the
event of delays in customs clearance that are not the
fault of the Supplier:
(i)
the Supplier shall be entitled to an extension in
the Time for Achieving Operational Acceptance,
pursuant to GCC Clause 40;
(ii)
the Contract Price shall be adjusted to
compensate the Supplier for any additional
storage charges that the Supplier may incur as a
result of the delay.
100
23. Product
Upgrades
Section IV. General Conditions of Contract
23.1 At any point during performance of the Contract, should
technological advances be introduced by the Supplier for
Information Technologies originally offered by the Supplier
in its bid and still to be delivered, the Supplier shall be
obligated to offer to the Purchaser the latest versions of the
available Information Technologies having equal or better
performance or functionality at the same or lesser unit prices,
pursuant to GCC Clause 39 (Changes to the System).
23.2 At any point during performance of the Contract, for
Information Technologies still to be delivered, the Supplier
will also pass on to the Purchaser any cost reductions and
additional and/or improved support and facilities that it
offers to other clients of the Supplier in the Purchaser’s
Country, pursuant to GCC Clause 39 (Changes to the
System).
23.3 During performance of the Contract, the Supplier shall offer
to the Purchaser all new versions, releases, and updates of
Standard Software, as well as related documentation and
technical support services, within thirty (30) days of their
availability from the Supplier to other clients of the Supplier
in the Purchaser’s Country, and no later than twelve (12)
months after they are released in the country of origin. In no
case will the prices for these Software exceed those quoted
by the Supplier in the Recurrent Costs tables in its bid.
23.4 During the Warranty Period, unless otherwise specified in
the SCC, the Supplier will provide at no additional cost to
the Purchaser all new versions, releases, and updates for all
Standard Software that are used in the System, within thirty
(30) days of their availability from the Supplier to other
clients of the Supplier in the Purchaser’s country, and no
later than twelve (12) months after they are released in the
country of origin of the Software.
23.5 The Purchaser shall introduce all new versions, releases or
updates of the Software within eighteen (18) months of
receipt of a production-ready copy of the new version,
release, or update, provided that the new version, release, or
update does not adversely affect System operation or
performance or require extensive reworking of the System.
In cases where the new version, release, or update adversely
affects System operation or performance, or requires
extensive reworking of the System, the Supplier shall
continue to support and maintain the version or release
Section IV. General Conditions of Contract
101
previously in operation for as long as necessary to allow
introduction of the new version, release, or update. In no
case shall the Supplier stop supporting or maintaining a
version or release of the Software less than twenty four (24)
months after the Purchaser receives a production-ready copy
of a subsequent version, release, or update. The Purchaser
shall use all reasonable endeavors to implement any new
version, release, or update as soon as practicable, subject to
the twenty-four-month-long stop date.
24. Implementation,
Installation, and
Other Services
24.1 The Supplier shall provide all Services specified in the
Contract and Agreed and Finalized Project Plan in
accordance with the highest standards of professional
competence and integrity.
24.2 Prices charged by the Supplier for Services, if not included in
the Contract, shall be agreed upon in advance by the parties
(including, but not restricted to, any prices submitted by the
Supplier in the Recurrent Cost Schedules of its Bid) and
shall not exceed the prevailing rates charged by the Supplier
to other purchasers in the Purchaser’s Country for similar
services.
25. Inspections and
Tests
25.1 The Purchaser or its representative shall have the right to
inspect and/or test any components of the System, as
specified in the Technical Requirements, to confirm their
good working order and/or conformity to the Contract at the
point of delivery and/or at the Project Site.
25.2 The Purchaser or its representative shall be entitled to attend
any such inspections and/or tests of the components,
provided that the Purchaser shall bear all costs and expenses
incurred in connection with such attendance, including but
not limited to all inspection agent fees, travel, and related
expenses.
25.3 Should the inspected or tested components fail to conform to
the Contract, the Purchaser may reject the component(s), and
the Supplier shall either replace the rejected component(s),
or make alterations as necessary so that it meets the Contract
requirements free of cost to the Purchaser.
25.4 The Project Manager may require the Supplier to carry out
any inspection and/or test not specified in the Contract,
provided that the Supplier’s reasonable costs and expenses
incurred in the carrying out of such inspection and/or test
shall be added to the Contract Price. Further, if such
102
Section IV. General Conditions of Contract
inspection and/or test impedes the progress of work on the
System and/or the Supplier’s performance of its other
obligations under the Contract, due allowance will be made
in respect of the Time for Achieving Operational Acceptance
and the other obligations so affected.
25.5 If any dispute shall arise between the parties in connection
with or caused by an inspection and/or with regard to any
component to be incorporated in the System that cannot be
settled amicably between the parties within a reasonable
period of time, either party may invoke the process pursuant
to GCC Clause 6 (Settlement of Disputes), starting with
referral of the matter to the Adjudicator in case an
Adjudicator is included and named in the Contract
Agreement.
26. Installation of the 26.1 As soon as the System, or any Subsystem, has, in the opinion
of the Supplier, been delivered, Pre-commissioned, and made
System
ready for Commissioning and Operational Acceptance
Testing in accordance with the Technical Requirements, the
SCC and the Agreed and Finalized Project Plan, the Supplier
shall so notify the Purchaser in writing.
26.2 The Project Manager shall, within fourteen (14) days after
receipt of the Supplier’s notice under GCC Clause 26.1,
either issue an Installation Certificate in the form specified in
the Sample Forms Section in the Bidding Documents, stating
that the System, or major component or Subsystem (if
Acceptance by major component or Subsystem is specified
pursuant to the SCC for GCC Clause 27.2.1), has achieved
Installation by the date of the Supplier’s notice under GCC
Clause 26.1, or notify the Supplier in writing of any defects
and/or deficiencies, including, but not limited to, defects or
deficiencies in the interoperability or integration of the
various components and/or Subsystems making up the
System. The Supplier shall use all reasonable endeavors to
promptly remedy any defect and/or deficiencies that the
Project Manager has notified the Supplier of. The Supplier
shall then promptly carry out retesting of the System or
Subsystem and, when in the Supplier’s opinion the System or
Subsystem is ready for Commissioning and Operational
Acceptance Testing, notify the Purchaser in writing, in
accordance with GCC Clause 26.1. The procedure set out in
this GCC Clause 26.2 shall be repeated, as necessary, until
an Installation Certificate is issued.
Section IV. General Conditions of Contract
103
26.3 If the Project Manager fails to issue the Installation
Certificate and fails to inform the Supplier of any defects
and/or deficiencies within fourteen (14) days after receipt of
the Supplier’s notice under GCC Clause 26.1, or if the
Purchaser puts the System or a Subsystem into production
operation, then the System (or Subsystem) shall be deemed
to have achieved successful Installation as of the date of the
Supplier’s notice or repeated notice, or when the Purchaser
put the System into production operation, as the case may be.
27. Commissioning
and Operational
Acceptance
27.1 Commissioning
27.1.1 Commissioning of the System (or Subsystem if
specified pursuant to the SCC for GCC Clause 27.2.1)
shall be commenced by the Supplier:
(a)
immediately after the Installation Certificate is
issued by the Project Manager, pursuant to GCC
Clause 26.2; or
(b)
as otherwise specified in the Technical
Requirement or the Agreed and Finalized
Project Plan; or
(c)
immediately after Installation is deemed to have
occurred, under GCC Clause 26.3.
27.1.2 The Purchaser shall supply the operating and technical
personnel and all materials and information reasonably
required to enable the Supplier to carry out its
obligations with respect to Commissioning.
Production use of the System or Subsystem(s) shall
not commence prior to the start of formal Operational
Acceptance Testing.
27.2 Operational Acceptance Tests
27.2.1 The Operational Acceptance Tests (and repeats of
such tests) shall be the primary responsibility of the
Purchaser (in accordance with GCC Clause 10.9), but
shall be conducted with the full cooperation of the
Supplier during Commissioning of the System (or
major components or Subsystem[s] if specified in the
SCC and supported by the Technical Requirements),
to ascertain whether the System (or major component
or Subsystem[s]) conforms to the Technical
Requirements and meets the standard of performance
104
Section IV. General Conditions of Contract
quoted in the Supplier’s bid, including, but not
restricted to, the functional and technical performance
requirements. The Operational Acceptance Tests
during Commissioning will be conducted as specified
in the SCC, the Technical Requirements and/or the
Agreed and Finalized Project Plan.
At the Purchaser’s discretion, Operational Acceptance
Tests may also be performed on replacement Goods,
upgrades and new version releases, and Goods that are
added or field-modified after Operational Acceptance
of the System.
27.2.2 If for reasons attributable to the Purchaser, the
Operational Acceptance Test of the System (or
Subsystem[s] or major components, pursuant to the
SCC for GCC Clause 27.2.1) cannot be successfully
completed within the period specified in the SCC,
from the date of Installation or any other period agreed
upon in writing by the Purchaser and the Supplier, the
Supplier shall be deemed to have fulfilled its
obligations with respect to the technical and functional
aspects of the Technical Specifications, SCC and/or
the Agreed and Finalized Project Plan, and GCC
Clause 28.2 and 28.3 shall not apply.
27.3 Operational Acceptance
27.3.1 Subject to GCC Clause 27.4 (Partial Acceptance)
below, Operational Acceptance shall occur in respect
of the System, when
(a) the Operational Acceptance Tests, as specified in
the Technical Requirements, and/or SCC and/or
the Agreed and Finalized Project Plan have been
successfully completed; or
(b) the Operational Acceptance Tests have not been
successfully completed or have not been carried
out for reasons that are attributable to the
Purchaser within the period from the date of
Installation or any other agreed-upon period as
specified in GCC Clause 27.2.2 above; or
(c) the Purchaser has put the System into production
or use for sixty (60) consecutive days. If the
System is put into production or use in this
Section IV. General Conditions of Contract
105
manner, the Supplier shall notify the Purchaser
and document such use.
27.3.2 At any time after any of the events set out in GCC
Clause 27.3.1 have occurred, the Supplier may give a
notice to the Project Manager requesting the issue of
an Operational Acceptance Certificate.
27.3.3 After consultation with the Purchaser, and within
fourteen (14) days after receipt of the Supplier’s
notice, the Project Manager shall:
(a)
issue an Operational Acceptance Certificate; or
(b)
notify the Supplier in writing of any defect or
deficiencies or other reason for the failure of the
Operational Acceptance Tests; or
(c)
issue the Operational Acceptance Certificate, if the
situation covered by GCC Clause 27.3.1 (b) arises.
27.3.4 The Supplier shall use all reasonable endeavors to
promptly remedy any defect and/or deficiencies and/or
other reasons for the failure of the Operational
Acceptance Test that the Project Manager has notified
the Supplier of. Once such remedies have been made
by the Supplier, the Supplier shall notify the
Purchaser, and the Purchaser, with the full cooperation
of the Supplier, shall use all reasonable endeavors to
promptly carry out retesting of the System or
Subsystem. Upon the successful conclusion of the
Operational Acceptance Tests, the Supplier shall
notify the Purchaser of its request for Operational
Acceptance Certification, in accordance with GCC
Clause 27.3.3. The Purchaser shall then issue to the
Supplier the Operational Acceptance Certification in
accordance with GCC Clause 27.3.3 (a), or shall notify
the Supplier of further defects, deficiencies, or other
reasons for the failure of the Operational Acceptance
Test. The procedure set out in this GCC Clause 27.3.4
shall be repeated, as necessary, until an Operational
Acceptance Certificate is issued.
27.3.5 If the System or Subsystem fails to pass the
Operational Acceptance Test(s) in accordance with
GCC Clause 27.2, then either:
106
Section IV. General Conditions of Contract
(a)
the Purchaser may consider terminating the
Contract, pursuant to GCC Clause 41.2.2;
or
(b)
if the failure to achieve Operational Acceptance
within the specified time period is a result of the
failure of the Purchaser to fulfill its obligations
under the Contract, then the Supplier shall be
deemed to have fulfilled its obligations with
respect to the relevant technical and functional
aspects of the Contract, and GCC Clauses 30.3
and 30.4 shall not apply.
27.3.6 If within fourteen (14) days after receipt of the
Supplier’s notice the Project Manager fails to issue the
Operational Acceptance Certificate or fails to inform
the Supplier in writing of the justifiable reasons why
the Project Manager has not issued the Operational
Acceptance Certificate, the System or Subsystem shall
be deemed to have been accepted as of the date of the
Supplier’s said notice.
27.4 Partial Acceptance
27.4.1 If so specified in the SCC for GCC Clause 27.2.1,
Installation and Commissioning shall be carried out
individually for each identified major component or
Subsystem(s) of the System. In this event, the provisions
in the Contract relating to Installation and
Commissioning, including the Operational Acceptance
Test, shall apply to each such major component or
Subsystem individually, and Operational Acceptance
Certificate(s) shall be issued accordingly for each such
major component or Subsystem of the System, subject to
the limitations contained in GCC Clause 27.4.2.
27.4.2 The issuance of Operational Acceptance Certificates for
individual major components or Subsystems pursuant to
GCC Clause 27.4.1 shall not relieve the Supplier of its
obligation to obtain an Operational Acceptance
Certificate for the System as an integrated whole (if so
specified in the SCC for GCC Clauses 12.1 and 27.2.1)
once all major components and Subsystems have been
supplied, installed, tested, and commissioned.
27.4.3 In the case of minor components for the System that
by their nature do not require Commissioning or an
Section IV. General Conditions of Contract
107
Operational Acceptance Test (e.g., minor fittings,
furnishings or site works, etc.), the Project Manager
shall issue an Operational Acceptance Certificate
within fourteen (14) days after the fittings and/or
furnishings have been delivered and/or installed or the
site works have been completed. The Supplier shall,
however, use all reasonable endeavors to promptly
remedy any defects or deficiencies in such minor
components detected by the Purchaser or Supplier.
F. GUARANTEES AND LIABILITIES
28. Operational
Acceptance Time
Guarantee
28.1 The Supplier guarantees that it shall complete the supply,
Installation, Commissioning, and achieve Operational
Acceptance of the System (or Subsystems, pursuant to the
SCC for GCC Clause 27.2.1) within the time periods
specified in the Implementation Schedule in the Technical
Requirements Section and/or the Agreed and Finalized
Project Plan pursuant to GCC Clause 8.2, or within such
extended time to which the Supplier shall be entitled under
GCC Clause 40 (Extension of Time for Achieving
Operational Acceptance).
28.2 If the Supplier fails to supply, install, commission, and achieve
Operational Acceptance of the System (or Subsystems pursuant
to the SCC for GCC Clause 27.2.1) within the time for
achieving Operational Acceptance specified in the
Implementation Schedule in the Technical Requirement or the
Agreed and Finalized Project Plan, or any extension of the time
for achieving Operational Acceptance previously granted under
GCC Clause 40 (Extension of Time for Achieving Operational
Acceptance), the Supplier shall pay to the Purchaser liquidated
damages at the rate specified in the SCC as a percentage of the
Contract Price, or the relevant part of the Contract Price if a
Subsystem has not achieved Operational Acceptance. The
aggregate amount of such liquidated damages shall in no event
exceed the amount specified in the SCC (“the Maximum”).
Once the Maximum is reached, the Purchaser may consider
termination of the Contract, pursuant to GCC Clause 41.2.2.
28.3 Unless otherwise specified in the SCC, liquidated damages
payable under GCC Clause 28.2 shall apply only to the
failure to achieve Operational Acceptance of the System (and
Subsystems) as specified in the Implementation Schedule in
the Technical Requirements and/or Agreed and Finalized
108
Section IV. General Conditions of Contract
Project Plan. This Clause 28.3 shall not limit, however, any
other rights or remedies the Purchaser may have under the
Contract for other delays.
28.4 If liquidated damages are claimed by the Purchaser for the
System (or Subsystem), the Supplier shall have no further
liability whatsoever to the Purchaser in respect to the
Operational Acceptance time guarantee for the System (or
Subsystem). However, the payment of liquidated damages
shall not in any way relieve the Supplier from any of its
obligations to complete the System or from any other of its
obligations and liabilities under the Contract.
29. Defect Liability
29.1 The Supplier warrants that the System, including all
Information Technologies, Materials, and other Goods
supplied and Services provided, shall be free from defects in
the design, engineering, Materials, and workmanship that
prevent the System and/or any of its components from
fulfilling the Technical Requirements or that limit in a
material fashion the performance, reliability, or extensibility
of the System and/or Subsystems. Exceptions and/or
limitations, if any, to this warranty with respect to Software
(or categories of Software), shall be as specified in the SCC.
Commercial warranty provisions of products supplied under
the Contract shall apply to the extent that they do not conflict
with the provisions of this Contract.
29.2 The Supplier also warrants that the Information
Technologies, Materials, and other Goods supplied under the
Contract are new, unused, and incorporate all recent
improvements in design that materially affect the System’s or
Subsystem’s ability to fulfill the Technical Requirements.
29.3 In addition, the Supplier warrants that: (i) all Goods
components to be incorporated into the System form part of
the Supplier’s and/or Subcontractor’s current product lines,
(ii) they have been previously released to the market, and
(iii) those specific items identified in the SCC (if any) have
been in the market for at least the minimum periods
specified in the SCC.
29.4 The Warranty Period shall commence from the date of
Operational Acceptance of the System (or of any major
component or Subsystem for which separate Operational
Acceptance is provided for in the Contract) and shall extend
for the length of time specified in the SCC.
Section IV. General Conditions of Contract
109
29.5 If during the Warranty Period any defect as described in
GCC Clause 29.1 should be found in the design, engineering,
Materials, and workmanship of the Information Technologies
and other Goods supplied or of the Services provided by the
Supplier, the Supplier shall promptly, in consultation and
agreement with the Purchaser regarding appropriate
remedying of the defects, and at its sole cost, repair, replace,
or otherwise make good (as the Supplier shall, at its
discretion, determine) such defect as well as any damage to
the System caused by such defect. Any defective Information
Technologies or other Goods that have been replaced by the
Supplier shall remain the property of the Supplier.
29.6 The Supplier shall not be responsible for the repair,
replacement, or making good of any defect or of any damage
to the System arising out of or resulting from any of the
following causes:
(a) improper operation or maintenance of the System by the
Purchaser;
(b) normal wear and tear;
(c) use of the System with items not supplied by the
Supplier, unless otherwise identified in the Technical
Requirements, or approved by the Supplier; or
(d) modifications made to the System by the Purchaser, or a
third party, not approved by the Supplier.
29.7 The Supplier’s obligations under this GCC Clause 29 shall
not apply to:
(a) any materials that are normally consumed in operation or
have a normal life shorter than the Warranty Period; or
(b) any designs, specifications, or other data designed,
supplied, or specified by or on behalf of the Purchaser or
any matters for which the Supplier has disclaimed
responsibility, in accordance with GCC Clause 21.1.2.
29.8 The Purchaser shall give the Supplier a notice promptly
following the discovery of such defect, stating the nature of
any such defect together with all available evidence. The
Purchaser shall afford all reasonable opportunity for the
Supplier to inspect any such defect. The Purchaser shall
afford the Supplier all necessary access to the System and the
site to enable the Supplier to perform its obligations under
110
Section IV. General Conditions of Contract
this GCC Clause 29.
29.9 The Supplier may, with the consent of the Purchaser, remove
from the site any Information Technologies and other Goods
that are defective, if the nature of the defect, and/or any
damage to the System caused by the defect, is such that
repairs cannot be expeditiously carried out at the site. If the
repair, replacement, or making good is of such a character
that it may affect the efficiency of the System, the Purchaser
may give the Supplier notice requiring that tests of the
defective part be made by the Supplier immediately upon
completion of such remedial work, whereupon the Supplier
shall carry out such tests.
If such part fails the tests, the Supplier shall carry out further
repair, replacement, or making good (as the case may be)
until that part of the System passes such tests. The tests shall
be agreed upon by the Purchaser and the Supplier.
29.10
If the Supplier fails to commence the work necessary to
remedy such defect or any damage to the System caused by
such defect within the time period specified in the SCC, the
Purchaser may, following notice to the Supplier, proceed to
do such work or contract a third party (or parties) to do such
work, and the reasonable costs incurred by the Purchaser in
connection with such work shall be paid to the Purchaser by
the Supplier or may be deducted by the Purchaser from any
monies due the Supplier or claimed under the Performance
Security.
29.11 If the System or Subsystem cannot be used by reason of
such defect and/or making good of such defect, the Warranty
Period for the System shall be extended by a period equal to
the period during which the System or Subsystem could not
be used by the Purchaser because of such defect and/or
making good of such defect.
29.12 Items substituted for defective parts of the System during
the Warranty Period shall be covered by the Defect Liability
Warranty for the remainder of the Warranty Period
applicable for the part replaced or three (3) months,
whichever is greater.
29.13 At the request of the Purchaser and without prejudice to any
other rights and remedies that the Purchaser may have
against the Supplier under the Contract, the Supplier will
offer all possible assistance to the Purchaser to seek warranty
Section IV. General Conditions of Contract
111
services or remedial action from any subcontracted thirdparty producers or licensor of Goods included in the System,
including without limitation assignment or transfer in favor
of the Purchaser of the benefit of any warranties given by
such producers or licensors to the Supplier.
30. Functional
Guarantees
30.1 The Supplier guarantees that, once the Operational
Acceptance Certificate(s) has been issued, the System
represents a complete, integrated solution to the Purchaser’s
requirements set forth in the Technical Requirements and it
conforms to all other aspects of the Contract. The Supplier
acknowledges that GCC Clause 27 regarding Commissioning
and Operational Acceptance governs how technical
conformance of the System to the Contract requirements will
be determined.
30.2 If, for reasons attributable to the Supplier, the System does
not conform to the Technical Requirements or does not
conform to all other aspects of the Contract, the Supplier
shall at its cost and expense make such changes,
modifications, and/or additions to the System as may be
necessary to conform to the Technical Requirements and
meet all functional and performance standards. The Supplier
shall notify the Purchaser upon completion of the necessary
changes, modifications, and/or additions and shall request
the Purchaser to repeat the Operational Acceptance Tests
until the System achieves Operational Acceptance.
30.3 If the System (or Subsystem[s]) fails to achieve Operational
Acceptance, the Purchaser may consider termination of the
Contract, pursuant to GCC Clause 41.2.2, and forfeiture of
the Supplier’s Performance Security in accordance with GCC
Clause 13.3 in compensation for the extra costs and delays
likely to result from this failure.
31. Intellectual
Property Rights
Warranty
31.1 The Supplier hereby represents and warrants that:
(a)
the System as supplied, installed, tested, and accepted;
(b)
use of the System in accordance with the Contract; and
(c)
copying of the Software and Materials provided to the
Purchaser in accordance with the Contract
do not and will not infringe any Intellectual Property Rights
held by any third party and that it has all necessary rights or
at its sole expense shall have secured in writing all transfers
112
Section IV. General Conditions of Contract
of rights and other consents necessary to make the
assignments, licenses, and other transfers of Intellectual
Property Rights and the warranties set forth in the Contract,
and for the Purchaser to own or exercise all Intellectual
Property Rights as provided in the Contract. Without
limitation, the Supplier shall secure all necessary written
agreements, consents, and transfers of rights from its
employees and other persons or entities whose services are
used for development of the System.
32. Intellectual
Property Rights
Indemnity
32.1 The Supplier shall indemnify and hold harmless the
Purchaser and its employees and officers from and against
any and all losses, liabilities, and costs (including losses,
liabilities, and costs incurred in defending a claim alleging
such a liability), that the Purchaser or its employees or
officers may suffer as a result of any infringement or alleged
infringement of any Intellectual Property Rights by reason of:
(a)
installation of the System by the Supplier or the use of
the System, including the Materials, in the country
where the site is located;
(b)
copying of the Software and Materials provided the
Supplier in accordance with the Agreement; and
(c)
sale of the products produced by the System in any
country, except to the extent that such losses, liabilities,
and costs arise as a result of the Purchaser’s breach of
GCC Clause 32.2.
32.2 Such indemnity shall not cover any use of the System,
including the Materials, other than for the purpose indicated
by or to be reasonably inferred from the Contract, any
infringement resulting from the use of the System, or any
products of the System produced thereby in association or
combination with any other goods or services not supplied by
the Supplier, where the infringement arises because of such
association or combination and not because of use of the
System in its own right.
32.3 Such indemnities shall also not apply if any claim of
infringement:
(a)
is asserted by a parent, subsidiary, or affiliate of the
Purchaser’s organization;
(b)
is a direct result of a design mandated by the
Section IV. General Conditions of Contract
113
Purchaser’s Technical Requirements and the possibility
of such infringement was duly noted in the Supplier’s
Bid; or
(c)
results from the alteration of the System, including the
Materials, by the Purchaser or any persons other than
the Supplier or a person authorized by the Supplier.
32.4 If any proceedings are brought or any claim is made against
the Purchaser arising out of the matters referred to in GCC
Clause 32.1, the Purchaser shall promptly give the Supplier
notice of such proceedings or claims, and the Supplier may at
its own expense and in the Purchaser’s name conduct such
proceedings or claim and any negotiations for the settlement
of any such proceedings or claim.
If the Supplier fails to notify the Purchaser within twentyeight (28) days after receipt of such notice that it intends to
conduct any such proceedings or claim, then the Purchaser
shall be free to conduct the same on its own behalf. Unless
the Supplier has so failed to notify the Purchaser within the
twenty-eight (28) days, the Purchaser shall make no
admission that may be prejudicial to the defense of any such
proceedings or claim. The Purchaser shall, at the Supplier’s
request, afford all available assistance to the Supplier in
conducting such proceedings or claim and shall be
reimbursed by the Supplier for all reasonable expenses
incurred in so doing.
32.5 The Purchaser shall indemnify and hold harmless the
Supplier and its employees, officers, and Subcontractors
from and against any and all losses, liabilities, and costs
(including losses, liabilities, and costs incurred in defending
a claim alleging such a liability) that the Supplier or its
employees, officers, or Subcontractors may suffer as a result
of any infringement or alleged infringement of any
Intellectual Property Rights arising out of or in connection
with any design, data, drawing, specification, or other
documents or materials provided to the Supplier in
connection with this Contract by the Purchaser or any
persons (other than the Supplier) contracted by the
Purchaser, except to the extent that such losses, liabilities,
and costs arise as a result of the Supplier’s breach of GCC
Clause 32.8.
32.6 Such indemnity shall not cover
114
Section IV. General Conditions of Contract
(a)
any use of the design, data, drawing, specification, or
other documents or materials, other than for the
purpose indicated by or to be reasonably inferred from
the Contract;
(b)
any infringement resulting from the use of the design,
data, drawing, specification, or other documents or
materials, or any products produced thereby, in
association or combination with any other Goods or
Services not provided by the Purchaser or any other
person contracted by the Purchaser, where the
infringement arises because of such association or
combination and not because of the use of the design,
data, drawing, specification, or other documents or
materials in its own right.
32.7 Such indemnities shall also not apply:
(a)
if any claim of infringement is asserted by a parent,
subsidiary, or affiliate of the Supplier’s organization;
(b)
to the extent that any claim of infringement is caused
by the alteration, by the Supplier, or any persons
contracted by the Supplier, of the design, data,
drawing, specification, or other documents or materials
provided to the Supplier by the Purchaser or any
persons contracted by the Purchaser.
32.8 If any proceedings are brought or any claim is made against
the Supplier arising out of the matters referred to in GCC
Clause 32.5, the Supplier shall promptly give the Purchaser
notice of such proceedings or claims, and the Purchaser may
at its own expense and in the Supplier’s name conduct such
proceedings or claim and any negotiations for the settlement
of any such proceedings or claim. If the Purchaser fails to
notify the Supplier within twenty-eight (28) days after receipt
of such notice that it intends to conduct any such proceedings
or claim, then the Supplier shall be free to conduct the same
on its own behalf. Unless the Purchaser has so failed to
notify the Supplier within the twenty-eight (28) days, the
Supplier shall make no admission that may be prejudicial to
the defense of any such proceedings or claim. The Supplier
shall, at the Purchaser’s request, afford all available
assistance to the Purchaser in conducting such proceedings
or claim and shall be reimbursed by the Purchaser for all
reasonable expenses incurred in so doing.
Section IV. General Conditions of Contract
33. Limitation of
Liability
115
33.1 Provided the following does not exclude or limit any
liabilities of either party in ways not permitted by applicable
law:
(a)
the Supplier shall not be liable to the Purchaser,
whether in contract, tort, or otherwise, for any indirect
or consequential loss or damage, loss of use, loss of
production, or loss of profits or interest costs, provided
that this exclusion shall not apply to any obligation of
the Supplier to pay liquidated damages to the
Purchaser; and
(b)
the aggregate liability of the Supplier to the Purchaser,
whether under the Contract, in tort or otherwise, shall
not exceed the total Contract Price, provided that this
limitation shall not apply to any obligation of the
Supplier to indemnify the Purchaser with respect to
intellectual property rights infringement.
G. RISK DISTRIBUTION
34. Transfer of
Ownership
34.1 With the exception of Software and Materials, the ownership
of the Information Technologies and other Goods shall be
transferred to the Purchaser at the time of Delivery or
otherwise under terms that may be agreed upon and specified
in the Contract Agreement.
34.2 Ownership and the terms of usage of the Software and
Materials supplied under the Contract shall be governed by
GCC Clause 15 (Copyright) and any elaboration in the
Technical Requirements.
34.3 Ownership of the Supplier’s Equipment used by the Supplier
and its Subcontractors in connection with the Contract shall
remain with the Supplier or its Subcontractors.
35. Care of the
System
35.1 The Purchaser shall become responsible for the care and
custody of the System or Subsystems upon their Delivery.
The Purchaser shall make good at its own cost any loss or
damage that may occur to the System or Subsystems from
any cause from the date of Delivery until the date of
Operational Acceptance of the System or Subsystems,
pursuant to GCC Clause 27 (Commissioning and Operational
Acceptance), excepting such loss or damage arising from
acts or omissions of the Supplier, its employees, or
116
Section IV. General Conditions of Contract
subcontractors.
35.2 If any loss or damage occurs to the System or any part of the
System by reason of:
(a)
(insofar as they relate to the country where the Project
Site is located) nuclear reaction, nuclear radiation,
radioactive contamination, a pressure wave caused by
aircraft or other aerial objects, or any other occurrences
that an experienced contractor could not reasonably
foresee, or if reasonably foreseeable could not
reasonably make provision for or insure against, insofar
as such risks are not normally insurable on the
insurance market and are mentioned in the general
exclusions of the policy of insurance taken out under
GCC Clause 37;
(b)
any use not in accordance with the Contract, by the
Purchaser or any third party;
(c)
any use of or reliance upon any design, data, or
specification provided or designated by or on behalf of
the Purchaser, or any such matter for which the
Supplier has disclaimed responsibility in accordance
with GCC Clause 21.1.2,
the Purchaser shall pay to the Supplier all sums payable in
respect of the System or Subsystems that have achieved
Operational Acceptance, notwithstanding that the same be
lost, destroyed, or damaged. If the Purchaser requests the
Supplier in writing to make good any loss or damage to the
System thereby occasioned, the Supplier shall make good the
same at the cost of the Purchaser in accordance with GCC
Clause 39. If the Purchaser does not request the Supplier in
writing to make good any loss or damage to the System
thereby occasioned, the Purchaser shall either request a
change in accordance with GCC Clause 39, excluding the
performance of that part of the System thereby lost,
destroyed, or damaged, or, where the loss or damage affects a
substantial part of the System, the Purchaser shall terminate
the Contract pursuant to GCC Clause 41.1.
35.3 The Purchaser shall be liable for any loss of or damage to
any Supplier’s Equipment which the Purchaser has
authorized to locate within the Purchaser's premises for use
in fulfillment of Supplier's obligations under the Contract,
except where such loss or damage arises from acts or
Section IV. General Conditions of Contract
117
omissions of the Supplier, its employees, or subcontractors.
36. Loss of or
Damage to
Property;
Accident or
Injury to
Workers;
Indemnification
36.1 The Supplier and each and every Subcontractor shall abide
by the job safety, insurance, customs, and immigration
measures prevalent and laws in force in the Purchaser’s
Country.
36.2 Subject to GCC Clause 36.3, the Supplier shall indemnify
and hold harmless the Purchaser and its employees and
officers from and against any and all losses, liabilities and
costs (including losses, liabilities, and costs incurred in
defending a claim alleging such a liability) that the Purchaser
or its employees or officers may suffer as a result of the
death or injury of any person or loss of or damage to any
property (other than the System, whether accepted or not)
arising in connection with the supply, installation, testing,
and Commissioning of the System and by reason of the
negligence of the Supplier or its Subcontractors, or their
employees, officers or agents, except any injury, death, or
property damage caused by the negligence of the Purchaser,
its contractors, employees, officers, or agents.
36.3 If any proceedings are brought or any claim is made against
the Purchaser that might subject the Supplier to liability
under GCC Clause 36.2, the Purchaser shall promptly give
the Supplier notice of such proceedings or claims, and the
Supplier may at its own expense and in the Purchaser’s name
conduct such proceedings or claim and any negotiations for
the settlement of any such proceedings or claim. If the
Supplier fails to notify the Purchaser within twenty-eight
(28) days after receipt of such notice that it intends to
conduct any such proceedings or claim, then the Purchaser
shall be free to conduct the same on its own behalf. Unless
the Supplier has so failed to notify the Purchaser within the
twenty-eight (28) day period, the Purchaser shall make no
admission that may be prejudicial to the defense of any such
proceedings or claim. The Purchaser shall, at the Supplier’s
request, afford all available assistance to the Supplier in
conducting such proceedings or claim and shall be
reimbursed by the Supplier for all reasonable expenses
incurred in so doing.
36.4 The Purchaser shall indemnify and hold harmless the
Supplier and its employees, officers, and Subcontractors
from any and all losses, liabilities, and costs (including
losses, liabilities, and costs incurred in defending a claim
118
Section IV. General Conditions of Contract
alleging such a liability) that the Supplier or its employees,
officers, or Subcontractors may suffer as a result of the death
or personal injury of any person or loss of or damage to
property of the Purchaser, other than the System not yet
achieving Operational Acceptance, that is caused by fire,
explosion, or any other perils, in excess of the amount
recoverable from insurances procured under GCC Clause 37
(Insurances), provided that such fire, explosion, or other
perils were not caused by any act or failure of the Supplier.
36.5 If any proceedings are brought or any claim is made against
the Supplier that might subject the Purchaser to liability
under GCC Clause 36.4, the Supplier shall promptly give the
Purchaser notice of such proceedings or claims, and the
Purchaser may at its own expense and in the Supplier’s name
conduct such proceedings or claim and any negotiations for
the settlement of any such proceedings or claim. If the
Purchaser fails to notify the Supplier within twenty-eight
(28) days after receipt of such notice that it intends to
conduct any such proceedings or claim, then the Supplier
shall be free to conduct the same on its own behalf. Unless
the Purchaser has so failed to notify the Supplier within the
twenty-eight (28) days, the Supplier shall make no admission
that may be prejudicial to the defense of any such
proceedings or claim. The Supplier shall, at the Purchaser’s
request, afford all available assistance to the Purchaser in
conducting such proceedings or claim and shall be
reimbursed by the Purchaser for all reasonable expenses
incurred in so doing.
36.6 The party entitled to the benefit of an indemnity under this
GCC Clause 36 shall take all reasonable measures to
mitigate any loss or damage that has occurred. If the party
fails to take such measures, the other party’s liabilities shall
be correspondingly reduced.
37. Insurances
37.1 The Supplier shall at its expense take out and maintain in
effect, or cause to be taken out and maintained in effect,
during the performance of the Contract, the insurance set
forth below. The identity of the insurers and the form of the
policies shall be subject to the approval of the Purchaser,
who should not unreasonably withhold such approval.
(a)
Cargo Insurance During Transport
as applicable, 110 percent of the price of the
Section IV. General Conditions of Contract
119
Information Technologies and other Goods in a freely
convertible currency, covering the Goods from physical
loss or damage during shipment through receipt at the
Project Site.
(b)
Installation “All Risks” Insurance
as applicable, 110 percent of the price of the
Information Technologies and other Goods covering
the Goods at the site from all risks of physical loss or
damage (excluding only perils commonly excluded
under “all risks” insurance policies of this type by
reputable insurers) occurring prior to Operational
Acceptance of the System.
(c)
Third-Party Liability Insurance
On terms as specified in the SCC, covering bodily
injury or death suffered by third parties (including the
Purchaser’s personnel) and loss of or damage to
property (including the Purchaser’s property and any
Subsystems that have been accepted by the Purchaser)
occurring in connection with the supply and installation
of the Information System.
(d)
Automobile Liability Insurance
In accordance with the statutory requirements
prevailing in the Purchaser’s Country, covering use of
all vehicles used by the Supplier or its Subcontractors
(whether or not owned by them) in connection with the
execution of the Contract.
(e)
Other Insurance (if any), as specified in the SCC.
37.2 The Purchaser shall be named as co-insured under all
insurance policies taken out by the Supplier pursuant to GCC
Clause 37.1, except for the Third-Party Liability, and the
Supplier’s Subcontractors shall be named as co-insured
under all insurance policies taken out by the Supplier
pursuant to GCC Clause 37.1 except for Cargo Insurance
During Transport. All insurer’s rights of subrogation against
such co-insured for losses or claims arising out of the
performance of the Contract shall be waived under such
policies.
37.3 The Supplier shall deliver to the Purchaser certificates of
insurance (or copies of the insurance policies) as evidence
120
Section IV. General Conditions of Contract
that the required policies are in full force and effect.
37.4 The Supplier shall ensure that, where applicable, its
Subcontractor(s) shall take out and maintain in effect
adequate insurance policies for their personnel and vehicles
and for work executed by them under the Contract, unless
such Subcontractors are covered by the policies taken out by
the Supplier.
37.5 If the Supplier fails to take out and/or maintain in effect the
insurance referred to in GCC Clause 37.1, the Purchaser may
take out and maintain in effect any such insurance and may
from time to time deduct from any amount due the Supplier
under the Contract any premium that the Purchaser shall
have paid to the insurer or may otherwise recover such
amount as a debt due from the Supplier.
37.6 Unless otherwise provided in the Contract, the Supplier shall
prepare and conduct all and any claims made under the
policies effected by it pursuant to this GCC Clause 37, and
all monies payable by any insurers shall be paid to the
Supplier. The Purchaser shall give to the Supplier all such
reasonable assistance as may be required by the Supplier in
connection with any claim under the relevant insurance
policies. With respect to insurance claims in which the
Purchaser’s interest is involved, the Supplier shall not give
any release or make any compromise with the insurer without
the prior written consent of the Purchaser. With respect to
insurance claims in which the Supplier’s interest is involved,
the Purchaser shall not give any release or make any
compromise with the insurer without the prior written
consent of the Supplier.
38. Force Majeure
38.1 “Force Majeure” shall mean any event beyond the reasonable
control of the Purchaser or of the Supplier, as the case may
be, and which is unavoidable notwithstanding the reasonable
care of the party affected and shall include, without
limitation, the following:
(a)
war, hostilities, or warlike operations (whether a state
of war be declared or not), invasion, act of foreign
enemy, and civil war;
(b)
rebellion, revolution, insurrection, mutiny, usurpation
of civil or military government, conspiracy, riot, civil
commotion, and terrorist acts;
Section IV. General Conditions of Contract
121
(c)
confiscation,
nationalization,
mobilization,
commandeering or requisition by or under the order of
any government or de jure or de facto authority or ruler,
or any other act or failure to act of any local state or
national government authority;
(d)
strike, sabotage, lockout, embargo,
port congestion, lack of usual
transportation and communication,
shipwreck, shortage or restriction
epidemics, quarantine, and plague;
(e)
earthquake, landslide, volcanic activity, fire, flood or
inundation, tidal wave, typhoon or cyclone, hurricane,
storm, lightning, or other inclement weather condition,
nuclear and pressure waves, or other natural or physical
disaster;
(f)
failure, by the Supplier, to obtain the necessary export
permit(s) from the governments of the Country(s) of
Origin of the Information Technologies or other Goods,
or Supplier’s Equipment provided that the Supplier has
made all reasonable efforts to obtain the required
export permit(s), including the exercise of due
diligence in determining the eligibility of the System
and all of its components for receipt of the necessary
export permits.
import restriction,
means of public
industrial dispute,
of power supply,
38.2 If either party is prevented, hindered, or delayed from or in
performing any of its obligations under the Contract by an
event of Force Majeure, then it shall notify the other in
writing of the occurrence of such event and the
circumstances of the event of Force Majeure within fourteen
(14) days after the occurrence of such event.
38.3 The party who has given such notice shall be excused from
the performance or punctual performance of its obligations
under the Contract for so long as the relevant event of Force
Majeure continues and to the extent that such party’s
performance is prevented, hindered, or delayed. The Time
for Achieving Operational Acceptance shall be extended in
accordance with GCC Clause 40 (Extension of Time for
Achieving Operational Acceptance).
38.4 The party or parties affected by the event of Force Majeure
shall use reasonable efforts to mitigate the effect of the event
of Force Majeure upon its or their performance of the
122
Section IV. General Conditions of Contract
Contract and to fulfill its or their obligations under the
Contract, but without prejudice to either party’s right to
terminate the Contract under GCC Clause 38.6.
38.5 No delay or nonperformance by either party to this Contract
caused by the occurrence of any event of Force Majeure
shall:
(a)
constitute a default or breach of the Contract;
(b)
(subject to GCC Clauses 35.2, 38.3, and 38.4) give rise
to any claim for damages or additional cost or expense
occasioned by the delay or nonperformance,
if, and to the extent that, such delay or nonperformance is
caused by the occurrence of an event of Force Majeure.
38.6 If the performance of the Contract is substantially prevented,
hindered, or delayed for a single period of more than sixty
(60) days or an aggregate period of more than one hundred
and twenty (120) days on account of one or more events of
Force Majeure during the time period covered by the
Contract, the parties will attempt to develop a mutually
satisfactory solution, failing which, either party may
terminate the Contract by giving a notice to the other.
38.7 In the event of termination pursuant to GCC Clause 38.6, the
rights and obligations of the Purchaser and the Supplier shall
be as specified in GCC Clauses 41.1.2 and 41.1.3.
38.8 Notwithstanding GCC Clause 38.5, Force Majeure shall not
apply to any obligation of the Purchaser to make payments to
the Supplier under this Contract.
H. CHANGE IN CONTRACT ELEMENTS
39. Changes to the
System
39.1 Introducing a Change
39.1.1 Subject to GCC Clauses 39.2.5 and 39.2.7, the
Purchaser shall have the right to propose, and
subsequently require, the Project Manager to order
the Supplier from time to time during the
performance of the Contract to make any change,
modification, addition, or deletion to, in, or from the
System (interchangeably called “Change”), provided
that such Change falls within the general scope of
the System, does not constitute unrelated work, and
Section IV. General Conditions of Contract
123
is technically practicable, taking into account both
the state of advancement of the System and the
technical compatibility of the Change envisaged
with the nature of the System as originally specified
in the Contract.
A Change may involve, but is not restricted to, the
substitution of updated Information Technologies
and related Services in accordance with
GCC Clause 23 (Product Upgrades).
39.1.2 The Supplier may from time to time during its
performance of the Contract propose to the
Purchaser (with a copy to the Project Manager) any
Change that the Supplier considers necessary or
desirable to improve the quality or efficiency of the
System. The Purchaser may at its discretion approve
or reject any Change proposed by the Supplier.
39.1.3 Notwithstanding GCC Clauses 39.1.1 and 39.1.2, no
change made necessary because of any default of the
Supplier in the performance of its obligations under
the Contract shall be deemed to be a Change, and
such change shall not result in any adjustment of the
Contract Price or the Time for Achieving
Operational Acceptance.
39.1.4 The procedure on how to proceed with and execute
Changes is specified in GCC Clauses 39.2 and 39.3,
and further details and sample forms are provided in
the Sample Forms Section in the Bidding
Documents.
39.1.5 Moreover, the Purchaser and Supplier will agree,
during development of the Project Plan, to a date
prior to the scheduled date for Operational
Acceptance, after which the Technical Requirements
for the System shall be “frozen.” Any Change
initiated after this time will be dealt with after
Operational Acceptance.
39.2 Changes Originating from Purchaser
39.2.1 If the Purchaser proposes a Change pursuant to GCC
Clauses 39.1.1, it shall send to the Supplier a
“Request for Change Proposal,” requiring the
Supplier to prepare and furnish to the Project
124
Section IV. General Conditions of Contract
Manager as soon as reasonably practicable a
“Change Proposal,” which shall include the
following:
(a) brief description of the Change;
(b) impact on the Time for Achieving Operational
Acceptance;
(c) detailed estimated cost of the Change;
(d) effect on Functional Guarantees (if any);
(e) effect on any other provisions of the Contract.
39.2.2 Prior to preparing and submitting the “Change
Proposal,” the Supplier shall submit to the Project
Manager an “Change Estimate Proposal,” which
shall be an estimate of the cost of preparing the
Change Proposal, plus a first approximation of the
suggested approach and cost for implementing the
changes. Upon receipt of the Supplier’s Change
Estimate Proposal, the Purchaser shall do one of the
following:
(a) accept the Supplier’s estimate with instructions
to the Supplier to proceed with the preparation of
the Change Proposal;
(b) advise the Supplier of any part of its Change
Estimate Proposal that is unacceptable and
request the Supplier to review its estimate;
(c) advise the Supplier that the Purchaser does not
intend to proceed with the Change.
39.2.3 Upon receipt of the Purchaser’s instruction to
proceed under GCC Clause 39.2.2 (a), the Supplier
shall, with proper expedition, proceed with the
preparation of the Change Proposal, in accordance
with GCC Clause 39.2.1. The Supplier, at its
discretion, may specify a validity period for the
Change Proposal, after which if the Purchaser and
Supplier has not reached agreement in accordance
with GCC Clause 39.2.6, then GCC Clause 39.2.7
shall apply.
39.2.4 The pricing of any Change shall, as far as
Section IV. General Conditions of Contract
125
practicable, be calculated in accordance with the
rates and prices included in the Contract. If the
nature of the Change is such that the Contract rates
and prices are inequitable, the parties to the Contract
shall agree on other specific rates to be used for
valuing the Change.
39.2.5 If before or during the preparation of the Change
Proposal it becomes apparent that the aggregate
impact of compliance with the Request for Change
Proposal and with all other Change Orders that have
already become binding upon the Supplier under this
GCC Clause 39 would be to increase or decrease the
Contract Price as originally set forth in Article 2
(Contract Price) of the Contract Agreement by more
than fifteen (15) percent, the Supplier may give a
written notice of objection to this Request for
Change Proposal prior to furnishing the Change
Proposal. If the Purchaser accepts the Supplier’s
objection, the Purchaser shall withdraw the proposed
Change and shall notify the Supplier in writing of its
acceptance.
The Supplier’s failure to so object to a Request for
Change Proposal shall neither affect its right to
object to any subsequent requested Changes or
Change Orders, nor affect its right to take into
account, when making such subsequent objection,
the percentage increase or decrease in the Contract
Price that any Change not objected to by the
Supplier represents.
39.2.6 Upon receipt of the Change Proposal, the Purchaser
and the Supplier shall mutually agree upon all
matters contained in the Change Proposal. Within
fourteen (14) days after such agreement, the
Purchaser shall, if it intends to proceed with the
Change, issue the Supplier a Change Order. If the
Purchaser is unable to reach a decision within
fourteen (14) days, it shall notify the Supplier with
details of when the Supplier can expect a decision.
If the Purchaser decides not to proceed with the
Change for whatever reason, it shall, within the said
period of fourteen (14) days, notify the Supplier
accordingly.
Under such circumstances, the
Supplier shall be entitled to reimbursement of all
126
Section IV. General Conditions of Contract
costs reasonably incurred by it in the preparation of
the Change Proposal, provided that these do not
exceed the amount given by the Supplier in its
Change Estimate Proposal submitted in accordance
with GCC Clause 39.2.2.
39.2.7 If the Purchaser and the Supplier cannot reach
agreement on the price for the Change, an equitable
adjustment to the Time for Achieving Operational
Acceptance, or any other matters identified in the
Change Proposal, the Change will not be
implemented. However, this provision does not
limit the rights of either party under GCC Clause 6
(Settlement of Disputes).
39.3 Changes Originating from Supplier
If the Supplier proposes a Change pursuant to GCC
Clause 39.1.2, the Supplier shall submit to the Project
Manager a written “Application for Change Proposal,”
giving reasons for the proposed Change and including the
information specified in GCC Clause 39.2.1. Upon receipt
of the Application for Change Proposal, the parties shall
follow the procedures outlined in GCC Clauses 39.2.6 and
39.2.7. However, should the Purchaser choose not to
proceed or the Purchaser and the Supplier cannot come to
agreement on the change during any validity period that the
Supplier may specify in its Application for Change Proposal,
the Supplier shall not be entitled to recover the costs of
preparing the Application for Change Proposal, unless
subject to an agreement between the Purchaser and the
Supplier to the contrary.
40. Extension of
Time for
Achieving
Operational
Acceptance
40.1 The time(s) for achieving Operational Acceptance specified
in the Schedule of Implementation shall be extended if the
Supplier is delayed or impeded in the performance of any of
its obligations under the Contract by reason of any of the
following:
(a)
any Change in the System as provided in GCC
Clause 39 (Change in the Information System);
(b)
any occurrence of Force Majeure as provided in GCC
Clause 38 (Force Majeure);
(c)
default of the Purchaser; or
Section IV. General Conditions of Contract
(d)
127
any other matter specifically mentioned in the Contract;
by such period as shall be fair and reasonable in all the
circumstances and as shall fairly reflect the delay or
impediment sustained by the Supplier.
40.2 Except where otherwise specifically provided in the
Contract, the Supplier shall submit to the Project Manager a
notice of a claim for an extension of the time for achieving
Operational Acceptance, together with particulars of the
event or circumstance justifying such extension as soon as
reasonably practicable after the commencement of such event
or circumstance. As soon as reasonably practicable after
receipt of such notice and supporting particulars of the claim,
the Purchaser and the Supplier shall agree upon the period of
such extension. In the event that the Supplier does not
accept the Purchaser’s estimate of a fair and reasonable time
extension, the Supplier shall be entitled to refer the matter to
the provisions for the Settlement of Disputes pursuant to
GCC Clause 6.
40.3 The Supplier shall at all times use its reasonable efforts to
minimize any delay in the performance of its obligations
under the Contract.
41. Termination
41.1 Termination for Purchaser’s Convenience
41.1.1 The Purchaser may at any time terminate the
Contract for any reason by giving the Supplier a
notice of termination that refers to this GCC
Clause 41.1.
41.1.2 Upon receipt of the notice of termination under GCC
Clause 41.1.1, the Supplier shall either as soon as
reasonably practical or upon the date specified in the
notice of termination
(a) cease all further work, except for such work as
the Purchaser may specify in the notice of
termination for the sole purpose of protecting
that part of the System already executed, or any
work required to leave the site in a clean and safe
condition;
(b) terminate all subcontracts, except those to be
assigned to the Purchaser pursuant to GCC
Clause 41.1.2 (d) (ii) below;
128
Section IV. General Conditions of Contract
(c) remove all Supplier’s Equipment from the site,
repatriate the Supplier’s and its Subcontractors’
personnel from the site, remove from the site any
wreckage, rubbish, and debris of any kind;
(d) in addition, the Supplier, subject to the payment
specified in GCC Clause 41.1.3, shall
(i)
deliver to the Purchaser the parts of the
System executed by the Supplier up to the
date of termination;
(ii)
to the extent legally possible, assign to the
Purchaser all right, title, and benefit of the
Supplier to the System, or Subsystem, as at
the date of termination, and, as may be
required by the Purchaser, in any
subcontracts concluded between the
Supplier and its Subcontractors;
(iii) deliver to the Purchaser all nonproprietary
drawings, specifications, and other
documents prepared by the Supplier or its
Subcontractors as of the date of
termination in connection with the System.
41.1.3 In the event of termination of the Contract under
GCC Clause 41.1.1, the Purchaser shall pay to the
Supplier the following amounts:
(a) the Contract Price, properly attributable to the
parts of the System executed by the Supplier as
of the date of termination;
(b) the costs reasonably incurred by the Supplier in
the removal of the Supplier’s Equipment from
the site and in the repatriation of the Supplier’s
and its Subcontractors’ personnel;
(c) any amount to be paid by the Supplier to its
Subcontractors in connection with the
termination of any subcontracts, including any
cancellation charges;
(d) costs incurred by the Supplier in protecting the
System and leaving the site in a clean and safe
condition pursuant to GCC Clause 41.1.2 (a); and
Section IV. General Conditions of Contract
129
(e) the cost of satisfying all other obligations,
commitments, and claims that the Supplier may
in good faith have undertaken with third parties
in connection with the Contract and that are not
covered by GCC Clauses 41.1.3 (a) through (d)
above.
41.2 Termination for Supplier’s Default
41.2.1
The Purchaser, without prejudice to any other
rights or remedies it may possess, may terminate
the Contract forthwith in the following
circumstances by giving a notice of termination and
its reasons therefore to the Supplier, referring to
this GCC Clause 41.2:
(a) if the Supplier becomes bankrupt or insolvent,
has a receiving order issued against it,
compounds with its creditors, or, if the Supplier
is a corporation, a resolution is passed or order is
made for its winding up (other than a voluntary
liquidation for the purposes of amalgamation or
reconstruction), a receiver is appointed over any
part of its undertaking or assets, or if the
Supplier takes or suffers any other analogous
action in consequence of debt;
(b) if the Supplier assigns or transfers the Contract
or any right or interest therein in violation of the
provision of GCC Clause 42 (Assignment); or
(c) if the Supplier, in the judgment of the Purchaser,
has engaged in corrupt, fraudulent, collusive,
coercive or obstructive practices, in competing
for or in executing the Contract, including but
not limited to willful misrepresentation of facts
concerning ownership of Intellectual Property
Rights in, or proper authorization and/or licenses
from the owner to offer, the hardware, software,
or materials provided under this Contract.
For the purposes of this Clause:
130
Section IV. General Conditions of Contract
(i)
“corrupt practice”1 is the offering, giving,
receiving or soliciting, directly or
indirectly, of anything of value to
influence improperly the actions of
another party;
(ii)
“fraudulent practice”2 is any act or
omission, including a misrepresentation,
that knowingly or recklessly misleads, or
attempts to mislead, a party to obtain a
financial or other benefit or to avoid an
obligation;
(iii) “collusive practice”3 is an arrangement
between two or more parties designed to
achieve an improper purpose, including to
influence improperly the actions of
another party;
(iv) “coercive practice”4 is impairing or
harming, or threatening to impair or harm,
directly or indirectly, any party or the
property of the party to influence
improperly the actions of a party;
(v)
“obstructive practice” is
(aa) deliberately destroying, falsifying,
altering or concealing of evidence
material to the investigation or
making
false
statements
to
investigators in order to materially
impede a Bank investigation into
allegations of a corrupt, fraudulent,
coercive or collusive practice; and/or
threatening, harassing or intimidating
any party to prevent it from
1
“Another party” refers to a public official acting in relation to the procurement process or contract
execution]. In this context, “public official” includes World Bank staff and employees of other
organizations taking or reviewing procurement decisions.
2
A “party” refers to a public official; the terms “benefit” and “obligation” relate to the procurement process
or contract execution; and the “act or omission” is intended to influence the procurement process or contract
execution.
3
“Parties” refers to participants in the procurement process (including public officials) attempting to
establish bid prices at artificial, non competitive levels.
4
A “party” refers to a participant in the procurement process or contract execution.
Section IV. General Conditions of Contract
131
disclosing its knowledge of matters
relevant to the investigation or from
pursuing the investigation; or
(bb) acts intended to materially impede
the exercise of the Bank’s inspection
and audit rights provided for under
Sub-Clause 9.8.
41.2.2 If the Supplier:
(a) has abandoned or repudiated the Contract;
(b) has without valid reason failed to commence
work on the System promptly;
(c) persistently fails to execute the Contract in
accordance with the Contract or persistently
neglects to carry out its obligations under the
Contract without just cause;
(d) refuses or is unable to provide sufficient
Materials, Services, or labor to execute and
complete the System in the manner specified in
the Agreed and Finalized Project Plan furnished
under GCC Clause 19 at rates of progress that
give reasonable assurance to the Purchaser that
the Supplier can attain Operational Acceptance
of the System by the Time for Achieving
Operational Acceptance as extended;
then the Purchaser may, without prejudice to any
other rights it may possess under the Contract, give a
notice to the Supplier stating the nature of the
default and requiring the Supplier to remedy the
same. If the Supplier fails to remedy or to take steps
to remedy the same within fourteen (14) days of its
receipt of such notice, then the Purchaser may
terminate the Contract forthwith by giving a notice
of termination to the Supplier that refers to this GCC
Clause 41.2.
41.2.3 Upon receipt of the notice of termination under GCC
Clauses 41.2.1 or 41.2.2, the Supplier shall, either
immediately or upon such date as is specified in the
notice of termination:
(a) cease all further work, except for such work as
132
Section IV. General Conditions of Contract
the Purchaser may specify in the notice of
termination for the sole purpose of protecting
that part of the System already executed or any
work required to leave the site in a clean and safe
condition;
(b) terminate all subcontracts, except those to be
assigned to the Purchaser pursuant to GCC
Clause 41.2.3 (d) below;
(c) deliver to the Purchaser the parts of the System
executed by the Supplier up to the date of
termination;
(d) to the extent legally possible, assign to the
Purchaser all right, title and benefit of the
Supplier to the System or Subsystems as at the
date of termination, and, as may be required by
the Purchaser, in any subcontracts concluded
between the Supplier and its Subcontractors;
(e) deliver to the Purchaser all drawings,
specifications, and other documents prepared by
the Supplier or its Subcontractors as at the date
of termination in connection with the System.
41.2.4 The Purchaser may enter upon the site, expel the
Supplier, and complete the System itself or by
employing any third party. Upon completion of the
System or at such earlier date as the Purchaser thinks
appropriate, the Purchaser shall give notice to the
Supplier that such Supplier’s Equipment will be
returned to the Supplier at or near the site and shall
return such Supplier’s Equipment to the Supplier in
accordance with such notice. The Supplier shall
thereafter without delay and at its cost remove or
arrange removal of the same from the site.
41.2.5 Subject to GCC Clause 41.2.6, the Supplier shall be
entitled to be paid the Contract Price attributable to
the portion of the System executed as at the date of
termination and the costs, if any, incurred in
protecting the System and in leaving the site in a
clean and safe condition pursuant to GCC
Clause 41.2.3 (a). Any sums due the Purchaser from
the Supplier accruing prior to the date of termination
shall be deducted from the amount to be paid to the
Section IV. General Conditions of Contract
133
Supplier under this Contract.
41.2.6 If the Purchaser completes the System, the cost of
completing the System by the Purchaser shall be
determined. If the sum that the Supplier is entitled
to be paid, pursuant to GCC Clause 41.2.5, plus the
reasonable costs incurred by the Purchaser in
completing the System, exceeds the Contract Price,
the Supplier shall be liable for such excess. If such
excess is greater than the sums due the Supplier
under GCC Clause 41.2.5, the Supplier shall pay the
balance to the Purchaser, and if such excess is less
than the sums due the Supplier under GCC
Clause 41.2.5, the Purchaser shall pay the balance to
the Supplier. The Purchaser and the Supplier shall
agree, in writing, on the computation described
above and the manner in which any sums shall be
paid.
41.3 Termination by Supplier
41.3.1 If:
(a) the Purchaser has failed to pay the Supplier any
sum due under the Contract within the specified
period, has failed to approve any invoice or
supporting documents without just cause
pursuant to the SCC, or commits a substantial
breach of the Contract, the Supplier may give a
notice to the Purchaser that requires payment of
such sum, with interest on this sum as stipulated
in GCC Clause 12.3, requires approval of such
invoice or supporting documents, or specifies the
breach and requires the Purchaser to remedy the
same, as the case may be. If the Purchaser fails
to pay such sum together with such interest, fails
to approve such invoice or supporting documents
or give its reasons for withholding such
approval, fails to remedy the breach or take steps
to remedy the breach within fourteen (14) days
after receipt of the Supplier’s notice; or
(b) the Supplier is unable to carry out any of its
obligations under the Contract for any reason
attributable to the Purchaser, including but not
limited to the Purchaser’s failure to provide
134
Section IV. General Conditions of Contract
possession of or access to the site or other areas
or failure to obtain any governmental permit
necessary for the execution and/or completion of
the System;
then the Supplier may give a notice to the Purchaser
of such events, and if the Purchaser has failed to pay
the outstanding sum, to approve the invoice or
supporting documents, to give its reasons for
withholding such approval, or to remedy the breach
within twenty-eight (28) days of such notice, or if
the Supplier is still unable to carry out any of its
obligations under the Contract for any reason
attributable to the Purchaser within twenty-eight (28)
days of the said notice, the Supplier may by a further
notice to the Purchaser referring to this GCC
Clause 41.3.1, forthwith terminate the Contract.
41.3.2 The Supplier may terminate the Contract
immediately by giving a notice to the Purchaser to
that effect, referring to this GCC Clause 41.3.2, if
the Purchaser becomes bankrupt or insolvent, has a
receiving order issued against it, compounds with its
creditors, or, being a corporation, if a resolution is
passed or order is made for its winding up (other
than a voluntary liquidation for the purposes of
amalgamation or reconstruction), a receiver is
appointed over any part of its undertaking or assets,
or if the Purchaser takes or suffers any other
analogous action in consequence of debt.
41.3.3 If the Contract is terminated under GCC
Clauses 41.3.1 or 41.3.2, then the Supplier shall
immediately:
(a) cease all further work, except for such work as
may be necessary for the purpose of protecting
that part of the System already executed, or any
work required to leave the site in a clean and
safe condition;
(b) terminate all subcontracts, except those to be
assigned to the Purchaser pursuant to
Clause 41.3.3 (d) (ii);
(c) remove all Supplier’s Equipment from the site
and repatriate the Supplier’s and its
Section IV. General Conditions of Contract
135
Subcontractor’s personnel from the site.
(d) In addition, the Supplier, subject to the payment
specified in GCC Clause 41.3.4, shall:
(i)
deliver to the Purchaser the parts of the
System executed by the Supplier up to the
date of termination;
(ii)
to the extent legally possible, assign to the
Purchaser all right, title, and benefit of the
Supplier to the System, or Subsystems, as
of the date of termination, and, as may be
required by the Purchaser, in any
subcontracts concluded between the
Supplier and its Subcontractors;
(iii) to the extent legally possible, deliver to the
Purchaser all drawings, specifications, and
other documents prepared by the Supplier
or its Subcontractors as of the date of
termination in connection with the System.
41.3.4 If the Contract is terminated under GCC
Clauses 41.3.1 or 41.3.2, the Purchaser shall pay to
the Supplier all payments specified in GCC
Clause 41.1.3, and reasonable compensation for all
loss, except for loss of profit, or damage sustained
by the Supplier arising out of, in connection with, or
in consequence of such termination.
41.3.5 Termination by the Supplier pursuant to this GCC
Clause 41.3 is without prejudice to any other rights
or remedies of the Supplier that may be exercised in
lieu of or in addition to rights conferred by GCC
Clause 41.3.
41.4 In this GCC Clause 41, the expression “portion of the
System executed” shall include all work executed, Services
provided, and all Information Technologies, or other Goods
acquired (or subject to a legally binding obligation to
purchase) by the Supplier and used or intended to be used for
the purpose of the System, up to and including the date of
termination.
41.5 In this GCC Clause 41, in calculating any monies due from
the Purchaser to the Supplier, account shall be taken of any
136
Section IV. General Conditions of Contract
sum previously paid by the Purchaser to the Supplier under
the Contract, including any advance payment paid pursuant
to the SCC.
42. Assignment
42.l Neither the Purchaser nor the Supplier shall, without the
express prior written consent of the other, assign to any third
party the Contract or any part thereof, or any right, benefit,
obligation, or interest therein or thereunder, except that the
Supplier shall be entitled to assign either absolutely or by
way of charge any monies due and payable to it or that may
become due and payable to it under the Contract.
137
SECTION V. SPECIAL CONDITIONS OF CONTRACT (SCC)
Notes on preparing the Special Conditions of Contract (SCC)
The SCC are analogous to the Bid Data Sheet (BDS) in that they are used to specify
in one place all the important information, deletions, changes, and additions relating to a
standard part of the Bidding Documents necessary to provide proper contractual coverage
for a particular Information System (System). In this instance, the deletions, changes, and
additions relate to the General Conditions of Contract (GCC). Users should avoid in
general, however, introducing major changes to the GCC. The standard GCC provisions
provide a balanced framework within which a System can be supplied and installed that is
fair to both the Purchaser and the successful Bidder. Major changes can upset this balance
and therefore will require the clearance of the Regional Procurement Advisor.
As for the BDS, illustrative sample text and explanatory notes are provided for each
Special Condition to assist the Purchaser in preparing more appropriate and focused SCC.
Much of the sample text may be adopted directly. The Purchaser may have to modify or
expand the suggested text, however, to accommodate the specific circumstances of the
Purchaser, the Purchaser’s Country and/or the System the Purchaser wishes to procure. In
particular, the Purchaser must ensure that the SCC clearly and completely specify:
(a)
all the Contract-specific information that the GCC explicitly state will be
specified in the SCC (e.g., governing law and language, names of the Purchaser
and the Supplier, currency(ies) of payment);
(b)
any modifications to the GCC that are required so that the Contract fits the
specific circumstances of the System (e.g., details of the operational acceptance
tests that will be carried out or the specific nature of any maintenance service
obligations that the Supplier will have to carry out);
(c)
and
any GCC clause, sub-clause that is non-applicable and should be deleted;
(d)
any additional Contract conditions called for by the specific nature of the
procurement and the risks associated with it, which are not adequately covered by
the standard GCC.
Since the SCC complete, complement, and extend the GCC, the structure of the
SCC presented here is designed to mirror that of the GCC themselves. For ease of use,
most, if not all SCC clauses should be explicitly linked to specific standard GCC clauses
and sub-clauses and be presented in the same sequence. The Purchaser should take
great care to maintain and verify the accuracy of all cross references used linking the two
sections. Also, in preparing the SCC, the Purchaser should avoid at all costs introducing
duplications and/or contradictions between the SCC and the GCC. When such
contradictions occur, the SCC prevail over the GCC, but in the process they create
ambiguity and confusion that can undermine the Purchaser’s ability to exercise its rights
under the Contract. In addition to maintaining the harmony between the SCC and the GCC,
the Purchaser should also ensure that the Technical Requirements (and the Implementation
Schedule that is part of the Technical Requirements) and the SCC remain internally
consistent.
138
Section V. Special Conditions of Contract
These SBD are written so that a single Contract can cover, if needed, all the supply
and service responsibilities potentially required throughout the life-cycle of a typical
Information System, including:
(a)
The period covering the supply, Delivery, Pre-commissioning, Installation,
Commissioning, and Operational Acceptance of the System;
(b)
The Warranty Period, following Operational Acceptance, during which the
System is in use and the Supplier remains liable for the repair of any defects that are
discovered in the System, and to provide any other Services specified in these SCC;
and
(c)
The Post-Warranty Services Period, during which the Supplier is obligated to
provide those Goods and Services that were: (i) identified in the Recurrent Cost
Sub-Table and (ii) specified in Clause 7.3 of the SCC as obligations of the Supplier.
These obligations may include, for example: providing software licenses annually,
emergency repair and other technical support, hardware and software maintenance,
etc.
To the extent that the items in the Post-Warranty Services Period can be classified
as normal recurrent operational costs of the Purchaser (as compared with one-time costs
associated with the Contract), the ability of the World Bank to finance them may be
affected, since normally such costs are the responsibility of the Borrower. Provided,
however, the World Bank has established so-called Country Financing Parameters with the
country of the Purchaser, an enlarged scope might exist for financing recurrent costs by the
World Bank in accordance with the Financing Guidelines of April 2004. In order to reduce
the administrative complexity of contracts, recurrent and other cost items not financed by
the World Bank but taken into consideration in the Evaluated Bid Price should be acquired
under separate, free-standing contract(s) between the Purchaser and the Supplier (or other
suppliers). These contracts are either self-financed or financed by other lenders. However
such costs are financed, it is in the Purchaser’s interest to carefully identify the key
recurrent cost items that are likely to be required in the Bidding Documents and invite
Bidders to quote for them in competition, because more economic prices are likely to result.
In addition to specifying these items in the Recurrent Cost Sub-Table of the Bidding
Document and incorporating them into the bid evaluation process specified in the ITB and
BDS, the Purchaser must also specify the technical and other features of these recurrent
obligations in the Technical Requirements and/or the SCC. For example, the coverage
period, the required response times, and how the maintenance services are carried out all
need to be defined.
Section V. Special Conditions of Contract
139
Table of Clauses
A. Contract and Interpretation .........................................................................................141
1.
2.
3.
4.
5.
6.
Definitions (GCC Clause 1) ....................................................................................141
Contract Documents (GCC Clause 2) .....................................................................142
Interpretation (GCC Clause 3) ................................................................................142
Notices (GCC Clause 4)..........................................................................................142
Governing Law (GCC Clause 5) .............................................................................142
Settlement of Disputes (GCC Clause 6) .................................................................143
B. Subject Matter of Contract ...........................................................................................143
7.
8.
9.
10.
Scope of the System (GCC Clause 7) .....................................................................143
Time for Commencement and Operational Acceptance (GCC Clause 8) ..............144
Supplier’s Responsibilities (GCC Clause 9) ...........................................................144
Purchaser’s Responsibilities (GCC Clause 10).......................................................145
C. Payment...........................................................................................................................145
11.
12.
13.
14.
Contract Price (GCC Clause 11) .............................................................................145
Terms of Payment (GCC Clause 12) ......................................................................145
Securities (GCC Clause 13) ....................................................................................147
Taxes and Duties (GCC Clause 14) ........................................................................148
D. Intellectual Property ......................................................................................................148
15.
16.
17.
Copyright (GCC Clause 15) ....................................................................................148
Software License Agreements (GCC Clause 16) ....................................................148
Confidential Information (GCC Clause 17) ............................................................149
E. Supply, Installation, Testing, Commissioning, and Acceptance of the System ........149
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
Representatives (GCC Clause 18) ..........................................................................149
Project Plan (GCC Clause 19) ................................................................................150
Subcontracting (GCC Clause 20)............................................................................151
Design and Engineering (GCC Clause 21) .............................................................152
Procurement, Delivery, and Transport (GCC Clause 22) .......................................152
Product Upgrades (GCC Clause 23) .......................................................................152
Implementation, Installation, and Other Services (GCC Clause 24) ......................152
Inspections and Tests (GCC Clause 25) .................................................................153
Installation of the System (GCC Clause 26) ...........................................................153
Commissioning and Operational Acceptance (GCC Clause 27) ............................153
F. Guarantees and Liabilities .............................................................................................153
28.
29.
30.
31.
32.
Operational Acceptance Time Guarantee (GCC Clause 28)...................................153
Defect Liability (GCC Clause 29)...........................................................................153
Functional Guarantees (GCC Clause 30) ................................................................154
Intellectual Property Rights Warranty (GCC Clause 31) ........................................154
Intellectual Property Rights Indemnity (GCC Clause 32).......................................154
140
Section V. Special Conditions of Contract
33.
Limitation of Liability (GCC Clause 33) ................................................................154
G. Risk Distribution ............................................................................................................154
34.
35.
36.
37.
38.
Transfer of Ownership (GCC Clause 34) ...............................................................154
Care of the System (GCC Clause 35) .....................................................................155
Loss of or Damage to Property; Accident or Injury to Workers; Indemnification
(GCC Clause 36) .....................................................................................................155
Insurances (GCC Clause 37) ...................................................................................155
Force Majeure (GCC Clause 38) ............................................................................155
H. Change in Contract Elements .......................................................................................156
39.
40.
41.
42.
Changes to the System (GCC Clause 39) ...............................................................156
Extension of Time for Achieving Operational Acceptance (GCC Clause 40) .......157
Termination (GCC Clause 41) ................................................................................157
Assignment (GCC Clause 42) .................................................................................157
Section V. Special Conditions of Contract
141
Special Conditions of Contract
The following Special Conditions of Contract (SCC) shall supplement or amend the General
Conditions of Contract (GCC). Whenever there is a conflict, the provisions of the SCC shall
prevail over those in the General Conditions of Contract. For the purposes of clarity, any
referenced GCC clause numbers are indicated in the left column of the SCC.
A. CONTRACT AND INTERPRETATION
1.
Definitions (GCC Clause 1)
GCC 1.1 (a) (ix)
The applicable edition of the Procurement Guidelines is dated:
Procurement under IBRD Loans and IDA Credits: May 2004
and Revised in October 2006 (“Procurement Guidelines”).
GCC 1.1 (b) (i)
The Purchaser is: Finance Division, Ministry of Finance represented by
the Project Director, Deepening Medium Term Budget
Framework (DMTBF) and Strengthening Financial
Accountability Project (Project-A) under Strengthening Public
Expenditure Management Program.
GCC 1.1 (b) (ii)
The Project Manager is: Mr. Ataur Rahman, Deputy Project Director.
GCC 1.1 (e) (i)
The Purchaser’s Country is: Bangladesh.
GCC 1.1 (e) (iii)
The Project Site(s) are: Finance Division, Ministry of Finance,
Bangladesh Secretariat, Dhaka and Office of the Controller
General of Accounts, Dhaka.
GCC 1.1 (e) (x)
The Contract shall continue in force until the Information System and
all the Services have been provided unless the Contract is
terminated earlier in accordance with the terms set out in the
Contract.
GCC 1.1. (e) (xii) The Post-Warranty Services Period is: twenty four (24) months starting
with the completion of the Warranty Period.
The bidders shall provide separate pricing for Post-Warranty Services
as mentioned in the technical specification as a mandatory
requirement. Post-Warranty Services price will not be
considered in the evaluation process. The Purchaser may elect
142
Section V. Special Conditions of Contract
to take Post-Warranty Services from the successful bidder or
from any other bidder or may not take post-warranty service at
all.
2.
GCC 2
Contract Documents (GCC Clause 2)
There are no Special Conditions of Contract applicable to GCC Clause
2.
3.
GCC 3.1.1
Interpretation (GCC Clause 3)
The Contract's governing language is: English.
4.
GCC 4.3
Notices (GCC Clause 4)
Address of the Project Manager:
Deepening Medium Term Budget Framework and Strengthening
Financial Accountability Project (Project-A) Office
UCEP Cheyne Tower (2nd floor)
25 Segunbagicha, Dhaka 1000
Telephone No. 8391131-3, Fax No. 8391136
e-mail: ekramahmed1458@ gmail.com Bangladesh
Fallback address of the Purchaser:
Deepening Medium Term Budget Framework and Strengthening
Financial Accountability Project (Project-A) Office
UCEP Cheyne Tower (2nd floor)
25 Segunbagicha, Dhaka 1000
Bangladesh
Telephone No. 8391131-3, Fax No. 8391136
e-mail: ekramahmed1458@ gmail.com
5.
GCC 5.1
Governing Law (GCC Clause 5)
The Contract shall be interpreted in accordance with the laws of:
Bangladesh.
Section V. Special Conditions of Contract
6.
GCC 6.1.4
143
Settlement of Disputes (GCC Clause 6)
The Appointing Authority for the Adjudicator is:
(a) If the Supplier is foreign (including a Joint Venture when at least
one partner is foreign): International Chamber of Commerce
(b) If the Supplier is local: President of the Institution of Engineers
in consultation with the Executive Director of the Bangladesh
Computer Council.
If the Supplier is foreign (including a Joint Venture when at least one
partner is foreign), the Contract shall contain the following
provision:
Arbitration proceedings shall be conducted in
accordance with the rules of arbitration of: the International
Chamber of Commerce (ICC). These rules, in the version in
force at the time of the request for arbitration, will be deemed to
form part of this Contract.
If the Supplier is a national of the Purchaser's country, the Contract
shall contain the following provision: Any dispute between the
Purchaser and a Supplier arising in connection with the present
Contract shall be referred to arbitration in accordance with the
laws of the Purchaser’s country that is The Arbitration Act (Act
No. 1 of 2001) of Bangladesh.
B. SUBJECT MATTER OF CONTRACT
7.
GCC 7.3
Scope of the System (GCC Clause 7)
The Supplier’s obligations under the Contract will include the following
recurrent cost items, as identified in the Recurrent Cost tables in
the Supplier’s Bid:
the recurrent cost items/services that are included in the
Contract; also provide cross reference to the place in the
Technical Requirements where each item/service is specified in
detail.
The Supplier agrees to supply spare parts required for the operation and
maintenance of the System, as stated below, for the: three (3)
years beginning with Operational Acceptance. Moreover, the
144
Section V. Special Conditions of Contract
price of such spare parts shall be those specified in the spare parts
price schedule submitted by the Suppler as part of its bid. These
prices shall include the purchase price for such spare parts and
other costs and expenses (including the Supplier’s fees) relating
to the supply of spare parts.
8.
Time for Commencement and Operational Acceptance (GCC Clause 8)
GCC 8.1
The Supplier shall commence work on the System within: seven (7) days
from the Effective Date of the Contract.
GCC 8.2
Operational Acceptance will occur on or before: Operational Acceptance
date consistent with the Implementation Schedule in the
Technical Requirements Section.
9.
GCC 9.9
Supplier’s Responsibilities (GCC Clause 9)
The Supplier shall have the following additional responsibilities:
1. To provide a project manager
2. To provide a person as focal point.
3. To deliver ready stock & spare parts at customer premises.
4. Supplier shall provide and employ only technical personnel who
are skilled and experienced in their respective callings and
supervisory staff who are competent to adequately supervise the
work at hand.
5. The Supplier shall be responsible for timely provision of all
resources, information, and decision making under its control
that are necessary to reach a mutually Agreed and Finalized
Project Plan
6. Laptop with Console cable
7. Tools Box
Section V. Special Conditions of Contract
145
8. Crimpers for patch cord and Tester for UTP cables checkup.
9. Fiber splicer
10. Necessary fiber cables and UTP cables
11. Suitable vehicles for transporting server equipments
12. Ladder to use at Data Centers
13. RMS digital meter
14. Earthling meter to checkup grounding
15. Trolley for transporting related equipments
16. Fork lifter to handle heavy weight server/rack.
10.
GCC 10.12
Purchaser’s Responsibilities (GCC Clause 10)
The Purchaser shall have the following additional responsibilities: none.
C. PAYMENT
11.
GCC 11.2 (b)
Adjustments to the Contract Price shall be as follows: none
12.
GCC 12.1
Contract Price (GCC Clause 11)
Terms of Payment (GCC Clause 12)
Subject to the provisions of GCC Clause 12 (Terms of Payment), the
Purchaser shall pay the Contract Price to the Supplier according
to the categories and in the manner specified below. Only the
categories Advance Payment and Complete System Integration
relate to the entire Contract Price. In other payment categories,
the term "total Contract Price" means the total cost of goods or
services under the specific payment category. Within each such
category, the Contract Implementation Schedule may trigger pro-
146
Section V. Special Conditions of Contract
rata payments for the portion of the total Contract Price for the
category corresponding to the goods or services actually
Delivered, Installed, or Operationally Accepted, at unit prices
and in the currencies specified in the Price Schedules of the
Contract Agreement.
(a)
Advance Payment
Not Applicable
(b)
Information Technologies, Materials, and other Goods, with the
exception of Custom Software and Custom Materials:
sixty percent (60%) of the total or pro-rata Contract Price for this
category against Delivery
ten percent (10%) of the same price against Installation
ten percent (10%) of the same price against Operational
Acceptance.
(c)
Custom Software and Custom Materials:
sixty percent (60%) of the total or pro-rata Contract Price for this
category against Installation
twenty percent (20%) of the same price against Operational
Acceptance.
(d)
Services other than Training:
eighty percent (80%) of the pro-rata Contract Price for services
performed will be paid monthly in arrears, on submission and
Purchaser’s approval of invoices.
(e)
Training
thirty percent (30%) of the total Contract Price for training
services at the start of the full training program
fifty percent (50%) of the pro-rata Contract Price for training
services performed will be paid monthly in arrears, on
submission and approval of appropriate invoices.
(f)
Complete System Integration
twenty percent (20%) of the entire Contract Price, exclusive of
all Recurrent Costs, as final payment against Operational
Acceptance of the System as an integrated whole.
Section V. Special Conditions of Contract
(g)
147
Recurrent Costs
one hundred percent (100%) of the price of the services actually
delivered will be paid monthly in arrears, on submission and
Purchaser’s approval of invoices.
GCC 12.3
The Purchaser shall pay to the Supplier interest on the delayed payments
at a rate of: LIBOR +2% for foreign currency and Bangladesh Bank
Short Term (90 days) Treasury Bill Auction rate +2% for local
currency per annum.
GCC 12.4
For Goods and Services supplied locally, the Purchaser will pay the
Supplier in: Bangladesh Taka.
GCC 12.5
Payment for Goods supplied from outside the Purchaser’s Country shall
be in the form of: an irrevocable letter of credit.
13.
Securities (GCC Clause 13)
GCC 13.2.1
The Supplier shall provide within twenty-eight (28) days of the
notification of Contract award an Advance Payment Security in
the amount and currency of the Advance Payment specified in
SCC for GCC Clause 12.1 above. Not Applicable
GCC 13.2.2
The reduction in value and expiration of the Advance Payment Security
are calculated as follows: Not Applicable
GCC 13.3.1
The Performance Security shall be denominated in the currency or
currencies of the contract for an amount equal to: ten (10)
percent of the Contract Price, excluding any Recurrent Costs.
GCC 13.3.4
During the Warranty Period (i.e., after Operational Acceptance of the
System), the Performance Security shall be reduced to: five (5)
percent of the Contract Price, excluding any Recurrent Costs.
148
Section V. Special Conditions of Contract
14.
GCC 14
Taxes and Duties (GCC Clause 14)
There are no Special Conditions of Contract applicable to GCC Clause
14.
D. INTELLECTUAL PROPERTY
15.
Copyright (GCC Clause 15)
GCC 15.3
The Purchaser may assign, license, or otherwise voluntarily transfer its
contractual rights to use the Standard Software or elements of the
Standard Software, without the Supplier’s prior written consent,
under the following circumstances: none.
GCC 15.4
The Purchaser’s and Supplier’s rights and obligations with respect to
Custom Software or elements of the Custom Software are as
follows: not applicable.
The Purchaser’s and Supplier’s rights and obligations with respect to
Custom Materials or elements of the Custom Materials are as
follows: not applicable
GCC 15.5
No software escrow contract is required for the execution of the
Contract
16.
GCC 16.1 (a)
(iii)
Software License Agreements (GCC Clause 16)
The Standard Software license shall be valid: throughout the territory of
the Purchaser’s Country.
GCC 16.1 (a) (iv) Use of the software shall be subject to the following additional
restrictions: none.
GCC 16.1 (b) (ii) The Software license shall permit the Software to be used or copied for
use or transferred to a replacement computer: provided the
replacement computer falls within approximately the same class
of machine and maintains approximately the same number of
users, if a multi-user machine.
Section V. Special Conditions of Contract
149
GCC 16.1 (b)
(vi)
The Software license shall permit the Software to be disclosed to and
reproduced for use (including a valid sublicense) by: other
necessary and appropriate support entities and terms, subject to
the same restrictions set forth in this Contract.
GCC 16.1 (b)
(vii)
In addition to the persons specified in GCC Clause 16.1 (b) (vi), the
Software may be disclosed to, and reproduced for use by
Purchaser’s authorized staff subject to the same restrictions as
are set forth in this Contract.
GCC 16.2
The Supplier’s right to audit the Standard Software will be subject to the
following terms: none
17.
Confidential Information (GCC Clause 17)
GCC 17.1
There are no modifications to the confidentiality terms expressed in
GCC Clause 17.1.
GCC 17.7
The provisions of this GCC Clause 17 shall survive the termination, for
whatever reason, of the Contract for: the period specified in the
GCC.
E. SUPPLY, INSTALLATION, TESTING, COMMISSIONING, AND
ACCEPTANCE OF THE SYSTEM
18.
Representatives (GCC Clause 18)
GCC 18.1
The Purchaser’s Project Manager shall have the following additional
powers and / or limitations to his or her authority to represent the
Purchaser in matters relating to the Contract no additional powers
or limitations.
GCC 18.2.2
The Supplier’s Representative shall have the following additional
powers and / or limitations to his or her authority to represent the
Supplier in matters relating to the Contract no additional powers
or limitations.
150
Section V. Special Conditions of Contract
19.
GCC 19.1
Project Plan (GCC Clause 19)
Chapters in the Project Plan shall address the following subject:
(a)
Project Organization and Management Plan
(b)
Delivery and Installation Plan
(c)
Training Plan
(d)
Pre-commissioning and Operational Acceptance Testing
Plan
(e)
Warranty Service Plan
(f)
Task, Time, and Resource Schedules
(g)
Post-Warranty Service Plan (if applicable)
(h)
Technical Support Plan (if applicable)
(i)
Other relevant issues
Further details regarding the required contents of each of the
above chapters are contained in the Technical Requirements,
Section VI.
GCC 19.2
Within thirty (30) days from the Effective Date of the Contract, the
Supplier shall present a Project Plan to the Purchaser. The
Purchaser shall, within fourteen (14) days of receipt of the
Project Plan, notify the Supplier of any respects in which it
considers that the Project Plan does not adequately ensure that the
proposed program of work, proposed methods, and/or proposed
Information Technologies will satisfy the Technical Requirements
and/or the SCC (in this Clause 19.2 called “non-conformities”
below). The Supplier shall, within five (5) days of receipt of such
notification, correct the Project Plan and resubmit to the
Purchaser.
The Purchaser shall, within five (5) days of
resubmission of the Project Plan, notify the Supplier of any
remaining non-conformities. This procedure shall be repeated as
necessary until the Project Plan is free from non-conformities.
When the Project Plan is free from non-conformities, the
Purchaser shall provide confirmation in writing to the Supplier.
This approved Project Plan (“the Agreed and Finalized Project
Plan”) shall be contractually binding on the Purchaser and the
Supplier.
GCC 19.5
The Supplier shall submit to the Purchaser the following reports:
(a)
Monthly (Quarterly) progress reports, summarizing:
Section V. Special Conditions of Contract
151
(i)
results accomplished during the prior period;
(ii)
cumulative deviations to date from schedule of
progress milestones as specified in the Agreed and
Finalized Project Plan;
(iii) corrective actions to be taken to return to planned
schedule of progress; proposed revisions to planned
schedule;
(iv) other issues and outstanding problems; proposed
actions to be taken;
(v)
resources that the Supplier expects to be provided by
the Purchaser and/or actions to be taken by the
Purchaser in the next reporting period;
(vi) other issues or potential problems the Supplier
foresees that could impact on project progress
and/or effectiveness.
GCC 20
(b)
monthly log of service calls and problem resolution
20.
Subcontracting (GCC Clause 20)
There are no Special Conditions of Contract applicable to GCC Clause
20.
152
Section V. Special Conditions of Contract
21.
Design and Engineering (GCC Clause 21)
GCC 21.2
The Contract shall be executed in accordance with the edition or the
revised version of all referenced codes and standards current at
the date as specified in the GCC.
GCC 21.3.1
The Supplier shall prepare and furnish to the Project Manager the
following documents for which the Supplier must obtain the
Project Manager’s approval before proceeding with work on the
System or any Subsystem covered by the documents.
(a)
detailed site surveys;
(b)
detailed IP Network of servers, fabric switches, and
servers design;
(c) cable layout design between servers and racks
(d)
cable layout design between fabric switches and racks
(e) cable layout design between load balancers and racks
22.
Procurement, Delivery, and Transport (GCC Clause 22)
GCC 22.4.3
The Supplier shall be free to use transportation through carriers
registered in any eligible country and shall obtain insurance from
any eligible source country.
GCC 22.5
The Supplier shall provide the Purchaser with shipping and other
documents as specified in the GCC.
23.
GCC 23.4
24.
GCC 24
Product Upgrades (GCC Clause 23)
The Supplier shall provide the Purchaser: with all new versions, releases,
and updates to all Standard Software during the Warranty
Period, for free, as specified in the GCC.
Implementation, Installation, and Other Services (GCC Clause 24)
There are no Special Conditions of Contract applicable to GCC Clause
24.
Section V. Special Conditions of Contract
25.
153
Inspections and Tests (GCC Clause 25)
There are no Special Conditions of Contract applicable to GCC Clause
25.
GCC 25
26.
Installation of the System (GCC Clause 26)
There are no Special Conditions of Contract applicable to GCC Clause
26.
GCC 26
27.
Commissioning and Operational Acceptance (GCC Clause 27)
GCC 27.2.1
Operational Acceptance Testing shall be conducted in accordance with
System or the Subsystems, the tests, the test procedures, and the
required results for acceptance.
GCC 27.2.2
If the Operational Acceptance Test of the System, or Subsystem(s),
cannot be successfully completed within no more than one
hundred and forty (140) days from the date of Installation or any
other period agreed upon by the Purchaser and the Supplier, then
GCC Clause 27.3.5 (a) or (b) shall apply, as the circumstances
may dictate.
F. GUARANTEES AND LIABILITIES
28.
Operational Acceptance Time Guarantee (GCC Clause 28)
GCC 28.2
Liquidated damages shall be assessed at one half of one (0.5%) percent
per week. The maximum liquidated damages are ten (10%)
percent of the Contract Price, or relevant part of the Contract
Price if the liquidated damages apply to a Subsystem.
GCC 28.3
Liquidated damages shall be assessed only with respect to achieving
Operational Acceptance.
29.
Defect Liability (GCC Clause 29)
GCC 29.1
For Software, exceptions or limitations to the Supplier’s warranty
obligations shall be as follows: None.
GCC 29.3 (iii)
The Supplier warrants that the following items have been released to the
market for the following specific minimum time periods: No specific
154
Section V. Special Conditions of Contract
minimum time requirements are established for this Contract other
than that the Information Technologies must have been previously
released to the market.
GCC 29.4
The Warranty Period (N) shall begin from the date of Operational
Acceptance of the System or Subsystem and extend for: thirty
(36) months.
GCC 29.10
During the Warranty Period, the Supplier must commence the work
necessary to remedy defects or damage within the time mentioned
in the Service Level Agreement (SLA) upon notification.
30.
There are no Special Conditions of Contract applicable to GCC Clause
30.
GCC 30
31.
Intellectual Property Rights Warranty (GCC Clause 31)
There are no Special Conditions of Contract applicable to GCC Clause
31.
GCC 31
32.
GCC 32
Intellectual Property Rights Indemnity (GCC Clause 32)
There are no Special Conditions of Contract applicable to GCC Clause
32.
33.
GCC 33
Functional Guarantees (GCC Clause 30)
Limitation of Liability (GCC Clause 33)
There are no Special Conditions of Contract applicable to GCC
Clause 33.
G. RISK DISTRIBUTION
34.
GCC 34
Transfer of Ownership (GCC Clause 34)
There are no Special Conditions of Contract applicable to GCC Clause
34.
Section V. Special Conditions of Contract
35.
GCC 35
36.
155
Care of the System (GCC Clause 35)
There are no Special Conditions of Contract applicable to GCC Clause
35.
Loss of or Damage to Property; Accident or Injury to Workers; Indemnification
(GCC Clause 36)
GCC 36
There are no Special Conditions of Contract applicable to GCC Clause
36.
37.
Insurances (GCC Clause 37)
GCC 37.1 (c)
The Supplier shall obtain Third-Party Liability Insurance in the amount
of Bangladesh Taka three million (BDT 3,000,000) with
deductible limits of no more than Bangladesh Taka one
hundred thousand (BDT 100,000). The insured Parties shall be
the supplier and the purchaser. The Insurance shall cover the
period from beginning date, relative to the Effective Date of the
Contract until expiration date, relative to the Effective Date of
the Contract or its completion.
GCC 37.1 (e)
The Supplier shall obtain Worker’s Compensation Insurance in
accordance with the statutory requirements of Bangladesh.
Specifically: Bangladesh Taka two million (BDT 2,000,000).
The Insurance shall cover the period from beginning date,
relative to the Effective Date of the Contract until expiration
date, relative to the Effective Date of the Contract or its
completion.
The Supplier shall obtain Employer’s Liability Insurance in
accordance with the statutory requirements of Bangladesh. The
Insurance shall cover the period from beginning date, relative to
the Effective Date of the Contract expiration date, relative to
the Effective Date of Contract or its completion.
38.
GCC 38
Force Majeure (GCC Clause 38)
There are no Special Conditions of Contract applicable to GCC Clause
38.
156
Section V. Special Conditions of Contract
H. CHANGE IN CONTRACT ELEMENTS
39.
GCC 39
Changes to the System (GCC Clause 39)
There are no Special Conditions of Contract applicable to GCC Clause
39.
Section V. Special Conditions of Contract
40.
GCC 40
Extension of Time for Achieving Operational Acceptance (GCC Clause 40)
There are no Special Conditions of Contract applicable to GCC Clause
40.
41.
GCC 41
Termination (GCC Clause 41)
There are no Special Conditions of Contract applicable to GCC
Clause 41.
42.
GCC 42
157
Assignment (GCC Clause 42)
There are no Special Conditions of Contract applicable to GCC
Clause 42.
Section V1. Technical Requirements
SECTION VI. TECHNICAL REQUIREMENTS (INCLUDING
IMPLEMENTATION SCHEDULE)
157
Section V1. Technical Requirements
158
Contents
Section VI. Technical Requirements (including Implementation Schedule) .................157
Servers Infrastructure and Windows solution ..................................................................161
Background ..........................................................................................................................162
1.
2.
3.
4.
The Purchaser..........................................................................................................162
Business Objectives of the Purchaser .....................................................................162
Scope of the Procurement .......................................................................................163
Acronyms Used in These Technical Requirements ................................................163
Existing Scenario..................................................................................................................165
5.
6.
Introduction .............................................................................................................165
Current Systems ......................................................................................................165
Overview ...............................................................................................................................167
7.
8.
Developmental Analysis .........................................................................................167
General Summary of Requirement..........................................................................173
LOT-A Database Servers ....................................................................................................176
9.
10.
11.
12.
General Requirements:............................................................................................176
Technical Qualification criteria ..............................................................................177
DATABASE INFRASTRUCTURE SOLUTION (OPTION – 1 OR OPTION – 2)
.................................................................................................................................178
OPTION – 1 ............................................................................................................178
12.1.
12.2.
12.3.
12.4.
12.5.
12.5.1.
12.5.2.
12.5.3.
12.6.
12.7.
12.8.
12.9.
12.10.
13.
OPTION – 2 .............................................................. Error! Bookmark not defined.
13.1.
13.2.
13.3.
13.4.
13.4.1.
13.4.2.
13.4.3.
13.5.
13.6.
13.7.
13.8.
13.9.
14.
Database Machine for Production Data Centre (DC) ................................................................ 178
Database Machine for Disaster Data Center (DR) .................................................................... 181
Additional Database Machine for Production Data Centre (For DC if required) ..................... 184
RDBMS Specification for DC & DR : ......................................................................................... 187
Summary of Hardware and Software License............................................................................. 194
Database Machine at DC ....................................................................................................... 194
Database Machine at DR ....................................................................................................... 194
Additional Database Machine at DC (If Required) ............................................................... 195
Management Servers (1 unit at DC and 1 unit at DR)................................................................ 195
Backup/Media Servers (1 unit at DC and 1 unit at DR) ............................................................. 196
Backup Storage Appliance (1 unit at DC) .................................................................................. 198
Backup Storage Appliance: (1 unit at DR) ................................................................................ 201
Training and Training Material ............................................................................................. 204
Number of Core Analysis for option-2 DB Machines: ................................................................ 205
Database Servers for Production site [1 unit cluster solution at DC] ....................................... 206
Database Server for Disaster recovery site [ 1 Unit at DR ]...................................................... 209
RDBMS Specification for DC & DR : ......................................................................................... 212
Summary of Hardware and Software License ........................................................................ 218
Database Machine hardware & software at DC .................................................................... 219
Database Machine at DR ....................................................................................................... 220
Management Servers (1 unit at DC and 1 unit at DR)................................................................ 220
Backup/Media Servers (1 unit at DC and 1 unit at DR) ............................................................. 221
Backup Storage Appliance (1 unit at DC) .................................................................................. 222
Backup Storage Appliance: (1 unit at DR) ................................................................................ 226
Training and Training Material ................................................................................................. 229
Resource Allocation ................................................................................................229
Section V1. Technical Requirements
159
LOT-B Application Servers ..............................................................................................231
15.
16.
17.
18.
19.
General Requirements:............................................................................................231
Technical Qualification criteria ..............................................................................231
SCOPE OF WORK .................................................................................................233
Resource Allocation ................................................................................................233
Documentation Requirements .................................................................................234
19.1.
19.2.
20.
END-User documents: ................................................................................................................ 234
Technical Documents: ................................................................................................................ 234
Production Datacentre (At Secretariat) ...................................................................235
20.1.
20.2.
20.3.
20.4.
20.5.
20.6.
20.7.
20.8.
20.9.
20.10.
20.11.
20.12.
20.13.
20.14.
21.
Application server (4 Unit for DC) ............................................................................................. 235
Report Server (1 Unit for DC) .................................................................................................... 236
Test and Development (1 Unit for DC) ....................................................................................... 238
Data Centre Management Server (1 Unit for DC)...................................................................... 240
Primary Domain Controller (1 Unit for DC) .............................................................................. 241
Additional Domain Controller (1 Unit for DC) .......................................................................... 243
Patch Management Server: (1 Unit for DC) ............................................................................... 245
Mail Server: (1 Unit for DC) ...................................................................................................... 246
Backup Tape System: ( 1 Unit for DC) ....................................................................................... 248
Blade Chassis for DC (if blade solution) ............................................................................... 249
InfiniBand switch: ( 1 Unit for DC) ....................................................................................... 250
SAN Switches Extended ( At DC) ........................................................................................... 251
Load Balancer & Application Delivery Controllers (1 Unit for DC)..................................... 252
Power Strip (5 Units at DC)................................................................................................... 256
Disaster Recovery Datacentre ( At CGA) ...............................................................256
21.1.
21.2.
21.3.
21.4.
21.5.
21.6.
21.7.
21.8.
21.9.
Application Server (4 Unit for DR) ............................................................................................. 256
Report Server (1 Unit for DR) .................................................................................................... 258
Additional Domain Controller (1 Unit for DR) .......................................................................... 260
Mail Server(1 Unit for DR) ......................................................................................................... 262
Test and Development (1 Unit for DR) ....................................................................................... 263
Data Centre Management Server (1 Unit for DR) ...................................................................... 265
InfiniBand switch (1 Unit for DR) .............................................................................................. 266
Blade Chassis for DR (if blade solution) .................................................................................... 267
Load Balancer & Application Delivery Controllers (1 Unit for DR).......................................... 268
LOAD BALANCER planning. .............................................................................................................................. 273
21.10.
22.
Power Strip (5 Units at DR) ................................................................................................... 276
Microsoft Enterprise Agreement for Windows Licenses including Software
Assurance ................................................................................................................276
22.1.
22.2.
23.
24.
Windows Software Licenses requirement calculation ................................................................. 278
Windows Licenses including Software Assurance ...................................................................... 278
Disaster Recovery Solution for Application server (Hyper-V). ..............................279
Training on Microsoft Solution. .............................................................................281
24.1.
Local Training: ........................................................................................................................... 282
24.1.1.
24.1.2.
24.2.
System Center Configuration Manager (SCCM) .............................................................................. 282
System Center Operations Manager (SCOM) ................................................................................... 289
Foreign Training: ....................................................................................................................... 293
System Center Virtual Machine Manager (SCVMM) ............................................................................................ 293
Configuring and Deploying a Private Cloud with System Center 2012: ................................................................ 296
25.
25.1.
26.
26.1.
26.2.
26.3.
Microsoft Premier Support: ....................................................................................302
Details of Microsoft Services Premier Support .......................................................................... 302
Implementation service for Installation and commissioning: .................................304
Microsoft Exchange Solution (DC & DR): ................................................................................. 305
Unified Communication Solution with Microsoft Lync Server (DC & DR) ................................ 310
System Management Solution with Microsoft System Center ..................................................... 318
Service Level Agreement for Lot-A and Lot-B .................................................................329
1.
Introduction .............................................................................................................331
Section V1. Technical Requirements
1.1
1.2
1.3
1.4
1.5
2.
3.
4.
5.
6.
7.
8.
9.
160
Formal Definition of this Document .......................................................................331
Readership...............................................................................................................331
Applicable and Reference Documents ....................................................................331
Period of validity.....................................................................................................331
Changes to the Service ............................................................................................331
Delivery Requirements ...........................................................................................331
SERVICE REQUIREMENTS ................................................................................332
SUPPORT REQUIREMENTS ...............................................................................332
SECURITY REQUIREMENTS .............................................................................337
MONITORING REQUIREMENTS .......................................................................338
REPORTING REQUIREMENTS ..........................................................................338
DISPUTE RESOLUTION ......................................................................................338
GLOSSARY OF DEFINITIONS ............................................................................339
AGREEMENT .....................................................................................................................340
Appendix-A .........................................................................................................................341
APPENDIX B .......................................................................................................................341
Scope of Agreement .............................................................................................................342
Services and Requests Covered Under This Agreement ..................................................342
NAME AND DESCRIPTION OF PRIMARY SERVICE. .................................................................................... 342
DESCRIPTION OF MAINTENANCE PROGRAM. ............................................................................................ 342
DESCRIPTION OF MONITORING SERVICE.................................................................................................... 342
1.
Technical Support: ...............................................................................................345
2.
CHANGES TO SERVICE LEVEL AGREEMENT (SLA) ................................346
3.
PROCESSES AND PROCEDURES RELATING TO THIS AGREEMENT 347
4.
METRICS...............................................................................................................348
Section V1. Technical Requirements
161
SERVERS INFRASTRUCTURE AND WINDOWS SOLUTION
This document provides information to be procured to use in Finance Division to understand
the Infrastructure standard requirement.
Section V1. Technical Requirements
162
BACKGROUND
1. The Purchaser
1.1.1.
The Purchaser is the Finance Division under the Ministry of Finance, Government
of Bangladesh a sovereign Republic, member of the United Nations and the World
Bank. Deepening Medium-Term Budget Framework and Strengthening Financial
Accountability Project (DMTBF Project) is one of the three constituent projects under
umbrella program “Strengthening of Public Expenditure Management Program” or
SPEMP. The project aims to deepen and institutionalize the MTBF and build a more
strategic and performance oriented budget management process, while strengthening
financial accountability across the expenditure management cycle.
1.1.2.
The project supports fundamental reforms of operational budget management
functions in both central units and line ministries. Enhanced budget process and
financial accountability is likely to improve the allocate and operational efficiency in
public expenditure management which in turn will enable better provision of key
public services in support of the Government’s social and economic policy objectives.
The objectives of the Project are as follows:
1.1.3.
1.1.4.
•
Modernize long term strategic planning and policy development
•
Institutionalize and deepen the MTBF approach
•
Improve budget classification for more effective budget management
•
Effective Public Debt Management
•
Improve the linkages between procurement, planning and budgeting
•
Integrated budgeting, accounting, and monitoring functions at the LM level
•
Consolidation of IBAS towards a modern integrated budget and accounting
system
Policy and overall coordination of the project rests on the Project Management and
Coordination Unit (PMCU) headed by the Project Director. The overall
implementation responsibilities of the project are entrusted on the Project Director. He
is being assisted by the management consultancy firm named PDP Australia Pty Ltd
and other Consultants recruited by the PMCU.
Procurement aspect against this project will be handled by the Tender Evaluation
Committee (TEC) at the Finance Division. The TEC will be assisted by the Technical
Sub-Committee. The Contract shall be awarded after obtaining approval of the
Ministry of Finance.
2. Business Objectives of the Purchaser
2.1. For improving the efficiency and effectiveness of public financial management
service delivery the Finance Division of the Ministry of Finance has been
implementing a project named Deepening MTBF and Strengthening Financial
Accountability Project. As a key factor in the delivery of the goal, an integrated
Section V1. Technical Requirements
163
Budget and Accounting System (iBAS) is operational at the main budget and
accounting centers of the Ministry of Finance (MoF). A Data Center (DC) at
Bangladesh Secretariat and Disaster Recovery Site (DRS) at CGA office support the
operation of the iBAS system. The goal of automation is to increase the effectiveness
of the user and enable the user to produce more effective communications for the
completion of their assigned tasks.
2.2. The acquisition of Servers, LAN, WAN, Internet and related services will contribute
to the existing automation process. These will support the day to day objectives and
procedures of iBAS. It will provide the Purchaser personnel the tools, infrastructure
and training to become skilled in the use of iBAS to automate the processes of
financial management.
2.3. The introduction of latest technology will start to enable the purchaser to build
technology skills that will enable the user to perform their work in a more effective
and efficient manner. The responsibilities of the affected personnel will not change;
however, the manner of working will be based on current automated practices.
3. Scope of the Procurement
The main objective of these packages is to purchase servers systems and its maintenance support
service to ensure smooth operation of iBAS system on which Budgeting, Accounting, Enterprise
Resource Planning, Data Warehouse, etc and Office Automation application will run smoothly at
Internet and Intranet to give support Upazilla, DDU. CAO’s, DAO’s, MTBF’s and DCA’s. There are
numerous Local Area Network (LAN) and Wide Area Network (WAN) in 36 MTBF’s, all CAOs, all DCAs,
and all DAOs. Primary Data Centre located in the Finance Division (Data Center) and the Disaster
Recovery Site (DRS) located at the Comptroller General of Accounts building at Segunbagicha, Dhaka
are directly connected with fibre optic cable backbone to which listed servers will run. Data will be
synchronously backed up (online real time) at the DRS so that in the event of a disaster the operation
can be continued from the DRS in the shortest possible time without any loss of data. Double-Take
Backup and Restore Management Software are in place for the existing systems (M.S exchange and
DB).
4. Acronyms Used in These Technical Requirements
Term
Bps
Cps
CGA
DBMS
DOS
Dpi
DC
DRS
Ethernet
FD
GB
Hz
Explanation
bits per second
characters per second
Controller General of Accounts
Database Management System
Disk Operating System
dots per inch
Datacentre
Disaster Recovery Site
IEEE 802.3 Standard LAN protocol
Finance Division
Gigabyte
Hertz (cycles per second)
Section V1. Technical Requirements
Term
HA
IEEE
ISO
KB
kVA
LAN
lpi
lpm
MB
MTBF
NIC
NOS
ODBC
OLE
OS
PCL
ppm
PS
RAID
RAM
RISC
SCSI
SNMP
SLA
SQL
TCP/IP
V
Explanation
High Availability
Institute of Electrical and Electronics Engineers
International Standards Organization
Kilobyte
Kilovolt ampere
Local area network
lines per inch
lines per minute
Megabyte
Mean time between failures
Network interface card
Network operating system
Open Database Connectivity
Object Linking and Embedding
Operating system
Printer Command Language
pages per minute
PostScript -- Adobe page description language
Redundant array of inexpensive disks
Random access memory
Reduced instruction-set computer
Small Computer System Interface
Simple Network Management Protocol
Service Level Agreement
Structured Query Language
Transmission Control Protocol / Internet Protocol
Volt
164
Section V1. Technical Requirements
165
EXISTING SCENARIO
5. Introduction
The current Ministry of Finance iBAS system is being redeveloped and enhanced to provide a
quality Financial Management System for the Government of Bangladesh under the DMTBF
project.
An important aspect of the project is to provide upgraded network, hardware and software to
support the enhanced system. Much of the current equipment and software is 7 years old and
more, and has never been upgraded. The servers are now reaching the end of their useful life.
The risk of hardware failure increases exponentially in relation to the age of the hardware,
and there is also the possibility that expansion of systems and users will render the servers
incapable of handling the load. Because a primary aim of the project is to centralize the
Financial Management systems and allow access from across the nation to one system, it is
vital that the correct level of support systems is in place to cope with the increased demand.
Technology has made significant advances over the past 7 years, and it is proposed to make
the best use of current technologies to reduce the overall hardware footprint, and also reduce
power consumption and heat output, thus effecting savings to the environmental costs of
providing power and air-conditioning for the Datacentres.
CURRENT ESTIMATION OF LOAD
The current number of users for iBAS is approximately 500, or 1000 at peak times, such as
budget preparation. Estimated TPS is 20. When iBAS++ is implemented, the number of users
will increase significantly, but we have estimated an increase of concurrent usage by a factor
of 3, giving a peak tps of 60. Assuming a record size of 2048 bytes, this gives peak
throughput of 40 Kbs.
6. Current Systems
Below is a table of the current systems:
MoF
CGA
APPLICATION SERVER
DELL POWEREDGE 6850
APPLICATION SERVER
OS
PROC
RAM
WINDOWS 2003 2003 R2 ENTERPRISE
4 x INTEL XEON CPU 3.0 GHz
12 Gb
INTERNAL DISK
AVAILABLE DISK
2 x 73 Gb RAID 1
482/800
DATABASE SERVER
DELL POWEREDGE 6850
WINDOWS 2003 2003 R2 ENTERPRISE
4 x INTEL XEON CPU 3.0 GHz
16 Gb
INTERNAL DISK
AVAILABLE DISK
2 x 73 Gb RAID 1
344/900
REPORTING SERVER
IBM 3600
R2
OS
PROC
RAM
INTERNAL
DISK
2 x 73 Gb RAID 1
AVAILABLE DISK
DATABASE SERVER
OS
PROC
RAM
DELL POWEREDGE 6850
WINDOWS
2003
2003
ENTERPRISE
2 x INTEL XEON CPU 3.0 GHz
8 Gb
DELL POWEREDGE 6850
WINDOWS
2003
2003
ENTERPRISE
2 x INTEL XEON CPU 3.0 GHz
8 Gb
OS
PROC
RAM
INTERNAL
DISK
2 x 73 Gb RAID 1
AVAILABLE DISK
R2
Section V1. Technical Requirements
166
OS
PROC
RAM
INTERNAL DISK
AVAILABLE DISK
EMAIL SERVER
OS
PROC
RAM
INTERNAL DISK
AVAILABLE DISK
DOMAIN
(ROOT)
DELL POWEREDGE 6850
EMAIL SERVER
WINDOWS 2003
OS
4 X INTEL XEON CPU 3.0 GHz
PROC
8 Gb
RAM
INTERNAL
2 x 73 Gb RAID 1
DISK
300/400
AVAILABLE DISK
DELL POWEREDGE 6850
WINDOWS 2003
2 X INTEL XEON CPU 3.0 GHz
4 Gb
DELL POWEREDGE 2950
DOMAIN CONTROLLER
WINDOWS 2003
OS
2 x INTEL XEON CPU 3.0 GHz
PROC
2 Gb
RAM
INTERNAL
2 x 73 Gb RAID 1
DISK
AVAILABLE DISK
DELL POWEREDGE 2950
WINDOWS 2003
2 x INTEL XEON CPU 3.0 GHz
2 Gb
CONTROLLER
OS
PROC
RAM
INTERNAL DISK
AVAILABLE DISK
DOMAIN CONTROLLER
OS
PROC
RAM
INTERNAL DISK
AVAILABLE DISK
DELL POWEREDGE 2950
WINDOWS 2003
1 x INTEL XEON CPU 3.0 GHz
2 Gb
2 x 73 Gb RAID 1
ISA
SERVER
ISA
DELL POWEREDGE 2950
SERVER
WINDOWS 2003
1 x INTEL XEON CPU 3.0 GHz
2 Gb
OS
PROC
RAM
INTERNAL DISK
AVAILABLE DISK
KVM
TAPE BACKUP
2 x 73 Gb RAID 1
2 x 73 Gb RAID 1
OS
PROC
RAM
INTERNAL
DISK
AVAILABLE DISK
2 x 73 Gb RAID 1
DELL POWEREDGE 2950
WINDOWS 2003
1 x INTEL XEON CPU 3.0 GHz
2 Gb
2 x 73 Gb RAID 1
SERVER RACK WITH KVM
SERVER RACK WITH KVM
AUTOLOADER
TAPE
DRIVE
EMC STORAGE 3000 GB
SAN SWITCH
AUTOLOADER TAPE DRIVE
EMC STORAGE 3000 GB
SAN SWITCH
The current system performance indicates that in most instances, the current servers and
infrastructure is handling the current load adequately, apart from slowness when CPU peaks
at 70%, and when memory is reaching high levels.
Section V1. Technical Requirements
167
OVERVIEW
7. Developmental Analysis
OVERALL GENERAL REQUIREMENTS
Where possible it is planned to virtualize.
Working from the center outwards:
• The first requirement is for a Database and Storage solution.
• The next layer out is the Applications layer.
• Third layer is the Support and Utility layer.
• Finally there is the Access and Network layer.
DATABASE AND STORAGE
Database solution will be based on an Oracle platform, running in-house databases developed
under the application of .NET architecture.
APPLICATIONS
Applications have been developed in-house to access the database. Hardware is required to
house the applications. This should be in the form of blade servers (where possible) housed in
a chassis to further reduce power and air-conditioning requirements.
SUPPORT AND UTILITY
Support systems, such as Backup and Restore, Systems Monitoring and Management,
Environment Monitoring, HelpDesk, Domain Controllers, are required to provide these
services. Also, ancillary equipment such as Tape Libraries and tapes. It is anticipated that
Domain Controllers and Test Server will be rack servers outside of the virtualized
environment.
ACCESS AND NETWORK
Webservers, Mail, network configuration and hardware..
Networking components will be based on 10 GbE and Fibre and Infiniband. Infiniband is to
be used to provide accelerated channels at the application layer and database layer.
Section V1. Technical Requirements
168
SIZING
We have some information relating to the anticipated requirements of the new iBAS system,
as follows as per assumption basis:
INPUTS
# of divisions
7
# of districts
57
# of upazilas
500
# of working hours/day
8
# of working days/week
5
# of working weeks/year
52
1 GB (per disk manufacturers)
100000000
0
iBAS Transaction Users
# of PCs in CAO
150
# of PCs in districts
400
# of PCs in upazilas
800
# of PCs in CGA
50
# of PCs Misc
100
# of PCs for Budget Prep
200
Total PCs
1700
iBAS non-transaction users
# of PCs for reporting
150
(line ministries)
Casual end users
25000
ASSUMPTIONS
Frequency of Use (interactions)
minute
hour
day
week
year
iBAS transaction users
1
60
480
2400
124,800
Reporting
0.1
6
48
240
12,480
Casual end users
0.0063
0.375
3
15
780
Interactions per transaction
1
Peak factor
2
hour
day
week
year
PROJECTIONS
Transactions
minute
CAO
150
9,000
72,000
360,000
18,720,000
Districts
400
24,000
192,000
960,000
49,920,000
Upazilas
800
48,000
384,000
1,920,00
0
99,840,000
CGA
50
3,000
24,000
120,000
6,240,000
Section V1. Technical Requirements
Misc
100
Budget Prep
169
6,000
48,000
240,000
12,480,000
200
12,000
96,000
480,000
24,960,000
Total transactions
1700
102,00
0
816,000
4,080,00
0
212,160,00
0
Reporting
15
Casual
156.3
9,375
75,000
375,000
19,500,000
Total non-transactions
171
10,275
82,200
411,000
21,372,000
Grand Total
1871
112,27
5
898,200
4,491,00
0
233,532,00
0
Peak Total
3743
Peak Transactions/sec
62
65
Peak Transactions/min
3743
3900
% 20 more
DISK PROJECTIONS
"Size" of transaction, bytes
2048
Years
1
2
3
4
5
10
15
478.27
956.55
1,434.82
1,913.09
2,391.37
4,782.7
4
7,174.1
0
Transaction
(GB)
storage,
cumulative
APPLICATION ARCHITECTURE
RATIONALE
Part of the project is to provide an environment suitable for housing the iBAS++ system. This
has required sizing of environmental systems: Power, Cooling etc. In order to minimize
power and cooling requirements, we have looked at solutions which draw the least amount of
power. The optimal solution for this is the use of blade servers, which are housed in a chassis.
The chassis provides all of the environmental requirements for the servers, in the most
efficient and effective manner. We have also looked at integrated systems for running the
database layer of the systems, which will further reduce the requirements of power and
cooling.
Another benefit of integrated systems are that they are pre-configured to provide the
optimized service in terms of computing power and I/O throughput. Because I/O is one of our
key factors in the system design, an integrated database solution will provide a favorable
solution. Furthermore, at the application and access layers, all of the servers proposed are
standardized on a specific server model.
To ensure maximum I/O at application server levels we have included PCI Flash cards on
servers where relevant to accelerate the system besides SSD facilities at storage.
Because the anticipated requirement is for a significantly larger number of concurrent users,
at the application layer we propose running a number of instances of the applications in a
virtual pool, managed via a Load Balancing system. The application queries/updates received
Section V1. Technical Requirements
170
from the user can then be allocated via the Load Balancer and the virtualization software, on a
round-robin basis, to each instance of the application. This will avoid bottlenecks in the
traffic throughput. To further reduce bottlenecks, Report requests will be handled by a
separate system and database, thus maximizing the resources available to the Production
iBAS++ system. It will be important that the applications are optimised to take advantage of
this design.
Users access the application layer via internet or intranet, having gone through the necessary
validation and authentication features. Packets pass through a Load Balancer into the VM
Application layer.
The load balancer / virtualization software allocates the packet to an instance of the
application in the virtualized server resource pool. There are multiple instances of the
applications to allow for quick access and no delay. In the event of a hypervisor failing, the
other hypervisors in the resource pool will be able to take on the load of the failed hypervisor
with no interruption to service.
This architecture allows for 4 separately accessed versions of each application with full path
redundancy, hardware redundancy, and failover to DR as a final measure.
Queries are then passed to the Database layer for database processing, before being returned
to the user.
The architecture has been based on speed and I/O throughput. The main processing power
required is at the database layer, and this is catered for by a separate and different part of the
infrastructure from the application layer.
Apart from the hardware requirements, we will also need to ensure that the correct software
and number of software license is in place to enable us to effectively utilise the architecture.
Software requirements for the database platform, including utility products; Operating
Systems; VM software at all relevant levels; Backup and Restore software; Replication
software; Management software for systems, hardware, network, traffic, security,
environment and applications all need to be accurately sized. A service management system
which covers Software Licensing, Hardware Inventory, Change Management, Incident
Management, Configuration Management, with Key Performance Indicators and Service
Levels should be procured, and a Service Manager should be appointed to monitor, manage
and report on Service Levels.
It is equally important that once the system is up and running in Live Mode that there is an
on-going level of support and maintenance from the Vendors projected over a minimum
period of 3 years. Service level Agreements need to be agreed with the Vendor and
implemented. Because of the high level of redundancy built into the systems, we should
anticipate availability at 99.5%. Response times to incidents, hardware faults, etc will be
agreed with the Vendor and implemented. We should look to a response time within 2 hours,
and a resolution time within 8 hours in most instances, with a minimum response time of 30
minutes and resolution of 2 hours for serious issues. Vendor will also provide appropriate
training in specific areas, such as the Virtualization platform and Load Balancer management.
As the iBAS++ system is mission-critical to the MoF, we have a Disaster Recovery solution
in place. This is the final level of redundancy. The Disaster Recovery datacentre is situated in
the CGA building, and will house a range of redundant servers, which will take over the
running of the iBAS++ system if there is a catastrophic site failure at the Secretariat. It is
therefore essential that such a failover is as seamless as possible. To this end, systems at MoF
will be replicated across to CGA in real time. There will be a complete range of services
available at CGA to cope with this, although without the full level of hardware redundancy in
Section V1. Technical Requirements
171
place at MoF. The Load Balancing system will be able to point users to the DR site as
necessary automatically. Users will not be required to point to the different site themselves.
The overall solution includes a fully functional backup system. Because of the potentially
large amounts of data involved, the backup will be initially to a disk-based backup store. Tape
backups can then be carried out offline. Note that tapes should not be stored on-site at MoF.
Our recommendation is that the tapes are stored at an offsite facility. It may be necessary to
implement a process for this.
Section V1. Technical Requirements
172
Figure: Servers Diagram
Section V1. Technical Requirements
173
8. General Summary of Requirement
See the details in each Section
Lot-A
Option 1
Hardware
DATABASE SERVER
Management Servers (1 unit at DC)
Backup/Media Servers (1 unit at DC )
Backup Storage Appliance (1 unit at DC )
Management Servers (1 unit at DR)
Backup/Media Servers (1 unit at DR)
Backup Storage Appliance (1 unit at DR)
Oracle Software’s
Oracle Enterprise Database Enterprise Edition
Real Application Clusters
Partitioning
OEM Diagnostic Pack
OEM Turning Pack
Oracle Secure Backuup
Oracle Active Data Guard
Resource Allocation
Two Expert
Training
Oracle Database on Oracle 11g
Real Application Clusters (RAC) and Oracle implement partitioning on Oracle 11g
Database Administrator and Performance Tuning on Oracle 11g
System Administration on Operating System & Hardware Engineering Systems
Oracle Active Data Guard Administration and oracle secure backup
Technology sharing study tour
Option 2
Hardware
DATABASE SERVER
Management Servers (1 unit at DC)
Backup/Media Servers (1 unit at DC)
Backup Storage Appliance (1 unit at DC)
Management Servers (1 unit at DR)
Backup/Media Servers (1 unit at DR)
Backup Storage Appliance (1 unit at DR)
Oracle Software’s
Oracle Enterprise Database Enterprise Edition
Real Application Clusters
Partitioning
OEM Diagnostic Pack
OEM Turning Pack
Reference
Section V1. Technical Requirements
See the details in each Section
Oracle Secure Backuup
Oracle Active Data Guard
Resource Allocation
Two Expert
Training
Oracle Database on Oracle 11g
Real Application Clusters (RAC) and Oracle implement partitioning on Oracle 11g
Database Administrator and Performance Tuning on Oracle 11g
System Administration on Operating System & Hardware Engineering Systems
Oracle Active Data Guard Administration and oracle secure backup
Technology sharing study tour
Lot-B
Hardware
Application server (4 Unit for DC)
Application server ( 4 Unit for DR )
Report Server (1 Unit for DC )
Report Server (1 Unit for DR)
Test and Development (1 Unit for DC)
Test and Development (1 Unit for DR )
Data Centre Management Server (1 Unit for DC)
Data Centre Management Server (1 Unit for DR)
Primary Domain Controller (1 Unit for DC)
Additional Domain Controller (1 Unit for DC)
Additional Domain Controller (1 Unit for DR)
Patch Management Server: (1 Unit for DC)
Mail Server: (1 Unit for DC)
Mail Server: (1 Unit for DR)
Backup Tape System: (1 Unit for DC)
Blade Chassis (if blade solution - 1 Unit for DC)
Blade Chassis (if blade solution - 1 Unit for DR)
InfiniBand switch: ( 1 Unit for DC)
InfiniBand switch: (1 Unit for DR)
SAN Switches Extended ( At DC)
Load Balancer & Application Delivery Controllers (1 Unit for DC)
Load Balancer & Application Delivery Controllers (1 Unit for DR )
Power Strip (5 Units at DC)
Power Strip ( 5 Units at DR)
Resource Allocation
Two Expert
Windows Licenses including Software Assurance
CoreCAL ALNG LicSAPk MVL DvcCAL
CoreCAL ALNG LicSAPk MVL UsrCAL
ExchgEntCAL ALNG LicSAPk MVL DvcCAL wSrvcs
ExchgEntCAL ALNG LicSAPk MVL UsrCAL wSrvcs
174
Reference
Section V1. Technical Requirements
See the details in each Section
LyncSVrEnCAL ALNG LicSAPk MVL DvcCAL
LyncSVrEnCAL ALNG LicSAPk MVL UsrCAL
LyncSvrPlusCAL ALNG LicSAPk MVL DvcCAL
LyncSvrPlusCAL ALNG LicSAPk MVL UsrCAL
WinSvrDataCtr ALNG LicSAPk MVL 2Proc
WinSvrStd ALNG LicSAPk MVL 2Proc
ExchgSvrStd ALNG LicSAPk MVL
LyncSvr ALNG LicSAPk MVL
SysCtrDatactr ALNG LicSAPk MVL 2 Proc
SysCtrCltMgmtAte ALNG LicSAPk MVL PerOSE
SysCtrStd ALNG LicSAPk MVL 2Proc
Disaster Recovery Solution for Application server (One Hyper-V to another Hyper-V Double-Take
Solution)
Microsoft Premier Support.
204 hours for Microsoft Premier support
Local Training:
SCCM
SCOM
Foreign Training:
SCVMM
Deployment of Private Cloud.
Windows Implementation Service
208 hours support for implementation
175
Reference
Section V1. Technical Requirements
176
LOT-A DATABASE SERVERS
9. General Requirements:
1. Language Support: All information technologies must provide support for the
English. Specifically, all display technologies and software must support the
ISO character set and perform sorting according to Bangladesh Standard.
2. DATES: All information technologies MUST properly display, calculate, and
transmit date data, including, but not restricted to 21st-Century date data.
Required Date formats are DD-MM-YYYY, DD-Month-YYYY, Month DD,
YYYY etc. where DD, MM and YYYY represent two-digit date value, twodigit month value and four-digit year value respectively as prescribed by
Gregorian calendar and Bangla Academy for Bengali calendar.
3. Electrical Power: All active (powered) equipment must operate on voltage
range 220v +/- 20v and frequency range 50Hz +/- 2Hz. All active equipment
must include power plugs standard in BANGLADESH.
4. Environmental: Unless otherwise specified, all equipment must operate in
environments of 04 to 45 degrees centigrade, 20 to 95 percent relative
humidity, and 0 to 40 grams per cubic meter of dust.
5. Safety:
Unless otherwise specified, all equipment must operate at noise levels no
greater than 52 decibels.
All electronic equipment that emits electromagnetic energy must be certified
as meeting US FCC class B or EN 55022 and EN 50082-1, or
equivalent, emission standards.
6. The offered brand should be amongst the top 5 (five), according to the most
recent assessment of a reputed global market analyst, such as ‘Gartner’.
7. Licensing for all software (where applicable) must be registered through
Regional Headquarters, under which Bangladesh falls, of the global software
vendors for ensuring convenient upgrade facility and renewal (as and when
necessary) by the time of operational acceptance test is completed. Service and
maintenance should be provided locally for the project period including post
warranty support services.
8. The Bidder should provide authorization letter(s) from the respective hardware
and software vendor(s).
9. The bidder must submit the bid for all the components with detailed
specification as per defined Technical, Financial, Legal & General
requirements. In case of incomplete or insufficient data the bid may be
considered as non-responsive
Section V1. Technical Requirements
10.
177
Technical Qualification criteria
Sl.
Technical Criteria of participating bidder
22. Software Certified Expert:
Bidder must have at least one ORACLE certified Professional from each
category in below.
h) Oracle Certified Professional (OCP) Database Administrator on
Oracle 9i or 10g or 11g
i) Oracle Database 10g or 11g Certified Expert on Real Application
Clusters (RAC)
j) Oracle Database 10g or 11g Performance Tuning Certified Expert
Copy of relevant certificate must be provided as proof of their experience.
23. Experts for Implementation and Operation:
iii. The participating bidder shall have at least one Certified
Implementation Specialist who has significant experience on the
proposed Hardware in the provision of server partitioning, RAC
clustering, diagnostics and tuning.
iv. The participating bidder shall assign at least two (2) Engineers during
the contract period where at least one Certified Hardware engineer for
the proposed hardware solution and a certified oracle 11g expert. The
participating bidder shall provide relevant document and certificate
with the proposal.
24. Support Service:
The participating bidder has the capability of providing support 24/7 support
including parts replacement along with the certified engineers. Bidder shall
provide similar type of customer experience record with the proposal for the
support service and submit details of support steps.
25. Storage Experience:
The bidder must have Data replication and Database migration experience of
High volume of storage. At least one implementation experiences of Data
replication and Database migration in Active/Active mode or Active/Passive
mode of database servers between two datacenters.
26. Oracle Backup Management:
The bidder must have dedicated Backup & Recovery management team
consisting of at least one person with at least 2 years of experience in similar
type of solution. Also Bidder should have sufficient experience in “Active
Data Guard” and “Oracle Secure Backup” in DC/DR environment.
27. If the participating bidder is Sole Distributor or Distributor or Highest level of
partnership of the proposed Hardware manufacturer; relevant certificate and
contact details should be provided with proposal shall carry the weight.
Lot-A
Total Weighting
factor 100%
5%
5%
2.5%
2.5%
2.5%
2.5%
Option 1 or Option 2
Hardware
28. DATABASE SERVER
29. Management Servers (1 unit at DC)
20%
30. Backup/Media Servers (1 unit at DC )
31. Backup Storage Appliance (1 unit at DC )
5%
5%
5%
Section V1. Technical Requirements
Sl.
178
Technical Criteria of participating bidder
32. Management Servers (1 unit at DR)
33. Backup/Media Servers (1 unit at DR)
Total Weighting
factor 100%
5%
5%
5%
34. Backup Storage Appliance (1 unit at DR)
Oracle Software’s
35. Oracle Enterprise Database Enterprise Edition
15%
36. Real Application Clusters
3%
37. Partitioning
2%
38. OEM Diagnostic Pack
2%
39. OEM Turning Pack
2%
40. Oracle Secure Backuup
2%
41. Oracle Active Data Guard
3%
Training Expert
42. Training
1%
11. DATABASE INFRASTRUCTURE SOLUTION (OPTION – 1 OR
OPTION – 2)
The bidder will either choose
A) OPTION – 1
B) OPTION – 2
Bidders should not contrast or compare between the architecture solutions of above two
categories.
12.
OPTION – 1
12.1.
Level
Database Machine for Production Data Centre (DC)
Description
M
Quality Certifications
M
Category
M
Warranty
Requirement
Safety: UL/cUL, CE, BSMI, GOST R, S-Mark, CSA C22.2 No.
60950-1-07 2nd Ed, CCC
EMC: CE, FCC, VCCI, ICES, KCC, GOST R, BSMI Class A,
AS/NZ 3548, CCC
Internationally reputed top five pre-engineered Machine (with
Database Server, Database Storage and RDBMS) as per
benchmark result within same configuration. Bidder/Tenderer
may attach those document with the submitted bid/tender as
evidence
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
Bidders
Response
Section V1. Technical Requirements
Level
i.
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Description
179
Requirement
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
This support shall also include 24 x 7 support for proposed
storage software and major upgrades for those software.
Required minimum two (2) Database Server and specification for each Server
Brand
To be stated by the bidder/tenderer.
Model
To be stated by the bidder/tenderer.
Country of origin
To be stated by the bidder/tenderer.
Country of
To be stated by the bidder/tenderer.
Manufacture
Form Factor
Rack mount with the Rail Kit
Type of Processor
E5-2690 XEON Processor or higher
Processor clock
2.9 GHz or Higher
speed
No of processors
Min. 02 (Two)
physically
Core per processor
Min. 8 (Eight)
Chipset
Intel C602J or higher
System Bus (GT/s)
Min. 8 or higher
Cache Memory
Min. 20 MB L3 cache per Processor
Bus Architecture
Min. 64-Bit
RAM
Min. 128 GB Memory
RAM type
True 1600-MHz Low-Voltage RDIMM’s
Internal HDD bus
SAS (Serial Attached SCSI)
interface type
Internal HDD
Min. 4X300 GB (10K RPM) SAS Hot-Plug able Hard Disk
Capacity
Drives or Higher per server , If 600GB(15K RPM) is available
supply 600GB(15K RPM) instead of 300GB
Power Supply
2 x Redundant Hot Swappable Power Supplies
Drive Bays
To be mentioned by bidders
Expansion Slot
Four PCIe 3.0 slots or more to be mentioned by bidders
I/O Port
Minimum 4 x 1GbE/10GbE Base-T Ethernet Ports and
Minimum 2 x 10GbE Ethernet SFP+ Ports per server
InfiniBand port
2 x QDR (40Gb/s) Ports
Video RAM
To be mentioned by bidders
Host Bus
2 ports with 40Gbps bandwidth each
Adapter/Host Channel
Adapter
Certification
Safety: UL/cUL, CE, BSMI, GOST R, S-Mark, CSA
EMC: CCC, CE, FCC, VCCI, ICES, C-Tick, KCC, GOST R,
BSMI Class
Operating System
Oracle Enterprise Linux or Solaris
ii. Required 3 Storage for Database and Specification for each Storage:
Brand
Model
Country of Origin
Country of
Manufacture
Form Factor
No of CPU
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
Rack mount with the Rail Kit
Minimum 36 CPU cores for SQL processing
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
M
No of PCI flash card
Flash cache
M
Usable
Storage
capacity
Drive interface
Host Ports
InfiniBand Switches
Storage Controller
M
M
M
M
M
power systems,
Controller
M
Metric of High
Performance Disks
M
M
Power Supply
Dynamic
Capacity
Expansion
Storage Software
M
M
Metric of High
Performance
M
Spares Kit should
Include:
180
Requirement
12 PCI flash cards
4.8 TB must be database aware and smart. Should be
writeable
9.5TB
i.e Minimum 36 x 600 GB 15,000 RPM High
Performance disks
The storage shall be End-to-end 40Gbps capable technology
Minimum Six 40Gbps host ports
2 x 36 port QDR (40 Gb/sec) InfiniBand Switches
Minimum 3 controllers, battery backed cache 512MB for each
controller
• It shall support hot plugging and hot swapping of all
components on-line (i.e. disks, power supplies) with no
disruption to any application.
• The storage array shall be fully redundant, highly available
with redundant components (power supply etc.).
Disk bandwidth: 5.4 GB/s
Disk IOPS: 10,800
Disk data capacity (raw): 21.6 TB
Disk data capacity (usable): 9.5 TB (mirror)
Flash bandwidth: 21.5 GB/s
Flash read IOPS : 375,000
Flash write IOPS: 250,000
Flash data capacity (raw): 4.8 TB
Data load rate: 4 TB/hour
2 x Redundant Hot Swappable Power Supplies
Yes
Should be capable of offloading database load by quickly
process database queries and return only the relevant rows
and columns to the database server
Minimum Cache Read IOPS : Up to 375,000 Database Flash
IOPS
Minimum Disk Reads IOPS : Up to 10800 Database Disk IOPS
Minimum Write IOPs : Rack Type Setup, Measured as Data
Loading 4TB/hr
Minimum Cached Reads MB/s : 21.5 GB/s
Minimum Disk Reads MB/s : 5.4 GB/s
• 1 x 600 GB High Performance disks
• 1 x 400 GB Smart Flash Cache cards
• InfiniBand cables
• Ethernet switch for administration of the Database Machine
• 2 x Redundant Power Distributions Units (PDUs)
• 42U rack packaging
Spare parts included in the proposal to be owned by and
retained at customer premises.
iii. Server Rack for Database and storage:
M
M
M
M
M
M
M
Brand
Model
Country of origin
Country of
Manufacture
PDU
Power cable
Description
M
Management Switch
TIA/EIA recommended rack and same brand as server
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
2 x 10KVA PDU
30 Power extension (UK Type)
Rack should be perforated at front side and measurement is
[800(W)X42U(H)X1000mm(D)]. It should comply with TIA/EIA
standard and datacentre standard.
48 port management port and connections to all Database
Bidders
Response
Section V1. Technical Requirements
Level
M
Description
Accessories
181
Requirement
Bidders
Response
servers, Storages and Swiches
Hi-Volt power cable, Cooling Fans, All sides should be metallic
along with front door, castor wheel and Rear Door
iv. Required minimum two (2) SAN/HCA Switches and specification for each SAN/HCA
Switch
M
M
M
M
Brand
Model
Country of Origin
Country of
Manufacture
Country of Assemble
Chassis
Power Supply
ports
Characteristics of port
Port Speed
High availability
features
M
M
M
M
M
M
M
M
Management and
communication port
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
Should be mentioned
Should be mentioned
Redundant Power supply
Switch should have 36 Ports active
All port modules shall be hot-swappable
40Gbps
Redundant power supplies and fans, Redundant fabric
management, should support active/hot-standby dual-manager
configuration
Switch shall have integrated Ethernet and/or Serial port for
management & communication.
v. Accessories:
M
Related Items
M
Installation &
deployment
12.2.
Level
Product catalogue and manual, Power cables , any other
cables, switch , SFP+, etc. related to it should cover within the
package including original Software’s licenses with CD/DVD
media.
The participating bidder shall provide one certified
Implementation Specialist from the proposed hardware
manufacturer who has significant experience on the proposed
Hardware in the provision of server partitioning, RAC
clustering, diagnostics and tuning. Deployment shall run
complete the successful implementation and commissioning.
Database Machine for Disaster Data Center (DR)
Description
M
Quality Certifications
M
Category
M
Warranty
Requirement
Safety: UL/cUL, CE, BSMI, GOST R, S-Mark, CSA C22.2 No.
60950-1-07 2nd Ed, CCC
EMC: CE, FCC, VCCI, ICES, KCC, GOST R, BSMI Class A,
AS/NZ 3548, CCC
Internationally reputed top five pre-engineered Machine (with
Database Server, Database Storage and RDBMS) as per
benchmark result within same configuration. Bidder/Tenderer
may attach those document with the submitted bid/tender as
evidence
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
Bidders
Response
Section V1. Technical Requirements
Level
i.
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Description
182
Requirement
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
This support shall also include 24 x 7 support for proposed
storage software and major upgrades for those software
Required minimum two (2) Database Server and specification for each Server
Brand
To be stated by the bidder/tenderer.
Model
To be stated by the bidder/tenderer.
Country of origin
To be stated by the bidder/tenderer.
Country of
To be stated by the bidder/tenderer.
Manufacture
Form Factor
Rack mount with the Rail Kit
Type of Processor
E5-2690 XEON Processor or higher
Processor clock
2.9 GHz or Higher
speed
No of processors
Min. 02 (Two)
physically
Core per processor
Min. 8 (Eight)
Chipset
Intel C602J or higher
System Bus (GT/s)
Min. 8 or higher
Cache Memory
Min. 20 MB L3 cache per Processor
Bus Architecture
Min. 64-Bit
RAM
Min. 128 GB Memory
RAM type
True 1600-MHz Low-Voltage RDIMM’s
Internal HDD bus
SAS (Serial Attached SCSI)
interface type
Internal HDD
Min. 4X300 GB (10K RPM) SAS Hot-Plug able Hard Disk
Capacity
Drives or Higher per server , If 600GB(15K RPM) is available
supply 600GB(15K RPM) instead of 300GB
Power Supply
2 x Redundant Hot Swappable Power Supplies
Drive Bays
To be mentioned by bidders
Expansion Slot
Four PCIe 3.0 slots or more to be mentioned by bidders
I/O Port
Minimum 4 x 1GbE/10GbE Base-T Ethernet Ports and
Minimum 2 x 10GbE Ethernet SFP+ Ports per server
InfiniBand port
2 x QDR (40Gb/s) Ports
Video RAM
To be mentioned by bidders
Host Bus
2 ports with 40Gbps bandwidth each
Adapter/Host Channel
Adapter
Certification
Safety: UL/cUL, CE, BSMI, GOST R, S-Mark, CSA
EMC: CCC, CE, FCC, VCCI, ICES, C-Tick, KCC, GOST R,
BSMI Class
Operating System
Oracle Enterprise Linux or Solaris
ii. Required 3 Storage for Database and Specification for each Storage:
Brand
Model
Country of Origin
Country
of
Manufacture
Form Factor
No of CPU
No of PCI flash card
Flash cache
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
Rack mount with the Rail Kit
Minimum 36 CPU cores for SQL processing
12 PCI flash cards
4.8 TB , must be database aware and smart. Should be
writeable
Bidders
Response
Section V1. Technical Requirements
Level
M
M
M
M
M
Description
Requirement
Usable
Storage
capacity
Drive interface
Host Ports
InfiniBand Switches
Storage Controller
9.5TB
i.e Minimum 36 x 600 GB 15,000 RPM High
Performance disks
The storage shall be End-to-end 40Gbps capable technology
Minimum Six 40Gbps host ports
2 x 36 port QDR (40 Gb/sec) InfiniBand Switches
Minimum 3 controllers, battery backed cache 512MB for each
controller
• It shall support hot plugging and hot swapping of all
components on-line (i.e. disks, power supplies) with no
disruption to any application.
• The storage array shall be fully redundant, highly available
with redundant components (power supply etc.).
Disk bandwidth: 5.4 GB/s
Disk IOPS: 10,800
Disk data capacity (raw): 21.6 TB
Disk data capacity (usable): 9.5 TB (mirror)
Flash bandwidth: 21.5 GB/s
Flash read IOPS : 375,000
Flash write IOPS: 250,000
Flash data capacity (raw): 4.8 TB
Data load rate: 4 TB/hour
2 x Redundant Hot Swappable Power Supplies
Yes
M
power
Controller
M
Metric of High
Performance Disks
M
M
Power Supply
Dynamic
Capacity
Expansion
Storage Software
M
183
systems,
M
Metric of High
Performance
M
Spares Kit should
Include:
Should be capable of offloading database load by quickly
process database queries and return only the relevant rows
and columns to the database server
Minimum Cache Read IOPS : Up to 375,000 Database Flash
IOPS
Minimum Disk Reads IOPS : Up to 10800 Database Disk IOPS
Minimum Write IOPs : Rack Type Setup, Measured as Data
Loading 4TB/hr
Minimum Cached Reads MB/s : 21.5 GB/s
Minimum Disk Reads MB/s : 5.4 GB/s
• 1 x 600 GB High Performance disks
• 1 x 400 GB Smart Flash Cache cards
• InfiniBand cables
• Ethernet switch for administration of the Database Machine
• 2 x Redundant Power Distributions Units (PDUs)
• 42U rack packaging
Spare parts included in the proposal to be owned by and
retained at customer premises.
iii. Server Rack for Database and storage:
M
M
M
M
M
M
M
Brand
Model
Country of origin
Country of
Manufacture
PDU
Power cable
Description
M
Management Switch
M
Accessories
TIA/EIA recommended rack and same brand as server
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
2 x 10KVA PDU
30 Power extension (UK Type)
Rack should be perforated at front side and measurement is
[800(W)X42U(H)X1000mm(D)]. It should comply with TIA/EIA
standard and datacentre standard.
48 port management port and connections to all Database
servers, Storages and Swiches
Hi-Volt power cable, Cooling Fans, All sides should be metallic
along with front door, castor wheel and Rear Door
Bidders
Response
Section V1. Technical Requirements
Level
Description
184
Requirement
Bidders
Response
iv. Required minimum two (2) SAN/HCA Switches and specification for each SAN/HCA
Switch
M
M
M
M
Brand
Model
Country of Origin
Country
of
Manufacture
Country of Assemble
Chassis
Power Supply
ports
Characteristics of port
Port Speed
High availability
features
M
M
M
M
M
M
M
M
Management and
communication port
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
Should be mentioned
Should be mentioned
Redundant Power supply
Switch should have 36 Ports active
All port modules shall be hot-swappable
40Gbps
Redundant power supplies and fans, Redundant fabric
management, should support active/hot-standby dual-manager
configuration
Switch shall have integrated Ethernet and/or Serial port for
management & communication.
v. Accessories:
M
Related Items
M
Installation &
deployment
Product catalogue and manual, Power cables , any other
cables, switch , SFP+, etc. related to it should cover within the
package including original Software’s licenses with CD/DVD
media.
The participating bidder shall provide one certified
Implementation Specialist from the proposed hardware
manufacturer who has significant experience on the proposed
Hardware in the provision of server partitioning, RAC
clustering, diagnostics and tuning. Deployment shall run
complete the successful implementation and commissioning.
12.3.
Additional Database Machine for Production Data Centre (For
DC)
NB: This additional database machine will only be considered if expansions of the systems within two
(2) years necessitate the procurement of additional processing power and storage. However, it is
necessary for the bidder shall include this requirement in overall package and quote it separately but
purchaser reserve the right to receive this part of the package at any time within two (2) years or not.
When it necessary to deliver; Purchaser will notify to the bidder before 3 months prior to the deadline
or earlier.
Level
Description
M
Quality Certifications
M
Category
M
Warranty
Requirement
Safety: UL/cUL, CE, BSMI, GOST R, S-Mark, CSA C22.2 No.
60950-1-07 2nd Ed, CCC
EMC: CE, FCC, VCCI, ICES, KCC, GOST R, BSMI Class A,
AS/NZ 3548, CCC
Internationally reputed top five pre-engineered Machine (with
Database Server, Database Storage and RDBMS) as per
benchmark result within same configuration. Bidder/Tenderer
may attach those document with the submitted bid/tender as
evidence
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
Bidders
Response
Section V1. Technical Requirements
Level
i.
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Description
185
Requirement
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
This support shall also include 24 x 7 support for proposed
storage software and major upgrades for those software
Required minimum two (2) Database Server and specification for each Server
Brand
To be stated by the bidder/tenderer.
Model
To be stated by the bidder/tenderer.
Country of origin
To be stated by the bidder/tenderer.
Country of
To be stated by the bidder/tenderer.
Manufacture
Form Factor
Rack mount with the Rail Kit
Type of Processor
E5-2690 XEON Processor or higher
Processor clock
2.9 GHz or Higher
speed
No of processors
Min. 02 (Two)
physically
Core per processor
Min. 8 (Eight)
Chipset
Intel C602J or higher
System Bus (GT/s)
Min. 8 or higher
Cache Memory
Min. 20 MB L3 cache per Processor
Bus Architecture
Min. 64-Bit
RAM
Min. 128 GB Memory
RAM type
True 1600-MHz Low-Voltage RDIMM’s
Internal HDD bus
SAS (Serial Attached SCSI)
interface type
Internal HDD
Min. 4X300 GB (10K RPM) SAS Hot-Plug able Hard Disk
Capacity
Drives or Higher per server , If 600GB(15K RPM) is available
supply 600GB(15K RPM) instead of 300GB
Power Supply
2 x Redundant Hot Swappable Power Supplies
Drive Bays
To be mentioned by bidders
Expansion Slot
Four PCIe 3.0 slots or more to be mentioned by bidders
I/O Port
Minimum 4 x 1GbE/10GbE Base-T Ethernet Ports and
Minimum 2 x 10GbE Ethernet SFP+ Ports per server
InfiniBand port
2 x QDR (40Gb/s) Ports
Video RAM
To be mentioned by bidders
Host Bus
2 ports with 40Gbps bandwidth each
Adapter/Host Channel
Adapter
Certification
Safety: UL/cUL, CE, BSMI, GOST R, S-Mark, CSA
EMC: CCC, CE, FCC, VCCI, ICES, C-Tick, KCC, GOST R,
BSMI Class
Operating System
Oracle Enterprise Linux or Solaris
ii. Required 3 Storage for Database and Specification for each Storage:
Brand
Model
Country of Origin
Country
Manufacture
of
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
M
M
M
Form Factor
No of CPU
No of PCI flash card
Flash cache
M
Usable
Storage
capacity
Drive interface
Host Ports
InfiniBand Switches
Storage Controller
M
M
M
M
M
power
Controller
M
Metric of High
Performance Disks
M
M
Power Supply
Dynamic
Capacity
Expansion
Storage Software
M
systems,
M
Metric of High
Performance
M
Spares Kit should
Include:
186
Requirement
Rack mount with the Rail Kit
Minimum 36 CPU cores for SQL processing
12 PCI flash cards
4.8 TB , must be database aware and smart. Should be
writeable
9.5TB
i.e Minimum 36 x 600 GB 15,000 RPM High
Performance disks
The storage shall be End-to-end 40Gbps capable technology
Minimum Six 40Gbps host ports
2 x 36 port QDR (40 Gb/sec) InfiniBand Switches
Minimum 3 controllers, battery backed cache 512MB for each
controller
• It shall support hot plugging and hot swapping of all
components on-line (i.e. disks, power supplies) with no
disruption to any application.
• The storage array shall be fully redundant, highly available
with redundant components (power supply etc.).
Disk bandwidth: 5.4 GB/s
Disk IOPS: 10,800
Disk data capacity (raw): 21.6 TB
Disk data capacity (usable): 9.5 TB (mirror)
Flash bandwidth: 21.5 GB/s
Flash read IOPS : 375,000
Flash write IOPS: 250,000
Flash data capacity (raw): 4.8 TB
Data load rate: 4 TB/hour
2 x Redundant Hot Swappable Power Supplies
Yes
Should be capable of offloading database load by quickly
process database queries and return only the relevant rows
and columns to the database server
Minimum Cache Read IOPS : Up to 375,000 Database Flash
IOPS
Minimum Disk Reads IOPS : Up to 10800 Database Disk IOPS
Minimum Write IOPs : Rack Type Setup, Measured as Data
Loading 4TB/hr
Minimum Cached Reads MB/s : 21.5 GB/s
Minimum Disk Reads MB/s : 5.4 GB/s
• 1 x 600 GB High Performance disks
• 1 x 400 GB Smart Flash Cache cards
• InfiniBand cables
• Ethernet switch for administration of the Database Machine
• 2 x Redundant Power Distributions Units (PDUs)
• 42U rack packaging
Spare parts included in the proposal to be owned by and
retained at customer premises.
iii. Server Rack for Database and storage:
M
M
M
M
M
M
M
Brand
Model
Country of origin
Country of
Manufacture
PDU
Power cable
Description
TIA/EIA recommended rack and same brand as server
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
2 x 10KVA PDU
30 Power extension (UK Type)
Rack should be perforated at front side and measurement is
[800(W)X42U(H)X1000mm(D)]. It should comply with TIA/EIA
Bidders
Response
Section V1. Technical Requirements
Level
187
Description
M
Management Switch
M
Accessories
Requirement
Bidders
Response
standard and datacentre standard.
48 port management port and connections to all Database
servers, Storages and Swiches
Hi-Volt power cable, Cooling Fans, All sides should be metallic
along with front door, castor wheel and Rear Door
iv. Required minimum two (2) SAN/HCA Switches and specification for each SAN/HCA
Switch
M
M
M
M
Brand
Model
Country of Origin
Country
of
Manufacture
Country of Assemble
Chassis
Power Supply
ports
Characteristics of port
Port Speed
High availability
features
M
M
M
M
M
M
M
M
Management and
communication port
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
To be mentioned by the bidder
Should be mentioned
Should be mentioned
Redundant Power supply
Switch should have 36 Ports active
All port modules shall be hot-swappable
40Gbps
Redundant power supplies and fans, Redundant fabric
management, should support active/hot-standby dual-manager
configuration
Switch shall have integrated Ethernet and/or Serial port for
management & communication.
v. Accessories:
M
Related Items
M
Installation &
deployment
12.4.
S.
No.
1.
Product catalogue and manual, Power cables , any other
cables, switch , SFP+, etc. related to it should cover within the
package including original Software’s licenses with CD/DVD
media.
The participating bidder shall provide one certified
Implementation Specialist from the proposed hardware
manufacturer who has significant experience on the proposed
Hardware in the provision of server partitioning, RAC
clustering, diagnostics and tuning. Deployment shall run
complete the successful implementation and commissioning.
RDBMS Specification for DC & DR :
Feature
Requirement
(Essential OR
Desired)
The system will be an industry E
standard and leading Relational
Database Management system
(RDBMS).
2.
3.
The RDBMS
E
Will provide multiplatform/ OS
support for the ease of application
portability.
The database will include features E
with which the database can be
recovered in minimal time
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
4.
5.
Feature
188
Requirement
(Essential OR
Desired)
From user errors for example user
accidentally drops an important
Master table or even the Database.
The database will support non- E
escalating row level locking& support
multi-version read consistency and
provides concurrency
Whereby readers don't block writers
and writers don’t block readers
The database will have a complete E
management tool so that
Optimizes database memory
structures based upon runtime
workload, i.e. to tune memory
structures as well as automated
storage management of data, storage
management, mirroring, stripping
freeing the DBA from manual storage
management.
6.
7.
8.
9.
10.
11.
The database will remain available
more than 99.9% of the time running
with no degradation.
The database will support referential
integrity.
Data redistribution within the
RDBMS will not involve downtime
when additional resources are added
to the DB platform as a part of an
expansion.
The DB platform will not require the
DBA to determine the physical
location of each table index partition
or simple table space; it shall be
managed by database itself.
The DB platform will be capable of
supporting system expansion
to cater to the increasing growth of
data volumes of up to 30,000
clearing / Day, without unloading/reloading data, without making
changes into load utilities, production
jobs and packages.
The RDBMS solution will be designed
so that hardware and software
failures are handled without the
entire system going offline. The
entire system in this context means
the Data Center (DC) and the Disaster
Recovery System (DRS).
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
189
Feature
Requirement
(Essential OR
Desired)
The RDBMS solution will be able to
scale to multiple nodes with a shared
storage using a single database using
clustering. The clustering solution
must
provide
Active-Active
clustering.
The RDBMS architecture will allow
seamless addition to
Processing power and storage. It
must also support server level load
balancing at database tier.
The DB platform will support features
of built in hardware
Redundancy, fault tolerance and
ability to handle any single point of
failure.
The DB platform will support
seamless integration of failed units
That has been repaired.
The RDBMS will be continuously
available even in case of failure
within the system at unit level or CPU
level or other subsystem level.
The RDBMS offered will have
features to setup remote disaster
recovery systems.
The DB Platform will allow
parallelism for all operations like
loading,
query
,database
administration/management
operations like backup, restore,
creation& updates of index, creation
&refresh of materialized views etc.
Disaster Recovery Systems site will
be 'ON' at all times. In order to avoid
idle hardware, the features must
allow the DRS site to be used for
activities such as testing, reporting
etc. while it continuously applies
changes transmitted by primary
database.
The database will have support for
partitioning of heavy table data
transparent to the application.
The offered RDBMS
Solution will provide productionready Management tool.
The database will have the capability
E
E
E
E
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
Feature
of comprehensive online schema
reorganization/redefinition
The RDBMS solution will provide
index organized table capability to
increase performance and must
support
reverse
key
index
Implementation along with support
for built in advanced queuing
capability without additional costs.
The RDBMS solution will support the
capabilities to do diagnostic on both
database activities and hardware
capabilities to provide correlation
between database usages and
hardware performance and capability
to tune database structure, database
instance and also SQL statement for
improved performance.
The RDBMS solution will support a
single interface for management
console and other tools to provide
easy management of the system
including clusters.
The RDBMS solution will provide
single interface for simplified
management and administration.
The RDBMS solution will support
simple user-friendly GU l tools for
database
administration
and
management.
The RDBMS solution will support
performance
and
workload
dashboards.
The RDBMS solution will support
query metrics repository for tuning
analysis, resource accounting and
capacity planning.
The management of DB platform will
not be dependent on availability of
any particular node in the system and
management / administration shall
continue in the event of failures.
The DB platform will support the
ability to automatically perform
Workload management.
The DB platform will support mixed
workload ca ability, simultaneous
support for load (real time/near real-
190
Requirement
(Essential OR
Desired)
E
E
E
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
Feature
time and bulk) as well as query
(simple &complex) operations in
addition to maintenance work.
The DB platform will support query p
prioritization feature.
The DB platform will support
dynamic resource allocation at
runtime for query operations is
present based on resources needed,
without any manual intervention.
The system will allow for limiting
resource usage like IO, CPU etc. by
the administrator.
The optimization of the queries in
the DB platform will be automated.
The optimization of queries in the DB
platform will automatically parallelize
queries.
The DB platform will support query
tuning
without
any
manual
intervention.
The DB platform will support query
optimizer, which supports
Pipeline parallelism that allows
operators to start getting result sets
without having to wait for previous
operator to finish.
The DB Platform shall provide linear
scalability
without
diminishing
performance, across growing volume
of data, users, queries, complexity of
queries, database administration etc.
(RDBMS & OS).
The solution must be able to control
the execution of database commands
including DDL and DML access and
must be able to use environmental
parameters like IP Address or Time as
authentication mechanisms
The solution must not require Agent
installation at the database server
and must ensure security policies to
be enforced even if the system is
accessed from the console; i.e.
firewalls are bypassed
The solution should provide real time
query access to DR site without
stopping data synchronization with
191
Requirement
(Essential OR
Desired)
E
E
E
E
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
Feature
production site.
The solution should automatically
detect and repair data block
corruption
The solution should provide powerful
security controls for protecting
applications and sensitive data.
Prevent privileged users from
accessing application data, restricts
ad-hoc database changes and
enforce control over how, when and
where application data can be
accessed.
The solution must be able to restrict
access to business information on a
need-to-know basis and able to
control the execution of database
commands including DDL and DML
access and as well as audited. Must
be flexible enough to restrict access
to an entire application schema or a
subset of tables. This functionality
should be part of RDBMS kernel.
The database should have support
for partitioning of heavy table data
transparent to the application.
RDBMS should support hash-hash
composite partitioning of tables
The database system should provide
automatic database performance
diagnosis and should automatically
maintain workload history facilities
and history performance analysis
SQL Access Advisor and Automatic
SQL Tuning advisor must be available
along with Real-time SQL monitoring
The solution should eliminate the
need for manual tuning by
comprehensive
solution
for
application and SQL tuning
The solution shall provide details of
the RDBMS regarding the query
execution path in a graphical manner
to aid understanding of the query
execution process
Bioinformatics analysis like ANOVA
analysis, BLAST, Hypothesis testing
available.
192
Requirement
(Essential OR
Desired)
E
E
E
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
54.
55.
56.
57.
58.
59.
60.
61.
62.
193
Feature
Requirement
(Essential OR
Desired)
SQL Analytics features like Complex
calculations with MODEL clause,
Compute frequent item sets,
Cumulative Aggregates, functions like
NTILE, PIVOT, percentage, RANK,
Row Number must be available.
Security feature like Basic Auditing,
Column Access Control, Database
Role support, Encrypted Large object
data, Encryption APIs, Fine Grained
Auditing including DML support,
Hardware-Based
Master
Key
Protection, Label Security, Maintain a
long term history of data changes,
Password Policies, Row level security
must be available
Automated and integrated data
protection and disaster recovery,
Automatic
failover,
Automatic
resynchronization after network is
restored,
Automatic
resynchronization of old primary
database after a failover, Cascaded
standbys, Switchover and Zero data
loss capability must available.
Online Backup, DDL, Index creation,
index reorganization, recovery &
restore, table move, segment shrink,
table redefinition & reorganization
and rebalance from storage removal
is available.
Failure reporting capability.
E
Automated Point In Time Recovery,
Automated, disk-based backup,
Automatic Data File Creation, Backup
Compression, Backup Throttling block
Level Media Recovery, Duplexed
Backups,
Incrementally Updated
backups facility available.
The DB platform will be a unified
solution
of
database
server,
operating system, storage and
associated management tool.
The DB platform will be preconfigured with servers, storage, OS
& RDBMS in a rack type setup.
The DB platform will be able to
support multi-generation hardware
E
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
194
Feature
Requirement
(Essential OR
Desired)
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
to coexist to avoid hardware
redeployment keeping in mind future
upgrades or expansions to ensure
investment protection.
12.5.
Summary of Hardware and Software License
Bidder Shall Comply with the Minimum DB licenses required for the proposed Database Server based
on No of processor/Minimum user licenses.
12.5.1.
Database Machine at DC
Hardware Components
Database Machine warranty
Hardware performing Software
Software Components
1Yr
support
Y
2Yr
support
Y
3Yr
support
4Yr
support
5Yr
support
Machine
Unit
s
1
Y
Y
Y
Disk Drive
36
Y
Y
Y
Y
Y
Metric
Metric
Compl
y
Units
Database Licenses
Core Oracle Database Software
Oracle Database Enterprise Edition
ORACLE ENTERPRISE MANAGER OPS CENTER
12C
Oracle Real Application Clusters
NUP
400
Y
Y
Y
Y
Y
NUP
400
Y
Y
Y
Y
Y
Oracle Partitioning
NUP
400
Y
Y
Y
Y
Y
Oracle Management Options
Oracle OEM Diagnostic Pack
NUP
400
Y
Y
Y
Y
Y
Oracle OEM Tuning Pack
NUP
400
Y
Y
Y
Y
Y
Oracle Backup Management
Oracle Secure Backup
Drive
4
Y
Y
Y
Y
Y
NUP
400
Y
Y
Y
Y
Y
Disaster Recovery
Oracle Active Data Guard
12.5.2.
Database Machine at DR
Hardware Components
Database Machine warranty
Hardware performing Software
Software Components
2Yr
support
Y
3Yr
support
4Yr
support
5Yr
support
Y
Y
Y
Machine
1
1Yr
support
Y
Disk Drive
36
Y
Y
Y
Y
Y
Metric
Unit
s
NUP
400
Y
Y
Y
Y
Y
NUP
400
Y
Y
Y
Y
Y
Metric
Units
Database Licenses
Core Oracle Database Software
Oracle Database Enterprise Edition
ORACLE ENTERPRISE MANAGER OPS CENTER
12C
Oracle Real Application Clusters
Comply
Section V1. Technical Requirements
195
Oracle Partitioning
NUP
400
Y
Y
Y
Y
Y
Oracle Management Options
Oracle OEM Diagnostic Pack
NUP
400
Y
Y
Y
Y
Y
Oracle OEM Tuning Pack
NUP
400
Y
Y
Y
Y
Y
Disaster Recovery
Oracle Active Data Guard
NUP
400
Y
Y
Y
Y
Y
12.5.3.
Additional Database Machine at DC
NB: This additional database software’s will only be considered if expansions of the systems within two
(2) years necessitate the procurement of additional processing power and storage. However, it is
necessary for the bidder shall include this requirement in overall package and quote it separately but
purchaser reserve the right to receive this part of the package at any time within two (2) years or not.
When it necessary to deliver; Purchaser will notify to the bidder before 3 months prior to the deadline
or earlier.
Hardware Components
Database Machine warranty
Hardware performing Software
Software Components
2Yr
support
Y
3Yr
support
4Yr
support
5Yr
support
Y
Y
Y
Machine
1
1Yr
support
Y
Disk Drive
36
Y
Y
Y
Y
Y
Metric
Unit
s
Metric
Units
Comply
Database Licenses
Core Oracle Database Software
Oracle Database Enterprise Edition
ORACLE ENTERPRISE MANAGER OPS CENTER
12C
Oracle Real Application Clusters
NUP
400
Y
Y
Y
Y
Y
NUP
400
Y
Y
Y
Y
Y
Oracle Partitioning
NUP
400
Y
Y
Y
Y
Y
Oracle Management Options
Oracle OEM Diagnostic Pack
NUP
400
Y
Y
Y
Y
Y
Oracle OEM Tuning Pack
NUP
400
Y
Y
Y
Y
Y
Disaster Recovery
Oracle Active Data Guard
NUP
400
Y
Y
Y
N
N
12.6.
Level
Management Servers (1 unit at DC and 1 unit at DR)
Description
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
Form Factor
Processor
M
M
Requirement
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star for
quality assurance
Internationally reputed top five server manufacturer as per
latest Gartner rating. Bidder/Tenderer must attach latest
Gartner rating with the submitted bid/tender as evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack mount with the Rail Kit
Minimum 2x Eight-Core Intel® Xeon® Processor E5-2690
(20M Cache, 2.90 GHz, 8.00 GT/s Intel® QPI) or more
capacity or equivalent internationally reputed , industry
standard and widely used Processor
Bidders
Response
Section V1. Technical Requirements
Level
M
M
Description
M
Cache Memory
Quick Path
Interconnect
RAM
M
Hard Disk Drive
M
RAID
M
M
Chassis Form Factor
Optical Drive
M
M
M
M
M
M
M
NIC
Expansion Slot
Graphics/Video
Bays
Power Supply
Cooling Fan
Remote Management
M
M
OS
System supported OS
M
Virtualization
(manager and Server)
Cluster ware
Warranty
M
M
12.7.
Level
196
Requirement
Bidders
Response
20 MB Cache per processor
Minimum 8.00 GT/s
32 GB DDR3 RAM Min 1066/1333 MHz expandable to min
256GB
2 x 600 GB , 10K RPM, SAS hot swappable Serial Attached
(SAS) Hard Disk Expandable up to 8 Disk drives or more
Raid controller with min 512 MB Battery backed cache should
support RAID level 0, 1, 5, 10
2U Rack Mountable with rails
Internal DVD-RW Drive, factory fitted or Remote DVD/Storage
(RKVMS) supported
Four(4) x Port 1/10G Ethernet NIC.
Minimum four(4) PCI Express 3.0 slots
Integrated graphics controller with minimum 8 MB Memory
Min 8 hot plug hard drive Bays
Hot Plug Redundant Power Supply
Redundant cooling fan
Enterprise class remote management card with dedicated
network
port
Remote KVM and Remote storage mapping shall support
Require enterprise class Management software. (for
management /monitoring/Administration of hardware and
software)
Oracle Linux
Windows, VM, Enterprise Linux Edition, Solaris 10, Oracle Ent.
Linux ,Redhat, SUSE etc.
Unlimited VM with Virtual Manager Software (Enterprise
Edition)
Linux Cluster ware or Oracle Linux Cluster ware
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
Backup/Media Servers (1 unit at DC and 1 unit at DR)
Description
M
Quality
M
Brand
M
M
Model
Country of origin
Requirement
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star for
quality assurance
Internationally reputed top five server manufacturer as per
latest Gartner rating. Bidder/Tenderer must attach latest
Gartner rating with the submitted bid/tender as evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Bidders
Response
Section V1. Technical Requirements
Level
M
M
M
M
M
Description
Country of
Manufacture
Form Factor
Processor
M
Cache Memory
Quick Path
Interconnect
Ram
M
Hard Disk Drive
M
RAID
M
M
M
Expansion Slot
Chassis Form Factor
Optical Drive
M
M
M
M
M
M
M
M
NIC
HBA Card
HCA
Graphics/Video
Bays
Power Supply
Cooling Fan
Remote Management
M
M
OS
System supported OS
M
Virtualization
(manager and Server)
Cluster ware
Warranty
M
M
197
Requirement
To be stated by the bidder/tenderer.
Rack mount with the Rail Kit
Minimum 2x Eight-Core Intel® Xeon® Processor E5-2690
(20M Cache, 2.90 GHz, 8.00 GT/s Intel® QPI) or more
capacity or equivalent internationally reputed , industry
standard and widely used Processor
20 MB Cache per processor
Minimum 8.00 GT/s
64 GB DDR3 RAM Min 1066/1333 MHz expandable to min
256GB
4 x 600 GB , 10K RPM, SAS hot swappable Serial Attached
(SAS) Hard Disk Expandable up to 8 Disk drives or more
Raid controller with min 512 MB Battery backed cache should
support RAID level 0, 1, 5, 10
Minimum six (6) PCI Express 3.0 slots
2U Rack Mountable with rails
Internal DVD-RW Drive, factory fitted or Remote DVD/Storage
(RKVMS) supported
Four(4) x Port 1/10G Ethernet NIC
1x dual port 10Gbps FC Cards
2 x 40Gbps IB HCA (for connecting Database machines)
Integrated graphics controller with minimum 8 MB Memory
Min 8 hot plug hard drive Bays
Hot Plug Redundant Power Supply
Redundant cooling fan
Enterprise class remote management card with dedicated
network port
Remote KVM and Remote storage mapping shall support
Require enterprise class Management software. (for
management /monitoring/Administration of hardware and
software)
Oracle Linux
Windows, VM, Enterprise Linux Edition, Solaris 10, Oracle Ent.
Linux ,Redhat, SUSE etc.
Unlimited VM with Virtual Manager Software (Enterprise
Edition)
Linux Cluster ware or Oracle Linux Cluster ware
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
Bidders
Response
Section V1. Technical Requirements
12.8.
Level
Backup Storage Appliance (1 unit at DC)
Description
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
Form Factor
Hardware
Specifications
M
M
M
Controller
M
CPUs per Controller
M
Cache
M
Cache / Memory for
Entire System
M
M
M
Storage Operating
System
Client Operating
System Support
External Connectivity
Interface
M
Chassis
M
M
M
M
M
M
M
M
198
Power supply
File Level Protocol
Support
Block level Protocol
Support
Raid Level Supported
Disk Supported
Disk Storage required
Capacity
Disk Scalability
Reliability
Requirement
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star
for quality assurance
Internationally reputed top five backup storage appliance
manufacturers smoothly run with pre-engineered Machine.
Bidder should submit relevant documents.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack mount with the Rail Kit comes with standard Rack.
SAN and NAS Storages Solution
2 x Controller System (4 x Intel Xeon E7-4820 8-Core, 2GHz,
105W, 512GB RAM)
Intel Xeon based CPU
8 cores (2 GHz) per CPU or better
4 CPUs per Controller
8 x 73GB SSDs ( 8 x 73GB) - Write
4 x 512GB SSD (4 x 512GB) - Read
512GB Memory
Read Cache : as per above
Write Cache : as per above
Preferred to have Read and Write cache Separately
Operating System shall be storage-optimized distribution of
UNIX/LINUX
Storage system should support Red Hat Linux, Oracle Linux,
Windows Server 2008/2012 or higher
Four x 1 Gbps Ethernet and expandable up to 8 (NFS and
ISCSI Supported) per controller
2 x 40Gbps ports per controller (2 x IB card )
20-Meter High-Bandwidth QSFP/passive Optical Cable
4x QDR Ethernet QSFP Transceiver
2 x 8Gb FC Cards and 2 x cables (10m Cables to connect to
SAN switch)
1 Management Port
2 x 10G Ports including 10G SFP+
Bidder will deliver all related cables and transceiver required to
connect with interfaces.
Storage system should be Rack Mountable
Should provide a rack for the storage system
Should provide rack mount kits for the storage system
2 x Power supplies
NFS v2/v3/v4, CIFS, HTTP, WebDAV, FTP/SFTP/FTPS
iSCSI, Fibre Channel, IP over Infiniband , RDMA over
Infiniband
iSER, SRP
Striping, mirroring, triple-mirroring single-parity RAID, doubleparity RAID, triple-parity RAID, wide stripes
300GB/600GB (15K RPM), 3TB (7.2KRPM)
40 x 600GB (15K RPM)
44 x 3TB (7.2KRPM)
800 disk Drive or above
The storage having Redundant, hot-swappable controllers ,
Power Supplies, cooling fans and disks. Individual disk drive
slot power control facilities.
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Licensing
M
M
RAID Support
Supported OS
M
Array Management
Software
M
Storage Software
M
Storage Software
Feature
M
Snapshots
M
M
Clone
Replication
M
Licenses
M
M
M
De-duplication
Thin Provision
Compression
M
M
Quota management
Directory services
Plugin
Data security
Antivirus Plug-in Via
ICAP
Network services
Dynamic Routing
M
M
M
M
M
WebDev Protocol
Support
199
Requirement
All licenses for the above storage system should be configured
& provided for the entire system capacity by the storage vendor
from Day ONE
Storage system should support RAID 0,1,10, 3,5,6
Windows Server 2003; Windows Server 2008; Linux; VMWare;
ESX; Solaris
INCLUDED The management software will enable to manage
the whole storage system from a single point. There should be
a single OS to manage the storage system
Features and Services (Required to include Licenses and
24 x 7 Software subscription) for the proposed hardware
configuration
Host Integration Tool including Remote Setup Wizard , Host
Software For Windows and Host Software For VMware, Hyperv, Array Software supports all the mention required features
and support un-limited license without further additional costs.
Support Thin Provision, Snapshot, Clone, Remote Replication
feature to provide disaster recovery and business Continuity.
Non-Disruptive array addition and removal; Multi-Path I/O;
Automatic load balancing , Storage Tiering, Online Data and
Volume Movement, Automatic load balancing of volumes
across RAID Types;
Read only, ,Restore, Microsoft Volume Shadow Copy Support
(VSS)
minimum 16 snapshots per source volume shall be supported
Read/write (clone)
1:N, N:1, manual, scheduled, continuous
Replication to lower end Storage in Same family
Replication Licenses (async/sync)
Snapshow Licenses
Inline, block-level de-duplication
Thin Provision should be supported.
Normal Compression
LZJB (Fastest)
GZIP-2 (Fast)
GZIP (Default)
GZIP-9 (Best Compression)
Oracle EHCC (optional)
user based quota , volume based quota
Microsoft AD, LDAP, NIS including (Authentication and
Authorization, Quota management)
Checksum data and metadata, antivirus quarantine
Storage system should support and interoperable with all major
virus guards (including Sophos)
NTP, DHCP, SMTP
The RIP (Routing Information Protocol) is a distance-vector
dynamic routing protocol that is used by the appliance to
automatically configure optimal routes based on messages
received from other RIP-enabled on-link hosts (typically
routers). The appliance supports both RIPv1 and RIPv2 for
IPv4, and RIPng for IPv6. (Optional)
The HTTP service provides access to file systems using the
HTTP and HTTPS protocols and the HTTP extension
WebDAV (Web based Distributed Authoring and Versioning).
This allows clients to access shared file systems through a
web browser, or as a local file system if their client software
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
NDMP Backup
M
M
Management and
Monitoring
Monitoring
M
Management
M
Monitoring Tool
M
M
M
M
M
M
Monitoring and
Analytics
Analytics Capabilities
Set1 (Example)
M
Analytics Capabilities
Set2 (Example)
M
Analytics Capabilities
Set3 (Example)
M
M
Software
Automated
serviceability
Support and
Maintenance
M
M
M
M
M
Warranty/Support
200
Requirement
supports it.
The NDMP (Network Data Management Protocol) service
enables the system to participate in NDMP-based backup and
restore operations controlled by a remote NDMP client called a
Data Management Application (DMA)
Storage should have NDMP backup facility for all logical
volumes and restore facility NDMP v3/v4 protocol Supported
Backups and Normal Backup
For Symantec Netback up, Oracle Secure Backup , Tivoli
Backup
Storage system should have software utilities which would
provide pro active maintenance of disk drives, bad blocks,
system check etc. The software should be provided from Day
ONE.
BUI based and CLI Based Via HTTPS, SSH, SNMP v1/v2c,
IPMI
Role based Access Control
Work Flow automation
Appliance should provide real time monitoring/alerting tool to
monitor i/o performance
The monitoring tool should be capable of reporting allocation
patterns/ and analyzing i/o behaviour
Detailed Hardware View
Management Dashboards
The monitoring tool should be capable of defining alerts and
threshold levels for events on i/o performance, volume
capacity changes, and hardware and software related events
and relaying alerts as emails.
Details Analytics module (for system tuning and debugging);
Dashboard monitoring for key system performance metrics
Network based Analytics
Network bytes/sec
NFSv3 operations/sec
Disk operations/sec
CPU utilization
"NFS operations/sec"
"NFS operations/sec by type"
"NFS operations/sec of type read by client"
"NFS operations/sec of type read for client broken down by
filename
Analytics by protocol
Cache related Analytics
Application level Analytics
Client/User based analytics
Vendor shall provide all related software to replicate etc
"Phone Home" capability with automatic case creation,
configurable alerts
Support and Maintenance for Hardware and Software
Availability of Principal Manufacturer’s technical Assistance/
Support Center access and Support Service on 24Hrs x 365
Days basis. (for HW and Software)
Software Version Upgrades and Bug fixes
Hardware Replacement within eight (04) hours from the failure
The Post Warranty service period is twenty four (24) months
Bidders
Response
Section V1. Technical Requirements
Level
Description
201
Requirement
Bidders
Response
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
12.9.
Level
Backup Storage Appliance: (1 unit at DR)
Description
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
Form Factor
Hardware
Specifications
M
M
M
Controller
M
CPUs per Controller
M
Cache
M
Cache / Memory for
Entire System
M
M
M
Storage Operating
System
Client Operating
System Support
External Connectivity
Interface
Requirement
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star
for quality assurance
Internationally reputed top five backup storage appliance
manufacturers smoothly run with pre-engineered Machine.
Bidder should submit relevant documents.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack mount with the Rail Kit comes with standard Rack.
SAN and NAS Storages Solution
2 x Controller System (4 x Intel Xeon E7-4820 8-Core, 2GHz,
105W, 512GB RAM)
Intel Xeon based CPU
8 cores (2 GHz) per CPU or better
4 CPUs per Controller
8 x 73GB SSDs ( 8 x 73GB) - Write
4 x 512GB SSD (4 x 512GB) - Read
512GB Memory
Read Cache : as per above
Write Cache : as per above
Preferred to have Read and Write cache Separately
Operating System shall be storage-optimized distribution of
UNIX/LINUX
Storage system should support Red Hat Linux, Oracle Linux,
Windows Server 2008/2012 or higher
Four x 1 Gbps Ethernet and expandable up to 8 (NFS and
ISCSI Supported) per controller
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Chassis
M
M
M
M
M
M
Power supply
File Level Protocol
Support
Block level Protocol
Support
Raid Level Supported
M
M
Disk Supported
Disk Storage required
Capacity
Disk Scalability
Reliability
M
Licensing
M
M
RAID Support
Supported OS
M
Array Management
Software
M
Storage Software
M
Storage Software
Feature
M
Snapshots
M
M
Clone
Replication
M
Licenses
202
Requirement
2 x 40Gbps ports per controller (2 x IB card )
20-Meter High-Bandwidth QSFP/passive Optical Cable
4x QDR Ethernet QSFP Transceiver
2 x 8Gb FC Cards and 2 x cables (10m Cables to connect to
SAN switch)
1 Management Port
2 x 10G Ports including 10G SFP+
Bidder will deliver all related cables and transceiver required to
connect with interfaces.
Storage system should be Rack Mountable
Should provide a rack for the storage system
Should provide rack mount kits for the storage system
2 x Power supplies
NFS v2/v3/v4, CIFS, HTTP, WebDAV, FTP/SFTP/FTPS
iSCSI, Fibre Channel, IP over Infiniband , RDMA over
Infiniband
iSER, SRP
Striping, mirroring, triple-mirroring single-parity RAID, doubleparity RAID, triple-parity RAID, wide stripes
300GB/600GB (15K RPM), 3TB (7.2KRPM)
40 x 600GB (15K RPM)
44 x 3TB (7.2KRPM)
800 disk Drive or above
The storage having Redundant, hot-swappable controllers ,
Power Supplies, cooling fans and disks. Individual disk drive
slot power control facilities.
All licenses for the above storage system should be configured
& provided for the entire system capacity by the storage vendor
from Day ONE
Storage system should support RAID 0,1,10, 3,5,6
Windows Server 2003; Windows Server 2008; Linux; VMWare;
ESX; Solaris
INCLUDED The management software will enable to manage
the whole storage system from a single point. There should be
a single OS to manage the storage system
Features and Services (Required to include Licenses and
24 x 7 Software subscription) for the proposed hardware
configuration
Host Integration Tool including Remote Setup Wizard , Host
Software For Windows and Host Software For VMware, Hyperv, Array Software supports all the mention required features
and support un-limited license without further additional costs.
Support Thin Provision, Snapshot, Clone, Remote Replication
feature to provide disaster recovery and business Continuity.
Non-Disruptive array addition and removal; Multi-Path I/O;
Automatic load balancing , Storage Tiering, Online Data and
Volume Movement, Automatic load balancing of volumes
across RAID Types;
Read only, ,Restore, Microsoft Volume Shadow Copy Support
(VSS)
minimum 16 snapshots per source volume shall be supported
Read/write (clone)
1:N, N:1, manual, scheduled, continuous
Replication to lower end Storage in Same family
Replication Licenses (async/sync)
Snapshow Licenses
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
M
M
De-duplication
Thin Provision
Compression
M
M
Quota management
Directory services
Plugin
Data security
Antivirus Plug-in Via
ICAP
Network services
Dynamic Routing
M
M
M
M
M
WebDev Protocol
Support
M
NDMP Backup
M
Management and
Monitoring
M
203
Requirement
Inline, block-level de-duplication
Thin Provision should be supported.
Normal Compression
LZJB (Fastest)
GZIP-2 (Fast)
GZIP (Default)
GZIP-9 (Best Compression)
Oracle EHCC (optional)
user based quota , volume based quota
Microsoft AD, LDAP, NIS including (Authentication and
Authorization, Quota management)
Checksum data and metadata, antivirus quarantine
Storage system should support and interoperable with all major
virus guards (including Sophos)
NTP, DHCP, SMTP
The RIP (Routing Information Protocol) is a distance-vector
dynamic routing protocol that is used by the appliance to
automatically configure optimal routes based on messages
received from other RIP-enabled on-link hosts (typically
routers). The appliance supports both RIPv1 and RIPv2 for
IPv4, and RIPng for IPv6. (Optional)
The HTTP service provides access to file systems using the
HTTP and HTTPS protocols and the HTTP extension
WebDAV (Web based Distributed Authoring and Versioning).
This allows clients to access shared file systems through a
web browser, or as a local file system if their client software
supports it.
The NDMP (Network Data Management Protocol) service
enables the system to participate in NDMP-based backup and
restore operations controlled by a remote NDMP client called a
Data Management Application (DMA)
Storage should have NDMP backup facility for all logical
volumes and restore facility NDMP v3/v4 protocol Supported
Backups and Normal Backup
For Symantec Netback up, Oracle Secure Backup , Tivoli
Backup
Monitoring
Storage system should have software utilities which would
provide pro active maintenance of disk drives, bad blocks,
system check etc. The software should be provided from Day
ONE.
M
Management
M
Monitoring Tool
BUI based and CLI Based Via HTTPS, SSH, SNMP v1/v2c,
IPMI
Role based Access Control
Work Flow automation
Appliance should provide real time monitoring/alerting tool to
monitor i/o performance
The monitoring tool should be capable of reporting allocation
patterns/ and analyzing i/o behaviour
Detailed Hardware View
Management Dashboards
The monitoring tool should be capable of defining alerts and
threshold levels for events on i/o performance, volume
capacity changes, and hardware and software related events
and relaying alerts as emails.
Details Analytics module (for system tuning and debugging);
M
M
M
M
M
Monitoring and
Bidders
Response
Section V1. Technical Requirements
Level
Description
Analytics
Analytics Capabilities
Set1 (Example)
M
M
Analytics Capabilities
Set2 (Example)
M
Analytics Capabilities
Set3 (Example)
M
M
Software
Automated
serviceability
Support and
Maintenance
M
M
M
M
M
Warranty/Support
12.10.
204
Requirement
Bidders
Response
Dashboard monitoring for key system performance metrics
Network based Analytics
Network bytes/sec
NFSv3 operations/sec
Disk operations/sec
CPU utilization
"NFS operations/sec"
"NFS operations/sec by type"
"NFS operations/sec of type read by client"
"NFS operations/sec of type read for client broken down by
filename
Analytics by protocol
Cache related Analytics
Application level Analytics
Client/User based analytics
Vendor shall provide all related software to replicate etc
"Phone Home" capability with automatic case creation,
configurable alerts
Support and Maintenance for Hardware and Software
Availability of Principal Manufacturer’s technical Assistance/
Support Center access and Support Service on 24Hrs x 365
Days basis. (for HW and Software)
Software Version Upgrades and Bug fixes
Hardware Replacement within eight (04) hours from the failure
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
Training and Training Material
Bidder should propose local training at Dhaka city for the following modules:
No of
Participants
16
10
6
4
4
10
Name of Training
Duration
Oracle Database on Oracle 11g
Real Application Clusters (RAC) and Oracle implement partitioning
on Oracle 11g
Database Administrator and Performance Tuning on Oracle 11g
System Administration on Operating System & Hardware
Engineering Systems
Oracle Active Data Guard Administration and oracle secure backup
80 hour
80 hour
Technology sharing study tour at Singapore or Malaysia for
DMTBF Technical Core committee.
80 hour
80 hour
80 hour
5 days
Section V1. Technical Requirements
205
The recommended training should consider as 50% theoretical including questionnaire/assignment on
class and 50% practical for each participant. It should cover the certification for the above courses.
This training module should also cover the offered server and its software as well as hand on training
to expertise on the offered resources. To get the approval from authority; winner Bidder should submit
details of training topics and content after discussion with purchaser. Bidder should supply training
material, declare suitable venue and arrange necessary original vendor certified training material, food
refreshment for all trainee during the training session. Those training differentiate candidates in the
marketplace by providing a competitive edge through proven expertise. Up-to-date training and field
experience certified trainers are recommended.
For 5 days Technology sharing study tour; Bidder shall arrange two appointments to the
organizations either at Singapore or Malaysia where similar type of robust systems has been
running smoothly for three years. Their recommendation based on this workshop enhances
the future improvement of the Systems smooth operation. However; Bidder shall make all
appropriate logistical arrangements (both way airfare i.e Return AirTicket, visa fee, local
transportation, airport pickup, 3-star hotel accommodation for each participant in single
room, food, US$100 per diem per participant) for such workshop. Bidder should include all
those facilities and details quote the same.
13.
OPTION – 2
13.1.
Number of Core Analysis for option-2 DB Machines:
Example is given to identify the required cores and models:
DB
Size
(TB)
Systems (1TB -TPCH)
Cores
(QphH)
(QphH)
/Cores
=[Y]
IBM Power 780 ( IBM
POWER7 - 4.14 GHz )
1
32
164,747
5,148.34
HP
Integrity
Superdome
2
(Itanium 1.73 GHz )
SPARC T5-4 Server
(T5 - 3.6 GHz)
1
64
140,181
2,190.33
3
64
409,721
6,401.89
To be mention by the
bidder for any other
Manufacturer if
required.
Public Results
http://www.tpc.org/tpch/results
/tpch_result_detail.asp?id=11012
1501
http://www.tpc.org/tpch/results
/tpch_result_detail.asp?id=11004
2601
http://www.tpc.org/tpch/results
/tpch_result_detail.asp?id=11306
0701
Required
QphH
per node
=[X]
No# of Cores per
node required
for 164K QphH
= [X]/[y]
140000
27
140000
64
140000
22
Section V1. Technical Requirements
206
13.2.
Database Servers for Production site [1 unit cluster solution at
DC]
Level
Description
Requirement
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
Server type
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star
for quality assurance
Internationally reputed top five server manufacturer. The
offered server along with OS shall be certified to run the
Oracle 11g database system. Bidder/Tenderer must attach
latest TPC rating with the submitted bid/tender as evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
M
M
M
Form factor
Performance
Capacity of
System
Scalability
M
TPC-H
benchmarking
M
M
M
Processor Type
Processor
speed
Core per
processor
Chipset
No of Processor
Total # of
Threads
No of Core
M
Memory (RAM)
M
Cache Memory
M
Hard Disk
M
M
M
M
Database Server (Minimum 2 Node Cluster with 4 Physical
Partitions in each Node) Each physical server shall be
configured with licenses to create more partitions in future at
no additional cost.
Rack Mountable/Blade Architecture
Bidder should submit Manufacturer benchmarking document
of offered system for the Transaction per second capacity
against the oracle 11g database system.
The Manufacturer Model quoted for a clustered system
should have expandability capacity minimum 400% of the
offered cores.
As for example:
1. If each node is 32 core then bidder may select such a
model of 64 core and the model of same node should
support a cluster system where core capacity is
32*400% = 128 core.
or
2. If each node is 32 core then bidder may select such a
model where core capacity is 32*400% = 128 core for a
cluster system.
Each Node shall require minimum 140,000 QphH@1000GB
to meet the TPC-H benchmarking (www.tpc.org). To comply
with this benchmark bidder shall provide suitable size
system with regards to processors and cores according to
analysis mentioned above. Bidder/Tenderer must attach
supporting documentation with the submitted bid/tender as
evidence.
64 Bit, RISC Processor
Minimum 2.5GHz RISC/EPIC or substantially equivalent to
be stated by the bidder/tenderer.
Number of cores per processor can be 8 or above
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer to follow the “Number of
Core Analysis for option-2 DB Machines”
Each NODE equipped with at least 512 GB DDR3 memories
but the full system will have expandability option to minimum
4TB DDR3 RAM.
Must offer the highest available cache for the offered system
and to be stated by the bidder/tenderer.
Each node should have Internal Hard disk 8 X 600GB
10,000 RPM (Minimum) SAS/FC Disk Drive with Mirroring
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
M
M
I/O Slot
System Memory
Bandwidth
(GB/s)
System I/O
Bandwidth
(GB/s)
LAN Adapter
M
FC Adapter
M
HCA card
M
DVD ROM
M
M
Power supply
Operating
System
M
Cluster Software
M
Management
Software
M
High availabilitystandard server
features
M
Requirement
for Operating Systems (internal or external).
To be specify by the bidder/tenderer.
To be specify by the bidder/tenderer.
To be specify by the bidder/tenderer.
Each node shall have Min 8 X 10Gb Network port. Adapter
level redundancy shall be maintained.
Each node shall have Min 4 X Dual Port 8Gb FC Adapter.
Adapter level redundancy shall be maintained.
2 x 40Gbps IB HCA (for connecting SAN/ Infiniband switch)
including all connecting cables.
1x DVD-RW or equivalent device attached by which the
requirement will be fulfilled.
Redundant power supplies and cooling fans
64-bit UNIX Operating System with unlimited user license
along with the following features:
The vendor should guarantee the O/S backward
compatibility with oracle 11g database.
Any configuration change in one partition should not affect
any other partition unless desired
An error in one partition should not bring the entire system or
other partitions down
Each partition should be upgradeable separately and
independently without affecting other partitions.
Partition management software having dynamic
configuration feature with GUI / Web interface.
Management Consoles, for the same to be provided.
Redundant service processors with automatic failover
Redundant system clocks with dynamic failover
Hot-swappable disk bays
Hot-plug/blind-swap PCI slots
Hot-add I/O drawers
Hot-plug power supplies and cooling fans
Dynamic Processor Deallocation
Dynamic deallocation of logical partitions and PCI bus slots
C++ Software for UNIX should be included
Vendor must propose a two-node cluster Software.
Vendor must quote OS based Cluster software
The proposed cluster ware solution should provide:
Automatic package re-insertion
In flight transaction re-injection
No loss of session for user or batch process during failover.
Committed and uncommitted inflight transaction to be
protected.
The cluster solution must be able to provide fail over to the
other system triggered by failures in:
Hardware
Operating System
Partition
Application
Please include Server Management Software tool for
simplifies server setup, health monitoring, power and
thermal control, and for remote administration
2N (N+N) redundant power supplies
N+1 fans (or greater depending on the load)
Online, replaceable, and redundant OA, utilities, clock, and
207
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Capacity on
Demand
capabilities
M
Authentication
M
Accessories
should Include
M
Spares Kit
should Include:
M
Installation &
deployment
M
Warranty
Requirement
service processor subsystems
Fault Tolerant Crossbar Fabric built on dynamic multipathing and end-to-end retry technology
ECC on caches, Memory ECC, and double-chip spare
ECC, re-tries, and Link Width Reduction on data paths
Automatic de-configuration of memory and processors
I/O Advanced Error Recovery, and I/O isolation off Crossbar
Fabric
Support Physical Partition (Electrical Isolation) and Virtual
Partition
Support:
Instant Capacity on Demand
Temporary Instant Capacity on Demand
Global Instant Capacity on Demand
System must be configurable to up to 4 partitions / domains.
Each partition / domain must not share any system resource
(eg. CPU socket / Memory / I/O) with other partition /
domain.
Each partition / domain must be capable of independent
booting, patching, upgrades and states of operating system
kernel.
System must not have any CPU / Memory / I/O overhead
when more partitions and domains are hosted in the server.
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
• 2 x Redundant Power Distributions Units (PDUs) within
offered Rack including all required cables.
• 8 port (8GB) active SAN Switch with required cables.
• Database server should come with Rack (same brand of
supplied Server) where confirm the facilities of KVM Switch,
LCD rack Monitor, KVM Adapters of each port of KVM
switch, FC cables, UTP patch cords, etc.
• Rack should be perforated at front side and measurement
is [800(W)X42U(H)X1000mm(D)]. It should comply with
TIA/EIA standard and datacentre standard.
• 1 x 600 GB High Performance disks
• 1 x 400 GB Smart Flash Cache cards
• 1x FC Card
• Ethernet switch for administration of the Database Machine
• 1 x Redundant Power Distributions Units (PDUs)
• Spare parts included in the proposal to be owned by and
retained at customer premises.
The participating bidder shall provide one certified
Implementation Specialist from the proposed hardware
manufacturer who has significant experience on the
proposed Hardware in the provision of server partitioning,
RAC clustering, diagnostics and tuning. Deployment shall
run complete the successful implementation and
commissioning.
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The
Supplier shall be obliged to provide all services indicated in
GCC 1.1.(e) (xii). The post warranty services for the product
and services to be supplied in this package shall be included
in this contract. This service to be provided on an on-going
twelve (12) months renewal basis after three (3) years full
208
Bidders
Response
Section V1. Technical Requirements
Level
Description
Requirement
209
Bidders
Response
support with parts & services coverage. Renewal process
shall have to submit manufacturer warranty and this support
coverage document and support shall include 24 x 7
supports from Principal manufacturer and local partner.
13.3.
Database Server for Disaster recovery site [ 1 Unit at DR ]
Level
Description
Requirement
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
Server type
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star
for quality assurance
Internationally reputed top five server manufacturer. The
offered server along with OS shall be certified to run the
Oracle 11g database system. Bidder/Tenderer must attach
latest TPC rating with the submitted bid/tender as evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
M
M
M
Form factor
Performance
Capacity of
System
Scalability
M
TPC-H
benchmarking
M
M
M
Processor Type
Processor
speed
Core per
processor
Chipset
No of Processor
Total # of
Threads
No of Core
M
Memory (RAM)
M
M
M
M
Database Server (Minimum 2 Node Cluster with 4 Physical
Partitions in each Node) Each physical server shall be
configured with licenses to create more partitions in future at
no additional cost.
Rack Mountable/Blade Architecture
Bidder should submit Manufacturer benchmarking document
of offered system for the Transaction per second capacity
against the oracle 11g database system.
The Manufacturer Model quoted for a clustered system
should have expandability capacity minimum 400% of the
offered cores.
As for example:
3. If each node is 32 core then bidder may select such a
model of 64 core and the model of same node should
support a cluster system where core capacity is
32*400% = 128 core.
or
4. If each node is 32 core then bidder may select such a
model where core capacity is 32*400% = 128 core for a
cluster system.
Each Node shall require minimum 140,000 QphH@1000GB
to meet the TPC-H benchmarking (www.tpc.org). To comply
with this benchmark bidder shall provide suitable size
system with regards to processors and cores according to
analysis mentioned above. Bidder/Tenderer must attach
supporting documentation with the submitted bid/tender as
evidence.
64 Bit, RISC Processor
Minimum 2.5GHz RISC/EPIC or substantially equivalent to
be stated by the bidder/tenderer.
Number of cores per processor can be 8 or above
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer to follow the “Number of
Core Analysis for option-2 DB Machines”
Each NODE equipped with at least 512 GB DDR3 memories
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Cache Memory
M
Hard Disk
M
M
M
I/O Slot
System Memory
Bandwidth
(GB/s)
System I/O
Bandwidth
(GB/s)
LAN Adapter
M
FC Adapter
M
HCA card
M
DVD ROM
M
M
Power supply
Operating
System
M
Cluster Software
M
Requirement
but the full system will have expandability option to minimum
4TB DDR3 RAM.
Must offer the highest available cache for the offered system
and to be stated by the bidder/tenderer.
Each node should have Internal Hard disk 8 X 600GB
10,000 RPM (Minimum) SAS/FC Disk Drive with Mirroring
for Operating Systems (internal or external).
To be specify by the bidder/tenderer.
To be specify by the bidder/tenderer.
To be specify by the bidder/tenderer.
Each node shall have Min 8 X 10Gb Network port. Adapter
level redundancy shall be maintained.
Each node shall have Min 4 X Dual Port 8Gb FC Adapter.
Adapter level redundancy shall be maintained.
2 x 40Gbps IB HCA (for connecting SAN/ Infiniband switch)
including all connecting cables.
1x DVD-RW or equivalent device attached by which the
requirement will be fulfilled.
Redundant power supplies and cooling fans
64-bit UNIX Operating System with unlimited user license
along with the following features:
The vendor should guarantee the O/S backward
compatibility with oracle 11g database.
Any configuration change in one partition should not affect
any other partition unless desired
An error in one partition should not bring the entire system or
other partitions down
Each partition should be upgradeable separately and
independently without affecting other partitions.
Partition management software having dynamic
configuration feature with GUI / Web interface.
Management Consoles, for the same to be provided.
Redundant service processors with automatic failover
Redundant system clocks with dynamic failover
Hot-swappable disk bays
Hot-plug/blind-swap PCI slots
Hot-add I/O drawers
Hot-plug power supplies and cooling fans
Dynamic Processor Deallocation
Dynamic deallocation of logical partitions and PCI bus slots
C++ Software for UNIX should be included
Vendor must propose a two-node cluster Software.
Vendor must quote OS based Cluster software
The proposed cluster ware solution should provide:
Automatic package re-insertion
In flight transaction re-injection
No loss of session for user or batch process during failover.
Committed and uncommitted inflight transaction to be
protected.
The cluster solution must be able to provide fail over to the
other system triggered by failures in:
Hardware
Operating System
Partition
Application
210
Bidders
Response
Section V1. Technical Requirements
Level
Description
Requirement
M
Management
Software
M
High availabilitystandard server
features
M
Capacity on
Demand
capabilities
M
Authentication
M
Accessories
should Include
M
Spares Kit
should Include:
Please include Server Management Software tool for
simplifies server setup, health monitoring, power and
thermal control, and for remote administration
2N (N+N) redundant power supplies
N+1 fans (or greater depending on the load)
Online, replaceable, and redundant OA, utilities, clock, and
service processor subsystems
Fault Tolerant Crossbar Fabric built on dynamic multipathing and end-to-end retry technology
ECC on caches, Memory ECC, and double-chip spare
ECC, re-tries, and Link Width Reduction on data paths
Automatic de-configuration of memory and processors
I/O Advanced Error Recovery, and I/O isolation off Crossbar
Fabric
Support Physical Partition (Electrical Isolation) and Virtual
Partition
Support:
Instant Capacity on Demand
Temporary Instant Capacity on Demand
Global Instant Capacity on Demand
System must be configurable to up to 4 partitions / domains.
Each partition / domain must not share any system resource
(eg. CPU socket / Memory / I/O) with other partition /
domain.
Each partition / domain must be capable of independent
booting, patching, upgrades and states of operating system
kernel.
System must not have any CPU / Memory / I/O overhead
when more partitions and domains are hosted in the server.
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
• 2 x Redundant Power Distributions Units (PDUs) within
offered Rack including all required cables.
• 8 port (8GB) active SAN Switch with required cables .
• Database server should come with Rack (same brand of
supplied Server) where confirm the facilities of KVM Switch,
LCD rack Monitor, KVM Adapters of each port of KVM
switch, FC cables, UTP patch cords, etc.
• Rack should be perforated at front side and measurement
is [800(W)X42U(H)X1000mm(D)]. It should comply with
TIA/EIA standard and datacentre standard.
• 1 x 600 GB High Performance disks
• 1 x 400 GB Smart Flash Cache cards
• 1x FC Card
• Ethernet switch for administration of the Database Machine
• 1 x Redundant Power Distributions Units (PDUs)
• Spare parts included in the proposal to be owned by and
retained at customer premises.
M
Installation &
deployment
M
Warranty
The participating bidder shall provide one certified
Implementation Specialist from the proposed hardware
manufacturer who has significant experience on the
proposed Hardware in the provision of server partitioning,
RAC clustering, diagnostics and tuning. Deployment shall
run complete the successful implementation and
commissioning.
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
211
Bidders
Response
Section V1. Technical Requirements
Level
Description
212
Requirement
Bidders
Response
period including all maintenance and support for the system
from the date of commissioning and acceptance. The
Supplier shall be obliged to provide all services indicated in
GCC 1.1.(e) (xii). The post warranty services for the product
and services to be supplied in this package shall be included
in this contract. This service to be provided on an on-going
twelve (12) months renewal basis after three (3) years full
support with parts & services coverage. Renewal process
shall have to submit manufacturer warranty and this support
coverage document and support shall include 24 x 7
supports from Principal manufacturer and local partner.
13.4.
S.
No.
RDBMS Specification for DC & DR :
Feature
Requirement
(Essential OR
Desired)
1. The system will be an industry E
standard and leading Relational
Database Management system
(RDBMS).
2.
3.
4.
5.
The RDBMS
Will provide multiplatform/ OS
support for the ease of application
portability.
The database will include features
with which the database can be
recovered in minimal time
From user errors for example user
accidentally drops an important
Master table or even the Database.
The database will support nonescalating row level locking& support
multi-version read consistency and
provides concurrency
Whereby readers don't block writers
and writers don’t block readers
The database will have a complete
management tool so that
E
E
E
E
Optimizes database memory
structures based upon runtime
workload, i.e. to tune memory
structures as well as automated
storage management of data, storage
management, mirroring, stripping
freeing the DBA from manual storage
management.
6.
7.
The database will remain available E
more than 99.9% of the time running
with no degradation.
The database will support referential E
integrity.
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
8.
9.
10.
11.
12.
13.
14.
15.
16.
213
Feature
Requirement
(Essential OR
Desired)
Data redistribution within the
RDBMS will not involve downtime
when additional resources are added
to the DB platform as a part of an
expansion.
The DB platform will not require the
DBA to determine the physical
location of each table index partition
or simple table space; it shall be
managed by database itself.
The DB platform will be capable of
supporting system expansion
to cater to the increasing growth of
data volumes of up to 30,000
clearing / Day, without unloading/reloading data, without making
changes into load utilities, production
jobs and packages.
The RDBMS solution will be designed
so that hardware and software
failures are handled without the
entire system going offline. The
entire system in this context means
the Data Center (DC) and the Disaster
Recovery System (DRS).
The RDBMS solution will be able to
scale to multiple nodes with a shared
storage using a single database using
clustering. The clustering solution
must
provide
Active-Active
clustering.
The RDBMS architecture will allow
seamless addition to
Processing power and storage. It
must also support server level load
balancing at database tier.
The DB platform will support features
of built in hardware
Redundancy, fault tolerance and
ability to handle any single point of
failure.
The DB platform will support
seamless integration of failed units
That has been repaired.
The RDBMS will be continuously
available even in case of failure
within the system at unit level or CPU
level or other subsystem level.
E
E
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
17.
18.
19.
20.
21.
22.
23.
24.
25.
214
Feature
Requirement
(Essential OR
Desired)
The RDBMS offered will have
features to setup remote disaster
recovery systems.
The DB Platform will allow
parallelism for all operations like
loading,
query
,database
administration/management
operations like backup, restore,
creation& updates of index, creation
&refresh of materialized views etc.
Disaster Recovery Systems site will
be 'ON' at all times. In order to avoid
idle hardware, the features must
allow the DRS site to be used for
activities such as testing, reporting
etc. while it continuously applies
changes transmitted by primary
database.
The database will have support for
partitioning of heavy table data
transparent to the application.
The offered RDBMS
Solution will provide productionready Management tool.
The database will have the capability
of comprehensive online schema
reorganization/redefinition
The RDBMS solution will provide
index organized table capability to
increase performance and must
support
reverse
key
index
Implementation along with support
for built in advanced queuing
capability without additional costs.
The RDBMS solution will support the
capabilities to do diagnostic on both
database activities and hardware
capabilities to provide correlation
between database usages and
hardware performance and capability
to tune database structure, database
instance and also SQL statement for
improved performance.
The RDBMS solution will support a
single interface for management
console and other tools to provide
easy management of the system
including clusters.
E
E
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
215
Feature
Requirement
(Essential OR
Desired)
The RDBMS solution will provide
single interface for simplified
management and administration.
The RDBMS solution will support
simple user-friendly GU l tools for
database
administration
and
management.
The RDBMS solution will support
performance
and
workload
dashboards.
The RDBMS solution will support
query metrics repository for tuning
analysis, resource accounting and
capacity planning.
The management of DB platform will
not be dependent on availability of
any particular node in the system and
management / administration shall
continue in the event of failures.
The DB platform will support the
ability to automatically perform
Workload management.
The DB platform will support mixed
workload ca ability, simultaneous
support for load (real time/near realtime and bulk) as well as query
(simple &complex) operations in
addition to maintenance work.
The DB platform will support query p
prioritization feature.
The DB platform will support
dynamic resource allocation at
runtime for query operations is
present based on resources needed,
without any manual intervention.
The system will allow for limiting
resource usage like IO, CPU etc. by
the administrator.
The optimization of the queries in
the DB platform will be automated.
The optimization of queries in the DB
platform will automatically parallelize
queries.
The DB platform will support query
tuning
without
any
manual
intervention.
The DB platform will support query
optimizer, which supports
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
40.
41.
42.
43.
44.
45.
46.
Feature
Pipeline parallelism that allows
operators to start getting result sets
without having to wait for previous
operator to finish.
The DB Platform shall provide linear
scalability
without
diminishing
performance, across growing volume
of data, users, queries, complexity of
queries, database administration etc.
(RDBMS & OS).
The solution must be able to control
the execution of database commands
including DDL and DML access and
must be able to use environmental
parameters like IP Address or Time as
authentication mechanisms
The solution must not require Agent
installation at the database server
and must ensure security policies to
be enforced even if the system is
accessed from the console; i.e.
firewalls are bypassed
The solution should provide real time
query access to DR site without
stopping data synchronization with
production site.
The solution should automatically
detect and repair data block
corruption
The solution should provide powerful
security controls for protecting
applications and sensitive data.
Prevent privileged users from
accessing application data, restricts
ad-hoc database changes and
enforce control over how, when and
where application data can be
accessed.
The solution must be able to restrict
access to business information on a
need-to-know basis and able to
control the execution of database
commands including DDL and DML
access and as well as audited. Must
be flexible enough to restrict access
to an entire application schema or a
subset of tables. This functionality
should be part of RDBMS kernel.
216
Requirement
(Essential OR
Desired)
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
217
Feature
Requirement
(Essential OR
Desired)
The database should have support
for partitioning of heavy table data
transparent to the application.
RDBMS should support hash-hash
composite partitioning of tables
The database system should provide
automatic database performance
diagnosis and should automatically
maintain workload history facilities
and history performance analysis
SQL Access Advisor and Automatic
SQL Tuning advisor must be available
along with Real-time SQL monitoring
The solution should eliminate the
need for manual tuning by
comprehensive
solution
for
application and SQL tuning
The solution shall provide details of
the RDBMS regarding the query
execution path in a graphical manner
to aid understanding of the query
execution process
Bioinformatics analysis like ANOVA
analysis, BLAST, Hypothesis testing
available.
SQL Analytics features like Complex
calculations with MODEL clause,
Compute frequent item sets,
Cumulative Aggregates, functions like
NTILE, PIVOT, percentage, RANK,
Row Number must be available.
Security feature like Basic Auditing,
Column Access Control, Database
Role support, Encrypted Large object
data, Encryption APIs, Fine Grained
Auditing including DML support,
Hardware-Based
Master
Key
Protection, Label Security, Maintain a
long term history of data changes,
Password Policies, Row level security
must be available
Automated and integrated data
protection and disaster recovery,
Automatic
failover,
Automatic
resynchronization after network is
restored,
Automatic
resynchronization of old primary
database after a failover, Cascaded
E
E
E
E
E
E
E
E
E
E
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
Section V1. Technical Requirements
S.
No.
57.
58.
59.
60.
61.
62.
Feature
218
Requirement
(Essential OR
Desired)
Quantity
CPU /Min User
License
Perpetual
Remarks (please
justify
Customization)
standbys, Switchover and Zero data
loss capability must available.
Online Backup, DDL, Index creation, E
index reorganization, recovery &
restore, table move, segment shrink,
table redefinition & reorganization
and rebalance from storage removal
is available.
Failure reporting capability.
E
Automated Point In Time Recovery,
Automated, disk-based backup,
Automatic Data File Creation, Backup
Compression, Backup Throttling block
Level Media Recovery, Duplexed
Backups,
Incrementally Updated
backups facility available.
The DB platform will be a unified
solution
of
database
server,
operating system, storage and
associated management tool.
The DB platform will be preconfigured with servers, storage, OS
& RDBMS in a rack type setup.
The DB platform will be able to
support multi-generation hardware
to coexist to avoid hardware
redeployment keeping in mind future
upgrades or expansions to ensure
investment protection.
13.4.1.
E
E
E
E
Summary of Hardware and Software License
Bidder should propose the correct number of licenses according to processor per users to
ensure Ministry of Finance remains compliant. Bidder shall comply with the minimum oracle
database licenses required for the proposed DB Server based on the following method (Table
5.4.1) for individual manufacturer.
Details of Oracle Core Processor Licensing Factor (Updated 2013) specified in Oracle website
(http://www.oracle.com/us/corporate/contracts/processor-core-factor-table-070634.pdf).
Bidder should supply 75% of the total user licenses but 25% user licenses will supply within two(2)
years when required. This additional 25% of user licenses database software will only be considered if
expansions of the systems within 2 years necessitate the additional processing power and storage.
However, it is necessary for the bidder to include this requirement in overall package and quote it
separately for 25% but purchaser reserve the right to procure this part of the package at any time
within two years or not. When it necessary to deliver; Purchaser will notify to the bidder before 3
months prior to the deadline or earlier.
Table: 5.4.1
Section V1. Technical Requirements
219
Vendor and Processor
Number of
Core offered
in System
(Example)
Core
Processor
Licensing
Factor
(Details in
Oracle
Website)
Calculation of
Processor
license
No of User
license per
Processor
license
Total No of User
license required
for Database
Server
=P
=A
=B
C=A*B
=D
Total=C*D
INTEL
IBM RISC
SPARK T5 RISC
HP Integrity
Superdome 2/Intel
Itanium 9300 series;
Intel Itanium 9500
series
So on for other type
of processor
32
64
64
64
0.50
1.00
0.50
1.00
16
64
32
64
25
25
25
25
400
1600
800
1600
N.B “Number of core” specified in this table is an example of license in a system.
13.4.2.
Hardware Components
Database Machine warranty
Software Components
Database Machine hardware & software at DC
Metric
Machine
3Yr
support
4Yr
support
5Yr
support
Y
2Yr
support
Y
Y
Y
Y
1Yr
support
Units
1
Metric
Comply
Units
Database Licenses
Core Oracle Database Software
Oracle Database Enterprise Edition
ORACLE ENTERPRISE MANAGER OPS
CENTER 12C
Oracle Real Application Clusters
NUP
Follow Table: 5.4.1
and insert value
Y
Y
Y
Y
Y
NUP
Y
Y
Y
Y
Y
Oracle Partitioning
NUP
Y
Y
Y
Y
Y
Oracle Management Options
Oracle OEM Diagnostic Pack
NUP
Y
Y
Y
Y
Y
Oracle OEM Tuning Pack
NUP
Follow Table: 5.4.1
and insert value
Follow Table: 5.4.1
and insert value
Follow Table: 5.4.1
and insert value
Follow Table: 5.4.1
and insert value
Follow Table: 5.4.1
and insert value
Y
Y
Y
Y
Y
Oracle Backup Management
Oracle Secure Backup
Drive
4
Y
Y
Y
Y
Y
NUP
Follow Table: 5.4.1
and insert value
Y
Y
Y
Y
Y
3Yr
support
4Yr
support
5Yr
support
Y
Y
Y
Disaster Recovery
Oracle Active Data Guard
13.4.3.
Hardware Components
Database Machine
Software Components
Database Machine at DR
Metric
Units
Machine
1
Metric
Units
1Yr
support
Y
2Yr
support
Y
Comply
Section V1. Technical Requirements
220
Database Licenses
Core Oracle Database Software
Oracle Database Enterprise Edition
ORACLE ENTERPRISE MANAGER OPS
CENTER 12C
Oracle Real Application Clusters
NUP
Follow Table: 5.4.1
and insert value
Y
Y
Y
Y
Y
NUP
Y
Y
Y
Y
Y
Oracle Partitioning
NUP
Follow Table: 5.4.1
and insert value
Follow Table: 5.4.1
and insert value
Y
Y
Y
Y
Y
Oracle Management Options
Oracle OEM Diagnostic Pack
NUP
Y
Y
Y
Y
Y
Oracle OEM Tuning Pack
NUP
Follow Table: 5.4.1
and insert value
Follow Table: 5.4.1
and insert value
Y
Y
Y
Y
Y
Disaster Recovery
Oracle Active Data Guard
NUP
Follow Table: 5.4.1
and insert value
Y
Y
Y
Y
Y
13.5.
Level
Management Servers (1 unit at DC and 1 unit at DR)
Description
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
Form Factor
Processor
M
M
M
M
M
Cache Memory
Quick Path
Interconnect
Ram
M
Hard Disk Drive
M
RAID
M
M
M
Expansion Slot
Chassis Form Factor
Optical Drive
M
M
M
M
M
M
M
NIC
HBA Card
HCA
Graphics/Video
Bays
Power Supply
Cooling Fan
Requirement
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star for
quality assurance
Internationally reputed top five server manufacturer as per
latest Gartner rating. Bidder/Tenderer must attach latest
Gartner rating with the submitted bid/tender as evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack mount with the Rail Kit
Minimum 2x Eight-Core Intel® Xeon® Processor E5-2690
(20M Cache, 2.90 GHz, 8.00 GT/s Intel® QPI) or more
capacity or equivalent internationally reputed , industry
standard and widely used Processor
20 MB Cache per processor
Minimum 8.00 GT/s
32 GB DDR3 RAM Min 1066/1333/1600MHz expandable to
min 256GB
4 x 600 GB , 10K RPM (15K RPM if available), SAS hot
swappable Serial Attached (SAS) Hard Disk Expandable up to
8 Disk drives or more
Raid controller with min 512 MB Battery backed cache should
support RAID level 0, 1, 5, 10
Minimum six (6) PCI Express 3.0 slots
2U Rack Mountable with rails
Internal DVD-RW Drive, factory fitted or Remote DVD/Storage
(RKVMS) supported
Two(2) x Dual port 10G Ethernet NIC
1x dual port 10Gbps FC Cards
Two port 40Gbps IB HCA (for connecting Database machines)
Integrated graphics controller with minimum 8 MB Memory
Min 8 hot plug hard drive Bays
Hot Plug Redundant Power Supply
Redundant cooling fan
Bidders
Response
Section V1. Technical Requirements
Level
221
Description
Requirement
M
Remote Management
M
M
OS
System supported OS
M
Virtualization
(manager and Server)
Cluster ware
Warranty
Enterprise class remote management card with dedicated
network port
Remote KVM and Remote storage mapping shall support
Require enterprise class Management software. (for
management /monitoring/Administration of hardware and
software)
Oracle Linux
Windows, VM, Enterprise Linux Edition, Solaris 10, Oracle Ent.
Linux ,Redhat, SUSE etc.
Unlimited VM with Virtual Manager Software (Enterprise
Edition)
Linux Cluster ware or Oracle Linux Cluster ware
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three(3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
M
M
13.6.
Level
Backup/Media Servers (1 unit at DC and 1 unit at DR)
Description
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
Form Factor
Processor
M
M
M
M
Bidders
Response
M
Cache Memory
Quick Path
Interconnect
Ram
M
Hard Disk Drive
M
RAID
M
Expansion Slot
Requirement
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star for
quality assurance
Internationally reputed top five server manufacturer as per
latest Gartner rating. Bidder/Tenderer must attach latest
Gartner rating with the submitted bid/tender as evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack mount with the Rail Kit
Minimum 2x Eight-Core Intel® Xeon® Processor E5-2690
(20M Cache, 2.90 GHz, 8.00 GT/s Intel® QPI) or more
capacity or equivalent internationally reputed , industry
standard and widely used Processor
20 MB Cache per processor
Minimum 8.00 GT/s
64 GB DDR3 RAM Min 1066/1333/1600MHz expandable to
min 256GB
4 x 600 GB , 10K RPM(15K RPM if available), SAS hot
swappable Serial Attached (SAS) Hard Disk Expandable up to
8 Disk drives or more
Raid controller with min 512 MB Battery backed cache should
support RAID level 0, 1, 5, 10
Minimum six (6) PCI Express 3.0 slots
Bidders
Response
Section V1. Technical Requirements
Level
222
Description
Requirement
M
M
Chassis Form Factor
Optical Drive
M
M
M
M
M
M
M
M
NIC
HBA Card
HCA
Graphics/Video
Bays
Power Supply
Cooling Fan
Remote Management
M
M
OS
System supported OS
M
Virtualization
(manager and Server)
Cluster ware
Warranty
2U Rack Mountable with rails
Internal DVD-RW Drive, factory fitted or Remote DVD/Storage
(RKVMS) supported
Two(2) x Dual port 10G Ethernet NIC
1x dual port 10Gbps FC Cards
Two port 40Gbps IB HCA (for connecting Database machines)
Integrated graphics controller with minimum 8 MB Memory
Min 8 hot plug hard drive Bays
Hot Plug Redundant Power Supply
Redundant cooling fan
Enterprise class remote management card with dedicated
network port
Remote KVM and Remote storage mapping shall support
Require enterprise class Management software. (for
management /monitoring/Administration of hardware and
software)
Oracle Linux
Windows, VM, Enterprise Linux Edition, Solaris 10, Oracle Ent.
Linux ,Redhat, SUSE etc.
Unlimited VM with Virtual Manager Software (Enterprise
Edition)
Linux Cluster ware or Oracle Linux Cluster ware
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three(3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
M
M
13.7.
Level
Backup Storage Appliance (1 unit at DC)
Description
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
Form Factor
Hardware
Specifications
Controller
CPUs per Controller
M
M
M
M
Bidders
Response
Requirement
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star
for quality assurance
Internationally reputed top five backup storage appliance
manufacturer for pre-engineered Machine
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack mount with the Rail Kit comes with standard Rack.
SAN and NAS Storages Solution
2 x Controller System with high memory.
Intel Xeon based CPU
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Cache
M
Storage Operating
System
Client Operating
System Support
External Connectivity
Interface
M
M
M
Chassis
M
M
M
M
M
M
M
M
Power supply
File Level Protocol
Support
Block level Protocol
Support
Raid Level Supported
Disk Supported
Disk Storage required
Capacity
Disk Scalability
223
Requirement
8 cores per CPU or better
4 CPUs per Controller
8 x 73GB SSDs ( 8 x 73GB) - Write
4 x 512GB SSD (4 x 512GB) – Read
Operating System shall be storage-optimized distribution of
UNIX/LINUX
Storage system should support Red Hat Linux, Oracle Linux,
Windows Server 2008/2012 or higher
Four x 1 Gbps Ethernet and expandable up to 8 (NFS and
ISCSI Supported) per controller
2 x 40Gbps ports per controller (2 x IB card )
20-Meter High-Bandwidth QSFP/passive Optical Cable
4x QDR Ethernet QSFP Transceiver
2 x 8Gb FC Cards and 2 x cables (10m Cables to connect to
SAN switch)
1 Management Port
2 x 10G Ports including 10G SFP+
Bidder will deliver all related cables and transceiver required to
connect with interfaces.
Storage system should be Rack Mountable
Should provide a rack for the storage system
Should provide rack mount kits for the storage system
2 x Power supplies
NFS v2/v3/v4, CIFS, HTTP, WebDAV, FTP/SFTP/FTPS
iSCSI, Fibre Channel, IP over Infiniband , RDMA over
Infiniband
iSER, SRP
Striping, mirroring, triple-mirroring single-parity RAID, doubleparity RAID, triple-parity RAID, wide stripes
300GB/600GB (15K RPM), 3TB (7.2KRPM)
40 x 600GB (15K RPM)
44 x 3TB (7.2KRPM)
800 disk Drive or above
Reliability
The storage having Redundant, hot-swappable controllers ,
Power Supplies, cooling fans and disks. Individual disk drive
slot power control facilities.
Licensing
All licenses for the above storage system should be configured
& provided for the entire system capacity by the storage vendor
from Day ONE
M
RAID Support
Storage system should support RAID 0,1,10, 3,5,6
M
Supported OS
Windows Server 2003; Windows Server 2008; Linux; VMWare;
ESX; Solaris
Array
Management
Software
INCLUDED The management software will enable to manage
the whole storage system from a single point. There should be
a single OS to manage the storage system
M
M
M
M
Storage Software
Storage Software
Feature
Features for the proposed hardware configuration with
un-limited license without further additional costs.
Host Integration Tool including Remote Setup Wizard , Host
Software For Windows and Host Software For VMware, Hyperv, Array Software supports all the mention required features
and support un-limited license without further additional costs.
Support Thin Provision, Snapshot, Clone, Remote Replication
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Snapshots
M
M
Clone
Replication
M
Licenses
M
M
M
De-duplication
Thin Provision
Compression
M
M
Quota management
Directory services
Plugin
Data security
Antivirus Plug-in Via
ICAP
Network services
Dynamic Routing
M
M
M
M
224
Requirement
feature to provide disaster recovery and business Continuity.
Non-Disruptive array addition and removal; Multi-Path I/O;
Automatic load balancing , Storage Tiering, Online Data and
Volume Movement, Automatic load balancing of volumes
across RAID Types;
Read only, ,Restore, Microsoft Volume Shadow Copy Support
(VSS)
minimum 16 snapshots per source volume shall be supported
Read/write (clone)
1:N, N:1, manual, scheduled, continuous
Replication to lower end Storage in Same family
Replication Licenses (async/sync)
Snapshow Licenses
Inline, block-level de-duplication
Thin Provision should be supported.
Normal Compression
LZJB (Fastest)
GZIP-2 (Fast)
GZIP (Default)
GZIP-9 (Best Compression)
Oracle EHCC (optional)
user based quota , volume based quota
Microsoft AD, LDAP, NIS including (Authentication and
Authorization, Quota management)
Checksum data and metadata, antivirus quarantine
Storage system should support and interoperable with all major
virus guards (including Sophos)
NTP, DHCP, SMTP
The RIP (Routing Information Protocol) is a distance-vector
dynamic routing protocol that is used by the appliance to
automatically configure optimal routes based on messages
received from other RIP-enabled on-link hosts (typically
routers). The appliance supports both RIPv1 and RIPv2 for
IPv4, and RIPng for IPv6. (Optional)
The HTTP service provides access to file systems using the
HTTP and HTTPS protocols and the HTTP extension
WebDAV (Web based Distributed Authoring and Versioning).
This allows clients to access shared file systems through a
web browser or as a local file system if their client software
supports it.
The NDMP (Network Data Management Protocol) service
enables the system to participate in NDMP-based backup and
restore operations controlled by a remote NDMP client called a
Data Management Application (DMA)
Storage should have NDMP backup facility for all logical
volumes and restore facility NDMP v3/v4 protocol Supported
Backups and Normal Backup
For Symantec Netback up, Oracle Secure Backup , Tivoli
Backup
Features for the proposed hardware configuration with
un-limited license without further additional costs.
M
WebDev Protocol
Support
M
NDMP Backup
M
Management and
Monitoring
M
Monitoring
Storage system should have software utilities which would
provide pro active maintenance of disk drives, bad blocks,
system check etc. The software should be provided from Day
ONE.
M
Management
BUI based and CLI Based Via HTTPS, SSH, SNMP v1/v2c,
IPMI
Bidders
Response
Section V1. Technical Requirements
Level
M
Description
Monitoring Tool
M
M
M
M
M
M
Monitoring and
Analytics
Analytics Capabilities
Set1 (Example)
M
Analytics Capabilities
Set2 (Example)
M
Analytics Capabilities
Set3 (Example)
M
Software
M
Automated
serviceability
Support and
Maintenance
M
M
M
M
M
Warranty/Support
225
Requirement
Role based Access Control
Work Flow automation
Appliance should provide real time monitoring/alerting tool to
monitor i/o performance
The monitoring tool should be capable of reporting allocation
patterns/ and analyzing i/o behaviour
Detailed Hardware View
Management Dashboards
The monitoring tool should be capable of defining alerts and
threshold levels for events on i/o performance, volume
capacity changes, and hardware and software related events
and relaying alerts as emails.
Details Analytics module (for system tuning and debugging);
Dashboard monitoring for key system performance metrics
Network based Analytics
Network bytes/sec
NFSv3 operations/sec
Disk operations/sec
CPU utilization
"NFS operations/sec"
"NFS operations/sec by type"
"NFS operations/sec of type read by client"
"NFS operations/sec of type read for client broken down by
filename
Analytics by protocol
Cache related Analytics
Application level Analytics
Client/User based analytics
Vendor shall provide all related software to replicate etc with
un-limited license without further additional costs.
"Phone Home" capability with automatic case creation,
configurable alerts
Support and Maintenance for Hardware and Software
Availability of Principal Manufacturer’s technical Assistance/
Support Center access and Support Service on 24Hrs x 365
Days basis. (for HW and Software)
Software Version Upgrades and Bug fixes
Hardware Replacement from the failure should follow the SLA.
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
Bidders
Response
Section V1. Technical Requirements
13.8.
Level
Backup Storage Appliance: (1 unit at DR)
Description
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
Form Factor
Hardware
Specifications
Controller
M
M
M
M
CPUs per Controller
M
Cache
M
Storage Operating
System
Client Operating
System Support
External Connectivity
Interface
M
M
M
Chassis
M
M
M
M
M
M
M
M
M
226
Power supply
File Level Protocol
Support
Block level Protocol
Support
Raid Level Supported
Disk Supported
Disk Storage required
Capacity
Disk Scalability
Requirement
ISO 9001/9002 for manufacturer, FCC Class B, Energy Star
for quality assurance
Internationally reputed top five backup storage appliance for
pre-engineered Machine
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack mount with the Rail Kit comes with standard Rack.
SAN and NAS Storages Solution
2 x Controller System with high memory.
Intel Xeon based CPU
8 cores per CPU or better
4 CPUs per Controller
8 x 73GB SSDs ( 8 x 73GB) - Write
4 x 512GB SSD (4 x 512GB) – Read
Operating System shall be storage-optimized distribution of
UNIX/LINUX
Storage system should support Red Hat Linux, Oracle Linux,
Windows Server 2008/2012 or higher
Four x 1 Gbps Ethernet and expandable up to 8 (NFS and
ISCSI Supported) per controller
2 x 40Gbps ports per controller (2 x IB card )
20-Meter High-Bandwidth QSFP/passive Optical Cable
4x QDR Ethernet QSFP Transceiver
2 x 8Gb FC Cards and 2 x cables (10m Cables to connect to
SAN switch)
1 Management Port
2 x 10G Ports including 10G SFP+
Bidder will deliver all related cables and transceiver required to
connect with interfaces.
Storage system should be Rack Mountable
Should provide a rack for the storage system
Should provide rack mount kits for the storage system
2 x Power supplies
NFS v2/v3/v4, CIFS, HTTP, WebDAV, FTP/SFTP/FTPS
iSCSI, Fibre Channel, IP over Infiniband , RDMA over
Infiniband
iSER, SRP
Striping, mirroring, triple-mirroring single-parity RAID, doubleparity RAID, triple-parity RAID, wide stripes
300GB/600GB (15K RPM), 3TB (7.2KRPM)
40 x 600GB (15K RPM)
44 x 3TB (7.2KRPM)
800 disk Drive or above
Reliability
The storage having Redundant, hot-swappable controllers ,
Power Supplies, cooling fans and disks. Individual disk drive
slot power control facilities.
Licensing
All licenses for the above storage system should be configured
& provided for the entire system capacity by the storage vendor
from Day ONE
Bidders
Response
Section V1. Technical Requirements
Level
M
M
M
M
Description
Storage system should support RAID 0,1,10, 3,5,6
Supported OS
Windows Server 2003; Windows Server 2008; Linux; VMWare;
ESX; Solaris
Array
Management
Software
INCLUDED The management software will enable to manage
the whole storage system from a single point. There should be
a single OS to manage the storage system
Storage Software
Storage Software
Feature
M
Snapshots
M
M
Clone
Replication
M
Licenses
M
M
M
De-duplication
Thin Provision
Compression
M
M
Quota management
Directory services
Plugin
Data security
Antivirus Plug-in Via
ICAP
Network services
Dynamic Routing
M
M
Requirement
RAID Support
M
M
M
227
M
WebDev Protocol
Support
M
NDMP Backup
Features for the proposed hardware configuration with
un-limited license without further additional costs.
Host Integration Tool including Remote Setup Wizard , Host
Software For Windows and Host Software For VMware, Hyperv, Array Software supports all the mention required features
and support un-limited license without further additional costs.
Support Thin Provision, Snapshot, Clone, Remote Replication
feature to provide disaster recovery and business Continuity.
Non-Disruptive array addition and removal; Multi-Path I/O;
Automatic load balancing , Storage Tiering, Online Data and
Volume Movement, Automatic load balancing of volumes
across RAID Types;
Read only, ,Restore, Microsoft Volume Shadow Copy Support
(VSS)
minimum 16 snapshots per source volume shall be supported
Read/write (clone)
1:N, N:1, manual, scheduled, continuous
Replication to lower end Storage in Same family
Replication Licenses (async/sync)
Snapshow Licenses
Inline, block-level de-duplication
Thin Provision should be supported.
Normal Compression
LZJB (Fastest)
GZIP-2 (Fast)
GZIP (Default)
GZIP-9 (Best Compression)
Oracle EHCC (optional)
user based quota , volume based quota
Microsoft AD, LDAP, NIS including (Authentication and
Authorization, Quota management)
Checksum data and metadata, antivirus quarantine
Storage system should support and interoperable with all major
virus guards (including Sophos)
NTP, DHCP, SMTP
The RIP (Routing Information Protocol) is a distance-vector
dynamic routing protocol that is used by the appliance to
automatically configure optimal routes based on messages
received from other RIP-enabled on-link hosts (typically
routers). The appliance supports both RIPv1 and RIPv2 for
IPv4, and RIPng for IPv6. (Optional)
The HTTP service provides access to file systems using the
HTTP and HTTPS protocols and the HTTP extension
WebDAV (Web based Distributed Authoring and Versioning).
This allows clients to access shared file systems through a
web browser or as a local file system if their client software
supports it.
The NDMP (Network Data Management Protocol) service
enables the system to participate in NDMP-based backup and
Bidders
Response
Section V1. Technical Requirements
Level
Description
228
Requirement
restore operations controlled by a remote NDMP client called a
Data Management Application (DMA)
Storage should have NDMP backup facility for all logical
volumes and restore facility NDMP v3/v4 protocol Supported
Backups and Normal Backup
For Symantec Netback up, Oracle Secure Backup , Tivoli
Backup
Features for the proposed hardware configuration with
un-limited license without further additional costs.
M
Management and
Monitoring
M
Monitoring
Storage system should have software utilities which would
provide pro active maintenance of disk drives, bad blocks,
system check etc. The software should be provided from Day
ONE.
M
Management
M
Monitoring Tool
BUI based and CLI Based Via HTTPS, SSH, SNMP v1/v2c,
IPMI
Role based Access Control
Work Flow automation
Appliance should provide real time monitoring/alerting tool to
monitor i/o performance
The monitoring tool should be capable of reporting allocation
patterns/ and analyzing i/o behaviour
Detailed Hardware View
Management Dashboards
The monitoring tool should be capable of defining alerts and
threshold levels for events on i/o performance, volume
capacity changes, and hardware and software related events
and relaying alerts as emails.
Details Analytics module (for system tuning and debugging);
Dashboard monitoring for key system performance metrics
Network based Analytics
Network bytes/sec
NFSv3 operations/sec
Disk operations/sec
CPU utilization
"NFS operations/sec"
"NFS operations/sec by type"
"NFS operations/sec of type read by client"
"NFS operations/sec of type read for client broken down by
filename
Analytics by protocol
Cache related Analytics
Application level Analytics
Client/User based analytics
Vendor shall provide all related software to replicate etc with
un-limited license without further additional costs.
"Phone Home" capability with automatic case creation,
configurable alerts
Support and Maintenance for Hardware and Software
M
M
M
M
M
M
Monitoring and
Analytics
Analytics Capabilities
Set1 (Example)
M
Analytics Capabilities
Set2 (Example)
M
Analytics Capabilities
Set3 (Example)
M
Software
M
Automated
serviceability
Support and
Maintenance
M
M
M
M
M
Warranty/Support
Availability of Principal Manufacturer’s technical Assistance/
Support Center access and Support Service on 24Hrs x 365
Days basis. (for HW and Software)
Software Version Upgrades and Bug fixes
Hardware Replacement within eight (08) hours from the failure
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
Bidders
Response
Section V1. Technical Requirements
Level
Description
229
Requirement
Bidders
Response
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty and this support coverage document
and support shall include 24 x 7 supports from Principal
manufacturer and local partner.
13.9.
Training and Training Material
Bidder should propose local training at Dhaka city for the following modules:
No of
Participants
20
10
6
4
4
10
Name of Training
Duration
Oracle Database on Oracle 11g
Real Application Clusters (RAC) and Oracle implement partitioning on
Oracle 11g
Database Administrator and Performance Tuning on Oracle 11g
System Administration on Operating System & Hardware Engineering
Systems
Oracle Active Data Guard Administration and oracle secure backup
80 hour
80 hour
Technology sharing study tour at Singapore or Malaysia for
DMTBF Technical Core committee.
80 hour
80 hour
80 hour
5 days
The recommended training should consider as 50% theoretical including questionnaire/assignment on
class and 50% practical for each participant. It should cover the certification for the above courses.
This training module should also cover the offered server and its software as well as hand on training
to expertise on the offered resources. To get the approval from authority; winner Bidder should submit
details of training topics and content after discussion with purchaser. Bidder should supply training
material, declare suitable venue and arrange necessary original vendor certified training material, food
refreshment for all trainee during the training session. Those training differentiate candidates in the
marketplace by providing a competitive edge through proven expertise. Up-to-date training and field
experience certified trainers are recommended.
For 5 days Technology sharing study tour; Bidder shall arrange two appointments to the
organizations either at Singapore or Malaysia where similar type of robust systems has been
running smoothly for three years. Their recommendation based on this workshop enhances
the future improvement of the Systems smooth operation. However; Bidder shall make all
appropriate logistical arrangements (both way airfare i.e Return AirTicket, visa fee, local
transportation, airport pickup, 3-star hotel accommodation for each participant in single
room, food, US$100 per diem per participant) for such workshop. Bidder should include all
those facilities and details quote the same.
14.
Resource Allocation
•
The Bidder must submit as part of their proposal a detailed plan including required manpower
to support the supplied Hardware and Software. Manpower can be changed with the advance
approval of the Purchaser but sufficient resources must be available to cover such instances
as resignation or unavailability of allocated support staff. The participating bidder shall assign
at least two (2) Engineers during the contract period where at least one Certified Hardware
engineer for the proposed hardware solution and a certified oracle 11g expert. The
participating bidder shall provide relevant document and certificate with the proposal.
Section V1. Technical Requirements
230
• To give instant support service and maintenance works; Bidder should dedicate minimum of
two qualified engineers during the office hour for Lot-A with the approval of purchaser.
Section V1. Technical Requirements
231
LOT-B APPLICATION SERVERS
15.
General Requirements:
1. Language Support: All information technologies must provide support for the English.
Specifically, all display technologies and software must support the ISO character set
and perform sorting according to Bangladesh Standard.
2. DATES: All information technologies MUST properly display, calculate, and transmit
date data, including, but not restricted to 21st-Century date data. Required Date
formats are DD-MM-YYYY, DD-Month-YYYY, Month DD, YYYY etc. where DD, MM
and YYYY represent two-digit date value, two-digit month value and four-digit year
value respectively as prescribed by Gregorian calendar and Bangla Academy for
Bengali calendar.
3. Electrical Power: All active (powered) equipment must operate on voltage range 220v
+/- 20v and frequency range 50Hz +/- 2Hz. All active equipment must include power
plugs standard in BANGLADESH.
4. Environmental: Unless otherwise specified, all equipment must operate in
environments of 04 to 45 degrees centigrade, 20 to 95 percent relative humidity, and
0 to 40 grams per cubic meter of dust.
5. Safety:
Unless otherwise specified, all equipment must operate at noise levels no greater
than 52 decibels.
All electronic equipment that emits electromagnetic energy must be certified as
meeting US FCC class B or EN 55022 and EN 50082-1, or equivalent,
emission standards.
6. The offered brand should be amongst the top 5 (five), according to the most recent
assessment of a reputed global market analyst, such as ‘Gartner’.
7. Licensing for all software (where applicable) must be registered through Regional
Headquarters, under which Bangladesh falls, of the global software vendors for
ensuring convenient upgrade facility and renewal (as and when necessary) by the
time of operational acceptance test is completed. Service and maintenance should be
provided locally for the project period including post warranty support services.
8. The Bidder should provide authorization letter(s) from the respective hardware and
software vendor(s).
9. The bidder must submit the bid for all the components with detailed specification as
per defined Technical, Financial, Legal & General requirements. In case of incomplete
or insufficient data the bid may be considered as non-responsive
16.
Technical Qualification criteria
Sl.
Technical Criteria of participating bidder
21.
Windows Software Certified Expert:
Bidder must have at least one Windows certified Professional from each
category in below.
k) Certified Professional of Private Cloud deployment
l) Certified Professional of SCVMM deployment
m) Certified Professional of SCCM & SCOM deployment
n) Certified Expert on Real Application Clusters (RAC) deployment
Total Weighting
factor 100%
5%
Section V1. Technical Requirements
Sl.
22.
23.
24.
25.
26.
Technical Criteria of participating bidder
Copy of relevant certificate must be provided as proof of their experience.
Experts for Implementation and Operation:
iii. The participating bidder shall have at least one Certified
Implementation Specialist who has significant experience on
the proposed Hardwares in the provision of server installation
and partitioning, diagnostics and tuning.
iv. The participating bidder shall assign at least two (2) Engineers
during the contract period where at least one Certified
Hardware engineer for the proposed hardware solution and a
certified Microsoft solution expert. The participating bidder
shall provide relevant document and certificate with the
proposal.
Stock Experience:
The participating bidder must have sufficient spares of similar product
kept for the other customers as suggested by Manufacturer. The record of
documentation carries the weight and evidence shall provide with the
proposal.
Support Service:
The participating bidder has the capability of providing support 24/7
support including parts replacement along with the certified engineers.
Bidder shall provide similar type of customer experience record with the
proposal for the support service and submit details of support delivery
steps.
Virtualization & Communication:
The participating bidder should have expertise on
i. Hyper-V replication, Private Cloud, Synchronization and Windows
live migration, System center 2012
ii. Exchange Server and Lync Servers planning implementation &
operation experience.
Certificates and the record of documentation of above expertise carry the
weight and evidence shall be provided with the proposal.
If the participating bidder is Sole Distributor or Distributor or Highest
level of partnership of the proposed Hardware manufacturer; relevant
certificate and contact details should be provided with proposal shall carry
the weight.
232
Total Weighting
factor 100%
5%
5%
5%
5%
2.5%
Hardware
27.
Application server (4 Unit for DC & 4 Unit for DR )
20
28.
Report Server (1 Unit for DC & 1 Unit for DR )
10
29.
Test and Development Server (1 Unit for DC & 1 Unit for DR)
2.5
30.
Data Centre Management Server (1 Unit for DC & 1 Unit for DR)
2.5
31.
Primary Domain Controller (1 Unit for DC)
2.5
32.
Additional Domain Controller (1 Unit for DC & 1 Unit for DR)
2.5
33.
Patch Management Server: (1 Unit for DC)
2.5
Section V1. Technical Requirements
Sl.
Technical Criteria of participating bidder
233
Total Weighting
factor 100%
34.
Mail Server: (1 Unit for DC & 1 Unit for DR)
5
35.
Backup Tape System: (1 Unit for DC)
5
36.
Blade Chassis (if blade solution - 1 Unit for DC & 1 Unit for DR)
2.5
37.
2.5
39.
Fabric switches: ( 2 Unit for DC & 1 Unit for DR)
Load Balancer & Application Delivery Controllers (1 Unit for DC &1 Unit
for DR)
Software
Experience on Double-Take Solution
40.
Microsoft Premier Support service experience.
38.
17.
5
5
5
SCOPE OF WORK
Following requirements define the scope of work of this tender.
•
The Selected Bidder will be responsible for the supply, installation, Integration,
testing and commissioning of all equipment and components in the said location.
•
The Selected Bidder will be responsible for the supply all patch cable, fibre patch
cord, power cable related to hardware implementation. For datacentre decoration,
every connecting cable should be organized with rack.
•
Selected Bidder must ensure that the supplied equipment is fully operational, new and
performs properly and meet the Technical Specification.
•
At the time of installation and commissioning, Selected Bidder must provide
Comprehensive system documentation of system deployed including diagrams,
labelling, schematics, configuration and manuals etc.
•
Selected bidder shall be responsible for minimum five year services (operation &
maintenance) as per SLA clauses for all the equipment provided, without any extra
cost or hidden charges.
18.
Resource Allocation
• The Bidder must submit as part of their proposal a detailed plan including required
manpower to support the supplied Hardware and Software. Manpower can be
changed with the advance approval of the Purchaser but sufficient resources must be
available to cover such instances as resignation or unavailability of allocated support
staff.
• To give instant support service and maintenance works; Bidder should dedicate
minimum of two qualified engineers during the office hour for Lot-B with the
approval of purchaser.
Section V1. Technical Requirements
234
19. Documentation Requirements
19.1.
END-User documents:
The Bidder should provide detail information regarding the documentation that will be
supplied with the system. The following minimum documentation (hard copy and soft copy)
on the proposed systems must be made available in English:
A. Project Documentation
• Project Management Controls
• Project Plans
• Implementation Controls
• Quality Controls
• Scope Management Controls
• Progress Reports
B. System Documentation
• Requirement Specifications
• Technical Specifications
• System Descriptions & Specifications
• Installation Manuals
• System Administration Guide
• Maintenance Documentation
C. User Documentation
• Training Requirements
• Training Documentations
• User Guides
• Administrator Documentations
• Transaction Processing Guidelines
• Operational Processing Guidelines
• Operational Procedures
• Error Correction Procedures
D. Testing Specifications
19.2.
Technical Documents:
•
•
•
•
Documentation should be consistent with international standards
Documentation should be user-friendly
Documentation should be indexed
Diagrams and schematics should be provided where possible to facilitate
practical understanding. The Vendor must assure on-going documentation
updates
Technical documentation appropriate to the hardware and systems that are being provided
must be made available in both hard copy and soft copy (CD-ROM). A commitment to
providing updated versions must be given.
Section V1. Technical Requirements
235
20. Production Datacentre (At Secretariat)
20.1.
Application server (4 Unit for DC)
Level
Description
M
Quality
M
Brand
M
M
M
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
M
PCIe Flash card
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
M
Operating System
support
Management
Software
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-4650 (20M Cache, 2.70 GHz,
8.00 GT/s Intel® QPI) or E5-4650L (20M Cache, 2.60
GHz, 8.00 GT/s Intel® QPI) or equivalent internationally
reputed , industry standard and widely used Processor
8 cores per processor
4 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 256 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Min 1 X 320GB SLC SSD PCIe Flash card
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four(4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
• 1x Dual port 1/10Gb Ethernet Network Adapter
including 1Gb and 10Gb SFP+ with required cables
connecting to Cisco Nexus 5548UP switch
• 1 X 8 GB Dual Port Fiber Channel Host Bus Adapter
including Multimode Fiber and SFP+
• Min 40Gb/s speed 1x Dual port InfiniBand HCA card
(Vendor shall supply all SFP+ modules , fiber cables to
match with offered IB switch .)
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Microsoft/equivalent Internationally reputed, Industry
standard and widely used proprietary Operating System
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
M
Warranty
20.2.
Level
236
Requirement
Bidders
Response
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts
& services coverage. Renewal process shall have to
submit manufacturer warranty, part number This support
coverage document and support shall include 24 x 7
supports from Principal manufacturer and local partner
Report Server (1 Unit for DC)
Description
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
M
Manufacture
Form factor
Processor Type
M
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
M
PCIe Flash card
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
237
Requirement
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-4650 (20M Cache, 2.70
GHz, 8.00 GT/s Intel® QPI) or E5-4650L (20M Cache,
2.60 GHz, 8.00 GT/s Intel® QPI) or equivalent
internationally reputed , industry standard and widely
used Processor
8 cores per processor
4 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 256 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 8 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Min 1 X 320GB SLC SSD PCIe Flash card
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum four(4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
• 1x Dual port 1/10Gb Ethernet Network Adapter
including 1Gb and 10Gb SFP+ with required cables
connecting to Cisco Nexus 5548UP switch
• 1 X 8 GB Dual Port Fiber Channel Host Bus Adapter
including Multimode Fiber and SFP+
• Min 40Gb/s speed 1x Dual port InfiniBand HCA card
(Vendor shall supply all SFP+ modules , fiber cables to
match with offered IB switch.)
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Authentication
M
Accessories
M
Warranty
20.3.
Level
238
Requirement
Bidders
Response
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
Test and Development (1 Unit for DC)
Description
Requirement
M
Quality
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
M
Brand
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
M
M
M
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-2690 (20M Cache, 2.90
GHz, 8.00 GT/s Intel® QPI) or more capacity or
equivalent internationally reputed , industry standard and
widely used Processor
8 cores per processor
2 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 128 GB DDR3 1333MHz RDIMMs with
Expandability
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
M
Warranty
239
Requirement
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
2x Dual (2) port 1Gb Ethernet Network Adapter (Must
support Teaming and VLAN)
1x Dual port FC adapter
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
Bidders
Response
Section V1. Technical Requirements
Level
Description
240
Requirement
Bidders
Response
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
20.4.
Level
Data Centre Management Server (1 Unit for DC)
Description
Requirement
M
Quality
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
M
Brand
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
M
M
M
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-2690 (20M Cache, 2.90
GHz, 8.00 GT/s Intel® QPI) or more capacity or
equivalent internationally reputed , industry standard and
widely used Processor
8 cores per processor
2 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 128 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
2x Dual (2) port 1Gb Ethernet Network Adapter (Must
support Teaming and VLAN)
1x dual port FC adapter
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
M
Warranty
20.5.
Level
241
Requirement
Bidders
Response
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
Primary Domain Controller (1 Unit for DC)
Description
Requirement
M
Quality
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
M
Brand
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
M
Model
To be stated by the bidder/tenderer.
Bidders
Response
Section V1. Technical Requirements
Level
242
Description
Requirement
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
M
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
M
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-2690 (20M Cache, 2.90
GHz, 8.00 GT/s Intel® QPI) or more capacity or
equivalent internationally reputed , industry standard and
widely used Processor
8 cores per processor
2 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 64 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 300GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
2 X Dual (2) port 1Gb Ethernet Network Adapter (Must
support Teaming and VLAN)
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Accessories
M
Warranty
20.6.
Level
243
Requirement
Bidders
Response
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
Additional Domain Controller (1 Unit for DC)
Description
Requirement
M
Quality
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
M
Brand
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
M
M
M
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-2690 (20M Cache, 2.90
GHz, 8.00 GT/s Intel® QPI) or more capacity or
equivalent internationally reputed , industry standard and
widely used Processor
8 cores per processor
2 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 64 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 300GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
M
Warranty
244
Requirement
2 X Dual (2) port 1Gb Ethernet Network Adapter (Must
support Teaming and VLAN)
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
Bidders
Response
Section V1. Technical Requirements
20.7.
Level
245
Patch Management Server: (1 Unit for DC)
Description
Requirement
M
Quality
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
M
Brand
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
M
M
M
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
Management
Software
M
Availability
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-2690 (20M Cache, 2.90
GHz, 8.00 GT/s Intel® QPI) or more capacity or
equivalent internationally reputed , industry standard and
widely used Processor
8 cores per processor
2 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 128 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
2 X Dual (2) port 1Gb Ethernet Network Adapter (Must
support Teaming and VLAN)
1x 8Gb FC card
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
M
Warranty
20.8.
Level
246
Requirement
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number. This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
Mail Server: (1 Unit for DC)
Description
Requirement
M
Quality
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
M
Brand
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
M
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
M
Bidders
Response
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-4650 (20M Cache, 2.70
GHz, 8.00 GT/s Intel® QPI) or E5-4650L (20M Cache,
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
247
Requirement
2.60 GHz, 8.00 GT/s Intel® QPI) or equivalent
internationally reputed , industry standard and widely
used Processor
8 cores per processor
4 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 128 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
• 1x Dual port 1/10Gb Ethernet Network Adapter
including 1Gb and 10Gb SFP+ with required cables
connecting to Cisco Nexus 5548UP switch
• 1x 8 GB Dual Port Fiber Channel Host Bus Adapter
including Multimode Fiber and SFP+
1X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
Bidders
Response
Section V1. Technical Requirements
Level
M
Description
Warranty
20.9.
Level
248
Requirement
Bidders
Response
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number. This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
Backup Tape System: ( 1 Unit for DC)
Description
Requirement
M
Quality
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
M
Brand
Internationally reputed top five server manufacturer as per
latest Gartner rating. Bidder/Tenderer must attach latest
Gartner rating with the submitted bid/tender as evidence.
M
M
M
Model
Country of origin
Country of
Manufacture
Form Factor
Brand
Model
Mounting
Interface
Tape Cartridges
supply
Number of Drive
Slots
Cartridge
Characteristics
Cartridge Media Type
Cartridge Substrate
Cartridge physical
Capacity
Drive Technology
Minimum Number of
Drives
Maximum Capacity
(2:1 compression)
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Rack mount with the Rail Kit
Internationally reputed brand
To be mentioned by the Bidder
Rack Mounted
FC Interface 8Gb speed
Hundred (100) LT05 Data and 5 cleaning cartridge
Minimum two (2)
Up to 48
Linear serpentine recording half-inch cartridge
Metal Particle (MP)
Polyethylene Naphthalate (PEN)
1.5 TB ( uncompressed) each data tape cartridge
1.5 TB Native; 3.0 TB with 2:1 compression
LTO-5 Ultrium
2 (Ultrium)
Up to 72 TB (LTO-5) compressed 2:1 with LTO Ultrium 5; 36
TB native
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Barcode Reader
M
M
Encryption capability
Connectivity
M
Management
M
Accessories
M
M
Warranty
20.10.
249
Requirement
Bidders
Response
Standard but Bar codes may also be required for each tape
cartridge. Bidder shall facilitate those and quote the same.
AES 256-bit
Offered Tape Library provides 8Gbps native FC connectivity to
SAN switches.
Offered Tape Library provides web based remote
management.
Supplier shall provide all necessary cables , FC adapter, SFP,
patch cord etc
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals, brackets
accessories, wire managers, Registration or warranty card etc.
comes in a package.
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty, part number. This support coverage
document and support shall include 24 x 7 supports from
Principal manufacturer and local partner.
Blade Chassis for DC (if blade solution)
Level
Description
Requirement
M
Form factor
M
Power Supplies
M
Cooling fans
Modular enclosure holds minimum six (6) full-height, twelve(12)
half-height, or twenty four (24) quarter-height blade servers
Minimum six hot-plug power supplies
Supported power supply configurations include:
• 3+3 and 2+2 (AC redundancy)
• 2+1, 3+1, 4+2, and 5+1 (power supply redundancy)
• 2+0 and 3+0 (non-redundant mode)
Minimum Nine (9) hot-pluggable, redundant fan modules
M
Input device
M
I/O modules
M
Management
Front Control Panel with interactive Graphical LCD:
• Supports initial configuration wizard
• Local server blade, enclosure, and module information and
troubleshooting
Two USB Keyboard/Mouse connections and one Video
connection (required for Avocent®,
iKVM switch to enable these ports) for local front “crash cart”
console connections that can be switched between blades
Minimum six total blade I/O modules for three fully redundant
fabrics that take
advantage of a fully passive midplane that can scale up to 8.4
Tbps with current
technologies featuring 1/10 Gb Ethernet to servers, 40Gb
Ethernet to top-of-rack
switches, Fibre Channel 8 Gb, and InfiniBand
QDR/FDR10/FDR . (This is specified in server specification.)
One (standard) or a second optional (redundant) Chassis
Bidder’s
Response
Section V1. Technical Requirements
M
Accessories
M
Warranty
20.11.
Level
Management Controller(s)
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals, brackets
accessories, wire managers, Registration or warranty card etc.
comes in a package.
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty, part number. This support coverage
document and support shall include 24 x 7 supports from
Principal manufacturer and local partner.
InfiniBand switch: ( 1 Unit for DC)
Description
M
Quality
M
Brand
M
M
M
Model
Country of origin
Country of
Manufacture
No of port
Form factor
InfiniBand HCA
supported switch
feature
M
M
M
250
M
Feature
M
Accessories
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top five infiniband fabric switch
manufacturer or OEM as per latest Gartner rating.
Bidder/Tenderer must attach latest Gartner rating with the
submitted bid/tender as evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Maximum 36 port
Rack Mountable
The servers listed here has PCI express 3.0 technology
where each server listed with IB card should support FDR
56Gb/s or 40Gb/s InfiniBand switch but make sure that
offered FDR 56Gb/s IB HCA card should compatible with
offered FDR 56Gb/s InfiniBand Switch or offered 40Gb/s
IB HCA card should compatible with offered 40Gb/s
InfiniBand Switch.
Industry-leading, switch platform in performance, power,
and density
Highest ROI - designed for energy and cost savings
Ultra low latency
Granular QoS for Cluster, LAN and SAN traffic
Quick and easy setup and management
Maximizes performance by removing fabric congestions
Fabric Management for cluster and converged I/O
applications
Manageable switch
Vendor will supply all SFP+ modules and cables to connect
servers specified in document and switches.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals, brackets
accessories, wire managers, Registration or warranty card
etc. comes in a package.
Bidders
Response
Section V1. Technical Requirements
Level
M
Description
Warranty
20.12.
Level
Description
Quality
M
M
M
M
Brand
Model
Country of origin
Country of
Manufacture
Requirement
M
M
Requirement
Bidders
Response
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in this
package shall be included in this contract. This service to
be provided on an on-going twelve (12) months renewal
basis after three (3) years full support with parts & services
coverage. Renewal process shall have to submit
manufacturer warranty, part number. This support
coverage document and support shall include 24 x 7
supports from Principal manufacturer and local partner.
Existaing SAN Switches Extended ( At DC)
M
M
251
FC fibre 16
pieces
Warranty
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Brocade
Brocade 300
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
We have existing Brocade 300 series 24 port SAN switch in
place where 8 ports have active licenses. So we require 16
port active licenses as well as SFP modules in same switch.
Vendor will provide 10 Meter fibre connecting to SAN switch
and server.
The Post Warranty service period is twenty four (24) months
(for the products and services having one year full warranty
period) starting with the completion of the one-year full
Warranty (onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The
Supplier shall be obliged to provide all services indicated in
GCC 1.1.(e) (xii). The post warranty services for the
products and services to be supplied in this package shall
be included in this contract. This service to be provided on
an on-going twelve (12) months renewal basis after first year
full support with parts & services coverage. Renewal
process shall have to submit manufacturer warranty and
support coverage document and this support shall include
24 x 7 supports from Principal manufacturer and local
partner
Bidders
Response
Section V1. Technical Requirements
252
20.13. Load Balancer & Application Delivery Controllers (1 Unit for
DC)
Level Description
Requirement
M
Quality
M
Brand
M
M
M
Model
Country of
origin
Country of
Manufacture
Type
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance.
Internationally reputed top 10 load balancer manufacturer as
per Gartner. Bidder must attach latest Gartner rating with the
submitted bid/tender as evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
M
Hardware
M
L4
throughput
L7
throughput
Power Supply
M
M
M
M
Load
balancing
Features
To be stated by the bidder/tenderer.
Server Load Balancer with Application Delivery Controllers
including global load balancer
Should be appliance based solution with high performance
purpose built hardware.
The appliance should have minimum 4 GB RAM but better is
highly desirable.
The appliance should have minimum 4x1GbE copper ports,
2x1GbE SFP ports (SX Fiber incl.), 2x10GbE SFP+ ports
include SFP+ modules.
The appliance should have minimum 10 Gbps of throughput
without any additional hardware and licences.
The appliance should support minimum 3M concurrent
connection and scalable to 4M without any additional hardware.
The appliance should provide full ipv6 support and OEM should
be IPv6 gold-certified. OEM should be listed vendor for ipv6
phase-2 certification.
To be mention by the bidder
To be mention by the bidder
Dual power supply and having Input voltage capacity: 220V,
Frequency: 50-60Hz
The appliance should support layer 2 to layer 7 load balancing
The appliance should support server load balancing algorithms
i.e. round robin, weighted round robin, least connection,
Persistent IP, Hash IP, Hash Cookie, consistent hash IP,
shortest response, proximity, snmp, SIP session ID, hash
header etc.
should support one arm, reverse and transparent proxy
mode deployment scenarios and should support nested
layer7 and l4 policies.
Should maintain server persistency based on source ip and
destination ip, http header, url, cookie and SSL ID.
The appliance should support multi port, scripted and
custom health check with content verification
Should provide application & server health checks for
well known protocols i.e. ARP, ICMP, TCP, DNS,
RADIUS, HTTP/HTTPS, RTSP etc..
The appliance should have and/or relationship to check
various dependencies for the application delivery
Bidders
Response
Section V1. Technical Requirements
Level Description
M
Clustering
and failover
M
SSL
acceleration
Features
Requirement
should support layer4 and layer 7 load balancing for
HTTP/HTTPS, FTP/FTPS, SIP, RTSP , RDP, TCP,
TCPS and UDP protocols
Should support minimum 100 Servers & Maximum 2000
Servers for load balancing
Should support graceful shut down of real services
Should provide comprehensive and reliable support for
high availability based on Per VIP based Active-active &
active standby unit redundancy mode.
Statefull session failover with Connection mirroring
support
Appliance should not have any limitations for connection
mirroring
Should support USB base FFO link to synchronize
configuration at boot time of HA or HA with cross cable.
Support for multiple communication links for real-time
configuration synchronizations including HA group,
gateway health check, decision rules, SSF sessions etc..
and heartbeat information
should have support for secondary communication link
for backup purpose
should support floating IP address and group for statefull
failover support. Appliance should have support 256
floating ip address for a floating group
should support built in failover decision conditions
including unit failover, group failover and reboot
should also have option to define customized rules for
gateway health check - the administrator should able to
define a rule to inspect the status of the link between the
unit and a gateway
Configuration synchronization at boot time and during run
time to keep consistence configuration on both units.
Should provide Secure online application delivery using
hardware-based high performance SSL acceleration with
minimum 2 Gbps of SSL throughput without further
license.
The appliance should support minimum 15,000 SSL TPS
without any additional hardware & without further
license.
The appliance should support Certificate format as
"OpenSSL/Apache, *.PEM", "MS IIS, *.PFX", and
"Netscape, *.DB".
The appliance should have additional hardware card to
perform the SSL offloading / acceleration for 1024 and
2048 bit certificates.
The appliance should support use of password protect
253
Bidders
Response
Section V1. Technical Requirements
Level Description
M
Security and
Application
Acceleration
Requirement
Certificate/Private Key backup/restore to/from local disk
or remote TFTP server, and through WebUI
The appliance should support Self generates CSR
(Certificate Signing Request), self-signed Certificate and
private key for specified host.
The appliance should support customization for SSL Error
pages.
The appliance should support HTTP to HTTPS location
header rewrite for enhanced application delivery support
The appliance should have end to end ssl support to act as
a SSL Server and/or as SSL Client
Should support client certificate verification, certificate
bases access control, CRL's (HTTP, FTP ,LDAP) and
OSCP protocol
Should provide performance optimization using TCP
connection multiplexing, TCP buffering and IEEE
802.3ad link aggregation.
should support TCP optimization options including
windows
scaling,
timestamp
&
Selective
Acknowledgement for enhanced TCP transmission speed.
TCP optimization option configuration should be defined
on per virtual service basis not globally.
Appliance should provide real time Dynamic Web
Content Compression to reduce server load.
should provide selective compression for Text, HTML,
XML, DOC, Java Scripts, CSS, PDF, PPT, and XLS
Mime types.
should provide have provision to define policy to skip
compression for selected trouble URL (RegEx, Web
Objects) for the specified Virtual.
should
provide
Advanced
high
performance
memory/packet based Web cache; fully integrated with
HTTP/HTTPS
should provide support for customized cache rules
including max object size, TTL objects, refresh time
interval etc..
should provide detailed cache access statistics based on ip
or http hosts
should support cache refresh with CLI, XML-RPC input
commands and "PURGE" request
The appliance should support transparent, layer 7 proxy
and triangular mode support
The appliance should support L7 rule based application
firewall to protect the internal applications within base
license
Should provide 2 GB dedicated storage capacity in RAM
254
Bidders
Response
Section V1. Technical Requirements
Level Description
M
Global Load
balancing
Features
M
Management
M
Accessories
M
Installation &
Requirement
without any additional hardware & without further
license.
Should support 700Mbps compression from day one
without any additional hardware & without further
license.
Appliance should have security features like reverse proxy
firewall, Syn-flood and dos attack protection features
from the day of installation without any additional
hardware & without further license.
The offered appliance licenses should support datacentre
site selection feature to provide global load balancing
features for disaster recovery and site redundancy without
any additional hardware & without further license.
Should support tight integratation with SLB devices
without sacrificing the ability to work in a heterogeneous
environment of DNS-capable networking products
The appliance should support global server load balancing
algorithms including
·
Weighted round robin
·
Weighted Least Connections
·
Administrative Priority
·
Geography
·
Proximity
·
Global Connection Overflow (GCO)
·
Global Least Connection (GLC)
·
IP Overflow (IPO)
The appliance should support multi-port, scripted and
custom health check with content verification
Should support application & server health checks for
well-known protocols i.e. ARP, ICMP, TCP, DNS,
RADIUS, HTTP/HTTPS, RTSP etc..
The appliance should support and/or relationship to
check various dependencies for the application delivery
The appliance should have extensive report like http squid
or customized http logging with inbuilt tcpdump and log
collecting functionality
The appliance should have SSH CLI, Direct Console,
SNMP, Single Console per Cluster, XML-RPC with
inbuilt reporting.
The appliance should be dual bootable to fall back to last
working configuration
The appliance should support alerting mechanism like
mail, Syslog and SNMP.
Vendor shall supply all 1GbE & 10GbE fibre SFP+ modules for
each unit, Rack mount Kit, cables etc. to connect servers
specified in document and switches in rack.
Certified Expertise from main Manufacturer will install &
255
Bidders
Response
Section V1. Technical Requirements
Level Description
Configuration
M
Support
Service
M
Warranty
20.14.
256
Requirement
Bidders
Response
configure it remotely & configure the systems based on the
basis of customer WAN architecture for smooth operation and
follow the described in LOAD BALANCER planning section.
This support shall include 24 x 7 supports from Principal
manufacturer and local partner.
This support shall also include 24 x 7 support for proposed
hardware and major upgrades for it software.
Bidder facilities the 24 x 7 supports remote support service &
phone call from Principal manufacturer and deliver their local
support instant basis when necessary.
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty, part number. This support coverage
document and support shall include 24 x 7 supports from
Principal manufacturer and local partner.
Power Strip (5 Units at DC)
Bidder should supply all required power strips with the supplied hardware’s.
Level
M
M
M
M
M
Description
Form factor
Brand
Model
Country of origin
Country of
Manufacture
Feature
M
Requirement
Bidder’s
Response
UK Type three pin flat power strip
Internationally reputed top five power strip
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
i) Eight (8) gangs, surge protector, dry contact relay, fuse,
ii) Two meter extension cable,
iii) Input voltage: 220V, Frequency: 50Hz
iv) Working Temperature: 0~40C, Relative Humidity: 20~80%
v) Warranty: Three (3) years
21. Disaster Recovery Datacentre ( At CGA)
21.1.
Application Server (4 Unit for DR)
Level
Description
M
Quality
M
Brand
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
Bidders
Response
Section V1. Technical Requirements
Level
M
M
M
Description
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
M
PCIe Flash card
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
Management
Software
M
Availability
M
Industry Standard
Compliance
257
Requirement
evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-4650 (20M Cache, 2.70
GHz, 8.00 GT/s Intel® QPI) or E5-4650L (20M Cache,
2.60 GHz, 8.00 GT/s Intel® QPI) or equivalent
internationally reputed , industry standard and widely
used Processor
8 cores per processor
4 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 256 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Min 1 X 320GB SLC SSD PCIe Flash card
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four(4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
• 1x Dual port 1/10Gb Ethernet Network Adapter
including 1Gb and 10Gb SFP+ with required cables
connecting to Cisco Nexus 5548UP switch
• 1 X 8 GB Dual Port Fiber Channel Host Bus Adapter
including Multimode Fiber and SFP+
• Min 40Gb/s speed 1x Dual port InfiniBand HCA card
(Vendor shall supply all SFP+ modules , fiber cables to
match with offered IB switch .)
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Security Features
M
Authentication
M
Accessories
M
Warranty
21.2.
Level
258
Requirement
Bidders
Response
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number. This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
Report Server (1 Unit for DR)
Description
M
Quality
M
Brand
M
M
M
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
M
No of cores
No of Processor
Chipset
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance.
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-4650 (20M Cache, 2.70
GHz, 8.00 GT/s Intel® QPI) or E5-4650L (20M Cache,
2.60 GHz, 8.00 GT/s Intel® QPI) or equivalent
internationally reputed , industry standard and widely
used Processor
8 cores per processor
4 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
M
PCIe Flash card
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
259
Requirement
Minimum 256 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 8 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Min 1 X 320GB SLC SSD PCIe Flash card
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum four(4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
• 1x Dual port 1/10Gb Ethernet Network Adapter
including 1Gb and 10Gb SFP+ with required cables
connecting to Cisco Nexus 5548UP switch
• 1 X 8 GB Dual Port Fiber Channel Host Bus Adapter
including Multimode Fiber and SFP+
• Min 40Gb/s speed 1x Dual port InfiniBand HCA card
(Vendor shall supply all SFP+ modules , fiber cables to
match with offered IB switch .)
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
Bidders
Response
Section V1. Technical Requirements
Level
M
Description
Warranty
21.3.
Level
Requirement
Bidders
Response
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number. This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
Additional Domain Controller (1 Unit for DR)
Description
M
Quality
M
Brand
M
M
M
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
M
M
260
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-2690 (20M Cache, 2.90
GHz, 8.00 GT/s Intel® QPI) or more capacity or
equivalent internationally reputed , industry standard and
widely used Processor
8 cores per processor
2 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 64 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 300GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
2 X Dual (2) port 1Gb Ethernet Network Adapter (Must
support Teaming and VLAN)
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Bidders
Response
Section V1. Technical Requirements
Level
Description
Requirement
Operating System
& Virtualization
Software
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number. This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
M
Warranty
21.4.
Level
M
261
Bidders
Response
Mail Server(1 Unit for DR)
Description
Quality
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Brand
M
M
M
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
Management
Software
M
Availability
M
Industry Standard
Compliance
262
Requirement
Energy Star for quality assurance
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-4650 (20M Cache, 2.70
GHz, 8.00 GT/s Intel® QPI) or E5-4650L (20M Cache,
2.60 GHz, 8.00 GT/s Intel® QPI) or equivalent
internationally reputed , industry standard and widely
used Processor
8 cores per processor
4 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 128 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
• 1x Dual port 1/10Gb Ethernet Network Adapter
including 1Gb and 10Gb SFP+ with required cables
connecting to Cisco Nexus 5548UP switch
• 1x 8 GB Dual Port Fiber Channel Host Bus Adapter
including Multimode Fiber and SFP+
2X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Security Features
M
Authentication
M
Accessories
M
Warranty
21.5.
Level
263
Requirement
Bidders
Response
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number. This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
Test and Development (1 Unit for DR)
Description
M
Quality
M
Brand
M
M
M
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-2690 (20M Cache, 2.90
GHz, 8.00 GT/s Intel® QPI) or more capacity or
equivalent internationally reputed , industry standard and
widely used Processor
8 cores per processor
2 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 128 GB DDR3 1333MHz RDIMMs with
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
M
Warranty
264
Requirement
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
2x Dual (2) port 1Gb Ethernet Network Adapter (Must
support Teaming and VLAN)
1x Dual port FC adapter
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
Bidders
Response
Section V1. Technical Requirements
Level
Description
265
Requirement
Bidders
Response
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number. This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
21.6.
Level
Data Centre Management Server (1 Unit for DR)
Description
M
Quality
M
Brand
M
M
M
M
M
Model
Country of origin
Country of
Manufacture
Form factor
Processor Type
M
M
No of cores
No of Processor
Chipset
M
Memory (RAM)
M
M
M
Cache Memory
QPI Speed
Internal Hard Disk
M
M
M
DVD ROM
I/O Slots
RAID Card
M
I/O Interface
M
Remote
Management card
Power supply
Supported
Operating System
& Virtualization
Software
M
M
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top five server manufacturer as
per latest Gartner rating. Bidder/Tenderer must attach
latest Gartner rating with the submitted bid/tender as
evidence.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Rack Mountable RACK server or Blade server
Intel® Xeon® Processor E5-2690 (20M Cache, 2.90
GHz, 8.00 GT/s Intel® QPI) or more capacity or
equivalent internationally reputed , industry standard and
widely used Processor
8 cores per processor
2 Processors.
Industry Standard Intel or equivalent internationally
reputed industry standard and widely used Chipset
Minimum 128 GB DDR3 1333MHz RDIMMs with
Expandability
20MB L3 Cache (Minimum) per processor
Minimum 8.00 GT/s QPI Speed
Min 4 X 600GB 15,000 RPM (Minimum) Hot Plug 2.5
SAS Disk Drive with RAID 10
Manufacturer factory fitted DVD-ROM/DVD-RW
Minimum Four (4) I/O expansion slots
RAID Card with 512MB Flash Backed/Battery Backed
write Cache and supports RAID 10
2x Dual (2) port 1Gb Ethernet Network Adapter (Must
support Teaming and VLAN)
1x Dual port FC adapter
1 X IP based Remote Management card.
Redundant power Supply
Microsoft Windows Server
Microsoft Windows Server Hyper V
Red Hat Enterprise Linux (RHEL)
SUSE Linux Enterprise Server (SLES)
Oracle Solaris
Oracle Linux
Oracle VM
VMware
Bidders
Response
Section V1. Technical Requirements
Level
Description
M
Management
Software
M
Availability
M
Industry Standard
Compliance
M
Security Features
M
Authentication
M
Accessories
M
Warranty
21.7.
Level
266
Requirement
Bidders
Response
Bidder should include Server Management Software tool
for simplifies server setup, health monitoring, power and
thermal control, and for remote administration
High-efficiency, hot-plug, redundant power supplies; hotplug drive bays; hot-plug
redundant fans; interactive LCD screen; extended
thermal support; ENERGY STAR® compliant; CD/DVD
for Required Driver and RAID
ACPI 2.0. Compliant
PCIE Compliant
PXE Support
WOL Support
Physical Address Extension (PAE) Support
USB 2.0 Support
Power-on password
Keyboard password
External USB port enable/disable
Network Server Mode
Serial interface control
Administrator's password
Removable CD-ROM or DVD drive
Different parts of the system must be certified with brand
company and should have Parts No. on each Part.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals,
brackets accessories, wire managers, Registration or
warranty card etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in
this package shall be included in this contract. This
service to be provided on an on-going twelve (12)
months renewal basis after three (3) years full support
with parts & services coverage. Renewal process shall
have to submit manufacturer warranty, part number. This
support coverage document and support shall include 24
x 7 supports from Principal manufacturer and local
partner.
InfiniBand switch (1 Unit for DR)
Description
M
Quality
M
Brand
M
M
Model
Country of origin
Requirement
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top five InfiniBand switch
manufacturer
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
Bidders
Response
Section V1. Technical Requirements
Level
M
Description
M
M
M
Country of
Manufacture
No of port
Form factor
InfiniBand HCA
supported switch
feature
M
Feature
M
Accessories
M
Warranty
21.8.
267
Requirement
Bidders
Response
To be stated by the bidder/tenderer.
Maximum 36 port
Rack Mountable
Most of the servers listed here has PCI express 3.0
technology where each server listed with IB card should
support FDR 56Gb/s or 40Gb/s InfiniBand switch but make
sure that offered FDR 56Gb/s IB HCA card should
compatible with offered FDR 56Gb/s InfiniBand Switch or
offered 40Gb/s IB HCA card should compatible with offered
40Gb/s InfiniBand Switch.
Industry-leading, switch platform in performance, power,
and density
Highest ROI - designed for energy and cost savings
Ultra low latency
Granular QoS for Cluster, LAN and SAN traffic
Quick and easy setup and management
Maximizes performance by removing fabric congestions
Fabric Management for cluster and converged I/O
applications
Manageable switch
Vendor will supply all SFP+ modules and cables to connect
servers specified in specification document and offered
switches.
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals, brackets
accessories, wire managers, Registration or warranty card
etc. comes in a package.
The Post Warranty service period is twenty four (24)
months starting with the completion of the three(3) years
full warranty(onsite covering everything with parts and
service) period including all maintenance and support for
the system from the date of commissioning and
acceptance. The Supplier shall be obliged to provide all
services indicated in GCC 1.1.(e) (xii). The post warranty
services for the product and services to be supplied in this
package shall be included in this contract. This service to
be provided on an on-going twelve (12) months renewal
basis after three (3) years full support with parts & services
coverage. Renewal process shall have to submit
manufacturer warranty, part number. This support
coverage document and support shall include 24 x 7
supports from Principal manufacturer and local partner.
Blade Chassis for DR (if blade solution)
Level
Description
Requirement
M
Quality
M
Brand
M
Model
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top five server manufacturer brand suits
to offered blade servers as per Gartner rating.
To be stated by the bidder/tenderer.
Bidder’s
Response
Section V1. Technical Requirements
M
Country of origin
To be stated by the bidder/tenderer.
M
To be stated by the bidder/tenderer.
M
Country of
Manufacture
Form Factor
M
Power Supplies
M
Cooling fans
M
Input device
M
I/O modules
M
Management
M
Accessories
M
Warranty
268
Modular enclosure holds minimum six (6) full-height, twelve(12)
half-height, or twenty four (24) quarter-height blade servers
Minimum six hot-plug power supplies
Supported power supply configurations include:
• 3+3 and 2+2 (AC redundancy)
• 2+1, 3+1, 4+2, and 5+1 (power supply redundancy)
• 2+0 and 3+0 (non-redundant mode)
Minimum Nine (9) hot-pluggable, redundant fan modules
Front Control Panel with interactive Graphical LCD:
• Supports initial configuration wizard
• Local server blade, enclosure, and module information and
troubleshooting
Two USB Keyboard/Mouse connections and one Video
connection (required for Avocent, iKVM switch to enable these
ports) for local front “crash cart”
console connections that can be switched between blades
Minimum six total blade I/O modules for three fully redundant
fabrics that take advantage of a fully passive midplane that can
scale up to 8.4 Tbps with current technologies featuring 1/10
Gb Ethernet to servers, 40Gb Ethernet to top-of-rack
switches, Fibre Channel 8 Gb, and InfiniBand
QDR/FDR10/FDR . (This is specified in server specification.)
One (standard) or a second optional (redundant) Chassis
Management Controller(s)
Should deliver with all necessary UK type power cords,
adapters, data cables, connectors, CDs, manuals, brackets
accessories, wire managers, Registration or warranty card etc.
comes in a package.
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty, part number. This support coverage
document and support shall include 24 x 7 supports from
Principal manufacturer and local partner.
21.9.
Load Balancer & Application Delivery Controllers (1 Unit for
DR)
Level Description
Requirement
M
Quality
M
Brand
M
Model
ISO 9001/9002 or higher for manufacturer, FCC Class B,
Energy Star for quality assurance
Internationally reputed top 10 load balancer manufacturer as
per latest Gartner. Bidder must attach latest Gartner rating with
the submitted bid/tender as evidence.
To be stated by the bidder/tenderer.
Bidders
Response
Section V1. Technical Requirements
Level Description
Requirement
M
To be stated by the bidder/tenderer.
M
Country of
origin
Country of
Manufacture
Type
M
Hardware
M
To be stated by the bidder/tenderer.
Server Load Balancer with Application Delivery Controllers
including global load balancer
Should be appliance based solution with high performance
purpose built hardware.
The appliance should have minimum 4 GB RAM but
better is highly desirable.
The appliance should have minimum 4x1GbE copper ports,
2x1GbE SFP ports (SX Fiber incl.), 2x10GbE SFP+ ports include
SFP+ modules .
The appliance should have minimum 10 Gbps of
throughput without any additional hardware and licences.
The appliance should support minimum 3M concurrent
connection and scalable to 4M without any additional
hardware.
The appliance should provide full ipv6 support and OEM
should be IPv6 gold-certified. OEM should be listed
vendor for ipv6 phase-2 certification.
M
M
M
M
L4
throughput
L7
throughput
Power Supply
Load
balancing
Features
To be mention by the bidder
To be mention by the bidder
Dual power supply and having Input voltage capacity:
220V, Frequency: 50-60Hz
The appliance should support layer 2 to layer 7 load
balancing
The appliance should support server load balancing
algorithms i.e. round robin, weighted round robin, least
connection, Persistent IP, Hash IP, Hash Cookie,
consistent hash IP, shortest response, proximity, snmp,
SIP session ID, hash header etc.
should support one arm, reverse and transparent proxy
mode deployment scenarios and should support nested
layer7 and l4 policies.
Should maintain server persistency based on source ip and
destination ip, http header, url, cookie and SSL ID.
The appliance should support multi port, scripted and
custom health check with content verification
Should provide application & server health checks for
well known protocols i.e. ARP, ICMP, TCP, DNS,
RADIUS, HTTP/HTTPS, RTSP etc..
The appliance should have and/or relationship to check
various dependencies for the application delivery
should support layer4 and layer 7 load balancing for
HTTP/HTTPS, FTP/FTPS, SIP, RTSP , RDP, TCP, TCPS
269
Bidders
Response
Section V1. Technical Requirements
Level Description
M
Clustering
and failover
M
SSL
acceleration
Features
Requirement
and UDP protocols
Should support minimum 100 Servers & Maximum 2000
Servers for load balancing
Should support graceful shut down of real services
Should provide comprehensive and reliable support for
high availability based on Per VIP based Active-active &
active standby unit redundancy mode.
Statefull session failover with Connection mirroring
support
Appliance should not have any limitations for connection
mirroring
Should support USB base FFO link to synchronize
configuration at boot time of HA or HA with cross cable.
Support for multiple communication links for real-time
configuration synchronizations including HA group,
gateway health check, decision rules, SSF sessions etc..
and heartbeat information
should have support for secondary communication link for
backup purpose
should support floating IP address and group for statefull
failover support. Appliance should have support 256
floating ip address for a floating group
should support built in failover decision conditions
including unit failover, group failover and reboot
should also have option to define customized rules for
gateway health check - the administrator should able to
define a rule to inspect the status of the link between the
unit and a gateway
Configuration synchronization at boot time and during run
time to keep consistence configuration on both units.
Should provide Secure online application delivery using
hardware-based high performance SSL acceleration with
minimum 2 Gbps of SSL throughput without further
license.
The appliance should support minimum 15,000 SSL TPS
without any additional hardware & without further license.
The appliance should support Certificate format as
"OpenSSL/Apache, *.PEM", "MS IIS, *.PFX", and
"Netscape, *.DB".
The appliance should have additional hardware card to
perform the SSL offloading / acceleration for 1024 and
2048 bit certificates.
The appliance should support use of password protect
Certificate/Private Key backup/restore to/from local disk
or remote TFTP server, and through WebUI
The appliance should support Self generates CSR
270
Bidders
Response
Section V1. Technical Requirements
Level Description
M
Security and
Application
Acceleration
Requirement
(Certificate Signing Request), self-signed Certificate and
private key for specified host.
The appliance should support customization for SSL Error
pages.
The appliance should support HTTP to HTTPS location
header rewrite for enhanced application delivery support
The appliance should have end to end ssl support to act as
a SSL Server and/or as SSL Client
Should support client certificate verification, certificate
bases access control, CRL's (HTTP, FTP ,LDAP) and
OSCP protocol
Should provide performance optimization using TCP
connection multiplexing, TCP buffering and IEEE
802.3ad link aggregation.
should support TCP optimization options including
windows
scaling,
timestamp
&
Selective
Acknowledgement for enhanced TCP transmission speed.
TCP optimization option configuration should be defined
on per virtual service basis not globally.
Appliance should provide real time Dynamic Web
Content Compression to reduce server load.
should provide selective compression for Text, HTML,
XML, DOC, Java Scripts, CSS, PDF, PPT, and XLS
Mime types.
should provide have provision to define policy to skip
compression for selected trouble URL (RegEx, Web
Objects) for the specified Virtual.
should
provide
Advanced
high
performance
memory/packet based Web cache; fully integrated with
HTTP/HTTPS
should provide support for customized cache rules
including max object size, TTL objects, refresh time
interval etc..
should provide detailed cache access statistics based on ip
or http hosts
should support cache refresh with CLI, XML-RPC input
commands and "PURGE" request
The appliance should support transparent, layer 7 proxy
and triangular mode support
The appliance should support L7 rule based application
firewall to protect the internal applications within base
license
Should provide 2 GB dedicated storage capacity in RAM
without any additional hardware & without further license.
Should support 700Mbps compression from day one
without any additional hardware & without further license.
271
Bidders
Response
Section V1. Technical Requirements
Level Description
M
Global Load
balancing
Features
M
Management
M
Accessories
M
Installation &
Configuration
M
Support
Service
Requirement
Appliance should have security features like reverse proxy
firewall, Syn-flood and dos attack protection features from
the day of installation without any additional hardware &
without further license.
The offered appliance licenses should support datacentre
site selection feature to provide global load balancing
features for disaster recovery and site redundancy without
any additional hardware & without further license.
Should support tight integratation with SLB devices
without sacrificing the ability to work in a heterogeneous
environment of DNS-capable networking products
The appliance should support global server load balancing
algorithms including
·
Weighted round robin
·
Weighted Least Connections
·
Administrative Priority
·
Geography
·
Proximity
·
Global Connection Overflow (GCO)
·
Global Least Connection (GLC)
·
IP Overflow (IPO)
The appliance should support multi-port, scripted and
custom health check with content verification
Should support application & server health checks for
well-known protocols i.e. ARP, ICMP, TCP, DNS,
RADIUS, HTTP/HTTPS, RTSP etc..
The appliance should support and/or relationship to check
various dependencies for the application delivery
The appliance should have extensive report like http squid
or customized http logging with inbuilt tcpdump and log
collecting functionality
The appliance should have SSH CLI, Direct Console,
SNMP, Single Console per Cluster, XML-RPC with
inbuilt reporting.
The appliance should be dual bootable to fall back to last
working configuration
The appliance should support alerting mechanism like
mail, Syslog and SNMP.
Vendor shall supply all 1GbE & 10GbE fibre SFP+ modules for
each unit, Rack mount Kit, cables etc. to connect servers
specified in document and switches in rack.
Certified Expertise from main Manufacturer will install &
configure it remotely & configure the systems based on the
basis of customer WAN architecture for smooth operation and
follow the described in LOAD BALANCER planning section.
This support shall include 24 x 7 supports from Principal
manufacturer and local partner.
This support shall also include 24 x 7 support for proposed
272
Bidders
Response
Section V1. Technical Requirements
Level Description
M
Warranty
Requirement
273
Bidders
Response
hardware and major upgrades for it software.
Bidder facilities the 24 x 7 supports remote support service &
phone call from Principal manufacturer and deliver their local
support instant basis when necessary.
The Post Warranty service period is twenty four (24) months
starting with the completion of the three(3) years full
warranty(onsite covering everything with parts and service)
period including all maintenance and support for the system
from the date of commissioning and acceptance. The Supplier
shall be obliged to provide all services indicated in GCC 1.1.(e)
(xii). The post warranty services for the product and services to
be supplied in this package shall be included in this contract.
This service to be provided on an on-going twelve (12) months
renewal basis after three (3) years full support with parts &
services coverage. Renewal process shall have to submit
manufacturer warranty, part number. This support coverage
document and support shall include 24 x 7 supports from
Principal manufacturer and local partner.
LOAD BALANCER planning.
We are planning to have 4 physical servers at DC and 4 physical servers at DR. Each Application
server should have 4 VM. Purchaser should design Live Migration to each other as Active-Active or
Active-Passive mode based on application requirement using System Centre latest version. Bidder
shall install and configured Server load balancer after completion of all Hyper-V installation and
configuration to integrate with Server Load balancer. Detailed logical solution diagram below:
Section V1. Technical Requirements
274
Section V1. Technical Requirements
275
Figure: Figure: Migrating Virtualized Applications between Data Centres with Hyper-V.
Brief description about this solution:
Hyper-V Live Migration provides powerful solutions for improving IT agility through virtualization.
Server Load balancer Application Delivery Controller integrates with Hyper-V Live Migration to take
this agility even further. By combining both solutions, users can perform efficient live migrations of
virtual machines and their storage, between data centres thousands of miles apart. Hyper-V Live
Migration enables users to move live virtual machines (VMs) from one server to another. Hyper-V Live
Migration normally requires that migration be restricted within a single local Hyper-V Server cluster and
layer 2 network domains. Furthermore, Hyper-V Live Migration performance is sensitive to network
latency and bandwidth, which historically prevented long-distance Hyper-V Live Migration events. This
solution overcomes both challenges by intelligently managing application network traffic and
accelerating the transmission between sites. The result is that previously impossible migrations
between distant sites are now fast, reliable, and secure
The solution delivery requires the following four key benefits:
• Local traffic control: Existing application client connections are redirected seamlessly, automatically,
and securely before, during, and after the Hyper-V Live Migration events.
• Global traffic control: New application client connections are directed intelligently and automatically to
the new data centre, in tandem with the local traffic control mechanism once Hyper-V Live Migration is
complete.
• Acceleration: In order to maximize the performance of the data transfers, WAN links are accelerated
using protocol optimization, compression, duplication, and encryption. Acceleration of Hyper-V Live
Migration is what enables successful migration despite network latency between data centers that
might be thousands of miles apart.
• Orchestration: The solution is integrated using APIs for a seamless migration process. It can be
easily integrated with any orchestration engine.
Section V1. Technical Requirements
276
Figure: Here applications are ACTIVE-ACTIVE but load balancer should work as ACTIVE-PASSIVE
21.10.
Power Strip (5 Units at DR)
Bidder should supply all required power strips with the supplied hardware’s.
Level
M
M
M
M
M
M
Description
Form factor
Brand
Model
Country of origin
Country of
Manufacture
Feature
Requirement
Bidder’s
Response
UK Type three pin flat power strip
Internationally reputed top five power strip
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
To be stated by the bidder/tenderer.
vi) Eight (8) gangs, surge protector, dry contact relay, fuse,
vii) Two meter extension cable,
viii)
Input voltage: 220V, Frequency: 50Hz
ix) Working Temperature: 0~40C, Relative Humidity: 20~80%
x) Warranty: Three (3) years
22.
Microsoft Enterprise Agreement for Windows Licenses
including Software Assurance
Bidder is responsible to select/hire the Microsoft Large Account Resellers (LAR) who is authorized in
Bangladesh to sell Microsoft Enterprise Agreement in favour of MINISTRY OF FINANCE,
GOVERNMENT OF BANGLADESH. The Microsoft Enterprise Agreement provides for lowest pricing
levels to the Government Purchasing. To solicit proposals from authorized Microsoft Large Account
Resellers (LAR) who is authorized to sell Microsoft Enterprise Agreement products and services to the
MINISTRY OF FINANCE, GOVERNMENT OF BANGLADESH.
Section V1. Technical Requirements
277
Microsoft Enterprise Agreement will follow the law of Bangladesh and MINISTRY OF FINANCE;
GOVERNMENT OF BANGLADESH will be the authority of contract. To complete this process
“Deepening the Medium Term Budget Framework and strengthening Financial Accountability Project
(http://www.mof.gov.bd/dmtbf) will represent MINISTRY OF FINANCE, GOVERNMENT OF
BANGLADESH to complete the necessary activities to fulfil the contact and sign. To supply copy of
Microsoft LAR authorise certificate within the proposal. Bidder will deliver all required Microsoft
products under this contract. Any future product required for Ministry of Finance; Bidder will quote
prices which will be the lowest and contract authority will verify those prices with other LAR holder in
Bangladesh.
To keep the secure accessibility of “Web account of MICROSOFT ENTERPRISE AGREEMENT”
delegated to FSMU administrators of Finance Division, Ministry of Finance. They will provide ISO to
the desired systems along with S/N.
Termination of Contract:
MINISTRY OF FINANCE shall be entitled to terminate MICROSOFT ENTERPRISE AGREEMENT and
PREMIER SUPPORT contract by giving notice to the successful Bidder in case:
a) Successful Bidder fails to integrate/implement/give support as per the requirements of tender. In
such eventuality, successful Bidder will refund to contract value in respect of licenses for Microsoft
CORE CAL Suite, which are not implemented.
b) Successful bidder fails to provide maintenance services as per terms and conditions agreed
hereunder and/or fail to fulfil any of its obligations enumerated hereunder. In such eventuality,
Successful Bidder shall refund to contract value the proportionate maintenance charges received in
advance, if any, for the remaining period
c) In the eventuality of termination of contract, MINISTRY OF FINANCE, GOVERNMENT OF
BANGLADESH shall have the right to avail the services of any other person for the purpose without
any let or hindrance from successful Bidder.
d) In the eventuality of termination of contract, besides claiming refund of amount as above, MINISTRY
OF FINANCE, GOVERNMENT OF BANGLADESH shall have a right to claim liquidated Damages as
decided by arbitrator.
e) Any other valid reason decided by contract authority.
Section V1. Technical Requirements
22.1.
SI
278
Windows Software Licenses requirement calculation
Server
No of
CPU
Windows
server
2012
standard
Windows
server
2012
Enterprise
No of
HyperV
2
1
2
System
Center
2012
Standard
for
server
ML
2
1
2
3
DC
Management Servers (1 unit at DC and 1
unit at DR)
Backup/Media Servers (1 unit at DC and 1
unit at DR)
Application server (1 Unit for DC)
4
2
4
2
4
Application server (1 Unit for DC)
4
2
4
2
5
Application server (1 Unit for DC)
4
2
4
2
6
Application server (1 Unit for DC)
4
2
4
2
7
Report Server (1 Unit for DC)
4
2
4
2
8
Test and Development (1 Unit for DC)
Data Centre Management Server (1 Unit for
DC)
2
1
2
Primary Domain Controller (1 Unit for DC)
2
1
2
Additional Domain Controller (1 Unit for DC)
2
1
2
Patch Management Server: (1 Unit for DC)
2
1
2
Mail Server: (1 Unit for DC)
4
1
2
9
1
0
1
1
1
2
1
3
2
1
2
System
Center
2012
DataCenter
for server
ML
8
1
8
2
DR
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
Application Server (1 Unit for DR)
4
2
4
2
Application Server (1 Unit for DR)
4
2
4
2
Application Server (1 Unit for DR)
4
2
4
2
Application Server (1 Unit for DR)
4
2
4
2
Report Server (1 Unit for DR)
4
2
4
2
Additional Domain Controller (1 Unit for DR)
2
1
2
Mail Server(1 Unit for DR)
4
Test and Development (1 Unit for DR)
2
Data Centre Management Server (1 Unit for
DR)
No of Licenses Required
2
1
2
68
28
8
2
2
1
8
6
88
21
4
Section V1. Technical Requirements
22.2.
279
Windows Licenses including Software Assurance
Bidder should quote the below specified licenses (“Core CAL Suite” , “User CAL” & “Enterprise
CAL Suite”) under Microsoft Enterprise Agreement (EA) in favour of “Ministry of Finance,
Government of Bangladesh” via Microsoft LAR under the Enterprise Agreement. Details information
of Microsoft Enterprise Agreement (EA) is given in earlier section. Bidder shall not load the licenses
via LAR without permission of Purchaser to minimize the unnecessary time without implementation.
Part no
Product Description
Product Name
W0600022
W0600445
PGI00267
PGI00268
7AH00281
7AH00282
YEG00396
YEG00397
P7107280
P7305897
31202177
5HU00215
T6L00237
T9L00222
MFF00502
CoreCAL ALNG LicSAPk MVL
DvcCAL
CoreCAL ALNG LicSAPk MVL
UsrCAL
ExchgEntCAL ALNG LicSAPk
MVL DvcCAL wSrvcs
ExchgEntCAL ALNG LicSAPk
MVL UsrCAL wSrvcs
LyncSVrEnCAL ALNG LicSAPk
MVL DvcCAL
LyncSVrEnCAL ALNG LicSAPk
MVL UsrCAL
LyncSvrPlusCAL ALNG LicSAPk
MVL DvcCAL
LyncSvrPlusCAL ALNG LicSAPk
MVL UsrCAL
WinSvrDataCtr ALNG LicSAPk
MVL 2Proc
WinSvrStd ALNG LicSAPk MVL
2Proc
Core
CALClient
Access License
Core
CALClient
Access License
Exchange
Enterprise CAL
Exchange
Enterprise CAL
Lync Server Ent
CAL
Lync Server Ent
CAL
Lync Server Plus
CAL
Lync Server Plus
CAL
Windows
Server
Datacenter
Windows
Server
Standard
Exchange
Server
Standard
ExchgSvrStd ALNG LicSAPk MVL
LyncSvr ALNG LicSAPk MVL
SysCtrDatactr ALNG LicSAPk MVL
2 Proc
SysCtrStd ALNG LicSAPk MVL
2Proc
SysCtrCltMgmtAte ALNG LicSAPk
MVL PerOSE
Device
CAL
User
CAL
200
QTY
Unit Price
Per Year
in USD
200
50
200
50
200
50
60
50
60
20
10
20
10
10
10
6
30
4
Lync Server
4
System
Center
DataCenter
4
Sys Ctr Standard
Client Management
Suite Client ML
21
25
Sub Total
Vat 4%
Total Payable in Yr. 1
Total Payable in Yr. 2
Total Payable in Yr. 3
Grand Total Payable in
3 Years
23.
Disaster Recovery Solution for Application server (Hyper-V).
Solution should goes beyond periodic backup to provide accessible and affordable data
protection, ensure minimal data loss, and enable immediate recovery from any disaster or
Line Total
in USD
Section V1. Technical Requirements
280
system outage. Purchaser has the disaster recovery solution environment with Double-Take
and will need to go for Double-Take VM solution. It should utilize patented replication and
failover technology that continuously captures byte-level changes as they happen and
replicates those changes to one or more target servers at any location, locally or at recovery
site miles away.
Level Description
Requirement
M
Requirement
Solution required only for two web applications hosted
in IIS within virtual environment. One hyper-V (VM)
contain web application located at production site and
another Hyper-v(VM) located at disaster site need to
require double-take solution for fail over & recovery
M
Features
Need
M
Failover
M
Failback
Real-time application and data protection.
• Asynchronous Replication.
• Continuously capture byte-level changes as they occur
and replicate only those changes to DR server.
(Replicating only the file changes rather than copying an
entire file)
• Failover executed in minutes, not hours, and supports
dissimilar hardware.
• Microsoft Volume Shadow Copy Service integration
allows you to schedule and recover
from up to 64 point-in-time copies of data on your
physical or virtual target.
• No distance limits for DR server.
• Near-zero data loss.
• Features one-click failover and restore
• Ensures easy installation and optimized configuration
• Presents centralized reporting and analysis
• Failover Server Name and IP address.
• Failover DNS Records.
• Start-up application services on DR machine.
• Users can reconnect within minutes of failure.
• Failover can occur across a LAN, WAN and even
NAT.
Failback Source Identity.
• Bring Source Applications Online.
• Users Reconnect within Minutes.
• Start Replication and resume Failover Monitoring for
Continued Protection.
M
Installation
M
Support
Service
Installation to be done by the remote control support from
double-take.
Bidder shall have to submit double-take support service
contract for each year. This support shall include 24 x 7
supports from Principal developer and local partner.
Bidders
Response
Section V1. Technical Requirements
Figure: Disaster recovery solution
Figure: Network Diagram for Disaster Recovery Solution
24.
Training on Microsoft Solution.
281
Section V1. Technical Requirements
24.1.
282
Local Training:
Training and Training Materials: Bidder shall provide vendor certified training material,
stationery and food refreshment during the training. Transportation and Venue will be agreed.
Bidder will use high skilled vendor certified trainer who has sound credentials in providing
similar training courses and submit the proof of same. Practical training will include
participants setting up the environment and configuring various scenarios.
Courses:
1. System Center Configuration Manager (SCCM), formerly Systems Management
Server (SMS), is a systems management software product by Microsoft for managing
large groups of Windows-based computer systems. Configuration Manager provides
remote control, patch management, software distribution, operating system
deployment, network access protection, and hardware and software inventory.
2. System Center Operations Manager (SCOM) is a cross-platform data center
management system for operating systems and hypervisors. It uses a single interface
that shows state, health and performance information of computer systems. It also
provides alerts generated according to some availability, performance, configuration
or security situation being identified.
The Bidder should propose local training at Dhaka for System Center Configuration
Manager (SCCM) & System Center Operations Manager (SCOM) of System Center 2012.
Total number of trainees is Ten (10). Training will be theoretical and practical. Purchaser
technical team and bidder technical team should finalize course contents according to
Microsoft standard guideline and practical lab. The Purchaser will designate appropriate staff
for the training courses to be given by the training provider and Bidder shall make all
appropriate logistical arrangements for such training as specified below:
Item
Description
System Center Configuration
Manager (SCCM)
System Center Operations
Manager (SCOM)
1
2
Duration
in Hours
Qty (no. of
participant)
40
10
40
10
Rate per
person in
USD
Line Total
in USD
24.1.1. System Center Configuration Manager (SCCM)
Description
This outline is subject to change anytime and bidder & purchaser IT team should finalize the course
contents after the contract award. However, this instructor-led course provides participants with the
knowledge to successfully maintain System Center Configuration Manager. This instructor-led course
provides students with the knowledge and skills to configure and manage a System Center 2012
Configuration Manager site and its associated site systems in the role of Configuration Manager
Administrators.
Objective
After completing this course, participants will be able to:
Section V1. Technical Requirements
283
•
Describe the System Center 2012 Configuration Manager feature set.
•
Discover and organize resources.
•
Manage the Configuration Manager client.
•
Manage inventory and software metering.
•
Query and report data.
•
Manage software deployments by using packages and programs.
•
Create and deploy applications.
•
Manage application deployment.
•
Deploy and manage software updates.
•
Implement System Center 2012 Endpoint Protection.
•
Deploy operating systems by using System Center 2012 Configuration
•
Manage compliance settings on devices.
•
Manage mobile devices.
•
Configure Wake On LAN, Power Management, and Remote Control.
Prerequisites
Manager.
Before attending this course, participants must have system administrator–level working
knowledge of:
•
•
•
•
•
•
•
•
Networking fundamentals, including TCP/IP and Domain Name System (DNS).
Active Directory principles and management.
Windows Server management including Windows Server 2008 and Windows Server
2008 R2.
Microsoft Windows client fundamentals.
Deployment, configuration, and troubleshooting for Windows-based personal
computers/
Microsoft SQL Server 2008 including Reporting Services.
Basic Public Key Infrastructure (PKI) concepts.
Desired: Have a base-level understanding of System Center Configuration Manager
2007
24.1.1.1. Course Outline
Module1
Overview of System Center 2012
Configuration
Manager
This module describes the System
Center
2012
Configuration
Manager feature set and explains
how to manage sites by using the
System Center 2012 Configuration
Manager
Console.
Module2
Discovering and Organizing Resources
This module explains how to configure
discovery
methods,
configure
boundaries and boundary groups,
manage user and device collections,
and implement role-based security.
Lessons
Configuring Resource
Discovery
•
Configuring Boundaries and
Boundary Groups
•
Configuring User and Device
Collections
•
Configuring Role-Based
Administration
Lab : Configuring Resource Discovery
and Boundaries
•
Lessons
•
Introduction to System
Center 2012 Configuration
Manager
•
Overview of the System
Center 2012 Configuration
Manager Architecture
•
Overview of the
Configuration Manager
Section V1. Technical Requirements
Console
Tools for Monitoring and
Troubleshooting a
Configuration Manager Site
Lab : Exploring the Configuration
Manager Console
Exploring the Configuration
Manager Console
Searching in the
Configuration Manager
Console
Lab
:
Monitoring
and
Troubleshooting a Configuration
Manager Site
Configuring Status
Summarizers
Managing Components by
Using Configuration
Manager Service Manager
Monitoring Site and
Component Status
Reviewing Log Files by Using
Configuration Manager
Trace Log Tool
After completing this module,
participants will be able to:
•
Describe the purpose and
functionality of System Center
2012 Configuration Manager.
•
Describe the System Center
2012 Configuration Manager
architecture.
•
Identify and locate the
management features
available in the Configuration
Manager console.
•
Identify and use the tools
available to monitor and
troubleshoot a Configuration
Manager site.
Managing
the
Configuration Module4
Manager
Client
This module explains how to
configure
client
deployment
methods, configure client settings,
and
monitor
client
status.
•
Module3
284
Configuring Active Directory
Discovery Methods
Configuring Boundaries and
Boundary Groups
Lab : Configuring User and Device
Collections
Creating a Device Collection
Creating a User Collection
Configuring a Maintenance
Window
Lab
:
Configuring
Role-Based
Administration
Configuring a New Scope for
Toronto Administrators
Configuring a New
Administrative User
After
completing
this
module,
participants will be able to:
•
Configure resource discovery.
•
Configure boundaries and
boundary groups.
•
Configure user and device
collections.
•
Configure role-based
administration.
Managing Inventory and Software
Metering
This module explains how to configure
and manage hardware and software
inventory, monitor inventory data flow,
and use Asset Intelligence and
software
metering.
Lessons
•
•
Overview of the
Configuration Manager Client
Deploying the Configuration
Manager Client
Lessons
•
•
Overview of Inventory
Collection
Configuring Hardware
Section V1. Technical Requirements
Managing Client Settings
Configuring and Monitoring
Client Status
Lab : Deploying the Configuration
Manager Client
Preparing the Site for Client
Installation
Deploying the Configuration
Manager Client by Using
Client Push Installation
Deploying the Configuration
Manager Client by Using
Group Policy (Optional)
Lab : Managing Client Agent Settings
Configuring Client Settings
Lab : Configuring and Monitoring
Client Status
Configuring and Monitoring
Client Communication and
Health Status
After completing this module,
participants will be able to:
•
Describe the requirements
for installing the Configuration
Manager 2012 client.
•
Describe the site roles and
methods used to deploy the
Configuration Manager client.
•
Describe how to configure
the client settings.
•
Describe how to monitor
client health.
Querying and Reporting Data Module6
This module explains how to create
queries and run reports by using SQL
Server
Reporting
Services
Inventory
Configuring Software Inventory
Managing Inventory Collection
Configuring Asset Intelligence
Configuring Software Metering
Lab : Configuring and Managing
Inventory Collection
Configuring Hardware
Inventory
Configuring Software Inventory
Lab : Configuring and Managing Asset
Intelligence
Preparing the Site for Asset
Intelligence
Configuring Asset Intelligence
Customizing Asset Intelligence
Viewing Asset Intelligence
Reports
Lab : Configuring Software Metering
Configuring Software Metering
After
completing
this
module,
participants will be able to:
•
Describe inventory collection.
•
Configure and collect hardware
inventory.
•
Configure and collect software
inventory.
•
Manage inventory collection.
•
Configure Asset Intelligence.
•
Configure software metering.
Lessons
Lessons
Introduction to Queries
Managing Queries
Configuring SQL Server
Reporting Services
Lab : Creating and Running Queries
Creating Data Queries
Creating Status Message
Queries
Lab : Configuring Reporting
Configuring a Reporting
Services Point
After completing this module,
participants will be able to:
•
Describe data and status
Configuring Software
Distribution
•
Configuring Packages and
Programs
•
Distributing Content to
Distribution Points
•
Deploying Programs to
Configuration Manager Clients
Lab : Managing Software Deployment
by Using Packages and Programs
Preparing the Infrastructure
for Software Deployment
Creating a Package and
Configuring Programs
•
•
Module5
285
•
•
•
•
•
•
•
Managing Software Deployments by
Using Packages and Programs
This module explains how to create
and deploy packages and programs.
•
Section V1. Technical Requirements
•
•
Module7
message queries.
Configure and manage data
and status message queries.
Configure and manage SQL
Server Reporting Services in
Configuration Manager.
Creating and Deploying Applications Module8
This module explains how to create
and deploy applications by using the
System Center 2012 Configuration
Manager
application
model.
286
Distributing Content to a
Distribution Point
Deploying a Program to
Configuration Manager Clients
After
completing
this
module,
participants will be able to:
•
Describe the software
distribution process and
configure software distribution
settings.
•
Configure packages and
programs.
•
Distribute content to
distribution points.
Deploy programs to Configuration
Manager clients
Managing Application Deployment
This module explains how to configure
application deployment requirements,
application supersedence, application
un-installation,
and
multiple
deployment
types.
Lessons
Overview of Application
Management
•
Creating Applications
•
Deploying Applications
•
Configuring the Application
Catalog
Lab : Creating and Deploying an
Application
Creating and Deploying a
Required Application
Creating and Deploying an
Available Application
Lab : Deploying Applications from
the Application Catalog
Installing and Configuring
the Application Catalog
Creating and Deploying
Applications to the
Application Catalog
Installing Applications from
the Application Catalog
After completing this module,
participants will be able to:
•
Describe application
management Configuration
Manager.
•
Create applications.
•
Deploy applications.
•
Configure the Application
•
Lessons
Configuring Requirements and
Dependencies for Deployment
Types
•
Configuring Multiple
Deployment Types and User
Device Affinity
•
Managing Applications
Lab
:
Advanced
Application
Deployment
Creating User Device Affinity
Creating Applications with
Requirements
Deploying Required
Applications to Users
Creating an Application with
Multiple Deployment Types
Lab
:
Managing
Application
Supersedence and Removal
Using Application
Supersedence
Uninstalling the Excel Viewer
Application
After
completing
this
module,
participants will be able to:
•
Describe the requirements and
dependencies for deployment
types.
•
Configure multiple deployment
•
Section V1. Technical Requirements
287
Catalog.
•
Module9
Deploying and Managing Software Module10
Updates
This module explains how to deploy
and manage software updates.
Lessons
Overview of Software
Updates
•
Preparing the Configuration
Manager Site for Software
Updates
•
Managing Software Updates
•
Configuring Automatic
Deployment Rules
•
Monitoring and
Troubleshooting Software
Updates
Lab : Configuring the Site for
Software Updates
Configuring and
Synchronizing the Software
Update Point
Lab : Deploying and Managing
Software Updates
Determining Software
Update Compliance
Deploying Software Updates
to Clients
Configuring Automatic
Deployment Rules
After completing this module,
participants will be able to:
•
Describe how the software
updates feature integrates
with System Center 2012
Configuration Manager.
•
Prepare a Configuration
Manager site for software
updates.
•
Manage software update
evaluation and deployment.
•
Configure automatic
deployment rules.
•
Monitor and troubleshoot
software updates.
Managing
Operating
System Module12
types and user device affinity.
Manage applications by
uninstalling and replacing
applications using application
supersedence.
Implementing Endpoint Protection in
Configuration
Manager
2012
This module explains how to integrate
and implement System Center 2012
Endpoint Protection with System
Center 2012 Configuration Manager
•
Module11
Lessons
Overview of Endpoint
Protection in Configuration
Manager
•
Configuring and Monitoring
Endpoint Protection Policies
Lab
:
Implementing
Endpoint
Protection
Configuring the Endpoint
Protection Point and Client
Settings
Configuring and Deploying
Endpoint Protection Policies
Monitoring Endpoint
Protection
After
completing
this
module,
participants will be able to:
•
Describe how Endpoint
Protection is used to detect and
remediate malware and security
vulnerabilities.
•
Configure and monitor
Endpoint Protection policies.
•
Managing
Compliance
Settings
Section V1. Technical Requirements
Deployment
This module explains how to deploy
operating systems by using the
System Center 2012 Configuration
Manager
infrastructure.
288
This module explains how to manage
configuration items and baselines to
assess and remediate the compliance
of
settings
on
devices.
Lessons
Lessons
Overview of Operating
System Deployment
•
Preparing the Site for
Operating System Deployment
•
Capturing an Operating
System Image
•
Deploying an Operating
System
Lab : Preparing the Environment for
Operating System Deployment
Configuring the Network
Environment for Operating
System Deployment
Managing Site System Roles
Used to Support Operating
System Deployment
Managing Packages to
Support Operating System
Deployment
Lab : Building and Capturing a
Reference Image
Creating a Build and Capture
Task Sequence
Capturing the Reference
Computer
Lab : Performing an In-Place
Upgrade
Preparing the Operating
System Image
Creating a Task Sequence to
Deploy an Image
Deploying an Image
After completing this module,
participants will be able to:
•
Describe operating system
deployment.
•
Prepare a site for operating
system deployment.
•
Capture operating system
images.
•
Deploy operating systems.
Managing
Mobile
Devices Module14
This module explains how to
configure the mobile device
management
settings.
•
Module13
Introduction to Compliance
Settings
•
Configuring Compliance
Settings
•
Viewing Compliance Results
Lab : Managing Compliance Settings
Managing Configuration Items
and Baselines
Viewing Compliance Settings
Reports
Using Remediation in
Compliance Settings
Using Compliance Information
to Create Collections
After
completing
this
module,
participants will be able to:
•
Describe the Compliance
Settings feature.
•
Configure the Compliance
Settings feature.
•
View compliance results.
•
Configuring Wake On LAN, Power
Management, and Remote Control
This module explains how to configure
Wake On LAN, Power Management
Section V1. Technical Requirements
289
policies,
and
Remote
Control.
Lessons
Configuring Mobile Device
Management
•
Configuring a Public Key
Infrastructure
•
Depth Management of
Mobile Devices
•
Deploying Applications to
Mobile Devices
Lab
:
Configuring
PKI
for
Configuration Manager
Creating Certificate
Templates for Configuration
Manager
Deploying Certificates for
Configuration Manager
Lab : Managing Mobile Devices
Preparing the Infrastructure
for Mobile Device
Management
Enrolling a Mobile Device
Managing Compliance
Settings for a Mobile Device
Deploying an Application to
a Mobile Device
After completing this module,
participants will be able to:
•
Configure mobile device
management.
•
Configure a public key
infrastructure (PKI).
•
Describe how you can use
depth management to manage
supported mobile devices.
•
Deploy applications to
mobile devices.
•
Lessons
Configuring Wake On LAN
Overview of Out of Band
Management
•
Configuring Power
Management Settings
•
Configuring Remote Control
Lab : Configuring Power Management
Settings
Applying a Power
Management Plan
Lab : Configuring Remote Control
Configuring the Remote Tools
Client Settings and Permissions
Managing Desktops by Using
Remote Control
After
completing
this
module,
participants will be able to:
•
Configure the Wake On LAN
feature.
•
Describe out of band
management.
•
Configure power management
settings.
•
Configure Remote Control
features.
•
•
24.1.2. System Center Operations Manager (SCOM)
Description
This outline is subject to change anytime and bidder & purchaser IT team should finalize the
course contents after the contract award. However, this instructor-led course provides
participants with the knowledge to successfully maintain the System Center Operations
Manager (SCOM). This course should provide instructor-led participants with the
knowledge to successfully design and deploy Microsoft's System Center 2012- Operations
Manager (SCOM). In this course, participants are introduced to the basic theory of service
monitoring. Participants also learn about configuration, deployment, monitoring, and
operation. Upon course completion, participants will have the skills necessary to manage
Operations Manager for maximum business benefit of Ministry of Finance. This course
Section V1. Technical Requirements
290
incorporates case-studies and hands-on learning opportunities so participants can practice
applying business solutions to real-world scenarios.
Objectives
After completing this course, participants will be able to:
•
•
•
•
•
•
•
•
•
Design and Build a Production Service Monitoring Program
Configure and administer Operations Manager 2012
Design monitoring deployment for Microsoft and non-Microsoft scenarios
Deploy monitoring for servers, applications and services
Deploy monitoring for UNIX/Linux and Network Devices
Tune monitors and rules for maximum benefit
Automate Operations Manager with PowerShell
Meet and exceed SLA's in order to bring value to business partners
Integrate Operations Manager with other tools
Prerequisites
Before taking this course, participants should have pre-requisite technical knowledge in the
following areas:
•
•
•
•
•
•
•
•
Windows Server® 2008 R2 operating system
Active Directory® Domain Services (AD DS)
Familiarity with data center management processes
Previous work with IT Infrastructure Library (ITIL)
Previous work with Microsoft Operations Framework (MOF)
Experience with PowerShell and SQL Server and SQL Server Reporting Services
Knowledge of previous versions of Operations Manager helpful
Knowledge of the product(s) that you plan to monitor
24.1.2.1. Course Outline
Module1
Introduction to Service Monitoring
and the System Center 2012 Suite
Lessons:
•
System Center 2012 Overview
•
Service Monitoring Overview
•
Documenting the Service
Monitoring Program
Objectives:
Module2
Introduction to Operations Manager
2012
Lessons:
•
Designing an Operations
Manager Environment
•
Operations Manager Console
Tour
•
The Operations Manager Agent
Objectives:
•
•
•
•
•
Understand and document a
monitored environment
Understand the differences
between servers, applications and
services
Understand and document
SLA's
Understand and define "Health"
for a monitored environment
Describe the members of the
SM team
•
•
•
•
•
•
Explain how to size and scale
Operations Manager 2012
Define the number of
management groups
Create a profile of the monitored
environment
Explain proactive versus reactive
monitoring
Prepare an active directory
Prepare security, users, and
Section V1. Technical Requirements
•
•
•
•
•
291
Define the SLA notification
levels
Identify SM team member roles
Clarify SM team member role
responsibilities
Define the SC 2012 products
Describe how the SC 2012
products interact
•
•
•
•
•
Module3
Configuring Operations Manager 2012
Module4
Lessons:
•
•
•
•
groups
Size and configure SQL 2008 R2
for SCOM
Locate the different parts of the
console
Locate the Operations Manager
agent
Identity the different
components of the agent
Identify configuration changes via
the Windows registry
Monitoring Basics
Lessons
Notifications (Subscribers,
Channels, and Subscriptions)
"Run As" Configuration
Security - Setting Up User Roles
General Settings
•
•
•
•
•
Objectives
Monitoring Basics
Agent Deployment
Management Pack Deployment
Rules, Monitors, Overrides, and
Tasks
Types of Endpoints to Monitor
Objectives
Implement notification
configuration
Run as configuration
Explain role-based security
Explain Discovery
Configure the general settings
Module5
Advanced Monitoring
Lessons:
•
•
•
•
•
UNIX/LINUX
Network Device Monitoring
Application Performance
Monitoring
Management Pack Creation and
Version Control
PowerShell Integration and
Automation
Objectives
Explain when to create new
MP's
Over-ride sealed MP's
Create new MP's
Module6
Understand templates,
rules, monitors and
discovery attributes
Initiate agent
deployment
Describe agentmonitored endpoints
Describe agentless
monitored endpoints
Initiate network device
monitoring
Tuning
Lessons:
•
•
•
•
Basics of Management Pack
Tuning
Rules and Monitors
Thresholds and Baselines
Overrides
Objectives:
Download sealed MP's
from Microsoft
Deploy sealed MP's from
Microsoft
Tune sealed management
packs
Set and use thresholds
Section V1. Technical Requirements
Module7
292
Compare and contrast sealed
versus unsealed MP's
Utilize version control
Explain an overview of the
Operations Manager shell
Describe the uses for
PowerShell in Operations
Manager
Create automated response to
alerts
Monitor UNIX/Linux
Establish a N-tier monitoring
solution
Establish application
performance monitoring (.Net
Framework)
Create synthetic transactions
Create end-to-end performance
monitoring
Distribute application service
level targets
Describe how sound processes
and practices translate into met
SLA's
Put new services into
production
Reporting, Dashboards, and Capacity
Management
Module8
Establish monitor
baselines
Beyond Operations Manager 2012
Lessons:
Lessons:
•
•
•
•
SCOM Data Warehouse
Creating Reports
Dashboards and SharePoint
Web Parts
Capacity Planning with
Operations Manager 2012
Objectives:
Manage new and
existing reports
Create reports
Create dashboards and
web parts
Plan for capacity
management with
Operations Manager
Use reporting data to
gauge capacity and
forecast
Configure data
collection for capacity
•
•
•
Service Manager
Orchestrator
Integration with Virtual Machine
Manager
Objectives:
Build task automation
with Orchestrator 2012
Create auto tickets in
Service Manager 2012
Share operations data
with other service
management applications
Section V1. Technical Requirements
24.2.
293
planning
Describe capacity
planning reporting
Foreign Training:
Training and Training Materials: Bidder shall provide vendor certified training material,
stationery during the training. Venue will be provided by course provider agreed upon
purchaser. Bidder will use high skilled vendor certified trainer who has sound credentials in
providing similar training courses. Practical training will include participants setting up the
environment and configuring various scenarios.
Courses:
1. System Center Virtual Machine Manager (SCVMM).
2. Configuring and Deploying a Private Cloud with System Center 2012
The Bidder should propose foreign training at Singapore or Indonesia or Malaysia depending
on course availability for “System Center Virtual Machine Manager (SCVMM)” and
“Configuring and Deploying a Private Cloud” with System Center 2012. Total number of
trainees is four (4) to be trained in groups of two at any one time. Training will be more
practical than theoretical. Purchaser technical team and bidder technical team should finalize
course contents according to Microsoft standard guideline and practical lab. The Purchaser
will designate appropriate staff for the training courses to be given by the training provider
and Bidder shall make all appropriate logistical arrangements (both way airfare, visa fee, local
transportation, airport transfer, 3-star hotel accommodation for each participant in single
room, food, US$100 per diem per trainee and cost to be included individually for each item in
the cost schedule.) for such training as specified below:
Item
1
2
Description
System Center Virtual Machine
Manager (SCVMM)
Configuring and Deploying a
Private Cloud with System
Center 2012
Duration in
Hours
Qty (no. of
participant)
40
4
40
4
Rate per
person in
USD
Line
Total in
USD
System Center Virtual Machine Manager (SCVMM)
Description:
This outline is subject to change anytime and bidder & purchaser IT team should finalize the course
contents after the contract award. However, this instructor-led course provides participants with the
knowledge to successfully maintain Virtual Machine manager within Ministry of Finance DataCenter. In
this course, participants are introduced to the various Systems Center products and provide a deepdive into SCVMM. Upon course completion, participants will be able to architect and deploy Virtual
Machine Manager. This course incorporates case-studies and hands-on learning opportunities so
participants can practice applying business solutions to real-world scenarios.
Objectives
After completing this course, participants will be able to:
Section V1. Technical Requirements
294
•
Install and Configure Virtual Machine Manager
•
Use the Virtual Machine Manager and the System
•
Administer Virtual Machine Manager
•
Configure Private Cloud
•
Leverage Templates and Profiles
Prerequisites
Center Suite
Before taking this course, participants should have pre-requisite technical knowledge in the following
areas:
•
•
•
•
•
•
Windows Server 2008 [R2]
Hyper-V version 2
Active Directory
PowerShell version 2
SQL 2005 or higher experience
Knowledge of the previous version of Virtual Machine Manager is helpful.
Course Outline
Module1
Introduction to the System Center
2012 Suite
•
•
•
•
Module3
Define a Private Cloud
Describe how Microsoft's
System Center products fit into
the concept of a private cloud
Describe the functionality of
each System Center product
Describe Private Cloud
Scenarios
Install and Configure VMM Server
•
•
•
•
•
•
•
•
•
Module2
Prerequisites
VMM Server
VMM Console
VMM Database
VMM Self-Service Portal
VMM Library Server
VMM Hosts
Installation walk-through
LAB
Introduction to System Center Virtual
Machine Manger 2012
Describe the main features of
SCVMM 2012
•
Design Scenarios
•
Deployment scenarios
•
Hypervisor Requirements
•
Storage Requirements
•
Network Requirements
•
Third-Party Integration
•
Xen Server support
•
VMWare support
Fabric Resources
•
Module4
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Hosts
Hyper-V
Bare-Metal Installation
Clusters
XenServer
VMWare
Networking
Logical Networks
IP address pools
Load Balancers
Storage
LUNs
Storage Classifications
Storage Pools
Library Servers and Shares
LAB
Section V1. Technical Requirements
Module5
Configure Load Balancers
Module7
MSFT NLB available by
default
•
Install configuration
provider for 3rd party - F5,
Brocade, Citrix
•
Prerequisites
•
Logical Network
•
IP Pools and VIP templates
•
LAB
Create Virtual Machine
295
Module6
•
•
•
•
•
•
•
Module9
•
•
•
•
•
•
•
Module11
•
Module13
Include "View Script" in
every lab.
LAB
Configure Service Templates
•
•
Module15
Run As Accounts
User Roles
Delegated Admins
Read-Only Admins
Self-Service Users
Ports and Protocols
LAB
PowerShell Components
•
Service Template Designer
LAB
Monitoring and Reporting
•
•
•
•
•
•
•
Module8
Blank Disk
Existing VHD
Existing VM
VM Template
P2V or V2V
LAB
Configuring Security
Operations Manager
Integration
Monitoring Jobs
Troubleshooting and
Create a Private Cloud
Configure VM Templates
•
•
•
•
•
Module1
0
Selecting fabric resources
Select library resources
Set Capacity
LAB
Source
Existing Template
Existing VHD
Existing VM
LAB
Configure Guest OS & Hardware
Profiles
Memory
CPUs
Network Adapters and
connections
•
Optical Drive
•
Guest OS Profile
•
Computer Name
•
Local Admin Password
•
Product Key
•
OS version
•
Domain
•
Server Roles
•
LAB
Configure Application Profiles
•
•
•
Module1
2
Module1
4
Module1
6
Server App-V
Web Deploy
SQL DAC
Scripted Installations
LAB
Performance Maintenance
•
•
•
•
•
Update Compliance
Dynamic Optimization
Power Optimization
PRO Tips
LAB
Troubleshooting
•
•
•
•
•
•
•
•
•
Installation Logs
VMM Configuration Analyzer
WMI for VMM
Virtual Machine Recovery Tool
Section V1. Technical Requirements
296
Repairing Jobs
Module17
System Center 2012 Service Pack 1
•
•
•
Changes in pre-requisites
Functionality Enhancements
LAB
MS Product Support Reporting
Tool
•
VMM Error Codes
•
LAB
Summary session for Question &
Answer.
•
Module1
8
Configuring and Deploying a Private Cloud with System Center 2012:
Description
This outline is subject to change anytime and bidder & purchaser IT team should finalize the course
contents after the contract award. However, this instructor-led course provides participants with the
knowledge to successfully maintain design, install and configure a private cloud, including how to
configure and deploy the application infrastructure as well as the key components of System Center
2012 that are necessary for delivering services on the private cloud infrastructure. This course
provides direction on producing a high-level design that accounts for requirements for the private
cloud environment. Participants will learn how to configure and deploy the application infrastructure,
how to configure a preboot execution environment (PXE) server, an update server, and a software
update baseline. Participants will learn how to sequence and deploy an application virtually, and how
to build the core components that are necessary for delivering services in the infrastructure. They will
also allocate resources and grant access to the private cloud. Additionally, participants will learn how
to monitor the private cloud, and setup, configure, and integrate the core System Center 2012 Service Manager Components into the private cloud infrastructure. Participants will learn how to
configure a service catalog and publish this catalog to the self-service portal. They will also gain the
knowledge required to deploy and configure System Center 2012 - Data Protection Manager (DPM)
and Orchestrator in a private cloud, and integrate these products with other System Center 2012
components. This course utilizes pre-release software in the virtual machine for the labs.
Prerequisites
Before attending this course, participants must already have the following technical knowledge:
•
•
•
•
•
•
•
•
Windows Server 2008 R2 operating system.
Active Directory Domain Services (AD DS).
Networking experience.
Working knowledge of previous versions of System Center products.
Microsoft SharePoint configuration.
Windows Server 2008 Hyper-V.
Familiarity with data center management processes.
Storage area networks (SANs).
Objective
After completing this course, participants will be able to:
•
•
•
•
•
•
•
Plan for the private cloud.
Configure and deploy the private cloud infrastructure.
Extend and maintain the private cloud infrastructure.
Configure virtual application delivery.
Create the private cloud building blocks.
Deploy and access the first business unit private cloud.
Monitor the private cloud infrastructure.
Section V1. Technical Requirements
•
•
•
•
•
297
Extend and customize monitoring of the private cloud infrastructure.
Implement service management for the private cloud.
Configure a private cloud service catalog.
Protect the private cloud infrastructure.
Automate and standardize the private cloud.
Course Outline
Module 1
Planning for the Private Cloud
Module 2
• Understanding the Private Cloud
• Requirements for Deploying a Private
Cloud
• Overview of VMNM Architecture and
Components
• Installing and Upgrading VMM
• Configuring VMM Security and Roles
• Understanding Host Groups
Lab : Configuring and Deploying the Private
Cloud Infrastructure
• Designing the Private Cloud
Infrastructure
• Overview of System Center 2012
• Components
• Deploying Hyper-V Host Cluster with
VMM
Reviewing and Configuring Hosts
Configuring Host Groups
Configuring User Roles and Run
As Accounts
•
Configuring Library Servers
•
Preparing the Private Cloud
Infrastructure
•
Deploying a New Virtual Machine
After completing this module, participants
will be able to:
•
•
•
• Planning for the Private Cloud
Lab : Creating a Hyper-V Cluster with
Virtual Machine Manager
After
completing
this
participants will be able to:
•
•
•
•
•
Module 3
module,
Describe the private cloud.
Describe the requirements for
deploying a private cloud.
Design private cloud
components.
Deploy a private cloud
infrastructure with System Center
2012.
Deploy Hyper-V clustering with
VMM.
Extending and Maintaining the Private
Cloud Infrastructure
• Overview of the PXE and Update
Server Roles
• Deploying Bare-Metal Hyper-V Host
Servers
• Configuring the Update Server Role
• Creating and Using an Update
Baseline
Lab : Maintaining the Private Cloud
Infrastructure
•
•
•
Configuring a PXE Server in
VMM
Configuring an Update Server
Role in VMM
Configuring a Software Update
Baseline in VMM
Configuring and Deploying the Private
Cloud Infrastructure
•
•
•
•
Module 4
Describe VMM architecture and
components.
Install and upgrade VMM.
Configure VMM security and
roles.
Understand host groups.
Configuring Virtual Application Delivery
• Dynamic Application Deployment
Overview
• Web Deployment Packages
• Server Application Virtualization
Overview
• Configuring Server App-V
Components
• Sequencing and Deploying Virtual
Applications
• Lab: Configuring Virtual Application
Delivery
Lab : Configuring Virtual Application
Delivery
•
Configuring the Server App-V
Sequencer
Section V1. Technical Requirements
After
completing
this
participants will be able to:
•
•
•
•
•
Module 5
298
module,
Describe how VMM integrates
with WDS and WSUS to provide
PXE and Update server roles.
Describe how to deploy baremetal Hyper-V host servers.
Describe how to maintain
updates within the VMM fabric.
Configure the Update server
role.
Create and remediate a
software update compliance
baseline
Creating the Private Cloud Building
Blocks
• Configuring Guest Operating
System Profiles
• Configuring Hardware Profiles
• Configuring SQL Server Using
SQL Server Profiles
• Configuring Application Profiles
• Configuring Virtual Machine
Templates
• Configuring the Self-Service User
Role
Lab: Creating the Private Cloud
Building Blocks
Configuring a Guest Operating
System Profile
•
Configuring a Hardware Profile
•
Configuring a SQL Server Profile
•
Configuring an Application
Profile
•
Configuring Virtual Machine
Templates
•
Configuring Security and Server
Roles for the Web Console
After
completing
this
module,
participants will be able to:
•
•
•
•
•
•
•
Configuring the Server App-V
Agent
•
Sequencing an Application
•
Testing the Server App-V Package
Deployment
After completing this module, participants
will be able to:
•
Configure guest operating
system profiles.
Configure hardware profiles.
Deploy SQL Server using SQL
Server profiles.
Configure application profiles
for a deployment.
Configure virtual machine
templates.
Configure self-service portal
users.
Describe dynamic application
deployment.
•
Create web deployment packages
by using the Web Deployment Tool.
•
Configure the Server App-V agent
and sequencer.
•
Sequence and then test a Server
App-V virtualized application.
Deploying and Accessing a
•
Module 6
Private Cloud
• Understanding Private Cloud
Computing
• Installing and Configuring App
Controller
• Creating and Managing Services
and Service Templates
Lab: Deploying and Accessing a Private
Cloud
Creating and Configuring a Private
Cloud
•
Configuring App Controller
•
Creating, Deploying, and
Managing Services
After completing this module, participants
will be able to:
•
•
•
•
Describe a business unit private
cloud.
Install and configure App
Controller.
Create and manage services and
service templates.
Section V1. Technical Requirements
Module 7
Monitoring
the
Infrastructure
299
Private
Cloud
Module 8
• Operations Manager Architecture
and Security
• Configuring the SharePoint Server
Portal
• Upgrading Operations Manager
• Configuring Notifications
• Configuring Management Packs
• Configuring Integration with
• System Center 2012
Lab: Monitoring the Private Cloud
Infrastructure
Using the Monitoring Templates
Understanding Distributed
Application Monitoring
Lab : Extending and Customizing
Monitoring of the Private Cloud
Infrastructure
•
•
Configuring the SharePoint
Console
•
Creating Custom Monitoring
•
Configuring a Distributed
Application Model
•
Configuring Service Level
Monitoring
•
Delivering Monitoring Views
•
Validating Monitoring
After completing this module, participants
will be able to:
•
Deploying Agents
Deploying and Configuring
Monitoring Management Packs
•
Configuring Notifications
•
Configuring VMM Integration
•
Configuring DPM Integration
After
completing
this
module,
participants will be able to:
•
•
Describe Operations Manager
architecture and security
considerations.
•
Upgrade from Operations
Manager 2007 R2 to System
Center 2012 – Operations
Manager.
•
Describe the notification
options available in Operations
Manager.
•
Install, configure, and upgrade
management packs.
•
Install and configure
Operations Manager integration
with VMM and DPM.
Implementing Service Management for
the Private Cloud
•
Module 9
Extending and Customizing Monitoring of
the Private Cloud Infrastructure
System Center Service Manager
Architecture Overview
•
Upgrading Service Manager
•
Understanding Service
Manager Work Items
•
Configuring System Center
Service Manager Connectors
•
Configuring Notifications
•
Understanding Incident and
Problem Management
Lab
:
Implementing
Service
Management for the Private Cloud
•
•
•
•
•
Configuring Connectors
Configuring the Service Catalog
Configuring Basic Settings
Configuring Incident and
Problem Management Settings
•
•
•
Module10
Integrate Operations Manager
data into a SharePoint portal.
Describe how to use monitoring
templates.
Implement distributed application
monitoring.
Configuring
Catalog
a
Private
Cloud
Service
What Is a Service Catalog?
Cloud Service Process
Management Pack Overview
•
Configuring Service Request
Fulfillment
•
Configuring Service Offerings
•
Service Level Management
Lab : Configuring a Private Cloud Service
Catalog
•
•
•
•
•
•
Installing the System Center Cloud
Services Process Pack
Configuring Services Roles and
Settings
Creating a Private Cloud Request
Offering
Creating an Incident Request and
Adding it to the Private Cloud
Offering
Section V1. Technical Requirements
•
Configuring Notifications
After
completing
this
module,
participants will be able to:
•
•
•
•
•
•
Setup and configure the core
components of Service Manager.
Plan an upgrade from Service
Manager 2010 R2 to System
Center 2012 - Service Manager.
Describe the various work
items and their relationships with
each other.
Configure the Service Manager
connectors.
Configure notifications.
Understand incident and
problem management.
300
Configuring Service Level
Management
After completing this module, participants
will be able to:
•
•
•
•
•
•
Describe the service catalog and
how it is implemented in Service
Manager.
Configure the Cloud Services
Process Management Pack.
Configure service request
fulfillment.
Configure service offerings.
Use service level management.
Section V1. Technical Requirements
Module 10
Protecting
the
Infrastructure
301
Private
Cloud
• Planning DPM Deployment
•
Data Protection Manager
Architecture and Security
•
Upgrading Data Protection
Manager
•
Configuring Data Protection
Manager for Protection of the
Private Cloud
•
Configuring Application
Protection for the Private Cloud
•
Restoring Applications to the
Private Cloud
Lab : Protecting the Private Cloud
Infrastructure
Creating a Storage Pool
Deploying Protection Agents
Automatically
•
Deploying Protection Agents
Manually
•
Creating and Configuring a
Hyper-V Protection Group
•
Creating and Configuring a SQL
Protection Group
•
Configuring SQL Self-Service
Recovery
•
Restoring Data from a SQL
Protection Group.
•
Using SQL Self-Service Recovery
to Restore a Database
After
completing
this
module,
participants will be able to:
•
•
•
•
•
•
•
Module 12
Describe Data Protection
Manager Architecture and security
considerations.
Plan an upgrade from Data
Protection Manager 2010 R2 to
System Center 2012 - Data
Protection Manager.
Configure the components
required to provide protection for
the private cloud infrastructure.
Configure protection of key
applications within the private
cloud infrastructure.
Restore key applications within
the private cloud infrastructure.
Configuring the Cloud Services Process
Pack
•
•
•
•
Implementing the Cloud Services
Process Pack
Service Level Management
Lab: Configuring the Cloud Service
Module 11
Automating and Standardizing the Private
Cloud
System Center Orchestrator
Overview
•
Deploying and Configuring Core
Components
•
Configuring Integration Packs
•
Creating Runbooks
•
Executing a Runbook from Service
Manager
Lab : Automating the Private Cloud
•
Creating a Runbook Server and
Configuring Integration Packs
•
Configuring a Template to Deploy
the SCOM and DPM Agents
•
Configuring Runbook to Protect
All Resources on a Server
•
Configuring Runbook to Deploy
Users
•
Creating a Virtual Machine
Request Template
After completing this module, participants
will be able to:
•
•
•
•
•
•
Describe key components of
System Center Orchestrator.
Describe how to deploy and
configure key Orchestrator
components in a private cloud.
Configure the System Center
integration packs in Orchestrator.
Create runbooks.
Configure Service Manager to
execute runbooks.
Section V1. Technical Requirements
302
Process Pack
However, if required, purchaser technical team and bidder should finalize course contents
again according to Microsoft standard guideline and practical lab after the bid awarded.
25.
Microsoft Premier Support:
Microsoft Services Premier Support team should provide service on 24 hours-a-day, seven days-aweek basis to help migrate to new technologies more efficiently with expert guidance and support. It
will enhance IT staff’s skills with training and knowledge transfer. Microsoft experts will help us keep
our technology healthy by providing a wide range of services including IT staff training, health and risk
assessments, and best practices. It should reduce costs by solving IT issues faster through remote
and on-site support and minimize critical support incidents and secure the server environment through
health and risk assessments. It should achieve competitive advantage in the marketplace by
implementing Microsoft best practices and Improve end user productivity through supporting to enable
product feature and reduced downtime. Bidder will arrange to deal directly for contract with Microsoft
for the Microsoft Premier Support service.
SI
1
2
3
Description (1 year contract)
Support Account Management
Support Assistance
Problem Resolution Support
TOTAL Hours
The requirement is for a 1 year contract based on
a Total of 204 hours where Problem Resolution
Support time to be considered as minimum 100
hours
With Microsoft Premier Support from Microsoft Services shall deliver:
•Accelerated response times—to speak to the correct subject matter expert’s right when need them
•Access to a global network of experts with unmatched knowledge of Microsoft products
•Direct assistance with planning, rollouts, and rigorous health checks and remediation services
•Operations assessments to help streamline processes, including security measures and resource
allocation
•Hands-on training and knowledge transfer to help increase IT staff expertise and improve alignment
between business goals and IT investments.
25.1.
Details of Microsoft Services Premier Support
Activities
Details
Support Account Management
Relationship
• Delivers a direct relationship with
Microsoft.
• Provides trusted advisors to help
improve the alignment between business
and IT.
• Helps to understand and optimize the
use of support benefits
• Helps increase performance and
availability of mission-critical systems
and minimize the cost of downtime.
• Helps with strategic planning to
maximize IT investments
Support Assistance
• Offers exclusive access to knowledgePrevent
sharing and best practices.
• Provides advanced technical training to
help IT staff act proactively and to
develop crisis-management skills.
• Helps identify and control platform risks
before they become threats.
Features
•
•
•
•
•
•
•
•
•
•
•
Service delivery plan
Remediation planning
Operational guidance from
subject matter experts
Monthly reporting and trending
advice
Escalation management
Account representative
On-site resources available
Knowledge sharing
Health checks, risk
assessment programs, and
reviews
Remediation services
Proactive information
Section V1. Technical Requirements
303
distribution
Helps maximize productive use of
technology to increase platform flexibility • Microsoft Premier Online
and agility.
• Product support workshops
• Provides access to the world’s top
• Workshops and Workshop
Microsoft subject matter experts.
PLUS
Problem Resolution Support
Fix
• Offers peace of mind so personnel are
• Hands-on collaboration
ready to react when problems arise.
• Problem-resolution services
• Maximizes the value of existing
• 24/7 Critical situation
resources and responds to changing IT
escalation management
and business demands.
• Rapid on-site support
• Covers non-service-related integration
issues between on-premises and cloudbased solutions.
• Helps decreases resolution time during
crisis with direct involvement from
Microsoft
MoF IT team will decide how & when they will use Microsoft premiere support services with the request
of Bidder and training course content will be finalize agreed by both parties(MoF IT team & Microsoft).
Not more than 16 participants joint the courses and training will be a part of Microsoft premiere support
services and bidder should not quote extra amount for it. MoF IT team will notify Microsoft premiere
support team for the time escalation and planning agreed upon both parties.
•
Section V1. Technical Requirements
26.
304
Implementation service for Installation and commissioning:
Bidder should hire Microsoft Large Account Resellers (LAR) for Installation and commissioning
purpose considered here 250 hours’ time to complete the implementation and quote the same. This
activity is additional but the bidder shall quote this requirement, but the purchaser reserves the rights
to choose whether this option is taken up or not in the bidding process.
Installation and commissioning
Primary DataCenter
Disaster Datacenter
Planning
& Design
(Hours)
Deployment
&
Commissioning (Hours)
Deployment
Commissioning
(Hours)
6
16
16
Exchange Server Migration
6
16
16
Lync Server
System
Center
Configuration
Manager
System Center Operation Manager
System Center Data Protection
Manager
System Center Service Manager
System Center Virtual Machine
Manager
System Center Orchestrator
6
16
16
8
8
8
8
8
8
8
8
8
8
8
8
Scope of work
Active Directory Migration
Application Server Implementation
TOTAL
16
8
8
8
42
104
104
&
This activity will be carried out in conjunction with Ministry of Finance IT team and bidder provided
Technical team of Microsoft Large Account Resellers (LAR).
Finance Division requires the design and deployment of each item specified in below sections and
hours allocated specified above. The latest based solution should be offered for Exchange, Lync,
System center, etc. servers located at DC and DR. Whenever primary server is subject to failure, the
secondary server will take over and work independently. The servers on Hyper-V environment must be
designed with HA (High Availability) within DC, architecture must be designed to facilitate a
redundancy and Site Disaster Recovery requirement which should also work on Hyper-V environment.
Bidder/Purchaser technical team should install and configure systems specified above and give
support for the provided servers according to agreed approval during the implementation period.
Details feature of deployment is given in below for each item.
Section V1. Technical Requirements
26.1.
Level
M
305
Microsoft Exchange Solution (DC & DR):
Description
Solution
Summary
Requirement
Microsoft Exchange Server 2013 or latest version at DC and
DR
1.
Finance Division requires the design and
implementation of a new Microsoft Exchange 2013
System(s). The latest based solution should be
offered for two physical servers; one located at DC
and one located at DR.
Primary mail server
independently works in DC which will replicate to
secondary mail server located at DR. Whenever
primary server is subject to failure, the secondary
server will take over the mail system and work
independently. Solution will also include migration of
all existing users’ inboxes from existing mail server to
new mail server. The new Microsoft Exchange server
on Hyper-V environment must be designed with HA
(High Availability) within DC, architecture must be
designed to facilitate a redundancy and Site Disaster
Recovery requirement which should also work on
Hyper-V environment. Mail and Communications
requirements must also have, but should not be
limited to, latest version of Lync Server (2013). The
solution must include the installation and
configuration of a proposed OWA presence, back-
Bidders
Response
Section V1. Technical Requirements
Level
Description
Scope of Works
306
Requirement
ups and fail over to CGA’s Disaster Recovery site.
Bidder/Purchaser technical team should install and
configure Microsoft Exchange server and give support for
the provided servers according to agreed approval. Design,
implement, configure and test a central high-availability
Microsoft Exchange platform to support the following client
access methods: Outlook Web Access, Exchange
ActiveSync for mobile devices, Outlook Anywhere, VPN.
The Exchange design, implementation and configuration
should resolve the following requirements:
• The solution provided should be compatible to Digital
Certificates in MS Outlook & Outlook Web Access.
• The E-Mail Solution should provide appropriate clustering
to provide server and application redundancy.
• The E-Mail Solution should enable configuration of
Deleted item recovery for end-user mail management.
FSMU administrators will define the maximum period for
which the mails, that have been removed from the
recycle bin, be kept for the end user to recover.
• The E-Mail Solution should support standard protocols
like MAPI, POP3, IMAP4, SMTP, HTTPS, etc. for mail
access and relay.
• The E-Mail Solution should support features for Mail
delivery commands to setup catchall, forwarding,
“Forward to host” – push mail to another account on
same/ different server, etc.
• Compliance: The E-Mail Solution should have inbuilt
engine to enforce standard security compliances &
regulation policies requirements on all mail transactions.
• Some of the requirements are listed below:
• Message Life Cycle Management for administration and
compliance purposes.
• Journaling of messages, distribution lists, user(s), etc. for
auditing.
• Mailbox(s) search based on query, content or phrase,
URL, user, IP, etc.
• Upon the event of a failure of the primary Email server,
the Emails should be automatically redirected towards
the secondary Email server.
• The secondary Email server should scan Emails for
spam and viruses.
• The secondary Email server should ensure that the
Emails are not lost during unexpected downtime or when
the primary Email server is too busy.
• The secondary Email should keep checking the primary
Email server continuously till it detects that the primary
Email server is available.
• The proposed solution should be design for 3000 inboxes
so that it can accommodate future scalability.
• Primary and secondary Mailbox server is a member of a
DAG; the Mailbox Databases on that server can be
copied to other members of the DAG: a collection of
mailbox servers that use continuous replication to update
database copies, communicate to manage failures and
can provide automatic failover to recover from a variety
of issues that can affect individual components,
databases, servers and datacentres.
Bidders
Response
Section V1. Technical Requirements
Level
Description
307
Requirement
Functional Specifications
Address Book
Anywhere Access
Web Access
Mobile Access
Calendaring
Security Features
It should be displayed in alphabetical order. Address Book
should be user friendly i.e. Addresses should be searched
through display name, last name, etc.
The E-Mail, Instant Messaging and Video Conferencing
Solutions should be accessible from the LAN, WAN and the
Internet (via VPN).
Web interface for accessing the mails through browser from
LAN, WAN and Internet via any browser and from any
device.
The E-Mail, Instant Messaging and Video Conferencing
Solutions should be configured for Push-based emails to
mobile devices.
• The E-Mail, Instant Messaging and Video Conferencing
Solutions should support an integrated, user-friendly,
calendaring feature that is able to support requirements
as listed below: Record Meeting Requests, Forward
Meeting Requests and Generate Alerts.
• Shared/Group Calendars, Schedule Reminders, Flexible
Events.
• Multiple Authors, Overlapping Event checking.
• It should be able to suggest best timing for meetings
based on participants’ availability by using Scheduling
Assistant, Attendance Confirmation.
• Import from Calendar, Diary System.
• Schedulable Out of Office.
• Group collaboration features.
• Tasks & Notes feature using rich mail client.
• Scheduling Assistant for suggesting best meeting time.
• Resource scheduling for conference rooms, projectors,
etc. The product should have wide administrative
capabilities to maintain control over calendaring.
• The E-Mail, Instant Messaging and Video Conferencing
Solutions should support English as well as other
languages.
• The E-Mail Solutions should be configured for Security
Policy (Password Policies, etc.) enforcement and
Remote Erase capability for Smartphone to protect data.
The E-Mail solution should support end to end encryption
of data; i.e. Client-Server and Server-Server Encryption
features for confidential messaging over all the mail
transactions. The encryption features should be able to
prevent spoofing, various malpractices, etc. It should also
support Start TLS encryption at gateway level.
Messaging Client and Server should support
Secure/Multipurpose Internet Mail Extensions (S/MIME),
enabling users to digitally sign and encrypt emails and
attachments.
• The software of the solution must have built-in malware
filtering capabilities which will help to protect our network
from malicious software transferred through email
messages.
• All messages sent or received by Exchange server are
scanned for malware (viruses and spyware). If malware
is detected, the message is deleted.
• Must have capability of Notifications which, once
Bidders
Response
Section V1. Technical Requirements
Level
Description
Permission
Availability
Administrative
Features
Exchange
Administration Center
(EAC)
In-Place Archiving,
retention, and
eDiscovery
Mail flow
308
Requirement
configured, will be sent to senders or administrators
when an infected message is deleted and not delivered.
Administrator also can choose to replace infected
attachments with either default or custom messages that
notify the recipients of the malware detection.
• The solution must have extremely precise permissions
models based on the roles of administrators and users.
High availability of the E-Mail Service. Availability of the
email services should be minimum 99.9% uptime.
The E-Mail Solutions should:
• Provide management from a single console. It should
also support remote management.
• Be able to provide graphical performance statistics using
performance monitor.
• Provide for command line based, easy to use
administration & scripting interface for all administrative
tasks.
• Allow administrators to manage individual domains like
Users, quotas, groups, etc.
• Provide administrative groups for granular delegation of
messaging administration across the organization.
• Support activity and error logging, mail delivery statistics
and message tracking.
• Support Problem diagnosis controls.
• Support health monitoring to generate periodic reports
about the health of the system, security status, etc.
• Be able to enforce email retention settings on users so
emails can be retained, archived, deleted as per the
policies.
• Provide Mail Log Report – reports on number of mails
including attachments sent / received by user; by date /
Month / year;– also logs on top 100 sent / received in
volume and in size.
• Support administration control over encrypting /
decrypting user’s password.
• Support multiple mail queues for quick mail delivery.
• Support Network Time Synchronization.
• List view.
• Add/Remove columns to the Recipient list view.
• Secure the ECP virtual.
• Public Folder.
• Notifications.
• Role Based Access Control (RBAC) User.
• Unified Messaging.
• In-Place:
• In-Place eDiscovery for Federated search, Query-based
In-Place Hold, Export search results ,Keyword, KQL, InPlace eDiscovery and Hold.
• Search across primary and archive mailboxes in Outlook
Web.
• Archive Lync content.
• Retention policies for Support for Calendar and Tasks
retention. Improved ability to retain items for a specified
period.
• Transport pipeline.
• Routing.
Bidders
Response
Section V1. Technical Requirements
Level
Description
Requirement
Recipients
Sharing
collaboration
and
Integration
SharePoint
Lync
with
and
Integration
with
IRM (Information
Right Management)
Clients and mobile
Unified Messaging
Batch
moves
309
Connectors.
Set-Send Connector.
Edge Transport.
Group naming.
Auditing reports.
Message tracking.
Public folders.
Site mailboxes.
Recipients > Shared Mailboxes.
Exchange 2013 integration with SharePoint 2013 to allow
users to collaborate more effectively by using site
mailboxes.
• Lync Server 2013 should archive content in Exchange
2013 and use Exchange 2013 as a contact store.
• Discovery Managers should perform In-Place eDiscovery
and Hold searches across SharePoint 2013, Exchange
2013, and Lync 2013 data.
• OAuth authentication allows partner applications to
authenticate as a service or impersonate users where
required.
• Must have capability to integrate MS Lync with Exchange
OWA.
• The solution must have the capability to integrate with
IRM solutions (ex. AD RMS) in future.
• The solution must have the capability for automatic IRM
protection.
• Must have the capability to create protection rule.
• Different predicates to automatically apply IRM
protection.
The Outlook Web App user interface is new and optimized
for tablets and smartphones as well as desktop and laptop
computers. New features include apps for Outlook, which
allow users and administrators to extend the capabilities of
Outlook Web App; Contact linking, the ability for users to
add contacts from their LinkedIn accounts; and updates to
the look and features of the calendar.
•
•
•
•
•
•
•
•
•
•
Unified Messaging in Exchange contains essentially
the voice mail features. The solution should have the
option to provision to enable voice mail features for
end users.
mailbox The new batch move architecture features the following
High availability and
site resilience
enhancements:
• Ability to move multiple mailboxes in large batches.
• Email notification during move with reporting.
• Automatic retry and automatic prioritization of moves.
• Primary and personal archive mailboxes can be moved
together or separately.
• Option for manual move request finalization, which
allows you to review a move before you complete it.
• Periodic incremental syncs to migrate the changes.
• Managed availability.
• Managed store.
• Support for multiple databases per disk.
• Automatic reseed.
• Automatic recovery from storage failures.
Bidders
Response
Section V1. Technical Requirements
Level
Description
Requirement
•
•
•
•
Availability,
Scalability and
Supportability
310
•
•
•
•
•
Bidders
Response
Lagged copy enhancements.
Single copy alert.
DAG network auto-configuration.
NLB for CAS.
Software Standards
The software must be latest version.
The software patches must be available.
The required hotfix must be obtainable when required.
The software must be upgradeable, reconfigurable and
capacity expendable.
The support for the software must be available for the
project lifecycle.
26.2.
Unified Communication Solution with Microsoft Lync Server
(DC & DR)
Level
M
Description
Summary Solution
Scope of Work
M
Platform Support
Requirement
Microsoft Lync Server 2013 or latest version at DC and
DR.
Two Lync servers could even be used to split the load of
5000 users in a location where 2500 are homed on each
server and both servers are paired (backup for each
other). The build list would look something like this:
2 x Lync Server 2013 servers (paired with each other in
the same site or stretched between a primary and DR
site);
2 x Lync Server 2013 Edge servers;
2 x Office Web App servers (WAC).
Deploy and enable technologies and consolidate
functionality with a single platform for Unified
Communication by Microsoft Lync 2013. Specifically,
deploy a new unified communications platform that will
give end users secure access to communications
resources regardless of location and combine the instant
messaging (IM) and presence capabilities with web,
audio conferencing and voice capabilities. There must
be provision to expand the deployed solution for
enterprise voice (ex. PSTN integration) and other
features/roles like Archiving, Monitoring in future.
The proposed solution must be run on client-server
computing architecture. The client system would be
compatible version of Windows, Mobile platform and
proponent in conjunction with MoF IT teamproponent in
conjunction with MoF IT team and MoF IT team will list
down all the supported platforms for both PC and mobile
devices for the proposed solution.
Proposed solution by proponent in conjunction with MoF
IT team must include an isolated, highly available
clustered database platform (e.g. Real Application
Cluster, SQL Failover Cluster). Please clearly mention
whether the proposed solution is ODBC compliant or
not.
Proposed solution must be integrated with enterprise
directory service (Active Directory Domain Service), Mail
Response
Section V1. Technical Requirements
Level
Description
M
Enterprise Scalability
M
Integrated Solution
Architectural Design
311
Requirement
Service (Microsoft Exchange 2013) and Microsoft
SharePoint of MOF.
The solution should have a single client interface for all
types of MS Lync Server 2013 meetings, including both
scheduled meetings and unplanned meetings.
The solution must have web based client application
which is a browser-based version of MS Lync 2013 that
allows people who do not have a MS Lync Server 2013
account and have not installed MS Lync 2013 to
participate in meetings.
The solution must have the option to download Microsoft
Lync 2013 Attendee client that enables users without
Microsoft Lync 2013 client to attend meetings.
The solution should have simple URLs for joining
meetings, dial-in conferencing, and administrative tasks
for operational efficiency and ease.
The solution system must support Microsoft applications
and services, including SharePoint and Exchange
support, including integration with the company’s latest
version of Office.
The proponent in conjunction with MoF IT team
proponent in conjunction with MoF IT team in
conjunction with MoF IT team has to propose a solution
to implement an Enterprise Communication system for
Ministry of Finance to serve a total number of users.
The proponent in conjunction with MoF IT team must
provide data on performance and availability in largescale environments (i.e. MOF has multiple regional
offices in a single site domain).
The proponent in conjunction with MoF IT team should
provide detailed capacity planning considering standard
practice around the globe for specified number of users.
For example, 100% users for IM and Presence, 50%
users for group chatting, 20% users for Audio
conferencing, 10% users for Video conferencing etc. (for
concurrent participation).
Submit references of customers with contact details who
have live instances of Microsoft Lync 2013 solutions that
have been implemented.
The proponent in conjunction with MoF IT team must
identify and list down the necessary components/
modules/ products/ connectors/drivers to build the
solution proposed.
The proponent in conjunction with MoF IT team must
include required software or hardware based load
balancer to build highly available platform as part of the
proposed solution.
The Proponent in conjunction with MoF IT team has to
explain in detail the System Management tools that have
been integrated with the solution, and how these tools
have been integrated.
The Proponent in conjunction with MoF IT team has to
provide a detailed alerting function based on events such
as exceptions and other security-related events,
including but not limited to:
a.
User activity auditable to individual user;
b.
Success/failure of login and logout;
c.
Multiple access attempts;
d.
Application restart/shutdown;
Response
Section V1. Technical Requirements
Level
312
Description
Requirement
e.
Other configurations for alerting – Customization.
The Proponent in conjunction with MoF IT team has to
explain for each of the products that make up the
solution, if the application offers a facility to timeout
requests. Can the timeouts be configurable?
The Proponent in conjunction with MoF IT team has to
provide full documentation describing any administration
processes that are required to manage the system.
M
M
Unified
Communication
Instant Messaging
The Proponent in conjunction with MoF IT team shall
provide details of its proposed instant messaging
solution.
The Proponent in conjunction with MoF IT team shall
provide details of the functionality built into the IM system
to record IM messages for audit, record and compliance
purposes. The Proponent in conjunction with MoF IT
team shall also identify the functionality available to the
IM user and the system administrator.
The Proponent in conjunction with MoF IT team shall
identify IM functionality for messaging groups of users.
The Proponent in conjunction with MoF IT team shall
confirm the maximum delay between submission of an
IM and the receipt by the message recipient or group of
IM users. This overall delay figure should be split
between the time to ‘up-load’ the information to the IM
server and the time for end stations to poll or receive the
message.
The Proponent in conjunction with MoF IT team shall
provide details of the user interface for IM using a PC or
laptop (both Microsoft Windows and Apple iOS), tablet
(i.e. iPad, Galaxy tab) and all smart mobile phone (for
example having platform iOS, Android, Symbian,
Windows etc.).
The Proponent in conjunction with MoF IT team shall
provide full details of virtual desktop environments
supported.
The Proponent in conjunction with MoF IT team shall
provide details of the ‘IM engine’ software operating
system. The Proponent in conjunction with MoF IT team
shall also detail the virtual server environments that are
supported. Note the term ‘IM engine’ refers to all
software and hardware used by the IM system other than
the client software.
The Proponent in conjunction with MoF IT team shall
confirm the manufacturer’s policy towards supporting the
above operating systems and future new releases. The
Proponent in conjunction with MoF IT team shall provide
evidence that this policy has been achieved in the past.
For example, detail the release dates of operating
systems and the release of presence clients supported
on the OS.
The Proponent in conjunction with MoF IT team shall
provide details of where a similar Unified
Communications System has been integrated with MS
Active Directory to drive IM from a definitive enterprise
data source.
Response
Section V1. Technical Requirements
Level
M
Description
Presence
313
Requirement
The Proponent in conjunction with MoF IT team shall
provide full details of the integration with third-party IM
services or systems (including any Internet based IM
services). The Proponent in conjunction with MoF IT
team shall also provide full details of any software
licensing and/or certificate issues.
The Proponent in conjunction with MoF IT team shall
provide full details of the interface and security
functionality to enable IM collaboration externally with
partner or supplier organizations.
The solution should have a message archiving feature to
archive the content of IM messages for all users in MOF,
or for only certain users.
The Proponent in conjunction with MoF IT team shall
provide details of its proposed solution to provide
presence functionality.
The Proponent in conjunction with MoF IT team shall
confirm the sources of presence information:
• Video conferencing (detailing any third party
systems supported);
• Mobile phone;
• Network log-on through laptop or PC;
• Other.
The Proponent in conjunction with MoF IT team shall
provide details of the different user presence states
identified by the system. The Proponent in conjunction
with MoF IT team shall also identify any variation
dependent on the source.
The Proponent in conjunction with MoF IT team shall
confirm the maximum delay between a change in a
system user’s presence status and presentation of the
presence information to system users. This overall delay
figure should be split between the time to ‘up-load’ the
information to the presence server and the time for
dissemination to end stations.
The Proponent in conjunction with MoF IT team shall
provide details of the user interface for presence using a
PC or laptop and a mobile phone.
The Proponent in conjunction with MoF IT team shall
provide details of how the presence status is integrated
with Microsoft Outlook.
The Proponent in conjunction with MoF IT team shall
provide details of how the presence status is altered if
the user is actively engaged on other activity (video call,
IM, working in a separate application).
The Proponent in conjunction with MoF IT team shall
confirm whether the presence client is a stand-alone
application or provides other functionality. i.e. softphone
or Instant Messaging functionality.
The Proponent in conjunction with MoF IT team shall
provide details of the ‘presence engine’ software
operating system. The Proponent in conjunction with
MoF IT team shall also detail the virtual server
environments that are supported. Note the term
‘presence engine’ refers to all software and hardware
used by the presence system other than the client
software.
The Proponent in conjunction with MoF IT team shall
Response
Section V1. Technical Requirements
Level
Description
314
Requirement
confirm its policy towards supporting the above operating
systems and future new releases. The Proponent in
conjunction with MoF IT team shall provide evidence that
this policy has been achieved in the past. For example,
detail the release dates of operating systems and the
release of presence clients supported on the OS.
M
M
Conferencing
Design Overview
M
Conference Size
M
Conference
Participation
The Proponent in conjunction with MoF IT team shall
propose a solution which is able to accommodate the
variety of different audio conferences indicated by the
historical data above. The Proponent in conjunction with
MoF IT team may wish to propose a hybrid solution
incorporating a dedicated solution for smaller
conferences and a bespoke service for large
conferences. Any breakpoints or overlaps used to
differentiate a large conference from a small conference
must be stated.
The Proponent in conjunction with MoF IT team shall
provide a “small conference” solution which will allow the
organizers to book manage and conduct the
conferences with no additional input required from the
participants.
The Proponent in conjunction with MoF IT team shall
provide a “large conference” solution which will allow the
organizers of large or more complex teleconferences to
book conferences with managed services from the
participants to organize manage and conduct the
conference on MOF’s behalf; a typical conference of this
nature might be a press conference.
The Proponent in conjunction with MoF IT team need to
provide detail about how a conference is initiated and
controlled from the single client interface.
The Proponent in conjunction with MoF IT team need to
provide detail about how many participants can take
place in a conference.
Any restrictions on the participant’s location (e.g. internal
or external).
The Proponent in conjunction with MoF IT team has to
clearly specify if there are limitations or disadvantages
with this form of conference.
The Proponent in conjunction with MoF IT team shall
describe the sequence of events when a new person
dials in to a conference including the following options:
(a) the new participant is able to join the on-going
conference directly (b) the new participant is admitted to
a conference lobby area from where the person
controlling the conference is able to admit the new
participant into the meeting.
The Proponent in conjunction with MoF IT team shall
describe the different devices which might be used to
access a conference both internally and externally.
The Proponent in conjunction with MoF IT team shall
describe the conference participant registration process,
how the process shall operate and how participant roles
can be assigned and maintained.
The Proponent in conjunction with MoF IT team shall
describe how the solution is able to host multiple
conferences simultaneously. Any limit on the number of
simultaneous conferences (whether limited by number of
Response
Section V1. Technical Requirements
Level
M
Description
Conference Booking
315
Requirement
conferences or total number of participants) must be
stated.
The Proponent in conjunction with MoF IT team shall
describe how long in advance of a predetermined
meeting time conference participants are able to connect
using the meeting details, this shall include what the
conference participants experience while waiting for the
conference to commence.
The Proponent in conjunction with MoF IT team shall
describe what happens when a conference is
terminated, but participants are still connected.
The Proponent in conjunction with MoF IT team shall
describe the various methods by which conference
participants joining and leaving the conference are
announced and how these announcements can be
controlled by the conference organizer including any
ability to mute them if required.
The Proponent in conjunction with MoF IT team shall
describe how participants who might be disconnected
are disconnected from ‘able to reconnect’ to a
conference in the same way that they initially joined.
The Proponent in conjunction with MoF IT team shall
state the maximum number of participants who can
connect to a single conference.
The Proponent in conjunction with MoF IT team shall
state the maximum number of conferences which can be
held concurrently.
The Proponent in conjunction with MoF IT team shall
state the maximum number of participants who can be
connected concurrently to all conferences. Any
restrictions on the locations of the participants (e.g.
external or internal) must be described.
The Proponent in conjunction with MoF IT team shall
describe how new participants can be announced
electronically on screens, to both all participants in the
conference and just to the conference chairperson.
The solution shall have the control by which an organizer
can limit the maximum number of participants who can
request to join in to a single conference.
The Proponent in conjunction with MoF IT team shall
describe how the conference facilities can be booked
and managed in the same way for a physical meeting
room.
The Proponent in conjunction with MoF IT team shall
describe how the teleconferencing facility will be booked
by MOF employees. Any integration with Microsoft
Exchange should be detailed.
The Proponent in conjunction with MoF IT team shall
describe if the proposed solution can automatically
identify the number of participants and if this is less than
a specific number (e.g. three) will suggest that the
meeting could be undertaken without recourse to the
teleconference facility.
The Proponent in conjunction with MoF IT team shall
describe how the solution will automatically notify all
meeting invitees of the relevant teleconference facilities
including conference codes or PINs (including notifying
the meeting organizer of the relevant PIN code for
controlling the meeting). All of the information should be
Response
Section V1. Technical Requirements
Level
M
Description
Conference
Management/Control
316
Requirement
up to date (this includes supplying up to date local
access numbers and latest conference access codes
and PIN codes).
The Proponent in conjunction with MoF IT team shall
describe how the conference organizer within the MOF is
able to dial out to participants and include (connect)
them in the conference, any limitations on this facility
must be stated.
The Proponent in conjunction with MoF IT team shall
describe how a conference organizer is able to dial out
and invite a new participant to join the conference
without this transaction being heard by the other
conference participants.
The Proponent in conjunction with MoF IT team shall
describe how conferences can be controlled by the
conference organizer including the following:
•
The ability to admit participants into the
conference when the conference commences;
•
The ability to remove participants from the
conference when the conference ends;
•
The ability to admit participants and remove
specific participants part way through a conference;
•
The ability to identify all participants in the
conference (both by the conference organizer and by
other conference participants);
•
The ability for conference participants to be
identified as a name rather than a telephone number
(how this is achieved shall be described);
•
The ability for a conference organizer to redial a
participant who might have become disconnected;
•
The ability for a conference participant to
reconnect with a conference should they become
disconnected;
•
Any other facilities offered by the proposed
solution.
The Proponent in conjunction with MoF IT team shall
describe how a conference is secured so that
unauthorized participants are unable to access or control
the conference: (a) before the conference commences,
(b) after the conference has started.
The Proponent in conjunction with MoF IT team shall
describe the method by which conference organizers are
able to reconnect to a conference if they become
accidentally disconnected. In the event of a conference
organizer becoming disconnected, the Proponent in
conjunction with MoF IT team shall describe the effect
that will have on the remaining conference participants.
The Proponent in conjunction with MoF IT team shall
describe how the proposed solution might record the
conference and store it for later editing, playback or
transcription. The Proponent in conjunction with MoF IT
team shall describe how this can be synchronized with
any visual record of the conference, such as
presentations, slide shows, desktop sharing, or video.
Any additional costs associated with this service must be
clearly identified. Any additional infrastructure
requirement must be stated.
The Proponent in conjunction with MoF IT team shall
describe their managed conference facility where the
Response
Section V1. Technical Requirements
Level
317
Description
M
Video Conference
M
Software Standards
Availability, Scalability
and Supportability
Requirement
participants shall manage the conference, monitoring
participants and ensuring that any necessary action is
taken to ensure that the meeting progresses without
interruption.
The Proponent in conjunction with MoF IT team shall
describe all facilities available for the conference
organizer or secretary to monitor and manage the
conference if required.
The Proponent in conjunction with MoF IT team must
state if their proposed solution integrates with Adobe
Connect version 8, and how this is achieved, including
identifying any limitations which might apply.
The Proponent in conjunction with MoF IT team must
state any other platforms with which their solution
integrates.
The solution must have the video conferencing feature
for user experience by incorporating video into the
unified client so that scheduling a meeting with video or
escalating to video spontaneously is seamless and
easily operable.
The solution must support multiple participants in a video
call or a conference, the active speaker is displayed in
the main video window and other users will be displayed
in the video window as well.
The Proponent in conjunction with MoF IT team need to
ensure smooth and seamless video conference facility in
all the regional office of MOF. Describe all the necessary
preparation/involvement from both MOF and proponent
in conjunction with MoF IT team.
The proponent in conjunction with MoF IT team has to
offer a compatible device to avail a panoramic view
(maximum number of participants) for the video
conference ensuring smoothness and efficiency (i.e.
bandwidth, equipment etc.).
The proponent in conjunction with MoF IT team has to
ensure an eagle eye view for one (01) conference room
proposing all the required accessories and ensuring
standard video quality.
The Proponent in conjunction with MoF IT team shall
describe the options for developing and expanding the
use of video technologies using the proposed solution. If
additional services are required to achieve this they must
be clearly identified.
•
•
•
•
•
The software must be latest version.
The software patches must be available.
The required hotfix must be obtainable when
required.
The software must be upgradeable, reconfigurable
and capacity expendable.
The support for the software must be available for
the project lifecycle.
Response
Section V1. Technical Requirements
26.3.
Level
318
System Management Solution with Microsoft System Center
Description
M
Summary
Solution
Requirement
M
Scope of Work
M
Summary
Specification
Requirement
Requirement
System Management Solution with Microsoft System Centre 2012
(or latest version) at DC and DR . It should install in Datacentres to
provide all of it’s components:
• App Controller
• Operations Manager
• Orchestrator
• Service Manager
• Virtual Machine Manager
• Data Protection Manager
• Endpoint Protection
• Configuration Manager
Currently there will one (1) physical server for System Center; all
components, but there must be provision for the future for high
availability of hardware or software failure across datacenter(s), i.e.
provision for DR site where DR will be a synchronised service site
also.
The Vendor is to provide an integrated management platform that
helps us to easily and efficiently manage our datacenters, client
devices, and hybrid cloud IT environments.
In terms of manageability, cost and ROI, we will drive with Microsoft
System Center 2012. The proponent in conjunction with MoF IT
team is to deploy System Center 2012 platform to offer
comprehensive management of applications, services, physical
resources, hypervisors, software defined networks, configuration,
and automation.
The proponent in conjunction with MoF IT team is to deploy the
components (Configuration Manager, Operation Manager, Virtual
Machine Manager, Data Protection Manager, End Point, Service
Manager, App Controller and Orchestrator) of System Center 2012
with standard administrative configuration whereas development
and future administrative tasks will be managed in-house by MoF..
System Center 2012 or latest must provide a common selfservice experience that will easily configure, deploy, and
manage virtual machines and services across private and
public clouds.
• Virtual Machine Manager should provide service templates
to help standardize application blueprints.
• Service template should typically include specifications for
the hardware, operating system, and application packages
that compose the service.
• Support for multiple package types for Microsoft .NET
applications, including MS Deploy for web tier (IIS) and
Microsoft Server Application Virtualization (Server App-V)
for application tier.
• It should specify application configuration requirements like
topology, elasticity and scale-out rules, health thresholds,
and upgrade rules.
• It should provide server App-V, a unique technology in
Virtual Machine Manager, optimize applications for private
cloud deployments by abstracting the application from the
underlying OS and virtual infrastructure.
• App Controller offers application owners a single view to
manage application services and virtual machines, whether
they are on-premises or cloud-based
System Centre Configuration Manager Plan and End Point Protection
•
Response
Section V1. Technical Requirements
Level
Description
Key Features
Maintaining
319
Requirement
Expert should install and must deploy the update to the production
servers in a reliable and efficient way. These include:
• Using Windows Server Update Services (WSUS): WSUS provides
a way to automatically deploy crucial updates and security rollups
to computers throughout a network, without requiring you to visit
each computer or write script.
• Using Systems Management Server (SMS): SMS is an enterprise
management tool for delivering configuration and change
management of Microsoft Windows server and workstation
operating systems.
Bringing patch management servers up to date with the latest
patches is part of the patch management cycle. The patch
management cycle begins again by knowing when new security
vulnerabilities are found and missing security updates become
available. Keeping these servers up to date with the latest security
patches involves this entire cycle.
Performing
Security
Assessments
Facilities MBSA to regularly check for security vulnerabilities and to
identify missing patches and updates. Schedule MBSA to run daily
and analyse the results to take action as needed.
Scope of work
for SCCM
Design and deploy System Centre Configuration Manager
2012(SCCM-2012) and System Centre End Point Protection
2012(SCEP-2012) and other necessary components.
Design and Implementation of the centralized Patch Management
solution, centralized Server/Desktop/Laptop Hardware and Software
Inventory, Software Metering, Remote Software Distribution,
Remote Troubleshooting and Remote OS deployment for 4,000+
desktops scalability.
Design should be part of the Active Directory design and optimized
for Ministry of Finance network architecture.
Central SCCM server and Database server should be implemented.
Distribution Servers should be part of the Hyper-V workload at the
remote Offices.
Patch Management solution should segregate the desktops, laptops
and servers and enable flexibility for the patches.
All the patches and application should be installed seamlessly
without user intervention.
Patch Management configuration and settings should be optimally
set during non-peak hours.
Asset Management configuration and reports should be according
to Ministry of Finance specific requirements.
Detailed report on the Software and Hardware inventory and
metering should be provided for all the desktops/laptops and
servers.
Appropriate audit configuration and reports should be generated as
per the Ministry of Finance requirements.
Provision for custom tags/details should be provided as per Ministry
of Finance requirements.
Software distribution should provide facility to use MSI packages.
The entire SCCM 2012 configuration should be as per Ministry of
Finance approved requirements.
Configuration must be scalable for over 4,000 machines.
Key
Assumptions
MINISTRY OF FINANCE will provide to the successful proponent in
conjunction with MoF IT team, information on network capacity,
utilization, line speeds and the number of devices at each physical
location that can be used as a basis for design decisions.
A fully routed network is in place at each building or major site and
Response
Section V1. Technical Requirements
Level
Description
Technical
Specifications
Requirement
320
Requirement
has been allocated a unique IP address range(s).
All client workstations that will be incorporated into the SCCM
environment have been installed with an OS greater than or equal to
Windows XP SP3 and servers have been installed with an OS
greater than or equal to Windows 2003 RTM and are configured to
use TCP/IP as their primary network protocol.
All Windows account domains will be used to store all machine and
user accounts in a single forest.
Consideration for non-AD registered workstations and locations not
on MINISTRY OF FINANCE Network should be made.
Proponent in conjunction with MoF IT teams should design and
Implement the following:
Centralized patch management solution;
Centralized Server/Desktop/Laptop hardware and software;
inventory, Software Metering, Remote Software distribution;
Rremote Troubleshooting and remote OS Deployment for 4,000+
desktops
Proponent in conjunction with MoF IT teams should design SCCM
2012 as part of the Active
Directory design and optimized for Ministry of Finance network
architecture.
Proponent in conjunction with MoF IT teams should harden the
Operating System before the installation of application as per
Ministry of Finance security policy.
Proponent in conjunction with MoF IT teams should design and
implement Central SCCM server and Database server and
distribution servers should be part of the Hyper-V workload at the
regional offices.
Proponent in conjunction with MoF IT teams should provide Patch
Management solution which will segregate the desktops, laptops
and servers for the patches.
Proponent in conjunction with MoF IT teams should provide and
implement all the patches and applications should be installed
without user intervention.
Proponent in conjunction with MoF IT teams should configure the
SCCM 2012 server for Patch Management configuration and the
settings optimally set for non-peak hours.
The desktop management agent on the distributed workstation
should not be reflected as part of “Add /Remove program”.
SCCM 2012 solution should be a complete GUI based Configuration
change.
The solution should take advantage of the Organization / Division
Unit Structure.
The performance, availability and reliability of the proposed solution
should be manageable centrally. It should be possible from a
centralized management
console to monitor the health and performance counters of the
Desktop management application (Along with the underlying OS,
Directory and Database) like starting and stopping of all Desktop
management server services, including critically dependent services
such as Windows Management Instrumentation (WMI), Internet
Information Server (IIS), and database. Any critical service stops,
service failures, performance thresholds, status messages, and site
system status should be able to raise alerts.
The hardware inventory items for collection must be customizable.
The solution must include pre-defined reports that allow
comprehensive reporting against hardware information. There
should be provisions to create customized reports and solution
Response
Section V1. Technical Requirements
Level
Description
Design
Disaster
321
Requirement
should provide secure access to reports based on Active Directory
user credentials.
The Inventory collection for Hardware should be very granular,
based on Asset Intelligence for effective decision making process.
The solution must be capable of providing inventory of all software
installed on the workstation with versions etc.
Installed Software / Applications should be available from multiple
methods like file information on the workstation, Registry contents
and Add/Remove Programs.
The solution should provide advanced level of Software
Identification and Categorization through a Knowledge
Catalog: The application detection technique should go beyond the
standard “Add/ Remove Programs”, “Registry scanning” etc. and
should be able to identify software which does not register itself in
the traditional way like “Add Remove program”, registry entry etc.
The solution should offer facility for basic License Monitoring
facilities like tracking License usage, managing computers with their
Application License Status across the enterprise and delivering
License compliance reporting (Entitled versus installed) etc. It
should help us to take informed decision for License reconciliation
exercises.
Active Directory integration is also required to build Laptop / Desktop
Location awareness and to identify the nearest point of patch
distribution for efficient WAN BW utilization.
The proposed Solution should support handheld devices like
Windows Mobile etc.
Proponent in conjunction with MoF IT teams should design and
implement the asset management configuration and reports should
be according to Ministry of Finance specific requirements.
Proponent in conjunction with MoF IT teams should provide detailed
report on the software and hardware inventory and metering for all
the desktops/laptops and servers.
Proponent in conjunction with MoF IT teams should setup
appropriate audit configuration and generate reports as per the
Ministry of Finance requirements.
Proponent in conjunction with MoF IT teams should provision for
custom tags/details as per Ministry of Finance requirements.
The- solution should allow Software distribution to use MSI
packages.
Proponent in conjunction with MoF IT teams should follow the entire
SCCM 2012 configuration as per Ministry of Finance approved
Requirements.
Proponent in conjunction with MoF IT teams must provide a project
plan that details the tasks and effort estimated for both the
successful proponent in conjunction with MoF IT team and
MINISTRY OF FINANCE staff. Project plan to cover SCCM and
SCEP configuration and deployment.
The successful proponent in conjunction with MoF IT team will be
expected to provide a design document that clearly outlines the
proposed MINISTRY OF FINANCE configuration, functionality,
options and staff responsibilities with the allocated servers proposed
here.
The Design will also set out the UA (User Accepted) test and
acceptance criteria
The successful proponent in conjunction with MoF IT team will
deploy and test SCCM 2012 in a lab environment to validate the
design to their own environment to get approval from the purchaser.
The successful proponent in conjunction with MoF IT team must
Response
Section V1. Technical Requirements
Level
Description
Recovery Plan
Operations
322
Requirement
provide DR scenarios for both Primary and Secondary servers. DR
plan must include information on what must be backed up and
restored, and any application specific requirements for performing
that backup and restore.
The successful proponent in conjunction with MoF IT team must
provide instructions on how to operate and maintain the system,
including troubleshooting. Instructions on how to image machines,
re-image existing and perform OS upgrades.
The successful proponent in conjunction with MoF IT team must
install the SCCM client on the designated computers in one site for
design validation.
The successful proponent in conjunction with MoF IT team must
work with MINISTRY OF FINANCE staff to develop WIN 7 desktop
that utilizes SCCM.
Knowledge
Transfer
M
Solution Summary
Requirement
M
Network
Monitoring:
M
Application
Monitoring:
M
Operating
System
Solution must be capable of deploying the SCCM client via client
push
The successful proponent in conjunction with MoF IT team must
provide demonstration to MINISTRY OF FINANCE ITS Staff of the
SCCM in the following areas:
• Security Patch Management;
• Software Deployment;
• Operating System Deployment/capture;
• Asset Management - Hardware and Software Inventory;
• Reporting;
• Remote Control.
System Centre Operation Manager (SCOM)
The proponent in conjunction with MoF IT team must design and
deploy the SCOM in such a way that will help organization to
monitor computers, networks, and applications. In our organization,
Operations Manager operators will be the first level of monitoring
and support and are limited in the possible actions they can take.
This level is sometimes called Tier I support or “front-end support”
or “help desk.” As the operator, they ust have provision to be notified
when there is an alert, and they should be first to have the
opportunity to react to an alert as needed.
Technical Features Requirement of SCOM
Operations Manager must provide the ability to discover and monitor
network routers and switches, including the network interfaces and
ports on those devices and the virtual LAN (VLAN) that they
participate in.
There must be provision to delete discovered network devices and
prevent the deleted network devices from being rediscovered the
next time discovery runs.
Operations Manager must monitor Internet Information Services
(IIS)-hosted .NET applications from server- and client-side
perspectives to get details about application performance and
reliability that can help pinpoint root causes of incidents.
There must provision to specify settings, the types of events to
collect, the performance goals to measure, and servers to monitor,
.NET Application Performance Monitoring reveals how web-based
applications are running.
Capability to see how frequently a problem is occurring, how a
server was performing when a problem occurred, and the chain of
events related to the slow request or method that is raising
exceptions.
Operations Manager must monitor Microsoft and Unix based
operating systems.
Response
Section V1. Technical Requirements
Level
Description
323
Requirement
Monitoring:
M
Performance and
Scale
M
Web Console
M
Dashboard
Views
M
Creating
Dashboard
Views
Display
Dashboard
Views in
SharePoint
M
M
Must have capability to configure resource pool in future
expansion which will contain only management servers and
provide the ability to distribute workloads across multiple
management servers, such as availability, network device
monitoring, distributed monitor health rollup, and group
calculation.
• The solution must have provisional capability to split
workload among all management servers in a management
group, which provides high availability without requiring a
cluster in future expansion.
Operations Manager must have web console that is optimized for
faster load times and provides access to the dashboards.
The dashboard views must have combined multiple panels of
information in a single view. In Operations Manager, we must have
option to add the new dashboard views to My Workspace and the
Monitoring workspace.
Dashboard views must have custom layouts and nested dashboard
views.
•
The Operations Manager web part will display specified dashboard
views and must have provision to add to Microsoft SharePoint 2010
sites in future.
In Operations Manager, provision to perform privileged
operations on UNIX-based and Linux-based computers
using unprivileged Run As accounts.
• Capability to avoid the need for UNIX or Linux root
passwords to be known on the management server, and
retain the privilege control entirely within the domain of the
UNIX or Linux administrator.
• PowerShell cmdlets for performing agent maintenance
functions on UNIX-based and Linux-based computers,
allowing for scripting and background operations.
The operation console should have Tasks pane, and include
Navigation Tasks that makes it easy to open views for a selected
object.
•
UNIX- and LinuxBased
Computers
M
Operations
Console
M
Monitoring
Windows
Services Built on
the .NET
Framework
Operations Manager should have the ability to monitor Windows
Services, not just IIS-hosted applications
M
Integration with
Team
Foundation
Server
Support
Database Server
Heartbeat
Monitoring
Operation Manager should have capability to integrate with Team
Foundation Server
M
M
M
Summary
Requirement
Operation Manager must support Microsoft and Oracle Database
Server to monitor
Must monitor heartbeat of Windows and Unix based systems
System Centre Data Protection Manager
The proponent in conjunction with MoF IT team is to provide
effective solution for data protection across the datacentre for
Response
Section V1. Technical Requirements
Level
Description
324
Requirement
servers OS, database and applications with System Center 2012
Data Protection Manager (DPM).
M
Technical
Features
Requirement
M
Protection
Requirement
M
Summary
Requirement
M
M
Technical
Specification
Requirement
Deploying VMM
M
M
Cross Platform
Networking
The solution must have Disk-based data protection and recovery.
There should be feature of Command-line scripting using Windows
PowerShell.
The proponent in conjunction with MoF IT team must follow
Enterprise deployment methods for distributing the DPM agent.
Must have capability for Enterprise monitoring of DPM with
Operations Manager.
Capability of Tape-based backup and archive solutions.
Disaster recovery solutions, which provides bare-metal recovery of
servers running Windows.
• File data from volumes, shares, and folders.
• Application data, such as Microsoft Exchange Server
storage groups, Microsoft SQL Server databases, Windows
SharePoint Services farms, and Microsoft Virtual Server
and its virtual machines.
• Files for workstations running Windows XP
Professional SP2 and all Windows Vista editions except
Home.
• Files and application data on clustered servers.
• System state for protected file and application servers.
System Centre Virtual Machine Manager
The bidder/purchaser IT team is to provide a management solution
for the virtualized datacenter, enabling us to configure and manage
our virtualization host, networking, and storage resources in order to
create and deploy virtual machines and services.
The solution should support Microsoft and Unix based operating
systems.
Integration with Windows Server 2012 which delivers numerous
Microsoft Hyper-V features, as follows:
• Large virtual machines;
• Clusters that can support a larger numbers of nodes;
• Storage management through SMI-S (Storage Management
Initiative – Specification).
Ability to manage VMware vSphere and Citrix XenServer.
• Must have ability to create and manage virtual machine
networking, including network virtualization and virtual local
area networks (VLANs) for network isolation.
• Management of the Hyper-V extensible switch, including
deployment and configuration of virtual switch extensions
using a new logical switch concept.
• Support for network virtualization that includes support for
using Dynamic Host Configuration Protocol (DHCP) to
assign customer addresses using Network Virtualization
with Generic Routing Encapsulation (NVGRE) to virtualize
the IP address of a virtual machine.
• Software-defined networking with support for Hyper-V
network virtualization and switch extension management.
This allows a constant network configuration in the
datacenter.
Response
Section V1. Technical Requirements
Level
Description
Requirement
•
•
•
M
Storage and Disk
•
•
•
•
•
•
M
Virtual Machine
•
•
•
•
•
•
•
•
•
•
•
•
•
M
Live Migration
325
•
•
•
Introduction of a logical switch that allows management of
individual switch instances across multiple Hyper-V hosts as
a single entity.
Ability to deploy and manage third-party switch extensions,
such as Cisco and InMon.
Support for Host vNIC configuration.
Must support Integration with third-party SANs and filebased storage on Windows Server 2012 File server.
Support for auto (dynamic) iSCSI target systems, such as
the Dell EqualLogic PS Series. System Center 2012 –
Virtual Machine Manager supports only static iSCSI target
systems.
Support for thin provisioning of logical units through VMM.
Support for using a virtual hard disk that is in the .vhdx
format as the base operating system image.
Support for startup disk selection as part of operating
system deployment.
Enhanced default auto disk selection logic as part of
operating system deployment.
Support for deployment of services to virtual machines in a
domain or workgroup that does not have a trust relationship
with the domain of the VMM management server.
Support for the deployment of services to virtual machines
that are not connected, where the service instance does not
have network connectivity to the VMM management server,
to a VMM library server, or to both.
Deploying a virtual machine as part of a service and
creating a SQL Server profile, added support for SQL
Server 2012 as an instance of Microsoft SQL Server.
Support for adding Windows Server 2012 roles and features
when creating and deploying services, such as the Windows
Server Update Services role.
Deployment of application packages.
Support of IIS application hosts.
Support for the new version of the virtual hard disk format
that is introduced in Windows Server 2012. This new format
is referred to as VHDX.
Convert a virtual hard disk for a virtual machine that is
deployed to a Windows Server 2012-based host from the
.vhd to .vhdx virtual hard disk format. The conversion
includes any associated checkpoints.
Use VMM to "rapidly provision" any virtual machines that
use VHDX-based virtual hard disks from SAN-copy capable
templates.
Must have library server.
Support for provisioning a physical computer as a Hyper-V
host.
Linux-based virtual machines supportability.
Ability to configure availability options for virtual machines
on Hyper-V host clusters by using the VMM console, without
having to open Failover Cluster Manager.
There must be a feature for Live Migration inside and
outside a cluster.
Live migration between nodes in two different clusters,
between nodes within a cluster, or between nodes in
different clusters.
Storage migration, which allows for the migration of virtual
machine storage.
Response
Section V1. Technical Requirements
Level
Description
Requirement
•
•
M
Integration with
Operation
Manager
M
Network
Virtualization
M
Summary
Requirement
M
M
M
Self-Service
Portal
Service Catalog
and Service
Requests
M
Integration with
VMM and
Orchestrator
M
Service Level
Agreement
Support for
Incident and
Service
Requests
Release
Management
Parallel Activity
Support
Parent – Child
Support for
Incident and
Release
Management
M
M
M
326
Live VSM. By using live virtual system migration (VSM)
migration of both virtual machines and storage in a single
action.
Concurrent live migration. Option for multiple concurrent live
migrations of virtual machines and storage. Must have an
allowable number of concurrent live migrations which can
be configured manually.
•
Ability to use Operations Manager to view information
related to application hosts, load balancers, and user roles
while also being able to monitor virtual machines, services,
host systems, network adapters, and other elements of the
fabric.
•
Generate reports that track the resource usage of each
configured service or service user, to aid in capacity
planning.
Must have capability for Network virtualization which will provide the
ability to run multiple virtual network infrastructures, potentially with
overlapping IP addresses, on the same physical network.
System Centre Service Manager (SCSM)
The bidder/purchaser and MoF IT team team will deploy System
Center 2012 Service Manager which will provide an integrated
platform for automating and adapting our organization’s IT service
management best practices such as incident and problem
resolution, change control, and asset lifecycle management.
Technical Features Requirement:
Integration with SharePoint for self service.
Easily Service Requests by end users.
There must be powerful automation engine that can perform
a wide range of service requests for our users coupling this
with Orchestrator.
•
There must be the capability to dynamically build forms,
based on the user inputs defined when the request offering
is created.
•
Must have Orchestrator web service that allows Service
Manager 2012 to initiate Runbooks, though that is another
discussion. These connectors will allow us to import data
from both of these products for use within Service Manager.
•
The VMM Connector imports objects such as clouds,
templates and VMs from VMM.
•
SLA calendar that can be used so that we can have SLAs
based on specified support hours.
•
Option to create multiple calendars i.e. standard users
might have SLAs set for business hours only while
executives get 24 x 7 support and have SLAs defined
accordingly.
There must have option for release management.
•
•
Parallel activities must be supported in workflows.
Ability to define parent and child relationships with incidents and
releases. This also allows Service Manager to be configured such
that when we resolve the parent incident, the linked child incidents
will also get resolved automatically.
Response
Section V1. Technical Requirements
Level
Description
M
System Center
Data Warehouse
M
Knowledgebased risk
management
Central
management
packs
Business
alignment
functionality
M
M
M
M
M
Summary
requirement
Custom
automation
M
Cross-platform
integration
M
End-to-end
orchestration
M
Extensible
structure
327
Requirement
Must have Data Warehouse reporting facility that will be used by
Service Manager. It imports data from Service Manager,
Configuration Manager, Ops Manager and VMM into a single data
warehouse for reporting.
The solution should collect information from several sources for
solution support while also evaluating risks associated with making
suggested changes.
There should be a separate central management pack to help
administrators control and customize the solution process.
Should have capability for SQL Server Reporting Services (SSRS),
which provides simple reporting capabilities for enhanced
performance monitoring.
System Centre Orchestrator (SCO)
The bidder/purchaser and MoF IT team team will deploy a workflow
management solution with System Center 2012 Orchestrator for the
data center which will allow us to automate the creation, monitoring,
and deployment of resources in our environment and reduce the
burden of performing multiple tasks and procedures to keep the
health of our computing environment up-to-date and our business
running.
The bidder/purchaser and MoF IT team team will deploy the
workflow management solution in an integrated solution using the
graphical user-interface Runbook Designer to create reliable,
flexible, and efficient end-to-end solutions in the IT environment.
The bidder/purchaser and MoF IT team team have to ensure
following tasks:
• Automate processes in the data center, regardless of
hardware or platform.
• Automate IT operations and standardize best practices to
improve operational efficiency.
Technical Specification Requirement:
•
Should provide consolidated tools to build, test, debug,
deploy, and manage automation in the environment.
•
Should provides an environment with shared access to
common data.
•
Feature to evolve and automate key processes between
groups and consolidate repetitive manual tasks.
•
Capability to enforce best practices for incident, change,
and service management.
•
Must have ability to integrate with System Center, other
Microsoft products, and non-Microsoft products to enable
interoperability across the data center.
•
Capability of management of complex cross-domain
processes.
•
Capability to combine software, hardware, and manual
processes into a seamless system
The solution must ensure that it provides extensible integration to
any system through the Orchestrator Integration Toolkit.
Response
Section V1. Technical Requirements
328
Section V1. Technical Requirements
SERVICE LEVEL AGREEMENT FOR LOT-A AND LOT-B
329
331
1. Introduction
1.1
Formal Definition of this Document
/1
This document is the Service Level Agreement (SLA) for the service. It specifies the
agreed level of services to be provided for the service, and penalties to be applied in
the event of failure to meet that level of service.
1.2
Readership
/1
This document is intended for all participants in the provided service namely
a.
The Authority Procuring the service Ministry of Finance, Govt of Bangladesh
b.
The service provider:
c.
The service user
xxxxxxxxxxxx
Ministry of Finance IT Department
1.3
Applicable and Reference Documents
#1
Technical Specification
1.4
Period of validity
#2
This document is valid from xx/xx/xxxx, and shall be applicable for a period of 36 months. Any
changes to the document within this period must have the agreement of all concerned parties.
1.5
Changes to the Service
#3
Special requests and improvements will be discussed at monthly service meetings, and
formalised in writing.
#4
Any changes to the document within this period must have the agreement of all concerned
parties.
#5
Changes to this document may occur with the implementation of additional hardware or
software, or the reduction in current hardware and/or software, or because of changes in the
organisational structure.
2. Delivery Requirements
a.
A network monitoring and maintenance service is to be provided at the address defined
in Appendix A to the specification defined in Appendix B.
b.
The service is required to be fully operational at the defined service level on (i)
DD/MM/YYYY. This is dependent upon the datacentre being fully prepared in readiness
for service delivery, including the provision of a fully functioning environment, and all
necessary equipment being in place and implemented. The provider will notify the
customer contact before (ii) DD/MM/YYYY of the required details of the customer’s
servers. The customer will provide those details as requested before (iii) DD/MM/YYYY
332
Section VI. Technical Requirements
c.
Failure by the provider to meet dates in (b (i)) above will be penalised at a percentage
reduction rate of 40%. If the provider is unable to meet the date (b (i)) solely because of
slip in the date (b (i)), the customer shall in any case be liable to billing for the service
from the date (b (i)).
3. SERVICE REQUIREMENTS
3.1
Service Hours
a.
The service is required to be available full time, except for planned downtime.
b.
Any requirement for planned downtime must be notified to the customer not less than
seven days in advance.
c.
A maximum of 15 minutes planned downtime in any calendar month is permitted. Any
excess will be treated as service failure.
Service hours will be 8:00AM to 6:00 Sunday – Thursday. Outside of these hours, Organization will
inform Vendor of requirements to extend hours up to 21:00, or beyond, or for weekend working.
Service Provider individual activities:
Time
Server Management
8:00am-6.00pm Sunday - Thursday
Server Monitoring
24x7x365
Onsite Labour
8:00am-6.00pm Sunday - Thursday
Remote Labour
All Other Times
TABLE 1 – MANAGEMENT AND MONITORING HOURS
3.2
Service Parameters
a.
Availability, measured by aggregating downtime over successive 12-month intervals from
the date of commencement of service…
b.
Shall be not less than 99.8%.
c.
Downtime shall be measured by automatic logging, to a resolution of 15 min or better.
d.
A penalty, as shown in Table 4 below, relating to the percentage cost of the overall
support requirement(monthly/yearly), shall be payable for each 0.02% below the target
service level.
4. SUPPORT REQUIREMENTS
4.1
Support Hours
a.
The service will be fully supported 08:00 – 18:00 Bangladesh Time Sunday-Thursday.
Weekend and other out of hours support is applicable if necessary with prior notice.
b.
Support calls will be accepted at any time, but if received outside the supported hours
there is no obligation to act upon the call until the next supported period, unless the issue
is raised as critical - i.e. total system or site unavailable. In these circumstances, issue
must be escalated and treated as Priority 1.
Section VI. Technical Requirements
4.2
333
Support Procedures
Activity Outline
Description Frequency Included in Agreement
General
Document software and hardware changes
As performed
YES
Monitor server systems.
Continuous
YES
Evaluate and analyze trends in issues
Monthly
YES
Monthly reports of work accomplished, work in progress, etc. to Finance IT.
Monthly
YES
Ensure that all server services are running
Daily/hourly
YES
Keep Service Packs, Patches and Hotfixes current as per company policy
Monthly
YES
Check event log of every server, identify any potential issues
As occurs
YES
Monitor hard drive free space on server via SNMP or WMI
Daily/hourly
YES
Reboot servers if needed
As needed
YES
Run defrag and chkdsk on all drives
As needed
YES
Scheduled off time server maintenance
As needed
YES
Install software upgrades on supplied items
As needed
YES
Check status of backup system
Daily
YES
Alert office server administrator to dangerous conditions
As needed
YES
As needed
YES
As Needed
YES
Systems
-Memory running low
-Hard drive showing sign of failure
-Hard drive running out of disk space
-Controllers losing interrupt
-Network Cards, FC, Inifiniband cards
report unusual
collision activity
-Any replacements required
Applications
Overall application disk space management
Disaster Recovery
Disaster Recovery of Server(s)
334
Section VI. Technical Requirements
Support and Maintenance coverage:
Hardware support and maintenance should cover but not be limited to the following:
•
•
•
•
•
•
•
•
•
Servers and server components
Disk Drives
Flash cards
Switches:- SAN, Ethernet, Infiniband
Ethernet /FIBER Transceivers/Receivers etc.
Cards/HBSa/HCAs:- Ethernet, FC, Infiniband, Remote Management, RAID
Load Balancer
Tape system
Blade Chassis and components (if used)
Spare parts and Replacement Procedure
Supply of common replaceable items to be available locally, preferably held on-site. Vendor to
provide solution for other parts with rapid response.
Call logging
a.
Support calls will be accepted from any authorised user of the service.
b.
Open Problem Reports will be progressed according to escalation procedure.
c.
A Problem Report will be raised for all calls, unless the caller agrees that this is
unnecessary.
Service calls can be taken 8:00AM to 6:00 Sunday – Thursday. Outside of these hours, Organization
will inform Vendor of requirements to extend hours up to 21:00, or beyond, or for weekend working.
Service Provider individual activities:
Time
Server Management
8:00am-6:00pm Sunday – Thursday
Servers & Fabric switches Monitoring
24x7x365
Onsite Labour
8:00am-6:00pm Sunday – Thursday
Remote Labour
Relevant Times
TABLE 2 – SUPPORT HOURS
Service Request Escalation Procedure
1. Support request is received
2. Trouble ticket is created
3. Issue is identified and documented in help desk system
4. Issue is qualified to determine if it can be resolved through Tier 1 Support
If issue can be resolved through Tier 1 Support:
5. Level 1 resolution -issue is worked to successful resolution
6. Quality control – issue is verified to be resolved to client’s satisfaction
7. Trouble ticket is closed, after complete problem resolution details have been updated in help desk
system
Section VI. Technical Requirements
335
If the issue cannot be resolved through Tier1 Support:
Issue is escalated to Tier 2 Support
8. Issue is qualified to determine if it can be resolved by Tier 2 Support
If issue can be resolved through Tier 2 Support:
9. Level 2 resolution -issue is worked to successful resolution
10. Quality control – issue is verified to be resolved to client’s satisfaction
11. Trouble ticket is closed, after complete problem resolution details have been updated in help desk
system
If issue cannot be resolved through Tier2 Support:
Issue is escalated to Tier 3 Support
12. Issue is qualified to determine if it can be resolved through Tier 3 Support
If issue can be resolved through Tier 3 Support:
13. Level 3 resolution -issue is worked to successful resolution
14. Quality control – issue is verified to be resolved to Client’s satisfaction
15. Trouble ticket is closed, after complete problem resolution details have been updated in help desk
system
If issue cannot be resolved through Tier3 Support:
Issue is escalated to Onsite Support
16. Issue is qualified to determine if it can be resolved through Onsite Support
If issue can be resolved through Onsite Support:
17. Onsite resolution -issue is worked to successful resolution
18. Quality control – issue is verified to be resolved to Client’s satisfaction
19. Trouble ticket is closed, after complete problem resolution details have been updated in help desk
system
If issue cannot be resolved through Onsite Support:
20. I.T. Manager Decision point – request is updated with complete details of all activity performed
Exclusions
The Services do not include maintenance or repair necessitated by:
· Accidents such as fire, lightning or floods.
· Theft or loss of the Equipment
. Power facilities failure
· Fluctuation in electricity supply
4.3
Support Parameters
a.
b.
c.
The time for initial response to a problem shall be not more than one hour on average.
Full service as defined shall be restored within three hours on average.
Repair shall be completed within one day on average.
d.
A penalty shall be payable for each percentage point by which the above are not met,
measured monthly, as shown in Table 4.
336
Section VI. Technical Requirements
Response and Resolution Times
The following table shows the targets of response and resolution times for each priority level during
standard operational hours:
ISSUE
Service not available (all
users and
Priority
Response time
(hours/minutes)
Resolution time
(hours/minutes)
Escalation threshold
1
Within 10
minutes
ASAP – Best
Effort
30 minutes
1
Within 30
minutes
ASAP – Best
Effort
1 Hr
2
Within 1 Hr
Within 4 working
Hrs
4 Hrs
3
within 4 Hrs
Within 8
Working Hrs
8 Hrs
(hours/minutes)
functions unavailable)
Significant degradation of
service
(large number of users or
business
critical functions affected)
Limited degradation of
service
(limited number of users or
functions affected, business
process
can continue)
Small service degradation
(business process can
continue, one user
affected).
TABLE 3 – RESPONSE AND RESOLUTION TIMES
.
Support Tiers
The following details and describes the Support Tier levels:
Support Tier Description
Tier 1 Support: All support incidents begin in Tier 1, where the initial trouble ticket is created, the
issue is identified and clearly documented, and basic hardware/software troubleshooting is initiated.
Tier 2 Support: All support incidents that cannot be resolved with Tier 1 Support are escalated to Tier
2, where more complex support on hardware/software issues can be provided by more experienced
engineers.
Section VI. Technical Requirements
337
Tier 3 Support: Support incidents that cannot be resolved by Tier 2 Support are escalated to Tier 3,
where support is provided by the most qualified and experienced Engineers who have the ability to
rd
collaborate with 3 party (Vendor) support engineers to resolve the most complex issues.
75
70
65
60
55
% Penalty50
45
40
35
30
25
20
15
10
5
0
98.6
98.8
99
99.2
99.4
99.6
99.8
100
% Availabilty
TABLE 4 – PENALTY GRAPH
4.4
Performance Remedies
a)
In the event that the Vendor fails to fulfil any of the service delivery requirements, the
Vendor shall, at the request of Finance Division, and without prejudice to Finance
Division’ other rights and remedies, arrange all such additional resources as are
necessary to fulfil the said service delivery requirements as early as practicable
thereafter at no additional charge to Finance Division.
b)
In the event that the Vendor fails to fulfil all of the service delivery requirements then a
penalty payment will apply on a sliding scale as shown in Table 4 above pertaining to
each service/system affected.
5. SECURITY REQUIREMENTS
Security
Confirm that backup has been performed on a daily basis
Daily
YES
Monitor for unusual activity among users
Ongoing
YES
Verify system log and report to authority if any unusual access attempt
occurred several times.
As required
YES
338
Section VI. Technical Requirements
a.
The provider will adhere to the security provisions specified in document xxx.
b.
Physical security of the customer premises is the customer’s responsibility.
6. MONITORING REQUIREMENTS
a.
Monitoring data shall be subject to the same availability as the service parameter being
monitored.
b.
Monitoring records shall be kept for 12 months and shall be available for inspection on
demand.
c.
Unavailability of monitoring data shall be subject to an additional penalty equal to that for
the service parameter being monitored.
7. REPORTING REQUIREMENTS
a.
A monthly report up to the last day of each calendar month will be produced containing
information relating to:
•
Service calls – number, resolution, within SLA, outstanding calls
•
Server performance and capacity and availability
•
Required maintenance activities
This monthly report will be presented at the monthly service review to be held in the first
week of the following month.
b.
Late delivery or missing content will be subject to a penalty of 1% of contract cost per day
delayed.
c.
Monthly service reviews will be held at the customer premises, with Service Provision
representatives present, either in person, or on conference call.
8. DISPUTE RESOLUTION
In the event of a service outage where the responsibility is unclear, priority should be given to
restoring service rather than determining responsibility.
In the event of a dispute, the burden of proof will be upon any party who is delinquent in respect of
monitoring or reporting obligations covering the incident.
Where a dispute results in failure to restore service within the allotted time, the Ministry of Finance
might reserve the right to bring in external experts to resolve the problem and charge the cost to the
disputing parties as a further penalty.
Section VI. Technical Requirements
339
9. GLOSSARY OF DEFINITIONS
Term
Meaning : Description
Availability
The time the service is available for normal use over a period, as a
ratio of the duration of the period
Escalation
Managerial escalation: to appeal for a decision level higher than in a
normal procedure in order to complain of an anomaly in the execution
of the service. This is an exceptional procedure engaged by a user or
the service requester. Anybody who is not satisfied with the service or
a person providing the service can escalate the problem at any time.
Operational escalation: to make use of means more and more
important and/or specialised in order to solve a problem or to answer a
question, including the associated reporting. This is a normal
intervention procedure under the control of the Service Provider.
Failure
Failure is defined as any condition that results in loss of functionality or
performance of the service that affects at least one user, subject to the
general exclusions
Latency
The time between the issuing of a request and its fulfillment
Maintenance
To keep the system subject to maintenance working, i.e., identify and
correct malfunctions of the hardware and software of the system.
MTTR
Maximum Time To Recover: It is the maximum time taken to recover
from a failure
MTBF
Mean Time Between Failures, the average time for which the system is
operational before it is subject to failure
SLA
Service Level Agreement
Service recovery
Service recovery is deemed to have been effected when the service
has been restored, and the service can resume normally, if necessary
by reconfiguration
Problem Report
Means by which a user’s problem is registered by the Help Desk of the
service provider and tracked until the problem is solved to the
satisfaction of the user.
340
Section VI. Technical Requirements
AGREEMENT
T he under s igned par ties her eby agr ee to the Ser vic e levels def ined in this
doc um ent f ollowed by APPENDIX - A, B
Signed:
Date:
O n behalf of supplier or ganization
________________________
________________________
_____________________
Signed:
Date:
O n behalf of Ministr y of F inance
Section VI. Technical Requirements
341
APPENDIX-A
For the contract:
LOT-A
LOT-B
LOCATION
The equipment to be provided, installed, commissioned and thereafter monitored and supported will
be located at the Primary Datacentre at the Ministry of Finance building, located in the Secretariat
campus in Dhaka, Bangladesh; and at the secondary Disaster Recovery Datacentre located in the
Office of Controller General of Accounts (CGA) building in Segunbagicha, Dhaka, Bangladesh.
APPENDIX B
SPECIAL CONDITIONS PERTAINING TO LOT-A
Because of the critical and technical nature of the requirements for LOT-A, which focusses on
the database solution for iBAS++ system for the Ministry of Finance, the requirement is for two (2)
database support specialists to be accommodated on site at the Ministry of Finance building,
Secretariat complex. These specialists will be required for a minimum of the first 12 months from the
commencement of the contract, and the requirement may be extended for a further period. This will
be reviewed at the end of the initial 12 month period.
These specialists will be the contact for Ministry of Finance for all issues and matters relating to the
equipment and services required under LOT-A. Response times for resolutions for issues raised in
relation to the equipment and services under LOT-A will be treated a Priority 1 issues, and response
and escalation times will be followed as set out in the terms of this document.
GENERAL CONDITIONS PERTAINING TO LOT A AND LOT B
1. PURPOSE
The purpose of this Support Service Level Agreement (SLA) is to formalize an arrangement between
DMTBF under Ministry of Finance (hereinafter, the Organization) and
<NAME OF VENDOR>
(hereinafter, the Vendor) to deliver equipment and support services, at specific levels of support, and
at an agreed-upon cost.
This SLA is intended to provide details of the provision of equipment and support services by
<NAME OF VENDOR>.
This SLA will evolve over time, with additional knowledge of the client requirements, as well as the
introduction of new devices and services into the support portfolio provided by
<NAME OF VENDOR>.
342
Section VI. Technical Requirements
SCOPE OF AGREEMENT
The following equipment and services are provided in response to the proposal submitted by the
Vendor to the Organization in accordance with a Request for Proposals for the DMTBF under Ministry
of Finance .
SERVICES AND REQUESTS COVERED UNDER THIS
AGREEMENT
T he f ollowing s er vic es ar e pr ovided by the Vendor to the O r ganization:
NAME AND DESCRIPTION OF PRIMARY SERVICE.
T his is all- inc lus ive
c ons um able s upplies .
of
equipm ent,
m aintenanc e,
par ts ,
tr avel,
and
all
DESCRIPTION OF MAINTENANCE PROGRAM.
Pr eventative m aintenanc e s hall be per f or m ed as the f r equenc y pr es c r ibed by the
m anuf ac tur e. O ngoing m aintenanc e to r es olve is s ues c aus ed by f aulty
equipm ent will be c ar r ied out under the ter m s of this SLA doc um ent.
DESCRIPTION OF MONITORING SERVICE.
Monitor ing of s ys tem s and s er vic es hous ed in the 2 c entr al loc ations s tated will
be m aintained ac c or ding to the ter m s of this SLA. Is s ues will be r ais ed by
Vendor Suppor t s taf f when m onitor ing s ys tem s f lag er r or s in s ys tem s and
s er vic es .
STATEMENT OF VENDOR RESPONSE TIME.
T he guar anteed r es pons e tim e f ollowing any s er vic e c all s hall be f our ( 4)
bus ines s hour s or les s , nor m al bus ines s hour s ( 8 a.m . – 6:00 p.m ., Sunday T hur s day) . T he r es pons e tim e begins when the r eques t is logged with the
Vendor ’s pr oblem - tic k eting s ys tem and is s topped when the tec hnic ian logs the
ar r ival at the equipm ent s ite and m eets with the Key O per ator .
STATEMENT OF SERVICE AVAILABILITY.
T he guar anteed r es pons e tim e f ollowing any s er vic e c all is f our ( 4) bus ines s
1
hour s or les s . If the Vendor is unable to r es pond to any s er vic e c all within f our
( 4) hour s f r om the tim e the c all was plac ed, penalties AS ST AT ED IN T HE
Agr eem ent s hall c om e into ef f ec t.T he m inim um ac c eptable level of uptime f or
any devic e s hall be 99.8% as deter m ined by the f ollowing f or m ula:
1
If the call can be satisfactorily resolved via telephone support, it shall be deemed an acceptable vendor
response.
Section VI. Technical Requirements
343
Uptime = (Total Time1 – Lost Time2)/Total Time x 100%
1
2
If uptime for a device or service falls within the 99.7-99.8% range during any twenty (20)
working day period, the charge to the Organization shall be reduced or credited by up to 25%
on that device or service.
If uptime for a device or service falls within the 99.6-99.7% range for any twenty (20) working
day period, the charge to the Organization shall be reduced or credited by up to 40%.
If a device experiences less than 99.6% uptime during three (3) consecutive twenty (20)
working day periods, the Vendor will replace the device with an equivalent device for the
remaining term of the contract at no additional cost to the Organization.
If a technician cannot satisfactorily repair a machine fault within two (2) business days, the
Vendor shall provide or loan multifunctional printer equal to the existing model. The Vendor
shall ensure that the loaned device connects to the network. This loaned device shall be
provided at no additional cost to the Organization, including no additional delivery costs, until
the existing device is fully operational and functioning in the intended manner.
In the event a device has had more than three (3) service calls for the same fault in any
quarter period, a Service Supervisor/Manager shall evaluate the performance of the device
and fully correct all problems with the device. If that device then requires a further service call
for the same fault within the next 90 days, the Vendor will remove the device and loan the
department a similar or equivalent model until the problem device is repaired and tested at
the Vendor’s service facility. All penalties apply to any device that falls below 99.6% uptime
for any twenty (20) working day period.
i.
All equipment moves/relocations shall be at no charge. This includes off-site storage if
required, removal, re-install, testing, and training.]
ii.
All requests for support for non-business hours shall be deemed to be After-Hours
Support. After-Hours Support will be provided free-of-charge if the Vendor is notified 24
hours in advance of the request for After-Hours Support.]
iii.
On-site training shall be provided with each piece of equipment. Key Operators and
selected users shall be trained for each device and all retraining shall be provided as
needed. Training shall include device functionality and usage, special features, and
service call generation. Additional functionality added later will be included with the
upgrade, including but not limited to networking, and scanning.]
Total Time = Available time for 8:00 a.m. – 6:00 p.m. for 20 days (10 hours x 20 days = 200). Note – at certain
times, extended hours of service and support will be required. From April – June, service and support will
be required from 08:00 – 21:00 at the primary site. During June, usually the last 2 weeks of the month,
extended support hours between 08:00 and 22:00 (and possibly beyond) will be required at both the
primary and the secondary site. These additional hours will be confirmed by the Organization with 7 days
prior notice.
Lost Time = Lost time in hours. The total elapsed time, within a ten (10) hour per day, between the limits of 8:00 a.m. –
6:00 p.m., Sunday – Thursday, excluding public holidays that the equipment is unable to function in accordance with the
specification for reasons attributable to equipment failure or withdrawal of equipment for remedial maintenance repair or
testing. Lost Time shall commence upon notification by the Customer to the Vendor’s specified service dispatch of a fault
condition which prevents full utilization of the equipment and shall end when the equipment is powered up and ready to
execute Customer’s work, and the fault call has been logged as complete by the servicing technician. Resolution times will
not take into account delays caused by strikes and demonstrations or inclement weather.
344
Section VI. Technical Requirements
iv.
Vendor support staff shall be available after market support of networking devices and
assisting the Organization’s staff. This includes conducting site surveys and proposing
devices or deployment strategies.]
v.
All device deletions, additions, and modifications shall be at the same cost rates.
Deletions may not exceed 3% of the installed base per year. Additions and
modifications will be at a cost rate commensurate with the service model.
vi.
New or changed processes, practices, or policies that affect the Organization support
team and that have an impact on the service shall be presented to the Organization to
understand, learn, and follow. All changes shall be coordinated with the Organization.
vii.
Reporting shall be presented monthly to encompass all service activity per device by
function. Reporting content shall be responsive to the Organization’s requirements.]
viii.
When an upgrade to an existing device is released; includes operating system
upgrades, device upgrades, software upgrades, and manufacturer-required upgrades
(Manufacturer requires the Vendor to upgrade in order to maintain Vendor support.), the
upgrade shall be coordinated with the preventative maintenance service calls or
scheduled with the Organization to reduce downtime.
ix.
If a device cannot be repaired on-site, a replacement of equal capability may be
introduced to lessen downtime. If the device is un-repairable, a replacement of like or
greater capability will be provided for the remaining term of the agreement. If a device
will be down for more than 30 hours (3 business days), the device shall have a
temporary placement.
Section VI. Technical Requirements
345
1. TECHNICAL SUPPORT:
Warranty Service:
All Hardware equipment and Software should have a warranty period that is in conformance with the
specifications supplied in the Technical Specification. During the Warranty Period, the Bidder will be
responsible for the repair, replacement, support of all malfunctioning equipment and software supplied
under this Bid.
The Bidder shall provide on-site support when necessary for Warranty Period. Repair and
replacement of equipment should be completed to the satisfaction of the Purchaser within the times
specified in Maintenance Service Level.
•
•
•
The Bidder should provide proper documentation from product manufacturer that confirms
24x7x365 support
The Bidder should provide hot-line support.
The Bidder should ensure maintenance support between the guaranteed resolutions times
mentioned in the Service Levels. Failing of the resolution time, a penalty of one half of
one percent (0.5%) of the cost of the related units shall be charged per day for
nonconformance of the supplied Hardware, Software and services.
User support / hot line:
The bidder should maintain the following user support:
a. The Bidder must have service capability in each location including DC and DRS.
b. A suitable Helpdesk and Service Center must be established to ensure a high level of
service. Manpower requirements for Helpdesk and Service Centers shall be specified by
the Bidder.
c. The Bidder should provide trained, experienced and certified technical manpower for
onsite support.
d. Service records must be maintained at the Helpdesk for both hardware and software
warranty support. In addition, calls to the Helpdesk must be tracked including the
disposition and subsequent resolution of problem. These records are to be reviewed
monthly with the Purchaser.
e. A satisfactory stock of spare parts/ complete units (list of spare parts/complete unit
should be attached with proposal) must be maintained for support of all items supplied
in this tender. An inventory stock of spare parts status should be maintained and reviewed
by the Purchaser on a monthly basis.
f. Availability of all parts must be assured for a minimum of the same version or compatible
higher version for five (05) years from the date of system acceptance.
346
Section VI. Technical Requirements
2. CHANGES TO SERVICE LEVEL AGREEMENT (SLA)
Termination of Agreement
The Organization may terminate this agreement without penalty if the Vendor repeatedly violates the
terms of this agreement. In such an event the Organization shall give the Vendor 30 days written
notice of intent to terminate, delivered to the Vendor.
Non-Appropriation
Funds for this service are payable from Organization appropriations. While the Organization intend to
make every effort for continued funding for the period of this contract, in the event no funds (or
insufficient funds) are appropriated and budgeted in any fiscal year for payments due under this
contract, then the Organization shall immediately notify the Vendor of such occurrence, and this shall
create no further obligation of the Organization as to such current or succeeding fiscal year and shall
be null and void, except as to the portions of payments herein agreed-upon for funds which shall have
been appropriated and budgeted. In such event, this service shall terminate without penalty or
expense to the Organization of any kind whatsoever on the last day of the year for which
appropriations were received.
Amendment to Agreement
Any amendment to the Terms and Conditions of this agreement would require the approval of the
Vendor and the <relevant Organization executive>. The amendment of the agreement would take
place through an addendum to this agreement and the recording of that addendum in an Appendix of
this agreement. There will be an opportunity on a monthly basis to make adjustments to this SLA. The
Vendor and the Organization should work together to make changes at that time.
New Applications or Devices
New applications and versions implemented during the term of this agreement will move into the
Vendor’s support model through the Vendor’s process. The Vendor will be responsible for initiating
and ensuring completion of the appropriate process. These applications will be incorporated into the
inventory of applications supported in Appendix A of the Statement of Work. Changes to the inventory
of applications supported will be reviewed on a regular basis, and if need be, changes to the SLA will
follow the process described in the Amendment to Agreement section above.
Section VI. Technical Requirements
347
3. PROCESSES AND PROCEDURES RELATING TO THIS AGREEMENT
Call Management Process
The Vendor’s problem-ticket system will be used by all support team levels (where approval and
technical access has been granted) to record and track all problem reports, inquiries, or other types of
calls received by support. This provides the Vendor with the ability to provide metrics with regard to
this SLA.
SLA Funding Agreement
Billing for services provided under this agreement will be accomplished through direct billing to the
Vendor under the terms and conditions of the appropriate Purchase Order raised for these services.
All overage costs shall be itemized on an invoice per device with reporting of the associated user
accounts.
Addenda
There are currently no addenda to this agreement. Any future addenda will be referenced in the
Statement of Work through an Addendum Log in Appendix A of the Statement of Work. (Note: an
Appendix must be written for each addendum)
348
Section VI. Technical Requirements
4. METRICS
Metrics Reporting
Regular reporting will be provided monthly by the Vendor to the Organization on available metrics as
related to target performance. These reports are expected to be produced by the Vendor’s problemticket system, which will detail ticket management performance against SLA targets in the Vendor’s
case management process.
General Terms and Conditions
Term of Agreement
This agreement is in effect upon the date of acceptance of this agreement and ends on the latest date
specified in any terms of the Statement(s) of Work submitted by the Vendor and agreed to by the
Organization.
Organizations
This agreement is between the Organization and the Vendor, as named on the cover of this
agreement.
Approvals
In order to make this agreement operational, approvals as per Appendix B of the Statement of Work
must be in place. (Note: SOW Appendices are created for each new contract)
Key Contacts
Key contacts are shown in Appendix B of the Statement of Work. (Note: SOW Appendices are
created for each new contract)
Annex A – Definitions
Support Request
For the purposes of this agreement, a Support Request is generally defined as a request for support
to fix a defect in existing device or a request for support that involves functionality of the stated device.
Work Order
For the purposes of this agreement, a Work Order is generally defined as any request to make
modifications to the functionality of an existing system or any request to add functionality to an existing
system. Such requests are only covered under this agreement if under five (5) days of effort.
Levels of Support
Only two levels of support are provided under this agreement. These levels, which are integrated into
the Vendor’s support process, are defined as follows: Standard Coverage and After-Hours Coverage.
Both levels are inclusive within the contract with no further cost. This is support provided by the
appropriate Vendor help desk when it receives the Support Request from the Organization. This
represents generalist support. If this level of support cannot resolve the problem, the Support Request
is passed to the Vendor’s Level-2 supports, which is then passed to the support specialists.
Section VI. Technical Requirements
349
Support Requests are taken by the Help Desk as follows:
Help Desks
Hours
Standard Coverage
8:00 a.m. – 6:00 p.m., Bangladesh time, Sunday –
Thursday (After hours, leave a voice message for a
return call the following business day.)
After-Hours Coverage
6:01 p.m. – 8:00 a.m., Bangladesh time, Sunday –
Thursday plus weekends and Public Holidays
Phone Contact
TABLE 5 – HELP DESK COVERAGE
During critical processing periods, support is extended to after-hours for agreed-upon periods of
support are requested by the Organization contacting the Vendor. The Organization shall notify the
vendor 24 hours in advance by phone or e-mail.
Annex B – Roles and Responsibilities
The Vendor
The Vendor has the following general responsibilities under this agreement:
The Vendor will conduct business in a courteous and professional manner with the Organization.
The Vendor will use its own appropriate help desk to provide Level-1 support, including creating
problem tickets and work orders and assigning responsibility to the appropriate Level-2 Vendor
resource.
The Vendor will use its own appropriate internal group to provide Level-2 server support services.
The Vendor will obtain the Organization’s approval before ticket closure.
Once a support request has been submitted, the Vendor will make itself available to work with
the Organization support resource assigned to the support request.
The Vendor will attempt to resolve problems over the phone on first call.
The Organization’s end-users will not contact the Vendor’s support resources directly to report a
problem. All problem calls must be logged through the appropriate help desk.
The Vendor will provide all necessary and requested documentation, information, and knowledge
capital to the Organization prior to the start of support of a new device or functionality.
The Organization
The Organization has the following general responsibilities under this agreement:
The Organization will conduct business in a courteous and professional manner with the Vendor.
The Organization will provide all information required to open a support request.
The Organization will log all information from the Vendor required to establish contact
information, document the nature of the problem and the Vendor’s hardware/network
environment (as applicable).There are several roles deployed within the Organization that are
integral to the provision of equipment and support services by the Vendor. These roles include
the following:
Program Manager
350
Section VI. Technical Requirements
The Organization’s Program Manager works as a point of contact for all activities relating to the
transition of a new or modified device from a Vendor development team to the Organization’s support
team and the decommissioning of supported devices. Reporting to the Organization’s Management,
the Program Manager is responsible for planning, coordinating, and overseeing the transition of new
devices into support, including:
Liaising between the Organization and the Vendor’s team and project managers
Liaising with the Organization’s user departments
Ensuring all required documentation, information, and knowledge capital has been prepared as
per transition checklist and turned over prior to the start of support for a new application
Managing all activities relating to transition:
Identifying resource requirements
Identifying all access requirements
Meeting with the Vendor team to set up timeline and develop transition/deployment plans
Reviewing training plans for Key Operators and users
Negotiating resource assignments with Organization staff.
Handling billable services to the Vendor:
Ensuring that SLA targets are met (coordinating all activities to ensure all tasks are
performed in a consistent manner and on schedule)
Ensuring all work is performed according to the agreed-upon work methods and standards
that are in effect within the Organization and the Vendor
Acting as point of escalation for issues beyond usual scope
Participating directly in the production of the associated deliverables.
IT Operations Manager
The Organization IT Operations Manager will provide the overall direction of the activities required
from the Organization’s Information Services Department, participate directly in the associated
deliverables, and will negotiate with the Vendor’s support manager regarding the introduction of
enhancements and the scheduling of tasks. The IT Operations Manager will report to the Organization
Program Manager, with duties that include:
Liaising with other Organization groups
Assessing the workload for each support request and assigning work to the team member having
the appropriate technical knowledge
Assisting in conducting all root-cause analysis and bug-fix isolation and resolution activities, and
associated documentation for the individual tasks, as assigned by the Organization Program
Manager
Acting as a point of contact for all issues for the Organization’s infrastructure
Determining (for enhancements) the potential high-level effort for all changes
Identifying all tasks associated with each support request and deriving estimates for the
completion of each task for Organization staff and resources
Conducting and participating in testing with the Vendor as needed
Providing knowledge transfer to key Organization support specialist on regular basis.
Key Operator
Section VI. Technical Requirements
The Organization will provide designated Organization resources to act as device-specific points of
contact for each device deployed. Duties will include:
Liaising with the users on service requests
Acting as a point of contact for all issues related to their specific device
Assisting with Vendor support staff in problem resolution
Generating service requests
Transferring training and knowledge of their specific device to users as needed.
351
352
Section VI. Technical Requirements
E. Implementation Schedule
Section VI. Technical Requirements
353
Implementation Schedule Table
System, Subsystem, or lot number: Package No. G-81: Lot-A and Lot-B
Line
Item
No.
0
Subsystem / Item
Project
Plan
requirement)
(mandatory
Configuration
Table No.
Site / Site
Code
--
--
Delivery
(Bidder to
specify in the
Preliminary
Project Plan)
Installation
(weeks from
Effective Date)
Acceptance
(weeks from
Effective Date)
Liquidated
Damages
Milestone
--
W6
no
Lot-A
INSTALLATION OF DATABASE SERVER
AND STORAGE
CONFIGURATION
HARDWARE/FABRIC
W12
OF
yes
W20
CONFIGURATION OF SOFTWARE
W22
INSTALLATION AND MIGRATION OF
DATABASE (will be done by the
bidder and the Purchaser)
W24
REPLICATION TESTING
W24
yes
no
PERFORMANCE /BENCHMARK
TESTING WITH PURCHASER’S
DATABASE AND OTHER HARDWARES
ORACLE TRAINING
yes
W16
no
no
W25
W1
W35
no
354
Section VI. Technical Requirements
Line
Item
No.
Configuration
Table No.
Subsystem / Item
Site / Site
Code
Delivery
(Bidder to
specify in the
Preliminary
Project Plan)
ACCEPTANCE
OF
IBAS++
APPLICATION
TESTING
WITH
DATABASE SERVER (will be done by
the Purchaser only)
Installation
(weeks from
Effective Date)
W24
W32
W32
no
WK 12
Lot-B
INSTALLATION OF SERVERS/FABRIC
SWITCHES/LOAD BALANCEER
Yes
WK 15
CONFIGURATION OF
SERVERS/FABRIC SWITCHES/LOAD
BALANCEER
WK 18
PERFORMANCE AND BENCHMARK
TESTING
W20
OF
Yes
W20
APPLICATIONS
Yes
no
(purchaser’s responsibility)
WINDOWS SOFTWARE
INCLUDING AGREEMENT
Liquidated
Damages
Milestone
no
OPERATIONAL ACCEPTANCE OF
THE SYSTEM AS AN
INTEGRATED WHOLE FOR
LOT-A
MIGRATION
SOFTWARE
Acceptance
(weeks from
Effective Date)
WK22
DELIVERY
W17
W19
W22
no
Section VI. Technical Requirements
Line
Item
No.
355
Configuration
Table No.
Subsystem / Item
Site / Site
Code
Delivery
(Bidder to
specify in the
Preliminary
Project Plan)
WINDOWS TRAINING
PREMIER
SUPPORT
OPERATIONAL ACCEPTANCE OF
THE SYSTEM AS AN
INTEGRATED WHOLE FOR
LOT-B
Note:
Acceptance
(weeks from
Effective Date)
W12
W1
DIISASTER RECOVERY SOFTWARE
(APPLICATION)
INSTALATION,
TESTING AND COMMISSIONING
MICROSOFT
SERVICE
Installation
(weeks from
Effective Date)
Liquidated
Damages
Milestone
no
no
W24
WK28
WK30
W17
no
W31
Refer to the System Inventory Table(s) below for the specific items and components that constitute the Subsystems or item. Refer to
the Site Table(s) below for details regarding the site and the site code.
- - indicates not applicable. “ indicates repetition of table entry above.
356
Section VI. Technical Requirements
System Inventory Table (Supply and Installation Cost Items) [ insert: identifying number ]
System, Subsystem, or lot number: Package No. G-81: Lot-A and Lot-B
Line item number: [ specify: relevant line item number from the Implementation Schedule (e.g., 1.1) ]
[ as necessary for the supply and installation of the System, specify: the detailed components and quantities in the System Inventory
Table below for the line item specified above, modifying the sample components and sample table entries as needed. Repeat the
System Inventory Table as needed to cover each and every line item in the Implementation Schedule that requires elaboration. ]
Component
No.
Component
Lot-A
Option 1
DATABASE SERVER
1.
Oracle Softwares
2.
2.1.
2.2.
2.3.
2.4.
Oracle Enterprise Database Enterprise Edition
Real Application Clusters
Partitioning
OEM Diagnostic Pack
Relevant Technical
Specifications
No.
Additional Site Information
(e.g., building, floor,
department, etc.)
--
Quantity
As per
Technical
Specification
Section VI. Technical Requirements
Component
No.
2.5.
2.6.
2.7.
357
Component
OEM Turning Pack
Oracle Secure Backuup
Oracle Active Data Guard
Management Servers (1 unit at DC)
3.
Backup/Media Servers (1 unit at DC )
4.
Backup Storage Appliance (1 unit at DC )
5.
Management Servers (1 unit at DR)
6.
Backup/Media Servers (1 unit at DR)
7.
Backup Storage Appliance (1 unit at DR)
8.
Training
9.
9.1.
9.2.
9.3.
9.4.
Oracle Database on Oracle 11g
Real Application Clusters (RAC) and Oracle implement partitioning on
Oracle 11g
Database Administrator and Performance Tuning on Oracle 11g
System Administration on Operating System & Hardware Engineering
Systems
Relevant Technical
Specifications
No.
Additional Site Information
(e.g., building, floor,
department, etc.)
Quantity
358
Section VI. Technical Requirements
Component
No.
9.5.
Component
Oracle Active Data Guard Administration and oracle secure backup
Option 2
DATABASE SERVER
10.
Oracle Softwares
11.
11.1.
11.2.
11.3.
11.4.
11.5.
11.6.
11.7.
12.
13.
14.
Oracle Enterprise Database Enterprise Edition
Real Application Clusters
Partitioning
OEM Diagnostic Pack
OEM Turning Pack
Oracle Secure Backuup
Oracle Active Data Guard
Management Servers (1 unit at DC)
Backup/Media Servers (1 unit at DC)
Backup Storage Appliance (1 unit at DC)
Relevant Technical
Specifications
No.
Additional Site Information
(e.g., building, floor,
department, etc.)
Quantity
Section VI. Technical Requirements
Component
No.
359
Component
Quantity
Backup/Media Servers (1 unit at DR)
16.
Backup Storage Appliance (1 unit at DR)
17.
Resource Allocation
18.
Training
19.
19.1.
19.2.
19.3.
19.4.
19.5.
Oracle Database on Oracle 11g
Real Application Clusters (RAC) and Oracle implement partitioning on
Oracle 11g
Database Administrator and Performance Tuning on Oracle 11g
System Administration on Operating System & Hardware Engineering
Systems
Oracle Active Data Guard Administration and oracle secure backup
Lot-B
21.
Additional Site Information
(e.g., building, floor,
department, etc.)
Management Servers (1 unit at DR)
15.
20.
Relevant Technical
Specifications
No.
Application server (4 Unit for DC )
Application server ( 4 Unit for DR )
As per
Technical
Specification
360
Section VI. Technical Requirements
Component
No.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
Component
Report Server (1 Unit for DC )
Report Server (1 Unit for DR)
Test and Development (1 Unit for DC)
Test and Development (1 Unit for DR )
Data Centre Management Server (1 Unit for DC)
Data Centre Management Server (1 Unit for DR)
Primary Domain Controller (1 Unit for DC)
Additional Domain Controller (1 Unit for DC)
Additional Domain Controller (1 Unit for DR)
Patch Management Server: (1 Unit for DC)
Mail Server: (1 Unit for DC)
Mail Server: (1 Unit for DR)
Backup Tape System: (1 Unit for DC)
Blade Chassis (if blade solution - 1 Unit for DC)
Relevant Technical
Specifications
No.
Additional Site Information
(e.g., building, floor,
department, etc.)
Quantity
Section VI. Technical Requirements
Component
No.
361
Component
Relevant Technical
Specifications
No.
Additional Site Information
(e.g., building, floor,
department, etc.)
Quantity
“
1
Blade Chassis (if blade solution - 1 Unit for DR)
36.
InfiniBand switch: ( 1 Unit for DC)
37.
InfiniBand switch: (1 Unit for DR)
38.
SAN Switches Extended ( At DC)
39.
Load Balancer & Application Delivery Controllers (1 Unit for DC)
40.
Load Balancer & Application Delivery Controllers (1 Unit for DR )
41.
Power Strip (5 Units at DC)
42.
Power Strip ( 5 Units at DR)
43.
Resource Allocation
44.
Windows Licenses including Software Assurance
45.
45.1.
CoreCAL ALNG LicSAPk MVL DvcCAL
45.2.
CoreCAL ALNG LicSAPk MVL UsrCAL
45.3.
ExchgEntCAL ALNG LicSAPk MVL DvcCAL wSrvcs
45.4.
ExchgEntCAL ALNG LicSAPk MVL UsrCAL wSrvcs
362
Section VI. Technical Requirements
Component
No.
46.
47.
Component
45.5.
LyncSVrEnCAL ALNG LicSAPk MVL DvcCAL
45.6.
LyncSVrEnCAL ALNG LicSAPk MVL UsrCAL
45.7.
LyncSvrPlusCAL ALNG LicSAPk MVL DvcCAL
45.8.
LyncSvrPlusCAL ALNG LicSAPk MVL UsrCAL
45.9.
WinSvrDataCtr ALNG LicSAPk MVL 2Proc
45.10.
WinSvrStd ALNG LicSAPk MVL 2Proc
45.11.
ExchgSvrStd ALNG LicSAPk MVL
45.12.
LyncSvr ALNG LicSAPk MVL
45.13.
SysCtrDatactr ALNG LicSAPk MVL 2 Proc
45.14.
SysCtrCltMgmtAte ALNG LicSAPk MVL PerOSE
45.15.
SysCtrStd ALNG LicSAPk MVL 2Proc
Disaster Recovery Solution for Application server
(One Hyper-V to another Hyper-V Double-Take Solution)
Microsoft Premier Support for 204 hours.
Relevant Technical
Specifications
No.
Additional Site Information
(e.g., building, floor,
department, etc.)
Quantity
Section VI. Technical Requirements
Component
No.
363
Component
Relevant Technical
Specifications
No.
Local Training:
48.
48.1.
48.2.
SCCM
SCOM
Foreign Training:
49.
49.1.
49.2.
SCVMM
Deployment of Private Cloud.
Windows Implementation Service
50.
50.1.
50.2.
Note:
- - indicates not applicable. “ indicates repetition of table entry above.
Additional Site Information
(e.g., building, floor,
department, etc.)
Quantity
364
Section VI. Technical Requirements
System Inventory Table (Recurrent Cost Items) [ insert: identifying number ]
System, Subsystem, or lot number: Package No. G-81: Lot-A and Lot-B
Line item number: [ specify: relevant line item number from the Implementation Schedule (e.g., z.1) ]
[ as necessary for the supply and installation of the System, specify: the detailed components and quantities in the System Inventory
Table below for the line item specified above, modifying the sample components and sample table entries as needed. Repeat the
System Inventory Table as needed to cover each and every line item in the Implementation Schedule that requires elaboration. ]
Component
No.
1.
Component
Hardware Maintenance
Relevant
Technical
Specifications No.
Y1
Y2
Y3
Y4
…
Yn
Incl. in
Incl. in
Incl. in
all
items,
all sites
…
main
server
& WAN
Warranty
Warranty
Warranty
Incl. in
all items,
all sites
all items,
all sites
all
items,
all sites
none
none
HQ
HQ
HQ
…
2.
2.1
2.2
Software Licenses and Updates:
System and General-Purpose
Software
Warranty
Application, Standard, and Custom
Software
Incl. in
Warranty
…
3.
Technical Services
HQ
HQ
Section VI. Technical Requirements
Component
No.
Component
365
Relevant
Technical
Specifications No.
Y1
Y2
Y3
Y4
…
Yn
3.1
Sr. Systems Analyst
80 days
40 days
20 days
10 days
0
0
3.2
Sr. Programmer
20 days
40 days
60 days
40 days
0
0
3.3
Sr. Network Specialist, …. etc.
--
20 days
20 days
0
0
0
…
Note:
4.
Telecommunications Services
…
…
…
...
…
…
5.
[Other recurrent services, if any]
…
…
…
…
…
…
- - indicates not applicable. “ indicates repetition of table entry above.
366
Section VI. Technical Requirements
Site Table(s)
System, Subsystem, or lot number: Package No. G-81: Lot-A and Lot-B
[ specify: the detailed information regarding the site(s) at which the System is to be operated ]
Site
Code
Site
HQ
Headquarters
R1
Region 1
R1.1
Region 1 Head Office
R1.2
ABC Branch Office
R1.3
DEF Branch Office
City / Town / Region
Primary Street Address
Drawing
Reference No.
(if any)
Section VI. Technical Requirements
367
Table of Holidays and Other Non-Working Days
[ specify: the days for each month for each year that are non-working days, due to Holidays or other business reasons (other than
weekends). ]
Month
2013
2014
1
2
3
4
5
6
7
8
9
10
11
12
As per
government
calendar
As per
government
calendar
...
20zz
368
Section VI. Technical Requirements
F. REQUIRED FORMAT OF TECHNICAL BIDS
5.1
5.2
5.3
Description of Information Technologies, Materials, Other Goods, and Services
5.1.0
The Bidder must provide detailed descriptions of the essential technical,
performance, or other relevant characteristics of all key Information
Technologies, Materials, other Goods, and Services offered in the bid (e.g.,
version, release, and model numbers). Without providing sufficient clear
detail, Bidders run the risk of their bids being declared non-responsive.
5.1.1
To assist in the bid evaluation, the detailed descriptions should be organized
and cross referenced in the same manner as the Bidder’s item-by-item
commentary on the Technical Requirements described in Section 5.2 below.
All information provided by cross reference must, at a minimum, include clear
titles and page numbers.
Item-by-Item Commentary on the Technical Requirements
5.2.0
The Bidder must provide an item-by-item commentary on the Purchaser’s
Technical Requirements, demonstrating the substantial responsiveness of the
overall design of the System and the individual Information Technologies,
Goods, and Services offered to those Requirements, see ITB Clause 16.2 (b).
5.2.1
In demonstrating the responsiveness of its bid, the Bidder is strongly urged to
use the Technical Responsiveness Checklist provided in Section G of the
Technical Requirements. Failure to do so, increases significantly the risk that
the Bidder’s Technical Bid will be declared technically non-responsive.
Among other things, the checklist should contain explicit cross references to
the relevant pages in the Bidder’s Technical Bid.
Preliminary Project Plan
5.3.0
The Bidder must prepare a Preliminary Project Plan describing, among other
things, the methods and human and material resources that the Bidder
proposes to employ in the design, management, coordination, and execution of
all its responsibilities, if awarded the Contract, as well as the estimated
duration and completion date for each major activity. The Preliminary Project
Plan must also address the topics and points of emphasis specified in
SCC Clause 19 including any additional items stated in the Bid Data Sheet
for ITB Clause 16.2 (c). The Preliminary Project Plan should also state the
Bidder’s assessment of the major responsibilities of the Purchaser and any
other involved third parties in System supply and installation, as well as the
Bidder’s proposed means for coordinating activities by each of the involved
parties to avoid delays or interference.
Section VI. Technical Requirements
5.4
369
5.3.1
In addition to the topics and points of emphasis, the Preliminary Project Plan
MUST address what steps will be taken if there is a failure; how project
progress will be reported; etc.
5.3.2
The Preliminary Project Plan must be submitted in Microsoft Office
Document or Microsoft Project format (.doc or .mpp) in electronin copy in
CD, in addition to hard copy.
Confirmation of Responsibility for Integration and Interoperability of
Information Technologies
5.4.0
The Bidder must submit a written confirmation that, if awarded the Contract,
it shall accept responsibility for successful integration and interoperability of
all the proposed Information Technologies included in the System, as further
specified in the Bidding Document.
5.5 Knowledge Transfer Plan
5.5.0
The bidder must submit a Knowledge Transfer Plan (KTP) for each lot
following the requirement mentioned in the technical specification and its
implementation processes for effectively transferring the technical know-how
necessary for managing the respective or individual systems to the Purchaser.
The plan must include the following issues:
a.
b.
c.
d.
e.
f.
g.
h.
Project Plan
Server and switch Design & Drawings
Data and Electrical Cabling
Configuration and Customization, where applicable
Testing
Implementation
Training
Maintenance
Execution of the above plans, processes and actions must be evidenced during and
after implementation.
370
Section VI. Technical Requirements
G. TECHNICAL RESPONSIVENESS CHECKLIST
Note on Preparation of the Checklist for Purchasers: The following is a sample format that
is designed to help Bidders quickly understand:
(a)
the Technical Specification given in the Technical Requirements;
(b)
whether each Requirement is mandatory or only “preferred”; and
(c)
to ensure that each Bidder includes along with a specific response to the
Purchaser, a cross reference to the supporting information provided
elsewhere in its Technical Bid.
It is important that the tables be prepared carefully and completely, with accurate references
to the relevant section and paragraph numbers in the Technical Requirements so that
Bidders will be more likely to submit complete information, particularly regarding the
mandatory and scored Requirements. In preparing each Checklist entry, Purchasers
should start with an abbreviated text of each Requirement so that Bidders can quickly
confirm that they are responding to the right Requirement. Inconsistencies between the
Checklist and the referenced section in the Technical Requirements should be avoided.
Giving Bidders a revisable, “electronic” version of the Checklist as part of the Bidding
Document will enhance the completeness of bids.
Section VI. Technical Requirements
371
Technical Responsiveness Checklist
Note to Bidders: The following Checklist is provided to help the Bidder organize and
consistently present its Technical Bid. For each of the following Technical Requirements,
the Bidder must describe how its Technical Bid responds to each Requirement. In addition,
the Bidder must provide cross references to the relevant supporting information, if any,
included in the bid. The cross reference should identify the relevant document(s), page
number(s), and paragraph(s). The Technical Responsiveness Checklist does not supersede
the rest of the Technical Requirements (or any other part of the Bidding Documents). If a
requirement is not mentioned in the Checklist that does not relieve the Bidder from the
responsibility of including supporting evidence of compliance with that other requirement in
its Technical Bid. One- or two-word responses (e.g. “Yes,” “No,” “Will comply,” etc.) are
normally not sufficient to confirm technical responsiveness with Technical Requirements.
M represents “Mandatory”,
P represents “Preferred”,
D represents “Desirable”.
The bidders will prepare their bids following the Technical Requirements (Section VI)
In addition, the following Project Management Documents will be required
Level
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
Requirements
END-User documents:
The Bidder should provide detail information regarding the documentation that will be
supplied with the system. The following minimum documentation (hard copy and soft
copy) on the proposed systems must be made available in English:
A. Project Documentation
Project Management Controls
Project Plans
Implementation Controls
Quality Controls
Scope Management Controls
Progress Reports
B. System Documentation
Requirement Specifications
Technical Specifications
System Descriptions & Specifications
Installation Manuals
System Administration Guide
Maintenance Documentation
C. User Documentation
Training Requirements
Training Documentations
User Guides
Administrator Documentations
Response
372
Level
M
M
M
M
M
M
M
M
M
M
M
M
Section VI. Technical Requirements
Requirements
Transaction Processing Guidelines
Operational Processing Guidelines
Operational Procedures
Error Correction Procedures
D. Testing Specifications
Technical Documents:
Documentation should be consistent with international standards
Documentation should be user-friendly
Documentation should be indexed
Diagrams and schematics should be provided where possible to facilitate practical
understanding. The Vendor must assure on-going documentation updates
The Vendor must supply the documentation of the applications on optical disks or other
digital media together with the system for its updating as changes are introduced
Technical documentation appropriate to the hardware and systems that are being provided
must be made available in both hard copy and soft copy (CD-ROM). A commitment to
providing updated versions must be given.
Response
Section VI. Technical Requirements
373
H. ATTACHMENTS
Attachment 1. Existing Information Systems / Information Technologies (Not Used)
Attachment 2. Site Drawings and Site Survey Information (Not Used)
Attachment 3. Sample Reports, Data Entry Forms, Data, Coding Schemes, Etc.
(Not Used)
Attachment 4. Relevant Legal Codes, Regulations, Etc. (Not Used)
Attachment 5. Available Training Facilities (Not Used)
Attachment 6. The Purchaser’s Project and Corporate Management Structure
374
Section VI. Technical Requirements
Attachment 6. The Purchaser’s Project and Corporate Management Structure
Project and Corporate Management Structure
The IT implementation process will be organised for maximum effectiveness with full senior
management involvement. Structures will be in place for decision-making, communication, and
management.
Factors to be considered are:
• The complexity of the Project
• The culture of the organisation and willingness to accept change
• The skills available and required
• The capacity of Finance Ministry to absorb change
Project Manager
The Finance division will designate a Project Manager who shall assist the Project Director in the
implementation of the contract with the supplier. The Supplier shall engage a Project Manager (PM)
for successful implementation of the project. The PM’s role is to provide Project Management
services for the implementation and s/he will report to the Project Director or his delegated
representatives on project status, progress, risks identified, and issues. The Project manager will also
coordinate the activities of all projects teams. Each project within this project will have a FD
appointed Project Manager (Team leader), Task Force and project team. The Project Manager will
report to the Project Manager as and when required, and in such format, as the Project Manager will
decide.
Task Force
The composition of the Task Force will depend on the project being undertaken. In a Business
project, the composition will be primarily of appropriate business managers and staff, while in a
Technical project, technical experts will be involved.
Section VI. Technical Requirements
375
A Task Force consists of the project manager, and a small number of expert team members who
represent the business owners' view. The expert team members are selected for their knowledge,
skills and suitability to the particular project. The Task Force may be multi-layered in that it may
contain both senior line management, who will provide the business direction, and also officers, who
will carry out the detailed work of the project.
The Task Force is the project management team. These are permanently appointed until the end of
the project. Each task force must have, as a minimum, one member of the ICT unit on the team.
The Task Force experts will have specific delegated authority to make decisions on the PD’s behalf.
In the event of uncertainty or ambiguity, the Task Force will in the first instance, refer to the systems
nominated Business Owner for guidance. If this remains an open issue, the project manager will refer
the issue to the Counterpart Project Manager for resolution.
Project Team
The Project team members may be sourced from the Contractor, FD user staff, and FD IT staff,
depending on need and skills required and available. These will be part-time secondments, although
there may be occasional need for a full time secondment.
377
SECTION VII. SAMPLE FORMS
378
Section VII. Sample Forms
Notes to Bidders on working with the Sample Forms
The Purchaser has prepared the forms in this section of the Bidding Documents to suit
the specific requirements of the System being procured. They are derived from the forms
contained in the World Bank’s Standard Bidding Documents for the Supply and Installation
of Information Systems. In its bid, the Bidder must use these forms (or forms that present in
the same sequence substantially the same information). Bidders should not introduce
changes without the Purchaser’s prior written consent (which may also require the clearance
of the World Bank). If the Bidder has a question regarding the meaning or appropriateness of
the contents or format of the forms and/or the instructions contained in them, these questions
should be brought to the Purchaser’s attention as soon as possible during the bid clarification
process, either at the pre-bid meeting or by addressing them to the Purchaser in writing
pursuant to ITB Clause 10.
The Purchaser has tried to provide explanatory text and instructions to help the Bidder
prepare the forms accurately and completely. The instructions that appear directly on the
forms themselves are indicated by use of typographical aides such as italicized text within
square brackets as is shown in the following example taken from the Bid Submission Form:
Duly authorized to sign this bid for and on behalf of [ insert: name of Bidder ]
In preparing its bid, the Bidder must ensure all such information is provided and that
the typographical aides are removed.
The sample forms provide a standard set of documents that support the procurement
process as it moves forward from the stage of bidding, through Contract formation and onto
Contract performance. The first set of forms must be completed and submitted as part of the
bid prior to the deadline for bid submission. These include: (i) the Bid Submission Form; (ii)
the Price Schedules; (iii) the Manufacturer’s Authorizations and key Subcontractor
agreements; (iv) the List of Proposed Subcontractors; (v) the form(s) for securing the bid (if
and as required); and other forms as found in sub-sections 1 through 4 of this Section VII of
the Bidding Documents.
•
Bid Submission Form: In addition to being the place where official confirmation of
the bid price, the currency breakdown, the completion date(s), and other important
Contract details are expressed, the Bid Submission Form is also used by the Bidder to
confirm - in case adjudication applies in this Contract - its acceptance of the
Purchaser’s proposed Adjudicator, or to propose an alternative. If the bid is being
submitted on behalf of a Joint Venture, it is essential that the Bid Submission Form be
signed by the partner in charge and that it be supported by the authorizations and
power of attorney required pursuant to ITB Clause 6.2. Given widespread concern
about illegal use of licensed software, Bidders will be asked to certify in the Bid
Submission Form that either the Software included in the bid was developed and is
owned by the Bidder, or, if not, the Software is covered by valid licenses with the
proprietor of the Software.
•
Price Schedules: The prices quoted in the Price Schedules should constitute full and
fair compensation for supply, installation, and achieving Operational Acceptance of
Section VII. Sample Forms
379
the System as described in the Technical Requirements based on the Implementation
Schedule, and the terms and conditions of the proposed Contract as set forth in the
Bidding Documents. Prices should be given for each line item provided in the
Schedules, with costs carefully aggregated first at the Subsystem level and then for
the entire System. If the Price Schedules provide only a summary breakdown of items
and components, or do not cover some items unique to the Bidder’s specific technical
solution, the Bidder may extend the Schedules to capture those items or components.
If supporting price and cost tables are needed for a full understanding of the bid, they
should be included.
Arithmetical errors should be avoided. If they occur, the Purchaser will correct them
according to ITB Clause 26.2 (ITB Clause 38.2 in the two-stage SBD) without
consulting the Bidder. Major omissions, inconsistencies, or lack of substantiating
detail can lead to rejection of a bid for commercial non-responsiveness. Presenting
prices according to the breakdown prescribed in the Price Schedules is also essential
for another reason. If a bid does not separate prices in the prescribed way, and, as a
result, the Purchaser cannot apply the domestic preference provision described in ITB
Clause 29 (ITB Clause 41 in the two-stage SBD), if they are applicable in this
bidding, the Bidder will lose the benefit of the preference. Once bids are opened, none
of these problems can be rectified. At that stage, Bidders are not permitted to change
their bid prices to overcome errors or omissions.
•
Manufacturer’s Authorizations and written agreements by key Subcontractors: In
accordance with ITB Clauses 6.1 (b) and (c), a Bidder may be required to submit, as
part of its bid, Manufacturer’s Authorizations in the format provided in the Bidding
Documents, and agreements by Subcontractors proposed for key services, for all items
specified in the Bid Data Sheet. There is no particular format (or sample form) for
Subcontractor agreements.
•
List of Proposed Subcontractors: In accordance with ITB Clause 6.3, a Bidder must
submit, as part of its bid, a list of proposed subcontracts for major items of
Technologies, Goods, and/or Services. The list should also include the names and
places of registration of the Subcontractors proposed for each item and a summary of
their qualifications.
•
List of Software and Materials: In accordance with ITB Clause 13.1 (e) (vi) (ITB
Clauses 13.1 (c) (vi) and 25.1 (e) (vi) in the two-stage SBD), Bidders must submit, as
part of their bids, lists of all the Software included in the bid assigned to one of the
following categories: (A) System, General-Purpose, or Application Software; or
(B) Standard or Custom Software. Bidders must also submit a list of all Custom
Materials. If provided for in the Bid Data Sheet, the Purchaser may reserve the right
to reassign certain key Software to a different category.
•
Qualification information forms: In accordance with ITB Clause 6, the Purchaser will
determine whether the Bidder is qualified to undertake the Contract. This entails
financial, technical as well as performance history criteria which are specified in the
BDS for ITB Clause 6. The Bidder must provide the necessary information for the
380
Section VII. Sample Forms
Purchaser to make this assessment through the forms in this sub-section. The forms
contain additional detailed instructions which the Bidder must follow.
•
Securing the bid: If the BDS for ITB Clause 17 (ITB Clause 29 in the two-stage
SBD) requires that bids be secured, the Bidder shall do so in accordance with the type
and details specified in the same ITB/BDS Clause, either using the form(s) included
in these Sample Forms or using another form acceptable to the Purchaser. If a Bidder
wishes to use an alternative form, it should ensure that the revised format provides
substantially the same protection as the standard format; failing that, the Bidder runs
the risk of rejection for commercial non-responsiveness.
Bidders need not provide the Performance Security and Advance Payment Security
with their bids. Only the Bidder selected for award by the Purchaser will be required to
provide these securities.
The following forms are to be completed and submitted by the successful Bidder
following notification of award: (i) Contract Agreement, with all Appendices;
(ii) Performance Security; and (iii) Advance Payment Security.
•
Contract Agreement: In addition to specifying the parties and the Contract Price, the
Contract Agreement is where the: (i) Supplier Representative; (ii) if applicable,
agreed Adjudicator and his/her compensation; and (iii) the List of Approved
Subcontractors are specified. In addition, modifications to the successful Bidder’s
Bid Price Schedules are attached to the Agreement. These contain corrections and
adjustments to the Supplier’s bid prices to correct errors, adjust the Contract Price to
reflect – if applicable - any extensions to bid validity beyond the last day of original
bid validity plus 56 days, etc.
•
Performance Security: Pursuant to GCC Clause 13.3, the successful Bidder is
required to provide the Performance Security in the form contained in this section of
these Bidding Documents and in the amount specified in accordance with the SCC.
•
Advance Payment Security: Pursuant to GCC Clause 13.2, the successful Bidder is
required to provide a bank guarantee for the full amount of the Advance Payment - if
an Advance Payment is specified in the SCC for GCC 12.1 - in the form contained in
this section of these Bidding Documents or another form acceptable to the Purchaser.
If a Bidder wishes to propose a different Advance Payment Security form, it should
submit a copy to the Purchaser promptly for review and confirmation of acceptability
before the bid submission deadline.
The Purchaser and Supplier will use the following additional forms during Contract
implementation to formalize or certify important Contract events: (i) the Installation and
Operational Acceptance Certificates; and (ii) the various Change Order forms. These and the
procedures for their use during performance of the Contract are included in the Bidding
Documents for the information of Bidders.
Section VII. Sample Forms
381
Table of Sample Forms
1. Bid Submission Form (Single-Stage Bidding) ..............................................................383
2. Price Schedule Forms .....................................................................................................387
2.1
2.2
2.3
2.4
2.5
2.6
2.7
Preamble .................................................................................................................388
Grand Summary Cost Table ....................................................................................390
Supply and Installation Cost Summary Table .........................................................391
Recurrent Cost Summary Table ..............................................................................394
Supply and Installation Cost Sub-Table [ insert: identifying number ]................395
Recurrent Cost Sub-Table [ insert: identifying number ] .....................................399
Country of Origin Code Table ................................................................................401
3. Other Bid Forms and Lists.............................................................................................402
3.1 Manufacturer’s Authorization .................................................................................403
3.2 List of Proposed Subcontractors .............................................................................404
3.3 Software List ...........................................................................................................405
3.4 List of Custom Materials ........................................................................................406
3.5.1 General Information Form ......................................................................................407
3.5.2 General Information Systems Experience Record ..................................................408
3.5.2a Joint Venture Summary........................................................................................409
3.5.3 Particular Information Systems Experience Record ...............................................410
3.5.3a Details of Contracts of Similar Nature and Complexity ......................................411
3.5.4 Summary Sheet: Current Contract Commitments / Work in Progress ..................412
3.5.5 Financial Capabilities..............................................................................................413
3.5.6 Personnel Capabilities .............................................................................................415
3.5.6a Candidate Summary .............................................................................................416
3.5.7 Technical Capabilities .............................................................................................417
3.5.8 Litigation History ....................................................................................................418
4. Bid-Securing Declaration ...............................................................................................419
4A. Bid Security (Bank Guarantee) ..................................................................................420
4B. Bid Security (Bid Bond) ...............................................................................................421
5. Contract Agreement .......................................................................................................422
Appendix 1.
Appendix 2.
Appendix 3.
Appendix 4.
Appendix 5.
Appendix 6.
Supplier’s Representative...........................................................................426
Adjudicator.................................................................................................427
List of Approved Subcontractors ...............................................................428
Categories of Software ...............................................................................429
Custom Materials .......................................................................................430
Revised Price Schedules ............................................................................431
382
Section VII. Sample Forms
Appendix 7. Minutes of Contract Finalization Discussions and Agreed-to Contract
Amendments ...........................................................................................................432
6. Performance and Advance Payment Security Forms ..................................................433
6.1
6.2
Performance Security Form (Bank Guarantee) .......................................................434
Advance Payment Security Form (Bank Guarantee) ..............................................435
7. Installation and Acceptance Certificates ......................................................................436
7.1
7.2
Installation Certificate .............................................................................................437
Operational Acceptance Certificate ........................................................................438
8. Change Order Procedures and Forms ..........................................................................439
8.1
8.2
8.3
8.4
8.5
8.6
Request for Change Proposal Form ........................................................................440
Change Estimate Proposal Form .............................................................................442
Estimate Acceptance Form .....................................................................................444
Change Proposal Form ............................................................................................446
Change Order Form ................................................................................................448
Application for Change Proposal Form ..................................................................450
Section VII. Sample Forms
383
1. BID SUBMISSION FORM (SINGLE-STAGE BIDDING)
Date:
Loan/Credit No.:
IFB:
Contract:
[ Bidder insert: date of bid ]
[ Purchaser insert: number ]
[ Purchaser insert: IFB title and number ]
[ Purchaser insert: name of Contract ]
To:
Project Director
Deepening Medium Term Budget Framework and Strengthening Financial Accountability
Project (Project-A)
UCEP Cheyne Tower (2nd floor)
25 Segunbagicha, Dhaka 1000
Bangladesh
Telephone No. 8391131-3, Fax No. 8391136
E-mail: ekramahmed1458@ gmail.com
Dear Sir or Madam:
Having examined the Bidding Documents, including Addenda Nos. [ insert
numbers ], the receipt of which is hereby acknowledged, we, the undersigned, offer to
supply, install, achieve Operational Acceptance of, and support the Information System under
the above-named Contract in full conformity with the said Bidding Documents for the sum
of:
plus
[ insert: amount of local
currency in words ]
([ insert: amount of local currency
in figures from corresponding Grand
Total entry of the Grand Summary
Cost Table ])
[ insert: amount of foreign
currency A in words ]
([ insert: amount of foreign
currency A in figures from
corresponding Grand Total entry of
the Grand Summary Cost Table ])
[ as appropriate, add the following ]
plus
[ insert: amount of foreign
currency B in words ]
([ insert: amount of foreign
currency B in figures from
corresponding Grand Total entry of
the Grand Summary Cost Table ])
plus
[ insert: amount of foreign
currency C in words ]
([ insert: amount of foreign
currency C in figures from
384
Section VII. Sample Forms
corresponding Grand Total entry of
the Grand Summary Cost Table ])
or such other sums as may be determined in accordance with the terms and conditions of the
Contract. The above amounts are in accordance with the Price Schedules attached herewith
and made part of this bid.
We undertake, if our bid is accepted, to commence work on the Information System
and to achieve Installation and Operational Acceptance within the respective times stated in
the Bidding Documents.
If our bid is accepted, and if these Bidding Documents so require, we undertake to
provide an advance payment security and a performance security in the form, in the amounts,
and within the times specified in the Bidding Documents.
[ As appropriate, include or delete the following paragraph ]
“We accept the appointment of [ Purchaser insert: name of proposed Adjudicator
from the Bid Data Sheet ] as the Adjudicator.”
[ and delete the following paragraph, or, as appropriate, delete the above
and include the following, or, if no Adjudicator is stated in the Bid Data
Sheet, delete both the above and the following ]
“We do not accept the appointment of [ Purchaser insert: name of proposed
Adjudicator from the Bid Data Sheet ] as the Adjudicator, and we propose instead that
[ insert: name ] be appointed as Adjudicator, whose résumé and hourly fees are attached.”
We hereby certify that the Software offered in this bid and to be supplied under the
Contract (i) either is owned by us, or (ii) if not owned by us, is covered by a valid license
from the proprietor of the Software.
We agree to abide by this bid, which, in accordance with ITB Clauses 13 and 16,
consists of this letter (Bid Submission Form) and the enclosures listed below, for a period of
[ Purchaser insert: number from Bid Data Sheet ] days from the date fixed for submission
of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may
be accepted by you at any time before the expiration of that period.
Commissions or gratuities, if any, paid or to be paid by us to agents relating to this
Bid, and to Contract execution if we are awarded the Contract, are listed below:
Name and Address
of Agent
Etc.
Amount and
Currency
[if none, state: “none”]
Purpose of
Commission or
Gratuity
Section VII. Sample Forms
385
Until the formal final Contract is prepared and executed between us, this bid, together
with your written acceptance of the bid and your notification of award, shall constitute a
binding contract between us. We understand that you are not bound to accept the lowest or
any bid you may receive.
Dated this [ insert: ordinal ] day of [ insert: month ], [ insert: year ].
Signed:
Date:
In the capacity of [ insert: title or position ]
Duly authorized to sign this bid for and on behalf of [ insert: name of Bidder ]
ENCLOSURES:
Price Schedules
Bid-Securing Declaration or Bid-Security (if and as required)
Signature Authorization [plus, in the case of a Joint Venture Bidder, list all other
authorizations pursuant to ITB Clause 6.2]
Attachment 1. Bidder’s Eligibility
Attachment 2. Bidder’s Qualifications (including Manufacturer’s Authorizations and
Subcontractor agreements if and as required)
Attachment 3. Eligibility of Goods and Services
Attachment 4. Conformity of the Information System to the Bidding Documents
Attachment 5. Proposed Subcontractors
Attachment 6. Intellectual Property (Software and Materials Lists)
[if appropriate, specify further attachments or other enclosures]
386
Section VII. Sample Forms
Bid Table of Contents and Checklist
Note: Purchasers should expand and modify (as appropriate) the following table to reflect
the required elements of the Bidder’s bid. As the following note to Bidders explains, it is in
both the Purchaser’s and Bidder’s interest to provide this table and accurately fill it out.
Note: Bidders should expand and (if appropriate) modify and complete the following table.
The purpose of the table is to provide the Bidder with a summary checklist of items that must
be included in the bid as described in ITB Clauses 13.1 and 16, in order for the bid to be
considered for Contract award. The table also provides a summary page reference scheme to
ease and speed the Purchaser’s bid evaluation process.
Item
Bid Submission Form......................................................
Price Schedules ...............................................................
Bid-Securing Declaration / Bid-Security (if and as
required) ..........................................................................
Signature Authorization (for Joint Ventures additionally
including the authorizations listed in ITB Clause 6.2) ....
Attachment 1 ...................................................................
Attachment 2 ...................................................................
Manufacturer’s Authorizations .................................
Subcontractor agreements .........................................
Attachment 3 ...................................................................
Attachment 4 ...................................................................
Attachment 5 ...................................................................
Attachment 6 ...................................................................
.........................................................................................
present: y/n
page no.
Section VII. Sample Forms
387
2. PRICE SCHEDULE FORMS
Note: in information systems procurement, the Contract Price (and payment schedule)
should be linked as much as possible to achievement of operational capabilities, not just to
the physical delivery of technology.
388
Section VII. Sample Forms
2.1
Preamble
Note: Purchasers should highlight any special requirements of the System and Contract in
a Preamble to the Price Schedules. The following is an example of one such
preamble.
General
1.
The Price Schedules are divided into separate Schedules as follows:
2.2
Grand Summary Cost Table
2.3
Supply and Installation Cost Summary Table
2.4
Recurrent Cost Summary Table
2.5
Supply and Installation Cost Sub-Table(s)
2.6
Recurrent Cost Sub-Tables(s)
2.7
Country of Origin Code Table
[ insert: any other Schedules as appropriate ]
2.
The Schedules do not generally give a full description of the information technologies
to be supplied, installed, and operationally accepted, or the Services to be performed
under each item. However, it is assumed that Bidders shall have read the Technical
Requirements and other sections of these Bidding Documents to ascertain the full scope
of the requirements associated with each item prior to filling in the rates and prices.
The quoted rates and prices shall be deemed to cover the full scope of these Technical
Requirements, as well as overhead and profit.
3.
If Bidders are unclear or uncertain as to the scope of any item, they shall seek
clarification in accordance with the Instructions to Bidders in the Bidding Documents
prior to submitting their bid.
Pricing
4.
Prices shall be filled in indelible ink, and any alterations necessary due to errors, etc.,
shall be initialed by the Bidder. As specified in the Bid Data Sheet, prices shall be
fixed and firm for the duration of the Contract.
5.
Bid prices shall be quoted in the manner indicated and in the currencies specified in
ITB Clauses 14 and 15 (ITB Clauses 27 and 28 in the two-stage SBD). Prices must
correspond to items of the scope and quality defined in the Technical Requirements or
elsewhere in these Bidding Documents.
6.
The Bidder must exercise great care in preparing its calculations, since there is no
opportunity to correct errors once the deadline for submission of bids has passed. A
single error in specifying a unit price can therefore change a Bidder’s overall total bid
price substantially, make the bid noncompetitive, or subject the Bidder to possible loss.
Section VII. Sample Forms
389
The Purchaser will correct any arithmetic error in accordance with the provisions of
ITB Clause 26.2 (ITB Clause 38.2 in the two-stage SBD).
7.
Payments will be made to the Supplier in the currency or currencies indicated under
each respective item. As specified in ITB Clause 15.1 (ITB Clause 28.1 in the twostage SBD), no more than three foreign currencies may be used. The price of an item
should be unique regardless of installation site.
390
Section VII. Sample Forms
2.2
Grand Summary Cost Table
[ insert: Local
Currency ]
Price
1.
Supply and Installation Costs (from
Supply and Installation Cost Summary
Table)
2.
Recurrent Costs (from Recurrent Cost
Summary Table)
3.
Grand Totals (to Bid Submission Form)
Name of Bidder:
Authorized Signature of Bidder:
[ insert: Foreign
Currency A ]
Price
[ insert: Foreign
Currency B ]
Price
[ insert: Foreign
Currency C ]
Price
Section VII. Sample Forms
391
2.3
Supply and Installation Cost Summary Table
System or Subsystem number: [ if a multi-lot procurement, insert: Subsystem number; otherwise state “entire System
procurement” ] [ as necessary for supply, installation, and achieving Operational Acceptance of the System, specify items in the
Table below, modifying, deleting, or expanding the sample line items and sample table entries as needed. ]
Costs MUST reflect prices and rates quoted in accordance with ITB Clauses 14 and 15 (ITB Clauses 27 and 28 in the two-stage SBD).
Supply & Installation Prices
Locally
supplied
items
Line
Item
No.
Subsystem / Item
Supply and
Installation
Cost SubTable No.
[ insert:
Local
Currency ]
Price
[ insert:
Local
Currency ]
Price
[ insert:
Foreign
Currency A]
Price
[ insert:
Foreign
Currency B]
Price
[ insert:
Foreign
Currency C]
Price
--
--
--
--
--
0
Project Plan
--
1
Headquarters Subsystem
1
1.1
Hardware, LAN & General-Purpose
Software
1
1.2
Database System
1
1.3
Training
1
2
Region 1 Branch Offices Subsystems
Items supplied from outside the Purchaser’s Country
2
392
Section VII. Sample Forms
Supply & Installation Prices
Locally
supplied
items
Line
Item
No.
Subsystem / Item
Supply and
Installation
Cost SubTable No.
2.1
Hardware, LAN & General-Purpose
Software
2
2.2
Training
2
j
Region J Branch Offices Subsystems
j.1
Hardware, LAN & General-Purpose
Software
j.2
Subsystem Design and Programming
Services
j.3
Training
j
“
“
:
k
WAN and integrated database access
Subsystems
k
k.1
WAN
“
k.2
Database Access Software
“
k.3
Training
“
[ insert:
Local
Currency ]
Price
Items supplied from outside the Purchaser’s Country
[ insert:
Local
Currency ]
Price
[ insert:
Foreign
Currency A]
Price
[ insert:
Foreign
Currency B]
Price
[ insert:
Foreign
Currency C]
Price
Section VII. Sample Forms
393
Supply & Installation Prices
Locally
supplied
items
Line
Item
No.
Supply and
Installation
Cost SubTable No.
Subsystem / Item
[ insert:
Local
Currency ]
Price
Items supplied from outside the Purchaser’s Country
[ insert:
Local
Currency ]
Price
[ insert:
Foreign
Currency A]
Price
[ insert:
Foreign
Currency B]
Price
[ insert:
Foreign
Currency C]
Price
:
m
Data Conversion Service
m
SUBTOTALS
TOTAL (To Grand Summary Table)
Note:
- - indicates not applicable. “ indicates repetition of table entry above. Refer to the relevant Supply and Installation Cost Sub-Table
for the specific components that constitute each Subsystem or line item in this summary table
Name of Bidder:
Authorized Signature of Bidder:
394
Section VII. Sample Forms
2.4
Recurrent Cost Summary Table
System or Subsystem number: [ if a multi-lot procurement, insert: Subsystem number, otherwise state “entire System
procurement” ] [ as necessary for the operation of the System, specify items in the Table below, modifying the sample line items and
sample table entries as needed. ]
Costs MUST reflect prices and rates quoted in accordance with ITB Clauses 14 and 15 (ITB Clauses 27 and 28 in the two-stage SBD).
Line
Item
No.
Z
Subsystem / Item
Recurrent
Cost SubTable No.
[ insert:
Local
Currency ]
Price
[ insert:
Foreign
Currency A ]
Price
[ insert:
Foreign
Currency B ]
Price
[ insert:
Foreign
Currency C ]
Price
Recurrent Cost Items
z.1
Headquarters Recurrent Cost
Items
n.1
z.2
Region 1 Recurrent Cost
Items
n.2
Subtotals (to Grand Summary Table)
Note:
Refer to the relevant Recurrent Cost Sub-Tables for the specific components that constitute the Subsystem or line item in this
summary table.
Name of Bidder:
Authorized Signature of Bidder:
Section VII. Sample Forms
2.5
395
Supply and Installation Cost Sub-Table [ insert: identifying number ]
System or Subsystem number: [ if a multi-lot procurement, insert: Subsystem number; otherwise state “entire System procurement” ]
Line item number: [ specify: relevant line item number from the Supply and Installation Cost Summary Table (e.g., 1.1) ]
[ as necessary for supply, installation, and achieving Operational Acceptance of the System, specify: the detailed components and
quantities in the Sub-Table below for the line item specified above, modifying the sample components and sample table entries as
needed. Repeat the Sub-Table as needed to cover each and every line item in the Supply and Installation Cost Summary Table that
requires elaboration. ]
Prices, rates, and subtotals MUST be quoted in accordance with ITB Clauses 14 and 15 (ITB Clauses 27 and 28 in the two-stage
SBD). Unit prices for the same item appearing several times in the table must be identical in amount and currency.
Unit Prices / Rates
Supplied
Locally
Compo- Component Country Quannent
Description of Origin
tity
No.
Code
1.1
Hardware –
Finance
Department
1.1.1
Supply of
Advanced
workstations
1.1.2
1.1.3
--
--
4
Standard
Workstations
12
High-speed
Laser Printer
1
Total Prices
Supplied from outside the Purchaser’s
Country
[ insert:
local
currency]
[ insert:
local
currency]
--
--
[ insert:
[ insert
[ insert:
foreign
foreign
foreign
currency currency currency
A]
B]
C]
--
--
--
Supplied
Locally
Supplied from outside the Purchaser’s Country
[ insert:
[ insert:
local
local
currency] currency]
[ insert:
foreign
currency
A]
[ insert:
foreign
currency
B]
[ insert:
foreign
currency
C]
396
Section VII. Sample Forms
Unit Prices / Rates
Supplied
Locally
Compo- Component Country Quannent
Description of Origin
tity
No.
Code
1.1.4
1.1.5
Standardspeed Laser
Printer
Continuousfeed Printer
Total Prices
Supplied from outside the Purchaser’s
Country
[ insert:
local
currency]
[ insert:
local
currency]
[ insert
[ insert:
[ insert:
foreign
foreign
foreign
currency currency currency
C]
A]
B]
3
3
1.1.6
Design and
Programming
Services
related to
Financial
Report
:1.1.7
Local
transport and
insurance
2.
LAN Headquarters
--
--
--
--
--
--
2.1
Supply of
Wiring Closet
Hardware
--
--
--
--
--
--
2.1.1
Hubs
7
Supplied
Locally
Supplied from outside the Purchaser’s Country
[ insert:
[ insert:
local
local
currency] currency]
[ insert:
foreign
currency
A]
[ insert:
foreign
currency
B]
[ insert:
foreign
currency
C]
Section VII. Sample Forms
397
Unit Prices / Rates
Supplied
Locally
Compo- Component Country Quannent
Description of Origin
tity
No.
Code
Total Prices
Supplied from outside the Purchaser’s
Country
[ insert:
local
currency]
[ insert:
local
currency]
[ insert
[ insert:
[ insert:
foreign
foreign
foreign
currency currency currency
C]
A]
B]
2.1.2
Punch-down
panel
7
2.1.3
Uninterrupted
Power Supply
(small)
7
2.1.4
Lockable
Equipment
Rack
7
2.2
In-Building
Wiring
--
--
--
--
--
--
2.2.1
Server Room
--
--
--
--
--
--
2.2.1.1
Dedicated
Telephone
Lines (data)
2 nodes
--
--
--
--
--
:
2.2.2
Backbone and
Risers (Fiber
optic)
28
nodes
2.2.3
Departmental
Wiring
--
Supplied
Locally
Supplied from outside the Purchaser’s Country
[ insert:
[ insert:
local
local
currency] currency]
[ insert:
foreign
currency
A]
[ insert:
foreign
currency
B]
[ insert:
foreign
currency
C]
398
Section VII. Sample Forms
Unit Prices / Rates
Supplied
Locally
Compo- Component Country Quannent
Description of Origin
tity
No.
Code
Total Prices
Supplied from outside the Purchaser’s
Country
[ insert:
local
currency]
[ insert:
local
currency]
[ insert
[ insert:
[ insert:
foreign
foreign
foreign
currency currency currency
C]
A]
B]
Finance
Department
40
nodes
2.3
In-Building
Wiring
(Goods)
--
--
--
--
--
--
2.4
Local
transport and
insurance for
Region 1 sites
3.
Supply of
GeneralPurpose
Software
--
--
--
--
--
--
2.2.3.1
--
Subtotals (to [ insert: line item ] of Supply and Installation Cost Summary Table)
Note: - - indicates not applicable.
Name of Bidder:
Authorized Signature of Bidder:
Supplied
Locally
Supplied from outside the Purchaser’s Country
[ insert:
[ insert:
local
local
currency] currency]
[ insert:
foreign
currency
A]
[ insert:
foreign
currency
B]
[ insert:
foreign
currency
C]
Section VII. Sample Forms
399
2.6
Recurrent Cost Sub-Table [ insert: identifying number ]
Lot number: [ if a multi-lot procurement, insert: lot number, otherwise state “single lot procurement” ]
Line item number: [ specify: relevant line item number from the Recurrent Cost Summary Table (e.g., z.1) ]
Currency: [ specify: the currency of the Recurrent Costs in which the costs expressed in this Sub-Table are expressed ]
[ as necessary for operation of the System, specify: the detailed components and quantities in the Sub-Table below for the line item
specified above, modifying the sample components and sample table entries as needed. Repeat the Sub-Table as needed to cover
each and every line item in the Recurrent Cost Summary Table that requires elaboration. ]
Costs MUST reflect prices and rates quoted in accordance with ITB Clauses 14 and 15 (ITB Clauses 27 and 28 in the two-stage SBD).
Unit prices for the same item appearing several times in the table must be identical in amount and currency.
Maximum all-inclusive costs (for costs in [ insert: currency ])
Component
No.
Component
Y1
Y2
Y3
Incl. in
Warranty
Incl. in
Warranty
1.
Hardware Maintenance
Incl. in
Warranty
2.
Software Licenses & Updates
Incl. in
Warranty
2.1
System and GeneralPurpose Software
Incl. in
Warranty
2.2
Application, Standard and
Custom Software
Incl. in
Warranty
3.
Technical Services
3.1
Sr. Systems Analyst
3.2
Sr. Programmer
Y4
...
Yn
Sub-total for [ insert:
currency ]
400
Section VII. Sample Forms
Maximum all-inclusive costs (for costs in [ insert: currency ])
Component
No.
Component
Y1
3.3
Sr. Network Specialist,
….. etc.
4.
Telecommunications costs [to
be detailed]
5.
[Identify other recurrent costs
as may apply]
Y2
Y3
Y4
...
Yn
Annual Subtotals:
Sub-total for [ insert:
currency ]
--
Cumulative Subtotal (to [ insert: currency ] entry for [ insert: line item ] in the Recurrent Cost Summary Table)
Name of Bidder:
Authorized Signature of Bidder:
Section VII. Sample Forms
401
2.7
Country of Origin
Country
Code
Country of Origin Code Table
Country of Origin
Country Code
Country of Origin
Country
Code
402
Section VII. Sample Forms
3. OTHER BID FORMS AND LISTS
Section VII. Sample Forms
403
3.1
Manufacturer’s Authorization
Invitation for Bids Title and No.:
[If applicable:] Lot, Slice, Subsystem No(s).:
To: ________________________________
WHEREAS _______________________________________ who are official producers of
_______________________________________________ and having production facilities at
__________________________________________________________ do hereby authorize
__________________________________________________________________ located at
_____________________________________________________ (hereinafter, the “Bidder”)
to submit a bid and subsequently negotiate and sign a Contract with you for resale of the
following Products produced by us:
.
We hereby confirm that, in case the bidding results in a Contract between you and the Bidder,
the above-listed products will come with our full standard warranty.
Name
In the capacity of
Signed
Duly authorized to sign the authorization for and on behalf of : ________________________
Dated on _______________________________ day of ______________________, ______.
Note: This authorization should be written on the letterhead of the Manufacturer and be
signed by a person with the proper authority to sign documents that are binding on the
Manufacturer.
404
Section VII. Sample Forms
3.2
Item
List of Proposed Subcontractors
Proposed Subcontractor
Place of Registration &
Qualifications
Section VII. Sample Forms
405
3.3
Software List
(select one per item)
Software Item
System
Software
GeneralPurpose
Software
Application
Software
(select one per item)
Standard
Software
Custom
Software
406
Section VII. Sample Forms
3.4
List of Custom Materials
Custom Materials
Section VII. Sample Forms
407
3.5.1 General Information Form
All individual firms and each partner of a Joint Venture that are bidding must complete the
information in this form. Nationality information should be provided for all owners or
Bidders that are partnerships or individually owned firms.
Where the Bidder proposes to use named Subcontractors for highly specialized components
of the Information System, the following information should also be supplied for the
Subcontractor(s), together with the information in Forms 3.5.2, 3.5.3, 3.5.3a, 3.5.4, and 3.5.5.
Joint Ventures must also fill out Form 3.5.2a.
1.
Name of firm
2.
Head office address
3.
Telephone
Contact
4.
Fax
Telex
5.
Place of incorporation / registration
Year of incorporation / registration
Nationality of owners¹
Name
Nationality
1.
2.
3.
4.
5.
¹/
To be completed by all owners of partnerships or individually owned firms.
408
Section VII. Sample Forms
3.5.2 General Information Systems Experience Record
Name of Bidder or partner of a Joint Venture
All individual firms and all partners of a Joint Venture must complete the information in this
form with regard to the management of Information Systems contracts generally. The
information supplied should be the annual turnover of the Bidder (or each member of a Joint
Venture), in terms of the amounts billed to clients for each year for work in progress or
completed, converted to U.S. dollars at the rate of exchange at the end of the period reported.
The annual periods should be calendar years, with partial accounting for the year up to the
date of submission of applications. This form may be included for Subcontractors only if the
Bid Data Sheet for ITB Clause 6.1 (a) explicitly permits experience and resources of (certain)
Subcontractors to contribute to the Bidder’s qualifications.
A brief note on each contract should be appended, describing the nature of the Information
System, duration and amount of contract, managerial arrangements, purchaser, and other
relevant details.
Use a separate page for each partner of a Joint Venture, and number these pages.
Bidders should not enclose testimonials, certificates, and publicity material with their
applications; they will not be taken into account in the evaluation of qualifications.
Annual turnover data (applicable activities only)
Year¹
Turnover
US$ equivalent
1.
2.
3.
4.
5.
¹/
Commencing with the partial year up to the date of submission of bids
Section VII. Sample Forms
409
3.5.2a Joint Venture Summary
Names of all partners of a Joint Venture
1. Partner in charge
2. Partner
3. Partner
4. Partner
5. Partner
6. etc.
Total value of annual turnover, in terms of Information System billed to clients, in US$
equivalent, converted at the rate of exchange at the end of the period reported:
Annual turnover data (applicable activities only; US$ equivalent)
Partner
1. Partner
in charge
2. Partner
3. Partner
4. Partner
5. Partner
6. Etc.
Totals
Form
Year 1
3.5.2
page no.
Year 2
Year 3
Year 4
Year 5
410
Section VII. Sample Forms
3.5.3 Particular Information Systems Experience Record
Name of Bidder or partner of a Joint Venture
On separate pages, using the format of Form 3.5.3a, the Bidder is requested to list contracts
of a similar nature, complexity, and requiring similar information technology and
methodologies to the contract or contracts for which these Bidding Documents are issued,
and which the Bidder has undertaken during the period, and of the number, specified in the
BDS for ITB Clause 6.1 (a). Each partner of a Joint Venture should separately provide
details of its own relevant contracts. The contract value should be based on the payment
currencies of the contracts converted into U.S. dollars, at the date of substantial completion,
or for ongoing contracts at the time of award.
Section VII. Sample Forms
411
3.5.3a Details of Contracts of Similar Nature and Complexity
Name of Bidder or partner of a Joint Venture
Use a separate sheet for each contract.
1.
Number of contract
Name of contract
Country
2.
Name of Purchaser
3.
Purchaser address
4.
Nature of Information Systems and special features relevant to the contract for which the
Bidding Documents are issued
5.
Contract role (check one)
Prime Supplier
Joint Venture
6.
Subcontractor
Partner in a
Amount of the total contract/subcontract/partner share (in specified currencies at
completion, or at date of award for current contracts)
Currency
7.
Management Contractor
Currency
Currency
Subcontract: $_______;
Partner share: $_______;
Equivalent amount US$
Total contract: $_______;
8.
Date of award/completion
9.
Contract was completed _____ months ahead/behind original schedule (if behind, provide
explanation).
10.
Contract was completed US$ _________ equivalent under/over original contract amount (if
over, provide explanation).
11.
Special contractual/technical requirements.
12.
Indicate the approximate percent of total contract value (and US$ amount) of Information
System undertaken by subcontract, if any, and the nature of such Information System.
412
Section VII. Sample Forms
3.5.4 Summary Sheet: Current Contract Commitments / Work in
Progress
Name of Bidder or partner of a Joint Venture
Bidders and each partner to an Joint Venture bid should provide information on their current
commitments on all contracts that have been awarded, or for which a letter of intent or
acceptance has been received, or for contracts approaching completion, but for which an
unqualified, full completion certificate has yet to be issued.
Name of contract
1.
2.
3.
4.
5.
etc.
Purchaser,
contact
address/tel./fax
Value of
outstanding
Information
System (current
US$ equivalent)
Estimated
completion date
Average monthly
invoicing over last
six months
(US$/month)
Section VII. Sample Forms
413
3.5.5 Financial Capabilities
Name of Bidder or partner of a Joint Venture
Bidders, including each partner of a Joint Venture, shall provide financial information to
demonstrate that they meet the requirements stated in the BDS for ITB Clause 6.1 (a). Each
Bidder or partner of a Joint Venture shall complete this form. If necessary, separate sheets
shall be used to provide complete banker information. A copy of the audited balance sheets
shall be attached.
Autonomous subdivisions of parent conglomerate businesses shall submit financial
information related only to the particular activities of the subdivision.
Banker
Name of banker
Address of banker
Telephone
Contact name and title
Fax
Telex
Summarize actual assets and liabilities in U.S. dollar equivalent (at the rates of exchange
current at the end of each year) for the previous five calendar years. Based upon known
commitments, summarize projected assets and liabilities in U.S. dollar equivalent for the next
two calendar years, unless the withholding of such information by stock market listed public
companies can be substantiated by the Bidder.
Financial
information in
US$ equivalent
Actual:
Projected:
Previous five years
Next two years
5
1. Total assets
2. Current assets
3. Total
liabilities
4. Current
liabilities
5. Profits before
taxes
6. Profits after
taxes
4
3
2
1
1
2
414
Section VII. Sample Forms
Specify proposed sources of financing, such as liquid assets, unencumbered real assets, lines
of credit, and other financial means, net of current commitments, available to meet the total
construction cash flow demands of the subject contract or contracts as indicated in the BDS
for ITB Clause 6.1 (a).
Source of financing
Amount (US$ equivalent)
1.
2.
3.
4.
Attach audited financial statements—including, as a minimum, profit and loss account,
balance sheet, and explanatory notes—for the period stated in the BDS for ITB Clause 6.1 (a)
(for the individual Bidder or each partner of a Joint Venture).
If audits are not required by the laws of Bidders' countries of origin, partnerships and firms
owned by individuals may submit their balance sheets certified by a registered accountant,
and supported by copies of tax returns,
Section VII. Sample Forms
415
3.5.6 Personnel Capabilities
Name of Bidder
For specific positions essential to contract management and implementation (and/or those
specified in the Bidding Documents, if any), Bidders should provide the names of at least two
candidates qualified to meet the specified requirements stated for each position. The data on
their experience should be supplied on separate sheets using one Form 3.5.6a for each
candidate.
Bidders may propose alternative management and implementation arrangements requiring
different key personnel, whose experience records should be provided.
1.
Title of position
Name of prime candidate
Name of alternate candidate
2.
Title of position
Name of prime candidate
Name of alternate candidate
3.
Title of position
Name of prime candidate
Name of alternate candidate
4.
Title of position
Name of prime candidate
Name of alternate candidate
416
Section VII. Sample Forms
3.5.6a Candidate Summary
Name of Bidder
Position
Candidate
Prime
Candidate
information
Name of candidate
Alternate
Date of birth
Professional qualifications
Present
employment
Name of Employer
Address of Employer
Telephone
Contact (manager / personnel officer)
Fax
Telex
Job title of candidate
Years with present Employer
Summarize professional experience over the last twenty years, in reverse chronological order.
Indicate particular technical and managerial experience relevant to the project.
From
To
Company/Project/ Position/Relevant technical and management experience
Section VII. Sample Forms
417
3.5.7 Technical Capabilities
Name of Bidder
The Bidder shall provide adequate information to demonstrate clearly that it has the technical
capability to meet the requirements for the Information System. With this form, the Bidder
should summarize important certifications, proprietary methodologies, and/or specialized
technologies which the Bidder proposes to utilize in the execution of the Contract or
Contracts.
418
Section VII. Sample Forms
3.5.8 Litigation History
Name of Bidder or partner of a Joint Venture
Bidders, including each of the partners of a Joint Venture, shall provide information on any
history of litigation or arbitration resulting from contracts executed in the last five years or
currently under execution. A separate sheet should be used for each partner of a Joint
Venture.
Year
Award FOR Name of client, cause of litigation, and matter in Disputed
amount
or AGAINST dispute
(current value, US$
Bidder
equivalent)
Section VII. Sample Forms
419
4. BID-SECURING DECLARATION
IFB: [insert: title and number of IFB]
To: [insert: name and address of Purchaser]
We, the undersigned, declare that:
We understand that, according to your conditions, bids must be supported by a Bid-Securing
Declaration.
We accept that we, and in the case of a Joint Venture all partners to it, will automatically be
suspended from being eligible for participating in bidding for any contract with you for the
period of time of [Purchaser insert: number of months or years], in case of, and starting
from the date of, breaching our obligation(s) under the bidding conditions due to:
(a)
withdrawing our bid, or any part of our bid, during the period of bid validity specified
in the Bid Submission Form or any extension of the period of bid validity which we
subsequently agreed to; or
(b)
having been notified of the acceptance of our bid by you during the period of bid
validity, (i) failing or refusing to execute the Contract Agreement, or (ii) failing or
refusing to furnish the performance security, if required, in accordance with the
Instructions to Bidders.
We understand this Bid-Securing Declaration shall expire if we are not the successful Bidder,
upon the earlier of (i) our receipt of your notification to us of the name of the successful
Bidder; or (ii) twenty-eight days after the expiration of the period of bid validity.
If the submission of alternative bids was permitted, and in case we did submit one or more
alternative bids, this Bid-Securing Declaration applies to these parts of our bid as well.
Signed: [insert: signature of person whose name and capacity are shown below]
Name: [insert: name of person signing the Bid-Securing Declaration], in the capacity of
[insert: legal capacity of person signing the Bid-Securing Declaration]
Duly authorized to sign the bid for and on behalf of: [insert: name of Bidder]
Dated on ____________ day of __________________, 20__
[add Corporate Seal (where appropriate)]
[Note to Bidders: Joint Ventures need to ensure that, their Bid-Securing Declaration meets the requirements for
Joint Ventures as stated in the ITB Clause on "Securing the Bid".]
420
Section VII. Sample Forms
4A. BID SECURITY (BANK GUARANTEE)
________________________________
[insert: Bank’s Name, and Address of Issuing Branch or Office]
Beneficiary: [insert: Name and Address of Purchaser]
Date: [insert: date]
BID GUARANTEE No.: [insert: Bid Guarantee Number]
We have been informed that [insert: name of the Bidder] (hereinafter called "the Bidder")
has submitted to you its bid dated [insert: bid date] (hereinafter called "the Bid") for the
execution of [insert: name of contract] under Invitation for Bids No. [insert: IFB number].
Furthermore, we understand that, according to your conditions, bids must be supported by a
bid guarantee, and that the bid guarantee automatically covers any alternative bids included in
the Bid, if the Bidder is permitted to offer alternatives and does so.
At the request of the Bidder, we [insert: name of Bank] hereby irrevocably undertake to pay
you any sum or sums not exceeding in total an amount of [insert: amount in figures]
([insert: amount in words]) upon receipt by us of your first demand in writing accompanied
by a written statement stating that the Bidder is in breach of its obligation(s) under the bid
conditions, because the Bidder:
(a)
has withdrawn the Bid (or any parts of it) during the period of bid validity specified
by the Bidder in the Bid Submission Form or any extension of the period of bid
validity which the Bidder subsequently agreed to; or
(b)
having been notified of the acceptance of the Bid by you during the period of bid
validity, (i) failed or refused to execute the Contract Agreement, or (ii) failed or
refused to furnish the performance security, if required, in accordance with the
Instructions to Bidders.
This guarantee will expire: (a) if the Bidder is the successful bidder, upon our receipt of
copies of the contract signed by the Bidder and the performance security issued to you upon
the instruction of the Bidder; or (b) if the Bidder is not the successful bidder, upon the earlier
of (i) our receipt of a copy of your notification to the Bidder of the name of the successful
bidder; or (ii) twenty-eight days after the expiration of the Bid's validity.
Consequently, any demand for payment under this guarantee must be received by us at the
office on or before that date.
This guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No.
458.
_____________________________
[Signature(s)]
[Note to Bidders: Instructions on amount and currency can be found in the ITB Clause and BDS for "Securing
the Bid." Joint Ventures need to also ensure that their Bank Guarantee meets the requirements for Joint
Ventures as provided in the same Clause.]
Section VII. Sample Forms
421
4B. BID SECURITY (BID BOND)
BOND NO.: ______________________
BY THIS BOND, [insert: name of Bidder] as Principal (hereinafter called “the Principal”),
and [insert: name, legal title, and address of surety], authorized to transact business in
[insert: name of Purchaser's country], as Surety (hereinafter called “the Surety”), are held
and firmly bound unto [insert name of Purchaser] as Obligee (hereinafter called “the
Purchaser”) in the sum of [insert amount of Bond in currency, figures and words], for the
payment of which sum, well and truly to be made, we, the said Principal and Surety, bind
ourselves, our successors and assigns, jointly and severally, firmly by these presents.
WHEREAS the Principal has submitted a written bid to the Purchaser dated the ___ day of
______, 20__, for the execution of [insert: name of contract] (hereinafter called "the Bid”).
If the Principal was permitted by the bidding conditions to submit alternative bid(s) and did
so, then these are deemed part of the Bid and thus covered by this Bond.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if the
Principal:
(a)
withdraws the Bid (or any parts of it) during the period of the Bid's validity specified
in the Bid Submission Form, or any extension of the period of the Bid's validity the
Principal subsequently agreed to, notice of which to the Surety is hereby waived; or
(b)
having been notified of the acceptance of the Bid by the Purchaser during the period
of the Bid's validity, (i) fails or refuses to execute the Contract Agreement, or (ii) fails
or refuses to furnish the performance security, if required, in accordance with the
Instructions to Bidders;
then the Surety undertakes to immediately pay to the Purchaser up to the above amount upon
receipt of the Purchaser's first written demand, without the Purchaser having to substantiate
its demand, provided that in its demand the Purchaser shall state that the demand arises from
the occurrence of any of the above events, specifying which event(s) has/have occurred.
The Surety hereby agrees that its obligation will remain in full force and effect up to and
including the date 28 days after the date of expiration of the Bid's validity.
IN TESTIMONY WHEREOF, the Principal and the Surety have caused these presents to be
executed in their respective names this ____ day of ____________ 20__.
Principal: _______________________
Surety: ______________________________
[add Corporate Seal(s) (where appropriate)]
_______________________________
____________________________________
[Signature]
[Signature]
_______________________________
____________________________________
[state: printed name and title]
[state: printed name and title]
[Note to Bidders: Instructions on amount and currency can be found in the ITB Clause and BDS for "Securing
the Bid." Joint Ventures need to also ensure that their Bid Bond meets the requirements for Joint Ventures as
provided in the same Clause.]
422
Section VII. Sample Forms
5. CONTRACT AGREEMENT
THIS CONTRACT AGREEMENT is made
the [ insert: ordinal ] day of [ insert: month ], [ insert: year ].
BETWEEN
(1)
[ insert: Name of Purchaser ], a [ insert: description of type of legal entity,
for example, an agency of the Ministry of . . . ] of the Government of
[ insert: country of Purchaser ], or corporation incorporated under the laws
of [ insert: country of Purchaser ] and having its principal place of business
at [ insert: address of Purchaser ] (hereinafter called “the Purchaser”), and
(2)
[ insert: name of Supplier], a corporation incorporated under the laws of
[ insert: country of Supplier] and having its principal place of business at
[ insert: address of Supplier ] (hereinafter called “the Supplier”).
WHEREAS the Purchaser desires to engage the Supplier to supply, install, achieve
Operational Acceptance of, and support the following Information System [ insert: brief
description of the Information System ] (“the System”), and the Supplier has agreed to such
engagement upon and subject to the terms and conditions appearing below in this Contract
Agreement.
NOW IT IS HEREBY AGREED as follows:
Article 1.
Contract
Documents
1.1
Contract Documents (Reference GCC Clause 1.1 (a) (ii))
The following documents shall constitute the Contract between
the Purchaser and the Supplier, and each shall be read and
construed as an integral part of the Contract:
(a)
This Contract Agreement and the Appendices attached to
the Contract Agreement
(b)
Special Conditions of Contract
(c)
General Conditions of Contract
(d)
Technical Requirements (including Implementation
Schedule)
(e)
The Supplier’s bid and original Price Schedules
(f)
[ Add here: any other documents ]
Section VII. Sample Forms
1.2
423
Order of Precedence (Reference GCC Clause 2)
In the event of any ambiguity or conflict between the Contract
Documents listed above, the order of precedence shall be the
order in which the Contract Documents are listed in Article 1.1
(Contract Documents) above, provided that Appendix 7 shall
prevail over all provisions of the Contract Agreement and the
other Appendices attached to the Contract Agreement and all the
other Contract Documents listed in Article 1.1 above.
1.3
Definitions (Reference GCC Clause 1)
Capitalized words and phrases used in this Contract Agreement
shall have the same meanings as are ascribed to them in the
General Conditions of Contract.
Article 2.
2.1
Contract Price
and Terms of
Payment
Contract Price (Reference GCC Clause 1.1(a)(viii) and GCC
Clause 11)
The Purchaser hereby agrees to pay to the Supplier the Contract
Price in consideration of the performance by the Supplier of its
obligations under the Contract. The Contract Price shall be the
aggregate of: [ insert: amount of foreign currency A in
words ], [insert: amount in figures ], plus [ insert: amount of
foreign currency B in words ], [insert: amount in figures ],
plus [ insert: amount of foreign currency C in words ], [insert:
amount in figures ], [ insert: amount of local currency in
words ], [ insert: amount in figures ], as specified in the Grand
Summary Price Schedule.
The Contract Price shall be understood to reflect the terms and
conditions used in the specification of prices in the detailed price
schedules, including the terms and conditions of the associated
Incoterms, and the taxes, duties and related levies if and as
identified.
Article 3.
Effective Date
for
Determining
Time for
Operational
Acceptance
3.1
Effective Date (Reference GCC Clause 1.1 (e) (ix))
The time allowed for supply, installation, and achieving
Operational Acceptance of the System shall be determined from
the date when all of the following conditions have been fulfilled:
(a)
This Contract Agreement has been duly executed for and
on behalf of the Purchaser and the Supplier;
(b)
The Supplier has submitted to the Purchaser the
performance security and the advance payment security, in
accordance with GCC Clause 13.2 and GCC Clause 13.3;
(c)
The Purchaser has paid the Supplier the advance payment,
424
Section VII. Sample Forms
in accordance with GCC Clause 12;
(d)
[ specify here: any other conditions, for example,
opening/confirmation of letter of credit ].
Each party shall use its best efforts to fulfill the above conditions
for which it is responsible as soon as practicable.
Article 4.
3.2
If the conditions listed under 3.1 are not fulfilled within two (2)
months from the date of this Contract Agreement because of
reasons not attributable to the Supplier, the parties shall discuss
and agree on an equitable adjustment to the Contract Price and
the Time for Achieving Operational Acceptance and/or other
relevant conditions of the Contract.
4.1
The Appendixes listed below shall be deemed to form an integral
part of this Contract Agreement.
4.2
Reference in the Contract to any Appendix shall mean the
Appendixes listed below and attached to this Contract
Agreement, and the Contract shall be read and construed
accordingly.
Appendixes
APPENDIXES
Appendix 1.
Appendix 2.
Appendix 3.
Appendix 4.
Appendix 5.
Appendix 6.
Appendix 7.
Supplier’s Representative
Adjudicator [if there is no Adjudicator, state “not applicable”]
List of Approved Subcontractors
Categories of Software
Custom Materials
Revised Price Schedules (if any)
Minutes of Contract Finalization Discussions and Agreed-to Contract
Amendments
Section VII. Sample Forms
425
IN WITNESS WHEREOF the Purchaser and the Supplier have caused this Agreement to be
duly executed by their duly authorized representatives the day and year first above written.
For and on behalf of the Purchaser
Signed:
in the capacity of [ insert: title or other appropriate designation ]
in the presence of
For and on behalf of the Supplier
Signed:
in the capacity of [ insert: title or other appropriate designation ]
in the presence of
CONTRACT AGREEMENT
dated the [ insert: number ] day of [ insert: month ], [ insert: year ]
BETWEEN
[ insert: name of Purchaser ], “the Purchaser”
and
[ insert: name of Supplier ], “the Supplier”
426
Section VII. Sample Forms
Appendix 1. Supplier’s Representative
In accordance with GCC Clause 1.1 (b) (iv), the Supplier’s Representative is:
Name:
[ insert: name and provide title and address further below, or state “to be
nominated within fourteen (14) days of the Effective Date” ]
Title:
[ if appropriate, insert: title ]
In accordance with GCC Clause 4.3, the Supplier's addresses for notices under the Contract
are:
Address of the Supplier's Representative: [ as appropriate, insert: personal delivery,
postal, cable, telegraph, telex, facsimile, electronic mail, and/or EDI addresses. ]
Fallback address of the Supplier: [ as appropriate, insert: personal delivery, postal,
cable, telegraph, telex, facsimile, electronic mail, and/or EDI addresses. ]
Section VII. Sample Forms
427
Appendix 2. Adjudicator
In accordance with GCC Clause 1.1 (b) (vi), the agreed-upon Adjudicator is:
Name: [ insert: name ]
Title: [ insert: title ]
Address: [ insert: postal address ]
Telephone: [ insert: telephone ]
In accordance with GCC Clause 6.1.3, the agreed-upon fees and reimbursable expenses are:
Hourly Fees: [ insert: hourly fees ]
Reimbursable Expenses: [ list: reimbursables ]
Pursuant to GCC Clause 6.1.4, if at the time of Contract signing, agreement has not been
reached between the Purchaser and the Supplier, an Adjudicator will be appointed by the
Appointing Authority named in the SCC.
428
Section VII. Sample Forms
Appendix 3. List of Approved Subcontractors
The Purchaser has approved use of the following Subcontractors nominated by the Supplier
for carrying out the item or component of the System indicated. Where more than one
Subcontractor is listed, the Supplier is free to choose between them, but it must notify the
Purchaser of its choice sufficiently in advance of the time when the subcontracted work needs
to commence to give the Purchaser reasonable time for review. In accordance with GCC
Clause 20.1, the Supplier is free to submit proposals for Subcontractors for additional items
from time to time. No subcontracts shall be placed with any such Subcontractors for
additional items until the Subcontractors have been approved in writing by the Purchaser and
their names have been added to this list of Approved Subcontractors, subject to GCC
Clause 20.3.
[ specify: item, approved Subcontractors, and their place of registration that the Supplier
proposed in the corresponding attachment to its bid and that the Purchaser approves that
the Supplier engage during the performance of the Contract. Add additional pages as
necessary. ]
Item
Approved Subcontractors
Place of Registration
Section VII. Sample Forms
429
Appendix 4. Categories of Software
The following table assigns each item of Software supplied and installed under the Contract
to one of the three categories: (i) System Software, (ii) General-Purpose Software, or
(iii) Application Software; and to one of the two categories: (i) Standard Software or
(ii) Custom Software.
(select one per item)
Software Item
System
Software
GeneralPurpose
Software
Application
Software
(select one per item)
Standard
Software
Custom
Software
430
Section VII. Sample Forms
Appendix 5. Custom Materials
The follow table specifies the Custom Materials the Supplier will provide under the Contract.
Custom Materials
Section VII. Sample Forms
431
Appendix 6. Revised Price Schedules
The attached Revised Price Schedules (if any) shall form part of this Contract Agreement
and, where differences exist, shall supersede the Price Schedules contained in the Supplier’s
Bid. These Revised Price Schedules reflect any corrections or adjustments to the Supplier’s
bid price, pursuant to the ITB Clauses 18.3, 26.2, and 33.1 (ITB Clauses 30.3, 38.2, and 45.1
in the two-stage SBD).
432
Section VII. Sample Forms
Appendix 7. Minutes of Contract Finalization Discussions and Agreed-to
Contract Amendments
The attached Contract amendments (if any) shall form part of this Contract Agreement and,
where differences exist, shall supersede the relevant clauses in the GCC, SCC, Technical
Requirements, or other parts of this Contract as defined in GCC Clause 1.1 (a) (ii).
Section VII. Sample Forms
6. PERFORMANCE AND ADVANCE PAYMENT SECURITY FORMS
433
434
Section VII. Sample Forms
6.1
Performance Security Form (Bank Guarantee)
________________________________
[insert: Bank’s Name, and Address of Issuing Branch or Office]
Beneficiary: [insert: Name and Address of Purchaser]
Date: [insert: date]
PERFORMANCE GUARANTEE No.: [insert: Performance Guarantee Number]
We have been informed that on [insert: date of award] you awarded Contract No. [insert:
Contract number] for [insert: title and/or brief description of the Contract] (hereinafter
called "the Contract") to [insert: complete name of Supplier] (hereinafter called "the
Supplier"). Furthermore, we understand that, according to the conditions of the Contract, a
performance guarantee is required.
At the request of the Supplier, we hereby irrevocably undertake to pay you any sum(s) not
exceeding [insert: amount(s)1 in figures and words] upon receipt by us of your first demand
in writing declaring the Supplier to be in default under the Contract, without cavil or
argument, or your needing to prove or to show grounds or reasons for your demand or the
sum specified therein.
On the date of your issuing, to the Supplier, the Operational Acceptance Certificate for the
System, the value of this guarantee will be reduced to any sum(s) not exceeding [insert:
amount(s)1 in figures and words]. This remaining guarantee shall expire no later than
[insert: number and select: of months/of years (of the Warranty Period that needs to be
covered by the remaining guarantee)] from the date of the Operational Acceptance
Certificate for the System,2 and any demand for payment under it must be received by us at
this office on or before that date.
This guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No.
458, except that subparagraph (ii) of Sub-article 20 (a) is hereby excluded.
_______________________
[Signature(s)]
1
The bank shall insert the amount(s) specified and denominated in the SCC for GCC Clauses
13.3.1 and 13.3.4 respectively, either in the currency(ies) of the Contract or a freely convertible
currency acceptable to the Purchaser.
2
In this sample form, the formulation of this paragraph reflects the usual SCC provisions for GCC
Clause 13.3. However, if the SCC for GCC Clauses 13.3.1 and 13.3.4 varies from the usual
provisions, the paragraph, and possibly the previous paragraph, need to be adjusted to precisely
reflect the provisions specified in the SCC.
Section VII. Sample Forms
6.2
435
Advance Payment Security Form (Bank Guarantee)
(Not Used)
[insert: Bank’s Name, and Address of Issuing Branch or Office]
Beneficiary: [insert: Name and Address of Purchaser]
Date: [insert: date]
ADVANCE PAYMENT GUARANTEE No.:
Number]
[insert: Advance Payment Guarantee
We have been informed that on [insert: date of award] you awarded Contract No. [insert:
Contract number] for [insert: title and/or brief description of the Contract] (hereinafter
called "the Contract") to [insert: complete name of Supplier] (hereinafter called "the
Supplier"). Furthermore, we understand that, according to the conditions of the Contract, an
advance payment in the sum of [insert: amount in numbers and words, for each currency of
the advance payment] is to be made to the Supplier against an advance payment guarantee.
At the request of the Supplier, we hereby irrevocably undertake to pay you any sum or sums
not exceeding in total the amount of the advance payment referred to above, upon receipt by
us of your first demand in writing declaring that the Supplier is in breach of its obligations
under the Contract because the Supplier used the advance payment for purposes other than
toward the proper execution of the Contract.
It is a condition for any claim and payment to be made under this guarantee that the advance
payment referred to above must have been received by the Supplier on its account [insert:
number and domicile of the account].
For each payment after the advance payment, which you will make to the Supplier under this
Contract, the maximum amount of this guarantee shall be reduced by the ninth part of such
payment.1 At the time at which the amount guaranteed becomes nil, this guarantee shall
become null and void, whether the original is returned to us or not.
This guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No.
458.
______________________
[Signature(s)]
1
This sample formulation assumes an Advance Payment of 10% of the Contract Price excluding
Recurrent Costs, and implementation of the main option proposed by this SBD in the SCC for
GCC Clause 13.2.2 for gradually reducing the value of the Advance Payment Security. If the
Advance Payment is other than 10%, or if the reduction in amount of the security follows a
different approach, this paragraph would need to be adjusted and edited accordingly.
436
Section VII. Sample Forms
7. INSTALLATION AND ACCEPTANCE CERTIFICATES
Section VII. Sample Forms
437
7.1
Installation Certificate
Date: [ insert: date ]
Loan/Credit Number: [ insert: loan or credit number from IFB ]
IFB: [ insert: title and number of IFB ]
Contract: [ insert: name and number of Contract ]
To: [ insert: name and address of Supplier ]
Dear Sir or Madam:
Pursuant to GCC Clause 26 (Installation of the System) of the Contract entered into
between yourselves and the [ insert: name of Purchaser ] (hereinafter the “Purchaser”)
dated [ insert: date of Contract ], relating to the [ insert: brief description of the
Information System ], we hereby notify you that the System (or a Subsystem or major
component thereof) was deemed to have been correctly installed on the date specified below.
1.
Description of the System (or relevant Subsystem or major component: [ insert:
description ]
2.
Date of Installation: [ insert: date ]
Notwithstanding the above, you are required to complete the outstanding items listed
in the attachment to this certificate as soon as practicable. This letter shall not relieve you of
your obligation to achieve Operational Acceptance of the System in accordance with the
Contract nor of your obligations during the Warranty Period.
For and on behalf of the Purchaser
Signed:
Date:
in the capacity of: [ state: “Project Manager” or state the title of a higher level authority
in the Purchaser’s organization ]
438
Section VII. Sample Forms
7.2
Operational Acceptance Certificate
Date: [ insert: date ]
Loan/Credit Number: [ insert: loan or credit number from IFB ]
IFB: [ insert: title and number of IFB ]
Contract: [ insert: name of System or Subsystem and
number of Contract ]
To: [ insert: name and address of Supplier ]
Dear Sir or Madam:
Pursuant to GCC Clause 27 (Commissioning and Operational Acceptance) of the
Contract entered into between yourselves and the [ insert: name of Purchaser ] (hereinafter
the “Purchaser”) dated [ insert: date of Contract ], relating to the [ insert: brief description
of the Information System ], we hereby notify you the System (or the Subsystem or major
component identified below) successfully completed the Operational Acceptance Tests
specified in the Contract. In accordance with the terms of the Contract, the Purchaser hereby
takes over the System (or the Subsystem or major component identified below), together with
the responsibility for care and custody and the risk of loss thereof on the date mentioned
below.
1.
Description of the System (or Subsystem or major component):
description ]
2.
[ insert:
Date of Operational Acceptance: [ insert: date ]
This letter shall not relieve you of your remaining performance obligations under the
Contract nor of your obligations during the Warranty Period.
For and on behalf of the Purchaser
Signed:
Date:
in the capacity of: [ state: “Project Manager” or higher level authority in the Purchaser’s
organization ]
Section VII. Sample Forms
439
8. CHANGE ORDER PROCEDURES AND FORMS
Date: [ insert: date ]
Loan/Credit Number: [ insert: loan or credit number from IFB ]
IFB: [ insert: title and number of IFB ]
Contract: [ insert: name or System or Subsystem and
number of Contract ]
General
This section provides samples of procedures and forms for carrying out changes to the
System during the performance of the Contract in accordance with GCC Clause 39
(Changes to the System) of the Contract.
Change Order Log
The Supplier shall keep an up-to-date Change Order Log to show the current status of
Requests for Change and Change Orders authorized or pending. Changes shall be
entered regularly in the Change Order Log to ensure that the log is kept up-to-date. The
Supplier shall attach a copy of the current Change Order Log in the monthly progress
report to be submitted to the Purchaser.
References to Changes
(1)
(2)
(3)
(4)
(5)
Request for Change Proposals (including Application for Change Proposals) shall
be serially numbered CR-nnn.
Change Estimate Proposals shall be numbered CN-nnn.
Estimate Acceptances shall be numbered CA-nnn.
Change Proposals shall be numbered CP-nnn.
Change Orders shall be numbered CO-nnn.
On all forms, the numbering shall be determined by the original CR-nnn.
Annexes
8.1
8.2
8.3
8.4
8.5
8.6
Request for Change Proposal Form
Change Estimate Proposal Form
Estimate Acceptance Form
Change Proposal Form
Change Order Form
Application for Change Proposal Form
440
Section VII. Sample Forms
8.1
Request for Change Proposal Form
(Purchaser’s Letterhead)
Date: [ insert: date ]
Loan/Credit Number: [ insert: loan or credit number from IFB ]
IFB: [ insert: title and number of IFB ]
Contract: [ insert: name of System or Subsystem or number
of Contract ]
To: [ insert: name of Supplier and address ]
Attention: [ insert: name and title ]
Dear Sir or Madam:
With reference to the above-referenced Contract, you are requested to prepare and
submit a Change Proposal for the Change noted below in accordance with the following
instructions within [ insert: number ] days of the date of this letter.
1.
Title of Change: [ insert: title ]
2.
Request for Change No./Rev.: [ insert: number ]
3.
Originator of Change: [ select Purchaser / Supplier (by Application for Change
Proposal), and add: name of originator ]
4.
Brief Description of Change: [ insert: description ]
5.
System (or Subsystem or major component affected by requested Change): [ insert:
description ]
6.
Technical documents and/or drawings for the request of Change:
Section VII. Sample Forms
Document or Drawing No.
441
Description
7.
Detailed conditions or special requirements of the requested Change:
description ]
8.
Procedures to be followed:
9.
[ insert:
(a)
Your Change Proposal will have to show what effect the requested Change will
have on the Contract Price.
(b)
Your Change Proposal shall explain the time it will take to complete the requested
Change and the impact, if any, it will have on the date when Operational
Acceptance of the entire System agreed in the Contract.
(c)
If you believe implementation of the requested Change will have a negative
impact on the quality, operability, or integrity of the System, please provide a
detailed explanation, including other approaches that might achieve the same
impact as the requested Change.
(d)
You should also indicate what impact the Change will have on the number and
mix of staff needed by the Supplier to perform the Contract.
(e)
You shall not proceed with the execution of work related to the requested Change
until we have accepted and confirmed the impact it will have on the Contract
Price and the Implementation Schedule in writing.
As next step, please respond using the Change Estimate Proposal form, indicating how
much it will cost you to prepare a concrete Change Proposal that will describe the
proposed approach for implementing the Change, all its elements, and will also address
the points in paragraph 8 above pursuant to GCC Clause 39.2.1. Your Change Estimate
Proposal should contain a first approximation of the proposed approach, and
implications for schedule and cost, of the Change.
For and on behalf of the Purchaser
Signed:
Date:
in the capacity of: [ state: “Project Manager” or higher level authority in the Purchaser’s
organization ]
442
Section VII. Sample Forms
8.2
Change Estimate Proposal Form
(Supplier’s Letterhead)
Date: [ insert: date ]
Loan/Credit Number: [ insert: loan or credit number from IFB ]
IFB: [ insert: title and number of IFB ]
Contract: [ insert: name of System or Subsystem and
number of Contract ]
To: [ insert: name of Purchaser and address ]
Attention: [ insert: name and title ]
Dear Sir or Madam:
With reference to your Request for Change Proposal, we are pleased to notify you of
the approximate cost of preparing the below-referenced Change in accordance with GCC
Clause 39.2.1 of the Contract. We acknowledge that your agreement to the cost of preparing
the Change Proposal, in accordance with GCC Clause 39.2.2, is required before we proceed
to prepare the actual Change Proposal including a detailed estimate of the cost of
implementing the Change itself.
1.
Title of Change: [ insert: title ]
2.
Request for Change No./Rev.: [ insert: number ]
3.
Brief Description of Change (including proposed implementation approach): [ insert:
description ]
4.
Schedule Impact of Change (initial estimate): [ insert: description ]
5.
Initial Cost Estimate for Implementing the Change: [insert: initial cost estimate]
Section VII. Sample Forms
6.
443
Cost for Preparation of Change Proposal: [ insert: cost in the currencies of the
Contract ], as detailed below in the breakdown of prices, rates, and quantities.
For and on behalf of the Supplier
Signed:
Date:
in the capacity of: [ state: “Supplier’s Representative” or other higher level authority in
the Supplier’s organization ]
444
Section VII. Sample Forms
8.3
Estimate Acceptance Form
(Purchaser’s Letterhead)
Date: [ insert: date ]
Loan/Credit Number: [ insert: loan or credit number from IFB ]
IFB: [ insert: title and number of IFB ]
Contract: [ insert: name of System or Subsystem and
number of Contract ]
To: [ insert: name of Supplier and address ]
Attention: [ insert: name and title ]
Dear Sir or Madam:
We hereby accept your Change Estimate and agree that you should proceed with the
preparation of a formal Change Proposal.
1.
Title of Change: [ insert: title ]
2.
Request for Change No./Rev.: [ insert: request number / revision ]
3.
Change Estimate Proposal No./Rev.: [ insert: proposal number / revision ]
4.
Estimate Acceptance No./Rev.: [ insert: estimate number / revision ]
5.
Brief Description of Change: [ insert: description ]
6.
Other Terms and Conditions:
In the event that we decide not to order the Change referenced above, you shall be
entitled to compensation for the cost of preparing the Change Proposal up to the amount
Section VII. Sample Forms
445
estimated for this purpose in the Change Estimate Proposal, in accordance with GCC
Clause 39 of the General Conditions of Contract.
For and on behalf of the Purchaser
Signed:
Date:
in the capacity of: [ state: “Project Manager” or higher level authority in the Purchaser’s
organization ]
446
Section VII. Sample Forms
8.4
Change Proposal Form
(Supplier’s Letterhead)
Date: [ insert: date ]
Loan/Credit Number: [ insert: loan or credit number from IFB ]
IFB: [ insert: title and number of IFB ]
Contract: [ insert: name of System or Subsystem and
number of Contract ]
To: [ insert: name of Purchaser and address ]
Attention: [ insert: name and title ]
Dear Sir or Madam:
In response to your Request for Change Proposal No. [ insert: number ], we hereby
submit our proposal as follows:
1.
Title of Change: [ insert: name ]
2.
Change Proposal No./Rev.: [ insert: proposal number/revision ]
3.
Originator of Change: [ select: Purchaser / Supplier; and add: name]
4.
Brief Description of Change: [ insert: description ]
5.
Reasons for Change: [ insert: reason ]
6.
The System Subsystem, major component, or equipment that will be affected by the
requested Change: [ insert: description ]
7.
Technical documents and/or drawings for the requested Change:
Section VII. Sample Forms
Document or Drawing No.
8.
447
Description
Estimate of the increase/decrease to the Contract Price resulting from the proposed
Change: [ insert: amount in currencies of Contract ], as detailed below in the
breakdown of prices, rates, and quantities.
Total lump sum cost of the Change:
Cost to prepare this Change Proposal (i.e., the amount payable if the Change is not
accepted, limited as provided by GCC Clause 39.2.6):
9.
Additional Time for Achieving Operational Acceptance required due to the Change:
[ insert: amount in days / weeks ]
10.
Effect on the Functional Guarantees: [ insert: description ]
11.
Effect on the other terms and conditions of the Contract: [ insert: description ]
12.
Validity of this Proposal: for a period of [ insert: number ] days after receipt of this
Proposal by the Purchaser
13.
Procedures to be followed:
(a)
You are requested to notify us of your acceptance, comments, or rejection of this
detailed Change Proposal within [ insert: number ] days from your receipt of this
Proposal.
(b)
The amount of any increase and/or decrease shall be taken into account in the
adjustment of the Contract Price.
For and on behalf of the Supplier
Signed:
Date:
in the capacity of: [ state: “Supplier’s Representative” or other higher level authority in
the Supplier’s organization ]
448
Section VII. Sample Forms
8.5
Change Order Form
(Purchaser’s Letterhead)
Date: [ insert: date ]
Loan/Credit Number: [ insert: loan or credit number from IFB ]
IFB: [ insert: title and number of IFB ]
Contract: [ insert: name of System or Subsystem and
number of Contract ]
To: [ insert: name of Supplier and address ]
Attention: [ insert: name and title ]
Dear Sir or Madam:
We hereby approve the Change Order for the work specified in Change Proposal No.
[ insert: number ], and agree to adjust the Contract Price, Time for Completion, and/or other
conditions of the Contract in accordance with GCC Clause 39 of the Contract.
1.
Title of Change: [ insert: name ]
2.
Request for Change No./Rev.: [ insert: request number / revision ]
3.
Change Order No./Rev.: [ insert: order number / revision ]
4.
Originator of Change: [ select: Purchaser / Supplier; and add: name ]
5.
Authorized Price for the Change:
Ref. No.: [ insert: number ]
Date: [ insert: date ]
Section VII. Sample Forms
449
[ insert: amount in foreign currency A ] plus [ insert: amount in foreign currency
B ] plus [ insert: amount in foreign currency C ] plus [ insert: amount in local
currency ]
6.
Adjustment of Time for Achieving Operational Acceptance: [ insert: amount and
description of adjustment ]
7.
Other effects, if any: [ state: “none” or insert description ]
For and on behalf of the Purchaser
Signed:
Date:
in the capacity of: [ state: “Project Manager” or higher level authority in the Purchaser’s
organization ]
For and on behalf of the Supplier
Signed:
Date:
in the capacity of: [ state “Supplier’s Representative” or higher level authority in the
Supplier’s organization ]
450
Section VII. Sample Forms
8.6
Application for Change Proposal Form
(Supplier’s Letterhead)
Date: [ insert: date ]
Loan/Credit Number: [ insert: loan or credit number from IFB ]
IFB: [ insert: title and number of IFB ]
Contract: [ insert: name of System or Subsystem and
number of Contract ]
To: [ insert: name of Purchaser and address ]
Attention: [ insert: name and title ]
Dear Sir or Madam:
We hereby propose that the below-mentioned work be treated as a Change to the
System.
1.
Title of Change: [ insert: name ]
2.
Application for Change Proposal No./Rev.:
[ insert: date ]
3.
Brief Description of Change: [ insert: description ]
4.
Reasons for Change: [ insert: description ]
5.
Order of Magnitude Estimation: [ insert: amount in currencies of the Contract ]
6.
Schedule Impact of Change: [ insert: description ]
7.
Effect on Functional Guarantees, if any: [ insert: description ]
[ insert:
number / revision] dated:
Section VII. Sample Forms
8.
451
Appendix: [ insert: titles (if any); otherwise state “none” ]
For and on behalf of the Supplier
Signed:
Date:
in the capacity of: [ state: “Supplier’s Representative” or higher level authority in the
Supplier’s organization ]