NOTES: 1. ALL DIMENSIONS ARE IN MM UNLESS STATED OTHERWISE. 2. PROGRAM, METHOD OF CONSTRUCTION AND SETTING OUT OF THE WORKS SHALL BE APPROVED BY THE ENGINEER BEFORE COMMENCEMENT OF WORK. 4. CONCRETE CLASS 35/20 FOR WATER RETAINING ELEMENTS CLASS 25/20 FOR OTHER STRUCTURAL ELEMENTS AND CLASS 15/40 FOR BLINDING. A B C 5. REINFORCEMENT: HIGH YIELD SQUARE TWISTED BARS TO BS 4461. BENDING DIMENSIONS TO BS 4466. 8360 2830 620 6660 600 110 250 6. ALL REINFORCEMENT LAPS TO BE STAGGERED. 7. MINIMUM COVER TO ALL REIN. TO BE 40mm UNLESS OTHERWISE SPECIFIED 1 8. BELOW EACH SLAB PROVIDE: -POLYTHENE SHEET -50mm BLINDING -200mm HARDCORE 1230 1 5300 230 110 230 9. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL SPACER BLOCKS, CHAIRS AND TYING WIRE 3060 2600 600 10. STRUCTURAL DRAWINGS ARE NOT TO BE SCALED. 11. ALL WALL-SLAB CONNECTIONS SHOULD HAVE A 75mm KICKER. 900X600mm ACCESS CENTRAL TO INLET & OUTLET PIPES. 12. SPECIAL ATTENTION SHOULD BE GIVEN TO THE CONCRETE SPECIFICATION FOR CONCRETING PROCEDURES AND METHODS. 1230 13. SITE LOCATION AND LEVELS TO BE APPROVED BY ENGINEER BEFORE CONSTRUCTION 230 2 14. CHECK ALL DIMENSIONS AND ELEVATIONS ON SITE. 2 A B C ROOF SLAB LAYOUT SCALE 1:50 A B 6Y10-04-200 TT C 14Y10-05a-200 B E 14Y10-03a-200 BB 8Y10-06a-200 T 16Y10-03b-200 B D 4Y10-05b-200 B 16Y10-09-200 TT 8Y10-06-200 T 1 1 12Y10-01-200 BB 2Y10-13-200 T C 4Y10-08 T&B C 4Y10-08 T&B 8Y10-12-200 T B 2Y10-14-200 T B C Increased manhole size July B Tank size reduction and provision for future tank June A Addition of inlet screens DESCRIPTION REV April DATE REPUBLIC OF SOUTH SUDAN 4Y10-08 T&B 4Y10-08 T&B 34Y10-02a-200 BB 12Y10-01-200 BB 2Y10-13-200 T 34Y10-02b-200 BB 2 2 MINISTRY OF WATER RESOURCES AND IRRIGATION PROJECT : D WATER AND SANITATION PROJECT YEI, SOUTH SUDAN E DRAWING TITLE: A B C SLAUGHTER HOUSE SEPTIC TANK ROOF SLAB DETAILS ROOF SLAB REINFORCEMENT H.P. Gauff Ingenieure GmbH & Co. KG-JBGConsulting Engineers P.O BOX 49817,NAIROBI,KENYA. TEL No.: +254-02-4445288 FAX No.: +254-02-4446124 SCALE 1:50 DESIGNED BY: DRAWN BY : N.M CHECKED BY: N.M DATE: S.M SCALE: A3 MAY 2012 SHEET No. As Shown DRG No. YEI/SAN/ST/1.2 1 OF 1 REV. C