8c 10c 12c 114c 16c 218c 19c 3 20c 5 4 21c 7 22c 8 23c 24c 10 11 9 6 Ac Bc Cc A Dc B C Ec 1 S06.01 D 1 S02.02 1 S02.03 SKA F CONSULTING ENGINEERS, INC. 300 Pomona Drive Greensboro, NC 27407 P: 336.855.0993 F: 336.855.6066 G www.skaeng.com NC License No. F-0508 SKA Project Number: Plotted: J K M N R A BD CD 1 S02.04 B C KEYPLAN Project: WAKE COUNTY BEAVERDAM ELEMENTARY SCHOOL (E-36) 3591 TARHEEL CLUB ROAD RALEIGH, NC Sheet Title: OVERALL FOUNDATION PLAN 1 S02.01 1c 2c 3c 4c 5c 6c 7c 9c 11c 13c 15c 17c 6 OVERALL FOUNDATION PLAN 1/16" = 1'-0" Issue Date: FEBRUARY 25, 2015 SLAB ON GRADE NOTES FOUNDATION PLAN NOTES 1. 1. 2. THE TOP OF THE INTERIOR CONCRETE SLAB ON GRADE SHALL BE AT ELEVATION INDICATED ON THE SITE PLAN, UNLESS OTHERWISE NOTED ON THE PLAN. THE FOLLOWING SYMBOLS ARE USED ON THE FOUNDATION PLAN TO NOTE ELEVATIONS ABOVE OR BELOW THE SPECIFIED ELEVATION FOR THE INTERIOR CONCRETE SLAB-ON-GRADE: ( .... ) ( .... ) TOP OF FOOTING TOP OF SLAB 3. CB_ F_ 4. AREAS MARKED WITH AN DENOTE DEPRESSIONS OF THE CONCRETE SLAB BELOW THE FINISHED FLOOR ELEVATION. PRIOR TO CONSTRUCTION, COORDINATE THE AMOUNT OF DEPRESSION WITH THE THICKNESS OF FLOOR FINISHES SHOWN ON THE ARCHITECTURAL DRAWINGS. SEE ARCHITECTURAL DRAWINGS FOR THE PERIMETER DIMENSIONS OF DEPRESSED AREAS. 5. 6. 7. 8. COLUMN BASE PLATE DESIGNATION. SEE SCHEDULE ON SHEET S4.1. FOOTING DESIGNATION. SEE SCHEDULE ON SHEET S2.1. SEE ARCHITECTURAL AND CIVIL DRAWINGS FOR EXTERIOR CONCRETE PADS, DRIVEWAYS, AND SIDEWALKS. 9. 10. C.J. DENOTES SLAB ON GRADE CONSTRUCTION/CONTROL JOINTS. THESE JOINTS MAY BE EITHER CONSTRUCTION JOINTS OR SAWCUT CONTROL JOINTS. SEE "TYPICAL SLAB ON GRADE CONTROL JOINT DETAILS" ON SHEET S4.1. COORDINATE ALL SLAB JOINT LOCATIONS WITH JOINTS IN ARCHITECTURAL FLOOR FINISHES TO ASSURE THAT ALIGNMENT IS APPLICABLE. UNLESS OTHERWISE INDICATED, ALL WALL FOOTINGS SHALL BE 1'-0" DEEP AND PROJECT 8" BEYOND EACH FACE OF THE SUPPORTED WALL. REINFORCING FOR SUCH FOOTINGS SHALL CONSIST OF (1) #5 CONTINUOUS LONGITUDINAL BAR FOR EACH FULL OR PARTIAL FOOT OF FOOTING WIDTH AND #5 TRANSVERSE BARS AT 24" O.C. MINIMUM FOOTING SHALL BE 2'-0" WIDE WITH (3) #5 CONT. LONGITUDINAL BARS. VAPOR BARRIER STONE BASE A. 4" 6x6 - W4.0xW4.0 WELDED WIRE MESH PLACED 1" CLEAR FOR TOP OF SLAB- W.W.M. SHALL BE SUPPORTED ON APPROPRIATE CHAIRS AT SPACING SUFFICIENT TO MAINTAIN SPECIFIED ELEVATION WITHIN SLAB (APPROXIMATELY 2'-0" ON CENTER EACH WAY) 15 MIL UNDERSLAB VAPOR BARRIER THAT MEETS OF EXCEEDS ASTM E 1745 CLASS B STANDARDS 4" COMPACTED WASHED STONE 12. IF FOOTING EXCAVATIONS MUST REMAIN OPEN OVERNIGHT OR IF RAINFALL OR GROUNDWATER INTRUSION IS IMMINENT BEFORE THE PLACEMENT OF CONCRETE, A 2" THICK "MUD MAT" OF LEAN CONCRETE SHALL BE PLACED IN THE EXCAVATION AFTER OVER EXCAVATING 2" IN DEPTH. ANY SOIL WHICH IS SOFTENED DUE TO MOISTURE EXPOSURE SHALL BE UNDERCUT TO FIRM SOIL AND THE DEPTH OF THE FOOTING SHALL BE INCREASED TO REPLACE THE SOFT SOIL THAT WAS REMOVED. 13. SEE ARCHITECTURAL AND PLUMBING DRAWINGS FOR LOCATIONS OF FLOOR DRAINS AND SLOPED SLAB AREAS. SLOPE SLABS TO DRAINS. FOOTING ELEVATIONS SHOWN ON PLAN ARE FOR ESTIMATING PURPOSES AND MAY BE VARIED TO SUIT SITE UNDERGROUND UTILITY CONDITIONS AS FOLLOWS: 14. SEE ARCHITECTURAL DRAWINGS FOR LOCATION AND SIZE OF INTERIOR MASONRY WALLS. VERIFY LOCATION AND SIZE OF ALL WALLS SHOWN ON THE FOUNDATION PLANS WITH THE ARCHITECTURAL DRAWINGS AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO CONSTRUCTION. MASONRY WALL PROJECTIONS, CHASES, PIERS, AND SIMILAR DETAIL ITEMS MAY NOT BE SHOWN; SEE ARCHITECTURAL DRAWINGS FOR DETAILED INFORMATION ON MASONRY CONSTRUCTION. A. B. SLAB REINFORCING THIS AREA SHALL CONSIST OF #4 BARS AT 12" O/C EACH WAY. SEE NOTES AND OTHER DETAILS FOR ADDITIONAL REQUIREMENTS. C. THE TOP OF ALL EXTERIOR FOOTINGS ARE TO BE A MINIMUM OF 1'-4" BELOW THE FINISHES GRADE, AND BELOW FROST LINE; COORDINATE WITH SITE PLAN. IN NO CASE SHALL TOP OF FOOTING ELEVATIONS BE HIGHER THAN INDICATED ON PLAN. PRIOR TO CONSTRUCTION, NOTIFY THE ENGINEER OF ALL FOOTING ELEVATIONS THAT VARY FROM THOSE SHOWN ON THE PLAN. COORDINATE FOOTING ELEVATIONS WITH UNDERGROUND UTILITIES. UNLESS OTHERWISE SHOWN OR APPROVED BY THE DESIGNER, THE MINIMUM CLEARANCE OF UNDERGROUND PIPING AND UTILITIES WHICH CROSS BELOW WALL FOOTINGS SHALL BE 8", OTHERWISE THE FOOTING SHALL BE STEPPED DOWN SO THAT THE PIPING MAY PASS ABOVE THE FOOTING AND THROUGH THE WALL. THIS WORK SHALL BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER. ANY PIPING WHICH MUST PASS UNDERNEATH A WALL FOOTING IS TO BE INSTALLED PRIOR TO THE CONSTRUCTION OF THE FOOTING AND THE TRENCH BACKFILLED AND COMPACTED AS REQUIRED. UNLESS OTHERWISE APPROVED BY THE DESIGNER, NO PIPING SHALL PASS UNDERNEATH OR WITHIN 5 FEET OF THE EDGES OF ISOLATED SPREAD FOOTINGS. SEE "TYPICAL STEPPED FOOTING DETAIL" ON SHEET S7.1. THICKNESS: REINFORCING: ALL SPREAD FOOTINGS ARE DESIGNED TO BEAR ON RESIDUAL SOIL OR COMPACTED ENGINEERED FILL HAVING A MINIMUM BEARING CAPACITY AS LISTED UNDER "STRUCTURAL DESIGN DATA" IN THE GENERAL NOTES. SPREAD FOOTING EXCAVATIONS ARE TO BE INSPECTED BY AN INDEPENDENT TESTING LABORATORY FOR SUITABLE SOILS, BEARING PRESSURE, AND COMPACTION. COMPACTION OF SOIL UNDER FOOTINGS TO BE 100% OF THE MAXIMUM STANDARD PROCTOR DRY DENSITY. ALL CONTINUOUS AND SPREAD FOOTING REINFORCING SHALL BE SUPPORTED ON THE SPECIFIED CHAIRS ON THE SOIL AND SHALL BE SECURED AGAINST LATERAL MOVEMENT. UNLESS OTHERWISE NOTED, THE SLAB ON GRADE SHALL COMPLY WITH THE FOLLOWING: THICKNESS REINFORCING 11. UNLESS OTHERWISE NOTED, THE CONCRETE SLAB-ON-GRADE SHALL COMPLY WITH THE FOLLOWING: FOUNDATION SCHEDULE 4" 6 x 6 - W4.0xW4.0 WELDED WIRE MESH PLACED 1" CLEAR OF TOP OF SLAB. W.W.M. SHALL BE SUPPORTED ON APPROPRIATE CHAIRS AT SPACING SUFFICIENT TO MAINTAIN SPECIFIED ELEVATION WITHIN SLAB (APPROXIMATELY 2'-0" ON CENTER EACH WAY). VAPOR BARRIER: 15 MIL UNDERSLAB VAPOR BARRIER THAT MEETS OR EXCEEDS ASTM E1745 CLASS A STANDARDS. STONE BASE: 4" COMPACTED WASHED STONE 2. SEE ALL TYPICAL DETAILS SHOWING CONSTRUCTION RELATED TO SLABS-ON-GRADE INCLUDING THOSE INDICATED BELOW: "SLAB-ON-GRADE JOINTS" "SLAB-ON-GRADE REINFORCING" "DEPRESSION AT SLAB-ON-GRADE" 3. JOINTS: A. C.J. DENOTES SLAB ON GRADE CONSTRUCTION/CONTROL JOINTS. THESE JOINTS MAY BE EITHER CONSTRUCTION JOINTS OR SAWCUT CONTROL JOINTS. SEE "TYPICAL SLAB ON GRADE CONTROL JOINT DETAILS" ON SHEET S7.1. COORDINATE ALL SLAB JOINT LOCATIONS WITH JOINTS IN ARCHITECTURAL FLOOR FINISHES TO ASSURE THAT ALIGNMENT IN APPLICABLE. B. FOR AREAS THAT DO NOT SHOW SLAB ON GRADE CONTROL/CONSTRUCTION JOINTS, THE CONTRACTOR SHALL SUBMIT A JOINT LAYOUT AND SPACING FOR REVIEW BY THE ENGINEER. LAYOUT SHOULD FOLLOW ACI RECOMMENDATIONS FOR SPACING AND INSTALLATION. C. COORDINATE ALL SLAB JOINT LOCATIONS WITH JOINTS IN ARCHITECTURAL FLOOR FINISHES TO ASSURE THAT ALIGNMENT IS APPLICABLE. 4. SLAB DEPRESSIONS: DEPRESSED AREAS ARE SHOWN ON THE PLAN FOR ESTIMATING PURPOSES ONLY. LOCATIONS AND DEPTHS OF ALL SLAB DEPRESSIONS SHALL BE DETERMINED IN ACCORDANCE WITH ARCHITECTURAL DRAWINGS. 5. SLAB SLOPES: SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FLOOR DRAINS AND SLOPED SLAB AREAS. SLOPE SURFACE UNIFORMLY TO DRAIN. SLOPED SLABS WHICH POND WATER SHALL BE REPLACED. Revisions: TYPE F40 F40T F50 F60 F60T F8060T LENGTH WIDTH THICKNESS 4' - 0" 4' - 0" 5' - 0" 6' - 0" 6' - 0" 8' - 0" 4' - 0" 4' - 0" 5' - 0" 6' - 0" 6' - 0" 6' - 0" 1' - 4" 1' - 4" 1' - 4" 1' - 4" 1' - 4" 1' - 4" BOTTOM QUANTITY BOTTOM REBAR (5) (5) (6) (7) (7) #5 #5 #5 #6 #6 #6 TOP BOTTOM SPACING QUANTITY EA. WAY EA. WAY EA. WAY EA. WAY EA. WAY 12"O/C EA. WAY TOP REBAR TOP SPACING (5) #5 EA. WAY (7) #6 #6 EA. WAY 12"O/C EA. WAY COMMENTS DOI & DPI COMMENTS 03/31/2015 Project Number: 14-187 Sheet Number: S02.01 As instruments of service these drawings and the design represented are the property of Walter Robbs Callahan & Pierce Architects, PA. Reproduction or use of these drawings other than for the project intended without the written consent from the architect is prohibited. Unauthorized use will be subject to legal action.