siemens.com/preactor SIMATIC IT Preactor APS What’s new in SIMATIC IT Preactor 2015 As well as introducing a whole new product range SIMATIC IT Preactor 2015 see the introduction of new functionality available to new and existing users of both our planning and scheduling software products. SIMATIC IT APS Product Range recognise that upstream systems might be passing down orders with a full routing and BoM, order header details for expansion in Preactor AS or even a mixture of the two. This is why a new flexible model for handling order routings has been introduced that can handle any of these Improved Data Editor Preactor 2015 sees the introduction of a new interface for viewing and editing the data held within the system. The intuitive new data grid allows live addition, removal and rearranging of the displayed fields to give the user the power to visualize their data exactly as they want. Powerful new sorting, filtering and grouping features which can be applied to any of the available data enhance the usability further. Table and Field Designer Alongside the improvements to the data editor there has also been the introduction of an embedded table and field designer. This give the user control over the display name of their tables and fields and enables them to design dialogs and set field attributes to fit the way that they want to use the software. This functionality is all available from within the Preactor user interface and most changes can be seen instantly, allowing rapid design implementation. SIMATIC IT Preactor AS Flexible Order Routing Setup As a system that is commonly interfaced with a variety of other business systems it is important for Preactor AS to have flexibility in the required data structure. We scenarios with no system configuration required. Simply import the data you need and start scheduling. SIMATIC IT MES Integration An out of the box integration with the ACM and Mechatronics libraries of SIMATIC IT MES gives customers the advantages of running a scheduling application alongside MES with none of the overheads of having to create a bespoke interface. Fully detailed order information is made available to the Preactor AS system and once scheduled passed back seamlessly to MES for execution. The scheduling system is also aware of deviations from the plan via automatic feedback from MES, allowing the planner to see and respond to any issue as they arise. Realize innovation. SIMATIC IT Preactor AP API access in the Preactor AP product Flexible Planning Rules The latest version of Preactor AP is a step change in the flexibility of the system. Due to the changes that have been made in moving the planning data into standard Preactor tables the in-memory data can now be interacted with via the standard Preactor API. With the addition, that has also been made, of some new Preactor AP specific events this allows system implementers to manipulate the data before, during and after the planning processes. This means that implementation teams now have greater power to deliver the Advanced Planning solutions that the customer requires. Preactor 2015 sees the introduction of flexible planning rules in the Preactor AP product. The new functionality allows the user to determine the criteria that is used for ranking work when constraining or moving the production across planning resources and resource groups. This gives the planner total control over deciding which production should be moved from its preferred make bucket or resource when there is an overload of capacity. Improved Repair Plan and Frozen Stock features An existing feature with added functionality in the new version of Preactor AP is the Repair Plan function, which now can be setup to automate the planning process on different buckets using the standard AP logic and/or user defined expressions. Additionally the Frozen Stock functionality which, as well as retaining its default behavior from the previous release, has the option to incorporate bespoke functionality in order to enable it to more closely represent the users requirements if needed. System Implementer Features PESP and PIO distribution tools Preactor 2015 contains a new feature to aid in the distribution of new and updated Import\Export(PIO) and Workflow(PESP) scripts. The functionality allows the saving to disk of the required scripts that can then be sent to the customer or, for global solutions, distributed around an organization. Once received there is a simple process to load the new script from disk into the database. In the event that the new script is an update there is the option to overwrite the existing version or add the new version with alternate name. This means that the tool can be used during initial system implementation when multiple similar scripts are required. Find out more www.siemens.com/preactor info.preactor.plm@siemens.com Subject to change without prior notice © Siemens AG 2015 All product designations may be trademarks or product names of Siemens AG or supplier companies whose use by third parties for their own purposes could violate the rights of the owners. Realize innovation.