seem 4™ led wall to ceiling corners

advertisement
seem 4 led wall to ceiling corners
™
FSM4L-CXF
LUMINAIRE MUST BE INSTALLED PRIOR TO DRYWALL.
configurations are run specific, please consult factory drawings before beginning installation.
key
parts lists
focal point
included hardware
S - start of run
reflector (70008)
power off
power on
mud flange (70005)
(6-32 X 5/16 PAN-HEAD
MACHINE SCREW)
(8-32 X 5/16” FLAT
UNDERCUT HEAD SCREW)
attention
backer flange
I - intermediate
(72001) (8-32X 3/8”
WASHER HEX HEAD SCREW)
lens tool
(A09052-02)
E - end of run
housing spacer
(11699)
(AFFIXED TO HOUSING.
ONE PER RUN)
shipped installed
corner units
tie-wire bracket
screw (72010)
C - ceiling
joiner
bracket
backer flange
(may be pre-installed
(11920)
)
(8-18 x 1/4 SELF TAPPING
SCREW)
or shipped loose
tie wire bracket
(12547)
W - wall
lens end piece
( A07670)
2"x6" FRAMING REQUIRED ON BOTH
SIDES OF WALL MOUNTED HOUSINGS
5.625" min
joiner bracket
(11849)
mud flange
(shipped loose)
feed
flex whip
specified luminaire length
ceiling height
specified luminaire length
6.0" max
2"x6"
framing
Luminaires must be installed by a qualified electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
IS0492 Rev. D
2016 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com
1 of 5
1
2
AVOID ALL CONTACT WITH LED SURFACE,
LEDs ARE EASILY DAMAGED!
ceiling units only
3a
4
using the backer flange
3b
placement guide from
page 1 determine the
proper placement of the
backer flange for your
drywall thickness.
if backer flanges were
pre-installed skip to step 6
BACKER FLANGE PLACEMENT GUIDE
drywall
orientation
guide point
position
3/8"
1
X
F
1/2"
1
X
E
5/8"
1
X
D
3/4"
1
X
C
7/8"
1
X
B
thickness
A
B
C
D
E
F
G
H
X
Y
orientation 1
Y
X
orientation 2
1"
1
X
A
11/8"
1
Y
G
11/4"
2
Y
F
13/8"
2
Y
E
11/2"
2
Y
D
15/8"
2
Y
C
13/4"
2
Y
B
17/8"
2
Y
A
2"
2
X
E
21/8"
2
X
D
1/2" drywall
A
B
C
D
E
F
G
H
X
orientation 1
1
/2 ”
5/8" drywall
A
B
C
D
E
F
G
H
X
orientation 1
5 /8 ”
5
2' - 4'
5' - 6'
7' - 8'
Luminaires must be installed by a qualified electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
IS0492 Rev. D
2015 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com
2 of 5
CORNER UNITS (C & W) INSTALLATION
WALL CORNER UNIT (W) ONLY
11
6
8
7
install
spacers
every
12"
11
9
10
x2
11
connect flex whip
secure ceiling
to ceiling unit
unit to structure
above
CONTINUE INSTALLING REMAINING CEILING UNITS
12
13
15
16
x4
AVOID ALL CONTACT WITH LED SURFACE,
LEDs ARE EASILY DAMAGED!
make electrical connections
11
14
x4
17
secure reflectors to housing
(2 screws per reflector)
Luminaires must be installed by a qualified electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
IS0492 Rev. D
2015 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com
3 of 5
18
INSTALL REMAINING WALL HOUSINGS
19
20
22
11
23
x4
install spacers every
12" in
ceiling units
&
remaining wall units
(wall unit shown)
11
21
x4
install
reflectors
starting
from bottom
AVOID ALL CONTACT WITH LED SURFACE,
LEDs ARE EASILY DAMAGED!
remove
spacers
make electrical connections
BEGIN DRYWALL INSTALLATION (ceiling units shown)
24
25
26
ATTENTION
before beginning drywall
secure reflectors
installation consult guide on
to housing (2 screws
page 2 to ensure the backer
per reflector)
DRYWALL
flange is set at the correct
depth for the drywall.
27
11
28
29
DRYWALL
MUD
Luminaires must be installed by a qualified electrician (check with local and national codes for proper installation).
To prevent electrical shock, disconnect electrical supply before installation or servicing.
IS0492 Rev. D
2015 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com
4 of 5
30
31
32
gently slide
lens into corner
before installing
remaining lenses
REFERENCE INSTRUCTIONS ON INCLUDED
TOOL FOR LENS INSTALLATION.
DRIVER SERVICE
1
2
3
EMERGENCY
SEE BATTERY MANUFACTURER
INSTRUCTIONS
emergency maximum mounting height:
13.00'
Contractor is responsible for adequately reinforcing walls and/or ceilings to support luminaire weight. Focal Point, LLC accepts no responsibility for inadequately reinforced walls
and/or ceilings. The information contained in this drawing is the sole property of Focal Point, LLC. Any reproduction in part or whole without the written permission of Focal Point, LLC
is prohibited.
IS0492 Rev. D
2016 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com
5 of 5