WESTINGHOUSE PLASMA GASIFICATION For Fuel Oil Replacement

advertisement
WESTINGHOUSE PLASMA GASIFICATION
For Fuel Oil Replacement
Providing energy independence by displacing high cost
fossil fuels with high quality Syngas
Westinghouse Plasma Gasification has
Significant Commercial Advantages
WESTINGHOUSE PLASMA CORP.
The Westinghouse Plasma
Minimal feedstock preparation
High reliability
•
•
Operates in rugged industrial applications
•
Over 500,000 hours and 20 years of
Typically a pre-sorting of recyclables and
a one stage shredding of the material
industrial use on the plasma torches
Gasification technology is
Handles a wide range of feed
compositions
commercially proven and
•
High moisture content
Low emissions and waste
by-products
capable of processing a
•
High inert content
•
variety of waste materials to
•
Blend any number of solid or liquid
syngas. Syngas is a versatile
natural gas
•
feedstock’s
generate a commodity grade
•
•
increases project economics
replace fossil fuels and
Vitrified Slag is inert/non-leaching and is
being used as a construction aggregate
Ability to blend feedstocks reduces
project feedstock risk and significantly
product that can be used to
Syngas, after cleanup, burns clean like
Low Greenhouse Gas Footprint when
compared to alternative methods of
creating power
generate power.
Alter NRG is your key
partner in Fuel Replacement
CLEANUP
via Plasma Gasification of
Waste materials. We provide
a scalable solution capable
SYNGAS
of replacing anywhere from
50,000 bbls/yr of fuel oil to
over a million bbls/yr per
WASTE
Plasma
Torches
facility. With today’s price
of oil over $100.00 per barrel
Air or
Oxygen
Slag &
Recovered
Metals
there is no better time to
secure energy independence.
Westinghouse Plasma Corp.
Diverse Gasification Portfolio
provides a complete design
Standard platforms
Engineering services
build solution for the fuel
P5
•
Feasibility Study
replacement market. Our
•
Replaces up to 50,000 bbls/yr of fossil fuel
•
Design Basis Memorandum (DBM)
project scope is designed to
•
30 to 100 tpd of Waste
•
Process Design Package (PDP)
minimize execution risk and
•
Replaces up to 5 MW electrical
provide the best possible
solutions and service for our
customers. From detailed
facility engineering to the
start-up and commissioning
of your facility, Westinghouse
Plasma Corp. is with you
every step of the way.
W 15
•
Replaces up to 150,000 bbls/yr of fossil fuel
•
100 to 290 tpd of Waste
•
Replaces up to 15 MW electrical
G 65
•
Replaces up to 650,000 bbls/yr of fossil fuel
•
450 to 1000 tpd of Waste
•
Replaces up to 50 MW electrical
Scope of supply
•
Feed System
•
Plasma gasification reactor
•
Plasma torch systems
•
Slag solidification system
•
Initial syngas cooling & cleaning
•
Syngas Cleaning Systems
•
Boiler Modifications (performed by
partner COEN)
WESTINGHOUSE PLASMA’S FUEL REPLACEMENT SOLUTION
In the refueling configuration, the Westinghouse
plasma gasifier will process waste materials and
create a commodity grade clean syngas.
This syngas is then co-fired in the existing boiler
through a modification of the boiler system.
The syngas will likely represent less than 25% of
the total fuel being delivered to the power station.
By controlling the amount of syngas as a
percentage of the total delivered fuel, the facility
will benefit from the significant economic and
environmental attributes of the syngas while
maintaining the original performance of the boiler.
Refueling has many advantages, including:
•
Create Energy Independence
•
Create an environmentally sustainable in country waste
management solution
•
Reduced reliance on expensive and volatile fossil fuel imports
•
Improve the CO2 footprint of power generation facilities by
reducing the amount of fuel oil
•
Existing infrastructure can be used without major capital
cost upgrades
Westinghouse Plasma’s Fuel Replacement Solution
Existing configuration
FUEL OIL
BOILER
Refueling configuration
FUEL OIL
STEAM
MODIFIED
BOILER
FEED STOCK
Industrial
Waste
STEAM
SYNGAS
Municipal
Waste
Waste
Biomass
Hazardous
Waste
Tires
etc.
Air or
Oxygen
Plasma
Torches
Slag &
Recovered
Metals
Westinghouse Plasma’s Fuel Replacement Solution Provides
Significant Economic Returns
Customer:
Project:
Date:
TBD
Fuel Replacement
June, 2012
Overview
Project Type
Plant Capacity (st/d)
Fuel Replacement
1,000
1xG-65
Max: 1,000 st/d
13.79 MJ/kg
5,927 Btu/lb
• Divert 1,000 tpd of
Waste and create up to
650,000 bbls/yr of
Replacement Fuel / yr
Feedstock
Combined Feedstock calorific Value
All dollar amounts are in USD
Outputs
**
st/d = short tons per day (1 st=2000 pounds)
Net Syngas from Gasifier HHV (MMBtu/year)
*** Economics assumed at $30 tipping fees
Total US barrels Replaced per Year
3,600,000
580,000 - 650,000
**** Disclaimer: All information contained in this worksheet is for
scoping purposes only and considered confidential.
WWW.WESTINGHOUSE-PLASMA.COM
Download