Aramco Fieldbus Approach - Honeywell Process Solutions

Saudi Aramco’s
Approach to Fieldbus
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
How will YOUR
company approach
Fieldbus on your next
project?
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
2. Approving a Fieldbus Solution
3. Requirements for Fieldbus Installation
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
2. Approving a Fieldbus Solution
3. Requirements for Fieldbus Installation
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
– FOUNDATION Fieldbus (FF) will be our
Strategic Bus
– FF Solutions must be Approved
– Start Small & Grow FF Experience
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
– FOUNDATION Fieldbus (FF) will be our
Strategic Bus
•
FFH1 is now a Mainstream Product
•
FF has Benefits We can’t Ignore
•
What are Our Options?!
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
FF H1 is Now a Mainstream Product
z
FF H1 Product is Mature
z
Major Oil & Gas Company’s use of FF
z
Engr Firm FF Expertise Available
z
FF Training Here & Acceptance High
Oil & Gas Major’s Use of FF H1
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
– FOUNDATION Fieldbus (FF) will be our
Strategic Bus
•
FFH1 is now a Mainstream Product
•
FF has Benefits We can’t Ignore
•
What are Our Options?!
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
FF has Benefits you can’t Ignore
– Project Savings
– FF Device & Process Diagnostics
– Resistance to Obsolescence
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
FF has Benefits you can’t Ignore
– Project Savings
– FF Device & Process Diagnostics
– Resistance to Obsolescence
PIB
Junction Box
D
Conventional Wiring
TB’s
87 devices
D
“Home Run” Cable
(Trunk)
D
TB’s for FF
16 segments
Up to 256 devices
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
FF has Benefits you can’t Ignore
– Project Savings
– FF Device & Process Diagnostics
– Resistance to Obsolescence
• No Problem Found Work Tickets
• Device & Process Diagnostics
• Increase in Plant Uptime
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
FF has Benefits you can’t Ignore
– Project Savings
– FF Device & Process Diagnostics
– Resistance to Obsolescence
• Infrastructure to Apply High Value Diagnostics
• Infrastructure to Apply FF HSE
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
– FOUNDATION Fieldbus (FF) will be our
Strategic Bus
•
FFH1 is now a Mainstream Product
•
FF has Benefits We can’t Ignore
•
What are Our Options?!
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
What are our Options?
– Analog or Proprietary
– Analog with HART
– Profibus PA
– FOUNDATION Fieldbus
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
– FOUNDATION Fieldbus (FF) will be our
Strategic Bus
– FF Solutions must be Approved
– Start Small & Grow FF Experience
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
– FF Solutions Must be Approved
•
Aramco DCS RVL - Must bid projects
•
Each Vendor has a FF ‘solution’
•
Aramco developed basic FF requirements
•
Honeywell EPKS is Aramco approved for FF
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
Experion PKS
TDC3000 FF (not)
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
– FOUNDATION Fieldbus (FF) will be our
Strategic Bus
– FF Solutions must be Approved
– Start Small & Grow FF Experience
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
– Start Small & Grow FF Experience
•
Aramco ‘Started Small’ to get experience
•
Proponent must commit to FF
•
Current Aramco FF Installations:
–
–
–
–
4 FF Installations (50-250 FF points each)
7 projects ongoing (100-500 FF points each)
1 larger project ongoing (>1000+ FF points)
Multiple LARGE FF projects coming !
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
2. Accepting a Fieldbus Solution
3. Requirements for Fieldbus Installation
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
2. Approving a Fieldbus Solution
3. Requirements for Fieldbus Installation
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
2. Approving a Fieldbus Solution
– Must be an Aramco approved DCS.
– Must meet Aramco’s FF Host Requirements:
– Must Pass 3 Aramco Tests :
FF Basic Functionality consistent with conventional
FF Reliability meets that of conventional
FF Configuration consistent with Conventional
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
2. Approving a Fieldbus Solution
– Must Meet Aramco’s FF Host Requirements
z
z
z
z
z
z
z
z
Redundant H1 Card & Power
Online/Offline FF Configuration Consistent with Conventional
Bulk Import Config Capability for Large FF Projects
FF Operation Consistent with Conventional
FF (& HART) Instrument Maintenance Tools
FF Training & Support Locally
Must have installed FF base
Internal Interoperability Verification
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
2. Approving a Fieldbus Solution
– Must Pass 3 Aramco Tests that Verify:
•
FF Basic Functionality consistent with conventional
•
FF Reliability meets that of conventional
•
FF Configuration consistent with Conventional
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Process Simulation Panel
FF Positioner
FF DP transmitter and flow orifice
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
2. Approving a Fieldbus Solution
– Must Pass 3 Aramco Tests that Verify:
•
FF Basic Functionality consistent with conventional
•
FF Reliability meets that of conventional
•
FF Configuration consistent with Conventional
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Column Feed
TC100
FC101
RC100
FC100
Column
C-210
Steam
Condensate
E-200
Bottoms Product
Test Purpose:
Basic Functionality Test
FF control & I/O operates consistently with conventional by:
1.
"Invalid Value" Detection And Propagation. Fail FT100 & then restore.
2.
Initialization Detection And Propagation. FIC100 to manual then Cascade.
3.
Windup Detection, Propagation And Protection Set output limits on FIC100, then restore.
4.
Controller Download From Configurator to FF Instrumentation. Evaluate control bumps.
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
2. Approving a Fieldbus Solution
– Must Pass 3 Aramco Tests that Verify:
•
FF Basic Functionality consistent with conventional
•
FF Reliability meets that of conventional
•
FF Configuration consistent with Conventional
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Test Objectives:
Determine FF device & function block
action on the following events:
1. Fail Redundant H1 Card & Controller
2. Add / Remove Device from Segment
3. Modify & Download Configuration
Back
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
FF Reliability
Test
Honeywell Users Group Meeting 2004 - Bahrain
Reliability Test Example Results
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
2. Approving a Fieldbus Solution
– Must Pass 3 Aramco Tests that Verify:
•
FF Basic Functionality consistent with conventional
•
FF Reliability meets that of conventional
•
FF Configuration consistent with Conventional
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Configuration Test Purpose
Configuration: Verify that both DCS conventional and FF control and
I/O configuration is done in similar way and on a consistent configurator.
Offline Configuration: Verify that FF configurations may be made
off-line , e.g. when no physical I/O is connected to the system.
Displays: Verify that conventional and FF points operate consistently
on faceplates, & custom graphics.
Operator View: Verify on-line changes, saves, historization, trending
and alarming is consistent for conventional and FF.
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Back
Honeywell Users Group Meeting 2004 - Bahrain
Honeywell FF
Test Hardware
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Currently Approved FF Solutions
Emerson DeltaV
Yokogawa Centum ALF111
Honeywell EPKS
– All 3 FF solutions well integrated in DCS.
– High consistency between FF and conventional.
– FF Redundancy provided.
– A few issues, but...
– All committed to make FF project successful.
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
2. Approving a Fieldbus Solution
3. Requirements for Fieldbus Installation
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
2. Approving a Fieldbus Solution
3. Requirements for Fieldbus Installation
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
3. Requirements for FF
Installation
z
SAES-J-904:
– Requirements for a
Quality FF Installation
– Includes Discussion of
‘Intent’
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
3. Requirements for FF Installation
J-904 Requirements:
–
–
–
–
–
–
–
Redundant H1 Interface Cards
Redundant FF Power Supply / Segment
Spur Short Circuit Protection
With Control - Max. 8 devices per Segment
Monitor Only - Max. 12 devices per Segment
Max. 2 final control devices (valves) per Segment
Plus Much More Risk Assessment – Spare Capacity
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
H1 Interface
Card
FF Power
Supply w/
Terminator
Spur Length &
Min Voltage
Relcom
Megablock w/
Spurguard
Field Devices
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Terminator
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
SAES-J-904: ISS Additions for FF
z
LAS capable (yes/no)
z
Minimum Operating Voltage (Vdc)
z
Quiescent Current Draw (mA)
z
Polarity Sensitive Termination (yes/no)
z
DD revision level
z
Channel number and Description,
(e.g., Channel 1 - Sensor 1, Channel 2 - Body
Temperature, Channel 3 - Sensor 2, etc.).
z
Function Blocks Available, (e.g., AI_1, AI_2,
PID_1, etc.)
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
2. Approving a Fieldbus Solution
3. Requirements for Fieldbus Installation
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
Aramco’s Fieldbus Approach
1. Fieldbus Strategy
2. Approving a Fieldbus Solution
3. Requirements for Fieldbus Installation
How will YOU approach
Fieldbus on your next project?
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain
END
Copyright © Saudi Aramco 2004. All rights reserved. No portion of this article may be reproduced by any
process or technique without the express written consent of Saudi Aramco
Honeywell Users Group Meeting 2004 - Bahrain