K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow Consortium Members Construction/ Development (3) IT (17) Energy (17) Research Centers/ etc. (8) Oversea Supporters (4) K-MEG Overview 01_Industry Analysis EPRI 02_K-MEG New Concept 03_Business Modeling 04_Workflow 2 Contents K-MEG Project Overview Industry Analysis K-MEG Overview 01_Industry Analysis K-MEG New Concept 02_K-MEG New Concept Business Modeling 03_Business Modeling 04_Workflow Workflow 3 Summary Project: Korea-Micro Energy Grid (K-MEG) Total energy solution package engaging IT, smart grid technologies, EMS, building automation, decentralized power sources, renewables, security, etc. Project Administrator - Korea Ministry of Knowledge Economy (MKE) Project Phases & Period - Phase I : Planning (4 months) - Phase II: Development (3 years) Budget - Phase I : Approx. 450,000 USD (100% government fund) - Phase II: Approx. 135 mil. USD (including 50% matching fund) K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 4 Objectives To develop an optimal total energy solution in response to energy production/supply/consumption To develop a systematized solution w/ a highly efficient O&M system To develop a custom-ready solution for target market To improve building energy saving by 30% thru active systems w/ limited renewable energy till 2015 To implement and validate the developed solutions in domestic and overseas public or commercial buildings K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 5 Target Energy Saving - 30% Energy Reduction by 2015 w/ Active System & Limited Renewables SAMSUNG C&T’s G.T. Project (2009.11) K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 6 Process & Schedule Planning Phase Process (2010.12~2011.04) 1st Round of Competition: 4 Consortiums 4 consortiums selected for Phase 1 2nd Round of Competition: 1 consortium selected for Phase 2 Development Phase (2011.06 ~ 2014.05) 1 Consortium Schedule K-MEG Overview ◊ 2010.11.29 Proposal Submission ◊ 2010.12.08 Evaluation (1st Round of Competition) ◊ 2010.12 ~ 2011.04 Phase 1 – Planning ◊ 2011.05 Evaluation (2nd Round of Competition) ◊ 2011.06 ~ 2014.05 Phase 2 – Development 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 7 K-MEG Industry Analysis Industry Analysis K-MEG Overview 01_Industry Analysis K-MEG New Concept 02_K-MEG New Concept Business Modeling 03_Business Modeling 04_Workflow Workflow 8 Energy Consumption by Sector Source: Energy Consumption Comparison 2005 Buildings + Industry: 60-70% in Energy Consumption K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 9 Energy Consumption by Building Type Buildings + Industry Require Comprehensive Review of Electric and Heating Energy Consumption Electric Power Heating High EnergyConsuming Industry Source: Samsung C&T, 2009 K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 10 Energy Master Plan _ U.S. DOE External Energy Supply Higher Efficiency & Minimal Energy Use Independent Energy Supply Renewable Energy & Micro-grid 60~70% Reduction (Active+Passive) in Energy Consumption 30~40% Independently Produced Renewable Energy Net Zero Energy Buildings by 2020 K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling Source : US DOE (United States Department of Energy, 2006) 04_Workflow 11 K-MEG New Concept Industry Analysis K-MEG Overview 01_Industry Analysis K-MEG New Concept 02_K-MEG New Concept Business Modeling 03_Business Modeling 04_Workflow Workflow Core Requirements Development of K-MEG System Optimizing Energy Production/Supply/Consumption 30% Energy Efficiency No Passive Systems Taken into Account K-MEG Overview 01_Industry Analysis Renewable Energy DC Grid EV Charger, Energy Storage, DC Appliances, etc. 02_K-MEG New Concept BIPV or Roof Mounted PV Cells, Heat Pump, etc. 03_Business Modeling 04_Workflow Performance Validation Domestic and Overseas Test Beds Inquired 13 Required Components & Functions Software Hardware • Energy & Utility Data Mining Network Monitor /Processing /Management • BIPV • DB & Visualization • Plasma Enhanced IGCC • Sensor Network • Energy Storage • Energy & Utility Prognosis/Diagnosis • Micro Gas Turbine • Monitoring & Control • Decentralized Energy Sources • Micro Grid EMS & BEMS • DR Program EMS O&M • Heat Pump Renewables Decentralized • DC Grid DC Infra • DC/DC Conditioner • Advanced Metering (Bidirectional Metering) • Hybrid AC/DC Power System • Total Operating Center (TOC) • Protection/Control System • BIM /Security /Safety • Cost Effective Meters/Smart Sensors • Energy Assessment Tool • Integrated Temp./Humidity Sensors K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept • DC for EV Charger 03_Business Modeling 04_Workflow 14 K-MEG New Concept From Macro Grid to Micro Grid! Integration of Electrical Power, Heat, and Gas Integration COP (Coefficient Of Performance) Integrated MICRO Grid Independent MACRO Grid K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 15 K-MEG System Overall Palette K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 16 Custom Modeling _ Various Energy Block Platforms Custom Modeling of Energy Supply/Consumption Systems Based on Energy Block Platform Concept Interlaced with IT Infrastructure Energy Block Platform Concept Customized Platform Modeling K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 17 K-MEG Biz Modeling Industry Analysis K-MEG Overview 01_Industry Analysis K-MEG New Concept 02_K-MEG New Concept Business Modeling 03_Business Modeling 04_Workflow Workflow Market Implementation Process Study of Regional Characteristics of Target Country Study of Market Volume and Economic Growth Review of Regulations & Ordinances of Target Countries 1 Customized Tech. Integration by Target Market 2 5 Business Models to Global Market Custom-ready Models for Advanced, Developing or Underdeveloped Countries Feasibility Study 3 4 Evaluating Custom-ready Models Based on Cost Required and Value to be Attained. Validation of Models over Demo Sites K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept Globally Standardized & Certified Proactive in International Market 03_Business Modeling 04_Workflow 19 Base Business Models K-MEG System Development Validation 01_Building Remodeling Model Standardization & Certification Business Marketing Advanced Technologies 02_Industrial Complex Retrofit Model Advanced Market Dominance 03_Independent Energy Supply Model - Real Estate Remodeling Investment Model - Energy-independent Industrial Complex Model - Underdeveloped Country Model using EDCF - ESCO Model - Aged Factory Remodeling Model - Resource Development Model for Resource-rich Countries K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 20 Demonstration Plan 02_Industrial Complex Retrofit Model Optimal K-MEG Biz Model Engaging Independent Energy Production and Microgrid Co-work with KICOX KICOX (Korea Industrial Complex Corp.) manages 45 industrial complexes throughout the country, involving more than 38,000 companies Domestic Demo Projects Planned Korea Industrial Complex I - Guro Digital Industrial Complex Korea Industrial Complex II - Banwol-Sihwa Industry Zone Iksan Industry Zone Kunjang Industy Zone Gumi Industry Zone Seoul National Univ. - Green Campus Source: KICOX K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 21 Demonstration Plan 01_Building Remodeling Model Empire states Remodeling, USA - Construction Cost : 100 million USD Windows Refurbishment Lighting sensor control Occupancy sensor High efficiency refrigerator/HVAC system BEMS Electricity use 38% reduction * Source: Reuters Overseas Demo Projects Chasing India: Plasma Enhanced IGCC Project USA: UC Berkeley Cory Hall Switzerland: ITU China/Vietnam: Industrial Complexes Singapore: JTC / CDL Kazakhstan: Net Zero Energy Project Germany: deENet Finland, etc. 03_Independent Energy Supply Model Investment Model for Underdeveloped Countries ▪ Investment model for underdeveloped countries using EDCF ▪ Resource development model for resource-rich countries ▪ Investment model for energy independence and natural resource development K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 22 Demonstration Sites & Models Finland • Building Remodeling Germany Kazakhstan • Building Remodeling • Industrial Complex Retrofit China • Industrial Complex Retrofit USA Korea Switzerland • Building Remodeling • Building Remodeling • Building Remodeling • Industrial Complex Retrofit • Independent Energy Supply India • Independent Energy Supply Singapore Vietnam • Industrial Complex Retrofit • Building Remodeling K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 23 Workflow Industry Analysis K-MEG Overview 01_Industry Analysis K-MEG New Concept 02_K-MEG New Concept Business Modeling 03_Business Modeling 04_Workflow Workflow Work Schedule K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow 25 K-MEG Overview 01_Industry Analysis 02_K-MEG New Concept 03_Business Modeling 04_Workflow