Construction Management | General Contracting
4
Founded in 1970, James E Fitzgerald, Inc. has established a reputation for excellence in the construction industry.
Classic Values form the foundation of the James E Fitzgerald, Inc. culture. These values include keeping honesty at the forefront, providing attention to detail and delivering excellence on every project.
Our company has successfully completed thousands of projects ranging in size and scale from minor partition changes to full scope renovations consisting of multiple floors, high end finishes and the integration of state of the art infrastructure and technology.
Integrity, Quality, Results.
The principals, John Fitzgerald and Hugh O'Connell, combined have more than forty years experience in Construction
Management and General Contracting services. Their expertise and hands-on approach has distinguished James E.
Fitzgerald, Inc. as a leader in the construction industry.
Being a mid-sized Construction Manager and General
Contractor allows the staff and management at James E.
Fitzgerald, Inc. the flexibility to dedicate their time and attention to all of our clients’ needs. Principal involvement is not a sales tactic; it is simply the way we run our projects and can be confirmed with any of our client references.
The satisfaction of our clients is one of the best endorsements of our work. Our goal is to partner with our clients from the beginning and maintain a long lasting relationship. We are proud that over 85% of our work is from repeat customers.
Our comprehensive services cover all aspects of the project from the initial bid to move-in. Services include:
Construction Management and General Contracting
Budgeting and Estimating
Pre-purchasing
Site Surveys
Value Engineering
Infrastructure Layout
Scheduling: Milestones and
Microsoft Projects
Verification of critical path events and long lead-time items
Site Safety Assessment and
Safety Program
State-of-the-art software:
Sage Timberline Office used for all financial management
Emergency response to water or fire damage
Client Vendor Support
Quality Control and
Punchlist Completion
Project Close-Out
Documentation
ABN-Amro, Inc.
Apollo Investment Corp.
American Express
Assured Guaranty
Bank of America
Catalyst Investors
Concept Capital Markets
Court Square Capital
Credit Suisse
Creditex
Deltec Asset Management
GE Capital
Goldman Sachs
HSBC
ION Trading
JP Morgan Chase
Lab 49
Leerink Swann
Market Axess
Maybank
Mitsubishi UFJ Securities
Mizuho Alternative
Investments
Mizuho Securities USA
Morgan Stanley
Neuberger Berman
Nomura
NTT America
NTT Docomo USA
NYSE Euronext
Thomson Reuters
Two Sigma Investments, LLC.
UBS
Association of the Bar of NYC
Curtis, Mallet-Prevost, Colt & Mosle
Dorsey & Whitney
Ellenoff, Grossman & Scholle
Fox Rothschild
Haves, Pine & Seligman
Morgan Lewis & Bockius
Morrison Cohen
Paul Weiss Rifkin Wharton & Garrison
Pryor Cashman
Quinn Emanuel
Wilk Auslander
American Numismatic Society
CUNY
Marble Collegiate Church
New York-Presbyterian/
Weill Cornell
New York University
Enterprise Ireland
Japan Local Government
MTA
New York State Dept. of Labor
UN Women
ABC Disney
Arnold Worldwide
Avaya
Cisco Systems, Inc.
Comcast
CNN
Digitas
Emmis Communications
Everyday Health
GE
HBO
Kodak
NBC
Publicis Modem
Razorfish
Sports Illustrated
Sybase Symantec
Time Warner WorldNow
Verizon
Yext
Brookfield Properties
CBRE
Cushman & Wakefield
Durst Organization
Empire State Building
Fisher Brothers
Heron Tower
Jones Lang LaSalle
Macklowe Properties
Newmark Grubb Knight Frank
RFR Realty, LLC
Rudin Management
SL Green Realty Corp.
Trinity Real Estate
Vornado Realty Trust
W & H Properties
Waterman Properties
Aetna
CityMD
GHI
Synergy Pharmaceuticals
United Health Group
Elie Tahari
Godiva Chocolatier
John Varvatos
The Limited, Inc.
Perry Ellis USA
Procter & Gamble
345 Park Avenue South
New York, New York
James E. Fitzgerald partnered with Digitas to develop the advertising agency’s first multi-media conference center. The project included the creation of a large, open, multi-use lounge area used for presentations and conferencing, featuring a dynamic backlit LED lighting element contained in a custom metal mesh column, Stone flooring, a floating fabric ceiling system fabricated in France, back painted glass panels with integrated recessed LED screens, Modernfold movable glass and fabric partitions, and a custom millwork bar and café area.
The conference rooms were designed to be flexible and able to be reconfigured in order to accommodate larger sized groups.
The state-of-the-art audiovisual and lighting solutions incorporate a multi-scene dimming with automated shades integrated into the master control system of the facility.
200 Madison Avenue
New York, New York
James E. Fitzgerald, Inc. constructed the new NYC headquarters for Garan. The space has a large, open floor plate with an exposed slab design which required
James E. Fitzgerald to extensively coordinate the various trades to achieve a highly organized layout for the various components such as ductwork, electrical conduits, cabling and lighting. The floors are a combination of polished concrete, stone and carpet; the reception and elevator lobby include custom millwork ceiling and wall features along with a custom illuminated reception desk; the office space consists of conference rooms/work rooms and a large café shared by clients and the staff.
1345 Avenue of the Americas
Top 2 Floors, New York, New York
James E. Fitzgerald, Inc. was selected by Gardiner
& Theobald and the project team to act as the
Construction Manager for the top two floors of 1345
Avenue of the Americas. The design includes materials and finishes that are as transparent as possible to accentuate the spectacular unobstructed views of central park. The project consists of a large conference center, open plan reception/lounge area with a central staircase, and open plan trading desks on raised floor.
The ceiling is organized in a modular system of metal pans to hold the light fixtures, air conditioning diffusers and sprinkler heads thus providing a “service zone” separated by unaltered, continuous oversized metal ceiling tiles.
A main computer room and several smaller cabling hubs were incorporated throughout the project providing the connectivity and network capacity for the trading operations. The finishes are ultra high end consisting of specialty glass, polished metal, stone and lacquered millwork.
Replacement of Rooftop Mammoth Units at 214 West 42nd Street, New York, New York
James E. Fitzgerald Inc. has been selected to replace
(3) rooftop Mammoth units on the historic New
Amsterdam Theater at 214 West 42nd Street for ABC
Disney. Because the scope of work is to be completed while the Theater is between shows, detailed critical path scheduling of all work and advance coordination of the various trades, supplied by both the owner and by James E. Fitzgerald, Inc., is of the utmost importance.
The equipment was pre-purchased and scheduled for delivery in a way so that all supplemental work, such as the replacement of the roof, piping, ductwork and associated electrical controls and infrastructure, can be phased ahead of the equipment replacement in order to efficiently utilize the manufacturing time of the units.
The installation and removal of the old equipment was scheduled to occur concurrently to minimize the required Department of
Transportation street closure permits and to use the crane in an efficient and cost-effective manner.
jefgc.com