DoubleBox Rail | Ceiling Cable | LED | 107 Remote Power Housing | Canopy & Rail Hub Installation Instructions Please read instructions in their entirety before proceeding with any part of the installation. This luminaire must be installed in accordance with the National Electric Code and local regulations. This luminaire must be installed by a qualified electrician. Use of ballast or other components not supplied by Vode Lighting voids warranty. To prevent electric shock, turn off electricity at the fuse box before proceeding. Do not install this product in wet locations. UL listed for dry and damp locations only. Retain instructions for future reference. Technical Support: 707-996-9898 remote power housing flex conduit (provided by others) Installation Instructions: Small and Large Canopy Assemblies junction box (provided by others) wire harnesses (18 gauge) universal mounting plate (smallcanopy orientation shown) 4 conductor power cord (22 gague) strain relief 1. Install Remote Power Supply and Junction Box IMPORTANT! Before installing power supply turn off electricity at fuse box and consult wiring diagram. When mounting junction box, refer to system layout center to center locations. Mount junction box and remote power supply housing, feeding wire harness through junction box to power supply. Junction box, conduit and conduit adapters provided by others. 2. Install Universal Mounting Plate and Drywall For small canopy Install universal mounting plate to junction box using screws provided and with protrusion facing out. Install 5/8" drywall. End of universal mounting plate protrusion should be flush with drywall. For large canopy: Install 5/8" drywall. Install universal mounting plate with screws provided and with protrusion facing in. 3. Preparing Ceiling Cable Hardware Push the cord gripper from the suspension disk and pull suspension cord through the disk until the specified installation length is reached. Release the cord gripper once desired length is reached. 4. Fasten Wire Harness Connectors Firmly fasten male and female wire harness connectors, as shown. Push remaining cord inside junction box. 5. Securing Suspension Disk Push suspension disk into universal mounting plate. Secure the suspension cord by tightening the hex screw on the side of the suspension disk protrusion, as shown. suspension disk small canopy (same for large canopy) 6. Secure Canopy Slide canopy up suspension cord, magnets located on the suspensions disk will secure canopy in place. Check alignment of system after final installation and if necessary, remove canopy to loosen hex screw to readjust cord to level the system. Rail to Hub/Coupler: 1. Install Rail to Hub. 2. Tighten set screw to lock rail to hub/coupler. DoubleBox hub © Copyright 2014. All ideas, arrangements, and plans indicated or represented by the above drawings, are the property of Vode Lighting LLC. and were created, evolved and developed for use on and in concoction with the specified project. No part of the above drawing, design, arrangements or ideas thereon shall be duplicated or used for any purpose whatsoever without the express permission of Vode Lighting LLC. Vode Lighting LLC 1206 East MacArthur June 9, 2014 St. #3 SOnoma, CA 95476 707.996.9898 BoxRail and RaceRail | Ceiling Cable | LED | 107 Remote Power Housing | Canopy & Rail Hub Installation Instructions Step 1: Install Remote Power Supply and Junction Box Step 2: Install Universal Mounting Plate and Drywall IMPORTANT! Before installing remote power supply turn off electricity at fuse box & For small canopy Install universal mounting plate to junction box using screws provided and with protrusion facing out. Install 5/8" drywall. End of universal mounting plate protrusion should be flush with drywall. For large canopy: Install 5/8" drywall. Install universal mounting plate with screws provided and with protrusion facing in. consult wiring diagram. When mounting junction box, refer to system layout center to center locations. Mount junction box and remote power supply housing, feeding wire harness through junction box to power supply. Junction box, conduit and conduit adapters provided by others. For installation of universal mounting plate after drywall. For use with large canopy For installation of universal mounting plate before drywall. For use with small canopy For use with small canopy For use with large canopy Step 3: Preparing Ceiling Cable Hardware Step 4: Fasten Wire Harness Connectors Push the cord gripper from the suspension disk and pull suspension cord through the disk until the specified installation length is reached. Release the cord gripper once desired length is reached. Position strain relief 6" from the suspension disk. Tighten the set screw on the strain relief. IMPORTANT: Vode small canopy mounting hardware designed for 5/8" drywall. Accurate placement and alignment of junction boxes is critical as it will determine the line of entire system. Refer to system layout for mounting locations. Firmly fasten male and female wire harness connectors, as shown. Push remaining cord inside junction box. 6" 1 connector labeled to power to upper/indirect 1 connector labeled to power to lower/direct For use with small canopy power fed through pins of hubs and couplers to green PCB boards on rails push here to release grip on cord, adjust length indirect 5/8" drywall For use with large canopy direct Step 5: Securing Suspension Disk Step 6: Secure Canopy Push suspension disk into universal mounting plate. Secure the suspension cord by tightening the hex screw on the side of the suspension disk protrusion, as shown. Slide canopy up suspension cord, magnets located on the suspensions disk will secure canopy in place. Check alignment of system after final installation and if necessary, remove canopy to loosen hex screw to re-adjust cord to level the system. For use with small canopy For use with large canopy To release suspension disk, push tab and pull disk out. small canopy large canopy DoubleBox Rail | Ceiling Cable | LED | 107 Rail Installation Instructions Please read instructions in their entirety before proceeding with any part of the installation. This luminaire must be installed in accordance with the National Electric Code and local regulations. This luminaire must be installed by a qualified electrician. Use of ballast or other components not supplied by Vode Lighting voids warranty. To prevent electric shock, turn off electricity at the fuse box before proceeding. Do not install this product in wet locations. UL listed for dry and damp locations only. Retain instructions for future reference. Technical Support: 707-996-9898 DoubleBox Rail hub Red warning disks indicate non-powered end of rail DoubleBox Rail coupler Green PCB boards indicate powered end of rail © Copyright 2014. All ideas, arrangements, and plans indicated or represented by the above drawings, are the property of Vode Lighting LLC. and were created, evolved and developed for use on and in concoction with the specified project. No part of the above drawing, design, arrangements or ideas thereon shall be duplicated or used for any purpose whatsoever without the express permission of Vode Lighting LLC. Vode Lighting LLC 1206 East MacArthur June 9, 2014 St. #3 SOnoma, CA 95476 707.996.9898 DoubleBox Rail | Ceiling Cable | LED | 107 Rail Installation Instructions note: Vode typically supplies one driver per rail DRIVER DRIVER DRIVER DRIVER DRIVER DRIVER ~ 2.01" Typ. Center-to-Center Typ. Center-to-Center ~ 1.98" Typ. Center-to-Center 2' rails = 24" 2' rails = 24" 2' rails = 24" 3' rails = 36" 3' rails = 36" 3' rails = 36" 4' rails = 48" 4' rails = 48" 4' rails = 48" 5' rails = 60" 5' rails = 60" 5' rails = 60" 6' rails = 72" 6' rails = 72" 6' rails = 72" 8' rails = 96" 8' rails = 96" 8' rails=96" install DoubleBox Rail to hub tighten set screw to lock rail to hub/coupler tighten set screw to lock rail to hub/ coupler install DoubleBox Rail to coupler install DoubleBox Rail to hub tighten set screw to lock rail to hub/coupler tighten set screw to lock rail to hub/coupler 1 connector labeled with green to power upper/ indirect power fed through pins of hubs and couplers to green PCB boards on rails 1 connector to power lower/direct Couplers have 1 power feed side and 1 non-powered side