6/18/2013 2013 Design Expo Utilities Coordination ‐ Tom Bane State Utilities Engineer 1 6/18/2013 2 6/18/2013 Potable Water Sanitary Sewers Storm Sewers Street lights Electricity Gas Oil Electricity Gas Oil Telephone Cable TV Internet Drainage pipes FDOT service lines ITS lines Traffic Signals poles Payphone booths Customer service lines Fence lines Ditches Conveyors Coolants Fuel line Structures Highway Fence lines High mast lighting Landscape Sprinklers Red‐light cameras Rest area water/sewer Driveways 3 6/18/2013 Point “A” Point “B” 4 6/18/2013 30’ Utility Easement N O R T H 100’ FDOT R/W Roadway 5 6/18/2013 30’ Utility Easement N O R T H 200’ FDOT R/W Roadway 30’ Utility Easement N O R T H 100’ FDOT R/W Roadway 30’ Utility Easement 6 6/18/2013 N O R T H 100’ FDOT R/W Roadway N O R T H 200’ FDOT R/W Roadway 7 6/18/2013 Agreement: •Freely entered •May be unilaterally vacated •Can’t order someone into agreement. Contract: •Payment for services •Cannot be vacated unless both agree. •Must fulfill the contract. Rule: •Chapter 120 F.S. and Chapter 14‐46 F.A.C. •Allows those governed a voice. •Can be required without individual agreement. Regulation: •Chapter 120 F.S. And the PSC not FDOT •Allows those governed a voice. • Governs where, when, who and how much services are provided. Order: • Directs one party to do something without agreement. •Must have statute authority •Must be reasonable. License: •Grants a party permission, not a right. •Conditions established by Rule. •Can be granted by silence. 8 6/18/2013 Florida Statutes Florida Statutes 337.401 - 337.404 334.044 Utility Perception of what Utilities Agreements ______________________________________ ENFORCE REASONABLE RULES Utility Master ______________________________________ ______________________________________ Rule 14-46 30-day Notice ______________________________________ ______________________________________ means ______________________________________ ______________________________________ Agreement ______________________________________ _____________ The Department can only compel Utility Work by Enforce: To compel obedience. obedience to demands that Highwayhave Contractor Utility Permit Within the limits of sound judgment and Agreement Reasonable: good sense. Utility Work evaluated the standard against the Schedule Sound: Free from any defect.in the field, Agreement 2010 UAM circumstances without Utility Work Subordination Judgment: An evaluation from standards circumstances hand any defect, and only toandthe limitsatof Agreement presented to the mind. good sense. ______________________________________ ______________________________________ _____________ ______________________________________ ______________________________________ _____________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ________________________________ ______________________________________ ______________________________________ ________________________________ ______________________________________ ______________________________________ ________________________________ ______________________________________ ______________________________________ ________________________________ ______________________________________ ______________________________________ ________________________________ ______________________________________ ______________________________________ ______________________________________ ________________________________ ______________________________________ ______________________________________ ________________________________ ______________________________________ ______________________________________ ________________________________ ______________________________________ ______________________________________ ________________________________ ______________________________________ ______________________________________ ________________ Utility Accommodation Manual ______________________________________ ______________________________________ (Pocket Version) ______________________________________ ______________________________________ ___________ ______________________________________ ____________________________________ ___________ Proposed Excavation ______________________________________ Temporary Survey Marks ______________________________________ ______________________________________ Electric Power Lines, Cables, Conduits and Lighting Cables ______________________________________ Gas, Oil, Petroleum, or Gaseous ______________________________________ Materials Communication, Alarm, or ______________________________________ Signal Lines, Cables or Conduits ______________________________________ ______________________________________ Reclaimed water, ______________________________________ Irrigation and Slurry ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ _ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ ______________________________________ Rule: Governmental requirement established by law Potable Water Lines Sewer and Drain Lines Requirement: That which can be demanded. Topic No: 710‐020‐001‐g 9 6/18/2013 TVTRON Beta Trans. City Utilities TVTRON Beta Trans. City Utilities Notice of Utility Delay Claim FDOT, The utilities have delayed me for 90 days, please pay me 90days x $10k/day= $900,000.00 Thank you! Webildit Const. Inc. 10 6/18/2013 OK, SHERMAN,,, SET THE WABAC MACHINE TO 1938 TO HELP FDOT OUT OF THIS MESS. 1938 N O R T H BBPC US ARMY 1998, FDOT plans to build a new corridor through 1938, Acme Electric buys a the area and starts negotiating to obtain the R/W. corridor from BBPC and installs a buried electric cable 1967, Beta Transmission buys out Acme and buys a corridor 1991 City Utilities from BBPC and installs an purchases easements to overhead electric line. 1985, Jim Nassium buys two parcels extend their distribution from BBPC and builds two houses for line to the facility. himself and his in‐laws Dusty & Anita Bath. City Utilities installs a meter to allows Jim to attach his service line. N O R T H Jim later runs his service line to Dusty and Anita to run Dusty’s dialysis machine. 1989, the US Army plans to build a top secret death‐ray gun and needs lots of cold water delivered to the facility. US ARMY 11 6/18/2013 2 2 3 4 N O R T H 8 6 5 N O R T H 7 12 6/18/2013 2003, FDOT completes the roadway with no hitches 2011, FDOT plans to add in a separate – life is good! project the installation of multiple overhead message boards‐one will be in 2005, TVTRON cable television and this area. – life is still good! internet service gets a permit to install a buried communication line N O R T H 2007, Beta Transmission gets a permit from FDOT to add a second overhead transmission line. 13 6/18/2013 TVTRON Beta Trans. City Utilities TVTRON Beta Trans. City Utilities 14 6/18/2013 TVTRON Beta Trans. City Utilities The contractor will find a deactivated electric line. And it will take some time for them to figure out it belongs to Beta Electric. Beta Electric will later produce title to the property and demand compensation for the road being on their property in addition to the relocation costs TVTRON Beta Trans. City Utilities The contractor will find an active electric line and won’t immediately know it goes to Dusty’s dialysis machine, and it will take some time to figure out who it belongs to. FDOT will claim it belongs to City Electric. City Electric will claim their line stopped at the meter. Dusty is too sick to respond, so his lawyer claims that FDOT owns the line and should have paid the City to move the meter for Mr. Bath. He also tags on a Tort claim for Mr. Bath’s sudden down turn in health due to the contractors illegal and harassing letters. 15 6/18/2013 TVTRON Beta Trans. City Utilities In this area, the contractor will find the utilities unwilling to relocate without being paid in advance. FDOT has no authority to order the utility to relocate at their expense. TVTRON Beta Trans. City Utilities In this area, the contractor will find a mysterious pipe and some smelly goo. They immediately think it is some kind of military nerve agent and quickly abandon the site. FDOT will have to determine what the goo is and what has to be done. 16 6/18/2013 TVTRON Beta Trans. City Utilities In this area, the contractor will find the Department has no right to request that the permitted service line be moved. Why do we let utilities cross our R/W? It would be impossible to provide utility services. 17 6/18/2013 What advantage does FDOT get for having utilities permitted longitudinally in the R/W? It aids expansion and lowers costs. Can FDOT order utilities to relocate at their expense? It depends. 18 6/18/2013 Do utilities have property rights when on FDOT R/W? It depends. Can FDOT order a utility to enter into Subordination Agreement? No. 19 6/18/2013 Can FDOT order the utilities to agree to be bound by requirements not in Rule 14‐46 or the UAM? Generally not. Can a utility enter into an agreement that binds the utility to requirements not in Rule 14‐46 or the UAM? Yes. 20 6/18/2013 What is the most common answer to all utility questions? “It depends.” 21