Nissan’s Quality Management Oct 29th, 2007 Hiroshi KITAZAWA Senior Manager TCSX(Total Customer Satisfaction Function) Field Quality Improvement Group Nissan Motor Co., Ltd. What is the quality in the vehicle ・Mass production (battle with variation) ・Durable years (durability, Deterioration durability quality) ・variously market environment - natural environment (temperature, humidity, climate etc.) - Field environment (road condition, fuel properties etc.) ・variously use condition - User (young、elder etc.) - How to use (commute, shopping, leisure etc.) - Driving condition (traffic congestion, highway, climbing etc) ・Perceived Quality (luxury, comfort, relax etc.) ・Recall system What is the quality in the vehicle Royal Customer Cycle Recommendation from customer who is satisfying it. (Word of mouth) Purchase consideration Visit to dealer rejecter Perceived Quality Repurchase Sales Quality Purchases rejecter Durability Quality Attractiveness Quality Durability Initial Service Quality Ownership experience 12MIS Initial Quality 3MIS Contents Management situations surrounding quality Quality improvement activities Ending remarks Contents Management situations surrounding quality Quality improvement activities Ending remarks Quality Current Status USA Consumer Reports “Top Picks” Upscale Sedan: Infiniti G35 Luxury Sedan: Infiniti M35 Infiniti G35 Issued April 2007 Infiniti M35 19 Segments New models Altima coupe (US) 2007 New Models X-Trail (EUR/JPN) G37 coupe (US/Korea) SKYLINE COUPE(JPN) Rouge(USA) Frontier Navara (THI) Livina (PRC) NISSAN GT-R (JPN) Dualis (JPN) EX35 (US) Murano (US) Grand Livina AtlasF24 (JPN) Aprio (MEX) (Indonesia) Fundamental quality activities for product Product Quality management system 1. Corporate standard 2. Project quality management Project Project quality quality management management Standards/Tools Standards/Tools Corporate Standard Standard Corporate Planning Development Trial Quality Quality assurance assurance by by D&D D&D Quality Quality assurance assurance by by Manufacturing Manufacturing Supplier Supplier quality quality assurance assurance 3. Field quality management Quality Quality analysis analysis // improvement improvement RS RS // Warranty Warranty management management Service Service management management RS:Recall and Service campaign D&D: Design and Development Production Project quality management 1. Corporate standard 2. Project quality management Project Project quality quality management management Standards/Tools Standards/Tools Corporate Standard Standard Corporate Planning Development Trial Quality Quality assurance assurance by by D&D D&D Quality Quality assurance assurance by by Manufacturing Manufacturing Supplier Supplier quality quality assurance assurance 3. Field quality management Quality Quality analysis analysis // improvement improvement RS RS // Warranty Warranty management management Service Service management management RS:Recall and Service campaign D&D: Design and Development Production Project quality management Project Quality Management New model quality assurance: PQD (Project Quality Director) management process Quality Target Setting PQD PQD SOS: Start of Sales SOP: Start of Production GOM (General Overseas Market) OPQD OPQD TCS OPQD OPQD Production PQD TCS OPQD Europe R&D PQD R&D Production R&D TCSX PQD PQD • SOP Judgment meeting North America Production Japan TCS • Quality Confirmation Production • Monozukuri milestone meeting GOM • SOS Judgment Production Development Start of production R&D • Project quality management Project Quality Management New Project Quality Assurance: PSQC (Pre-SOS Quality Clinic) This is quality inspection system, which includes running tests conducted under the regional road and environmental conditions our customers will encounter. In SKYLINE, ran about 430,000km total and carried out prior problem extraction and measures USA GCC SOS: Start of Sales RUSSIA INDONESIA Quality Assurance by D&D 1. Corporate standard 2. Project quality management Project Project quality quality management management Standards/Tools Standards/Tools Corporate Standard Standard Corporate Planning Development Trial Quality Quality assurance assurance by by D&D D&D Quality Quality assurance assurance by by Manufacturing Manufacturing Supplier Supplier quality quality assurance assurance 3. Field quality management Quality Quality analysis analysis // improvement improvement RS RS // Warranty Warranty management management Service Service management management RS:Recall and Service campaign D&D: Design and Development Production Quality Assurance by D&D Quality Assurance by D&D Correspondence to change in market environment Trend of ethanol fuel ①E85 :Country/region without standard (restriction)/information on ethanol :Country/region with standard of E10 or less(restriction) ①E95 :Country/region with standard of E10 or more(restriction) SWEDEN ①E5 ②63% (all premium) ③4.9% ④3% (n=8) EU ①E5 CHINA CANADA ①E10±2?⇒E15 ②20% ③12.4% ④9.9% (n=195) ①E10 ②6.5% ③9.9% ④9.6% (n=46) JAPAN ①E3 ②0.0% POLAND US ①E5 ②40% ③4% ④3.8% (n=5) TANZANIA, ZAMBIA ①E10 *2010~:E20 INDIA COLUMBIA ①E10 ①E10 PARAGUAY MALAWI AUSTRALIA ③24% ①E10 ②33% ③10.8% ④10.4% (n=8) ①E10 ①E10 ②28% ③10.3% ④9.2% (n=402) THAILAND ①E10 SOUTH AFRICA ①Standard value ②Market share of blended fuel ③Max concentration ④Average blended concentration ①E18 ②100% ③15.7% ④11.9% (n=8) ARGENTINA ①E5 ①E85 ②2%? ③85% ④85% BRAZIL ①E22 ②84% ③26.4% ④25.4% (n=16) ①E100 ②16% ③93.8% ④93.2% Quality Assurance by D&D Quality Assurance by D&D Correspondence to change in market environment Flex fuel system for BRAZIL Because the vapor pressure under the low temperature is low, the ethanol fuel is not made a fog easily. Assistance necessity of gasoline When the E100 starts at the low temperature, another putting tank supplies gasoline. Using E0 (100% gasoline) Separate placement of Fuel Tank Using E100 starts at low temperature Separate placement of Fuel Tank Gasoline Gasoline Injector Injector air air intake air Gasoline Fuel tank intake air exhaust E100 Fuel tank exhaust Quality Assurance by D&D Quality Assurance by D&D Corresponding the customer usage: EIPF (Electrical Integration PlatForm) “The check system which does not over look a program bug in the Electron/Electrical complicated circuit ” Quality Assurance by Manufacturing 1. Corporate standard 2. Project quality management Project Project quality quality management management Standards/Tools Standards/Tools Corporate Standard Standard Corporate Planning Development Trial Production Quality Quality assurance assurance by by D&D D&D Quality Quality assurance assurance by by Manufacturing Manufacturing Supplier Supplier quality quality assurance assurance 3. Field quality management Quality Quality analysis analysis // improvement improvement RS RS // Warranty Warranty management management Service Service management management Quality Assurance by Manufacturing Quality Assurance by Manufacture Correspondence of SOP: Dispersion reduce 【SOP preparation stage】 Interference during transfer in press process Robot teaching in body process Robot teaching in paint process 【SOP stage】 Paint Quality check by zebra Measurement of Fit/Gap/ Flash by laser sensor 100% driving inspection Supplier Quality Assurance 1. Corporate standard 2. Project quality management Project Project quality quality management management Standards/Tools Standards/Tools Corporate Standard Standard Corporate Planning Development Trial Production Quality Quality assurance assurance by by D&D D&D Quality Quality assurance assurance by by Manufacturing Manufacturing Supplier Supplier quality quality assurance assurance 3. Field quality management Quality Quality analysis analysis // improvement improvement RS RS // Warranty Warranty management management Service Service management management Supplier Quality Assurance Supplier Quality Assurance SQA (Supplier Quality Assurance) Partnership Supplier FQIA: ANPQP: ASES: SSC: NQA: FQIA ANPQP ASES SSC NQA GSQM Field Quality Investigation Analysis Alliance New Product Quality Procedure Alliance Supplier Evaluation Standard Supplier Score Card Nissan supplier Quality Award GSQM: Global Supplier Quality Meeting Nissan Supplier Quality Assurance Supplier Quality Assurance ANPQP (Alliance New Product Quality Procedure) Planning Design Production Production Preparation Special controlled parts activity ANPQP North American supplier European supplier Apply ANPQP to all suppliers For Renault / Nissan products The other areas suppliers Japanese supplier Supplier Quality Assurance Supplier Quality Assurance ASES (Alliance Supplier Evaluation Standard) 【Supplier evaluation before sourcing】 Number of Suppliers evaluated (2001 ~2006) E-EUR W-EUR R N RUSSIA R N R N CHINA TURKY R N IRAN R N INDIA R N R N R N THAI S-AFRICA R N R N US, CANADA KOREA TWN MLY R N IDN R N R N JAPAN R N R N MEXICO R N COLUMBIA R N BRAZIL PHL R N ARG R N R N Supplier Quality Assurance Supplier Quality Assurance SSC: Supplier Score Card 【Supplier evaluation after sourcing】 The one that supplier’s quality performance was evaluated based on each quality index. SSC Evaluation item Delivery quality (PPM) Supplier Quality improvement activity Sourcing information Field Quality (Warranty) Countermeasure period (Lead time) Nissan Quality Award(NQA) Response Important Quality problem (R/S) SSC=Supplier Score card PPM=Parts Per Million Excellent supplier Supplier Quality Assurance Supplier Quality Assurance GSQM (Global Supplier Quality Meeting) Company F Company B Company C Company D Company A Company G Company E GSQM is conducted by both Supplier and Nissan QA top management. Solve common issues of suppliers Supplier Quality Assurance Supplier Quality Assurance Reliability tool utilize Phenomenon Factor ⇒ List up of potential failure mode ⇒Decision of quality requirement for each failure mode - Failure mode Y - Failure mode Z ⇒ Suspected cause ⇒ Effect on upper level ⇒ Degree of importance Failure mode -Specification x -Specification y x y z・・・・ Concept - Failure mode X Design Process A B C D・・・・ Specification Design ⇒Setting up inspection technical standard for quality requirement FTA D-FMEA Part Process Clarification of quality assurance process P-FMEA Process Manufacturing (Production, Inspection) - Equipment failure - Material failure Improvement - Human error ⇒Probable cause ⇒Effect on product ⇒ Degree of importance for process failure Specification on drawing ○○mm±△ ・・・・ Process condition Condition of temp. ℃±℃ Control item of Process etc... Quality analysis / improvement 1. Corporate standard 2. Project quality management Project Project quality quality management management Standards/Tools Standards/Tools Corporate Standard Standard Corporate Planning Development Trial Production Quality Quality assurance assurance by by D&D D&D Quality Quality assurance assurance by by Manufacturing Manufacturing Supplier Supplier quality quality assurance assurance 3. Field quality management Quality Quality analysis analysis // improvement improvement RS RS // Warranty Warranty management management Service Service management management Quality analysis / improvement Quality analysis / improvement FQIA (Field Quality Investigation Analysis) 【Concept of FQIA activity】 Design & Development Supplier Field Quality Center Mecca of Quality Improvement Quality Assurance Production Knowledge Tool Standard Practice of 3 GEN principle Genba ・ Genbutsu ・ Genjitsu Quality analysis / improvement Quality analysis / improvement FQIA (Field Quality Investigation Analysis) FQC Nissan Global Network Farmington Hills (NTC-NA) Sept. 06 Cranfield, UK (NTC-E) Mar. 07 Kanagawa, Japan (NTC) Feb. 07 Smyrna, US Sept. 06 <Prospectus of FQC > * Quality is the foundation of brand * There is no terminal for Quality improvement * There is no royal road for Quality improvement * FQC is a mecca of Quality improvement FQC: Field Quality Center NTC: Nissan Technical Center NTC-NA: Nissan Technical Center -USA NTC-E: Nissan Technical Center-Europe Quality analysis / improvement Quality analysis / improvement FQIA (Field Quality Investigation Analysis) Parts Collection Nissan Technical Center Parts Investigation Joint Analysis Quality analysis / improvement 【FQC: EXHIBITION AREA】 Quality analysis / improvement Quality analysis / improvement FQIA: Field Quality Investigation Analysis 【FQC: FQIA activity area】 Quality analysis / improvement Quality analysis / improvement Quality analysis / improvement RCEP(Reliability Comparison Evaluation Program) Collection and analysis of quality information that exceeds warranty period (deterioration and durability quality) Investigation Market investigation RCEPSEMINAR Quality mindset 3~4years running vehicle Quality Improvement TCSX 100,000Km drive Countermeasure request Quality improvement request Design & Development Production Supplier RS / Warranty management 1. Corporate standard 2. Project quality management Project Project quality quality management management Standards/Tools Standards/Tools Corporate Standard Standard Corporate Planning Development Trial Production Quality Quality assurance assurance by by D&D D&D Quality Quality assurance assurance by by Manufacturing Manufacturing Supplier Supplier quality quality assurance assurance 3. Field quality management Quality Quality analysis analysis // improvement improvement RS RS // Warranty Warranty management management Service Service management management Product attractiveness quality PQ: Perceived Quality Definition of PQ The pleasure of looking, touching and operating by customers Luxury High Quality Amenity Comfort Easiness ・ Good Looking ・ Fit and Finish ・ Operating Quality ・ Cozy touch and Sound ・ Seat Comfort Product attractiveness quality PQ: Perceived Quality (Sensibility quality) Product attractiveness quality PQ: Perceived Quality (Sensibility quality) Product attractiveness quality PQ: Perceived Quality (Sensibility quality) INT Lighting Product attractiveness quality PQ: Perceived Quality (Sensibility quality) Evaluation of PQ Evaluation and validation of over 800 customer view point from the time of design process. PQ after launch survey Survey is conveyed at the launched market with the aim to reflect the results to the next model and validation of target achievement level of SOP models. Contents Management situations surrounding quality Quality improvement activities Ending remarks Ending Remarks Growth of Royal Customer Cycle Visit to dealer rejecter Perceived Quality Repurchase Sales Quality Purchases rejecter Durability Quality Attractiveness Quality Durability Initial Service Quality Ownership experience Initial Quality 3MIS Uninterrupted of12MIS Royal Customer Cycle creation