• • • • Caveat Emptor Thanks to the LCLS Linac for the opportunity to talk about Design Organization / Documentation. Any credibility comes from the long study of SLAC/SSRL & NLC work process. – I lie, cheat, and will steal when necessary! – I have experienced or were possibly personally responsible for many really good SLAC failures! – I’m a proponent revisionism! – I’m lazy to hell. Personally driven to help improve ‘project design process’ by promoting clear, simple, uniform, and early design product directions. I will need help to collect critical design information to improve project management and demonstrate clearly exceptional designs. Carl Rago LCLS Linac Design Document Presentation I 1 NLC 8-Pack Carl Rago LCLS Linac Design Document Presentation I 2 Project Levels • Upper Management – DOE Reports – Cost / Resources/ Schedule – WEB Interface / Security • Group / Sub System Management – Component Configuration Control – Component and Sub System Specifications – Traceability • Design Management – Component Models / Simulations / Excel & Project Sheets /Schematics /Production Control Documents Carl Rago LCLS Linac Design Document Presentation I 3 Project Documentation Relational DB Reports (Images) Component File Requirements Cost/Resources/Schedule Plan Specifications Mechanical Models Interface Control Parts & Assemblies Schematics & Images Document Storage Carl Rago Production Travelers QC Documentation Performance Data LCLS Linac Design Document Presentation I 4 Carl Rago LCLS Linac Design Document Presentation I 5 Documentation Needs • Mechanical Design Server – LLNL & ANL Interface to Tankersley – Excel Component Organization • LCLS Secure SLAC Drive (Access) – Documentation Folder under Project? Carl Rago LCLS Linac Design Document Presentation I 6