Sacramento City College Unit Plan Completed Spring 2002 Department Name: Photography Department Spokesperson: Andrew N. De Lucia Division Dean: Phil Cypret Elements of the Unit Plan: Place an X in the boxes of included elements Accomplishments X Three Year Plan X Action Plan X Budget Request X Budget Narrative Key Performance Indicators Photography # Action Item Department / Accomplishments 2001 - 2002 Goal 3: Linkage to other Plans 3a 3b 3c 3d 3e 3f Goal 4: 4a 4b 4c 4d 4e 4f Other Accomplishments Year-end status and accomplishments 3 – Year Plan Photography Department Long Range Plan 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Purchase 32 new computers/computer lab RN322 Continued start up of new Digital Video program New Camera system for studio, photo department has NO Cameras. Budget Increase. From 8,500 to 20,302 Budget has been the same since 1969. Satellite remote distance learning on location program 2003 – 2004 2004 – 2005 2005 2006 X X X X X X X Photography # Department / Action Plan 2002 – 2003 Action Item 1a 1b Computers for computer lab (RN322) Video Cameras / Computers (RN322) 2a Camera(s) (still) for studio. Goal 1: Linkage to other Plans Computer Class Video class Year-end status and accomplishments Have not yet received any. Received one camera to use jointly with Railroad classes, more needed with support equipment. Goal 2: Studio is complete (backgrounds) next stage is Camera(s) (we have none). 2b Goal 3: 3a Satellite remote distance learning on location program This idea is new to us and we are working to start a program with this new technology. 3b Goal 4: 4a Increase our budget All programs (14) Our budget has been the same since 1969, we have requested an increase. Photography Line # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Totals: Description Department Budget Request - 2003 - 2004 Operating New Instruction Marketing Budget Computers Equipment Furniture Program Supplies Materials Increase Start-up Computers 22,000 Digital Video program start up Our current Instructional Supplies (since 1969) 10,302 Mobile satellite remote distance learning system 120,000 8,500 50,000 Furniture program start up 1,000 10,302 8,500 250,072 Faculty Hires 1 full time 250,072 Cameras / Still Remodel Space 22,000 1,000 170,000 Staff Hires Student Hires Temp Hires 2 part time Budget Narrative 2003 - 2004 Photography Line # 1 Description Computers Total Amount 250,072 Priority Rank 1 Department Justification 40 computers in the Photography lab are in need of replacement. Apple’s Mac OS X and Photoshop 7.0 have been available for some time, but our lab is not capable of running this industry standard software effectively. 0S X requires 128MB of RAM for the system alone. Photoshop 7.0, Final Cut Pro and the other software packages we use require very large hard drives and very fast computers. Hard drives of 100 to 200GB’s, 1.5 GB’s of RAM and processors speeds of dual 1Ghz or faster, and computers with DVD and CD authoring capabilities are necessary to meet industry standards as well as student needs. Large transfers of student files require faster networking hardware between computers. Transfer rates with the newer computers start at 100 base T. This allows faster printing from unusually large files. Our existing computers do not meet these needs. Our department has expanded into teaching video classes. The current digital photo lab lacks the hardware and software support to run these software packages and does not meet industry standards. Student demand for classes in digital photography, and digital video has increased dramatically since the new lab was installed in 1998. NO additional building modification is needed. This Price shown includes all peripherals that meet industry standards. The Photography department has not had any camera purchase since 1976. all of our equipment is beyond repair as parts are no longer available. 2 3 4 5 6 7 Cameras / Still Digital Video program start up Our current Instructional Supplies (8,500 since 1969) Mobile satellite remote distance learning system Furniture program start up 22,000 4 This amount is for a new program startup of Digital video classes. First class offered had a 100% increase in students on the first offering. 120,000 3 Our department has been operating on a $8,500 budget since 1969. This amount shows the increase needed to remain up to date with rising costs of materials. Costs of materials has risen as much as 400%. 10,302 2 50,000 6 Mobile Satellite remote distance learning on location system. This is new to the photographic industry and is used world wide in ALL photography taken by news photographers (newspaper and magazine). Satellite transmission in now used by all news agencies. 1,000 5 Furniture to hold new computers on line one(1). Key Performance Indictors for Photography Department