FAC-003-AB-1 Transmission Vegetation Management Program Template Year: 20xx Rev. # Date mmm dd, yyyy Name/Position Author Checked Approved Signature Date FAC-003-AB-1 Transmission Vegetation Management Program REVISION HISTORY Rev. # Description Author Date Page 2 of 7 FAC-003-AB-1 Transmission Vegetation Management Program 1 OBJECTIVE....................................................................................................... 4 2 PRACTICES ...................................................................................................... 5 2.1 Clearance ............................................................................................................... 5 2.2 Personnel Qualifications ................................................................................... 5 3 PROCEDURES.................................................................................................. 6 3.1 Mitigation Measures - Clearance 1 Exceptions ........................................... 6 3.2 Communication of Imminent Threats ............................................................ 6 4 WORK SPECIFICATIONS ................................................................................ 7 4.1 Site Work Specification ..................................................................................... 7 4.2 Inspection Schedule ........................................................................................... 7 Page 3 of 7 FAC-003-AB-1 Transmission Vegetation Management Program 1 OBJECTIVE ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Page 4 of 7 FAC-003-AB-1 Transmission Vegetation Management Program 2 PRACTICES In the completion of this section, please follow the guidelines/examples as set out in Section 2 of the document, “TVMP Requirements” Note: The following practices are a minimum requirement for TFO’s. Other practices may be added or referenced as necessary. 2.1 Clearance Table 1: Clearances Clearance 1 distance (m) = estimated annual growth + 1m safety + Flash over Voltage (kV) Deciduous 1yr 2yrs 3yrs Clearance 2 distance (m) Non Deciduous 4yrs 1yr 2yrs 3yrs 4yrs 2.2 Personnel Qualifications Table 2: Position Requirements Position Position Requirements Acceptable Documentation Table 3: Individual Qualifications Individual Position Position Requirements Applicable Documentation 2.3 __________________________ 2.4 __________________________ Page 5 of 7 FAC-003-AB-1 Transmission Vegetation Management Program 3 PROCEDURES In the completion of this section, please follow the guidelines/examples as set out in Section 3 of the document, “TVMP Requirements” Note: The following procedures are a minimum requirement for TFO’s. Other procedures may be added or referenced as necessary. 3.1 Mitigation Measures - Clearance 1 Exceptions 3.2 Communication of Imminent Threats 3.3 __________________________ 3.4 __________________________ Page 6 of 7 FAC-003-AB-1 Transmission Vegetation Management Program 4 Work Specifications In the completion of this section, please follow the guidelines/examples as set out in Section 4 of the document, “TVMP Requirements” 4.1 Site Work Specification 4.2 Inspection Schedule As part of the Vegetation Management Plan the TFO shall provide a list of all scheduled patrols for the NERC related lines plus all system critical lines. Patrols to include but not limited to: Annual Fall Air Patrol (YAP) – off cycle work identified Field Verification of off cycle work identified during YAP, this work may not be included in Vegetation Management Plan Detailed Ground Patrol (DGP) Cyclical Vegetation Management Patrols Detailed Air Patrols (DAP), both cyclical and as required The following table identifies when each line (or line segment) is planned to be inspected and tracks when the work is actually done. Line Inspection Type Planned Year Date Complete Applicable Documentation Page 7 of 7