CXC Manager’s Status Report
Chandra Users’ Committee Meeting
Roger J. Brissenden
25 January 2005
Topics
• Program Level Status
– Program Management
– Spacecraft
– Mission Planning
– Science Instruments and Calibration
– OCC
– Data Processing
– CXCDS
– CDO
– Education and Outreach
• Mission Metrics
• Chandra Grant Awards
25 January 2005 CXC Status Report/CUC Page 2
Program Level Status 6/30/04 – 1/25/05
• Program Management
– Successfully passed the 5 year milestone on July 23, 2004!
– CXC remained within budget for FY04 and expect FY05 costs to track to POP04 plan. HRC, ACIS & HETG PI subcontracts moved under SAO, 1 Oct 04.
– Staffing: Martin Elvis resigned as Lead for Science Data System
Planning, Jonathon McDowell appointed new Lead with Mike
Wise (MIT) as Deputy.
– Tom Aldcroft certified as 3 rd Chandra Flight Director (replaces
Rob Cameron).
– Facilities: Draper Labs moving ahead with new Hill building attachment. ~1500 sf floor space to be lost to 7 th floor including the conference room and 5 offices. ACIS room to be sacrificed to allow for new conference room to be built. ACIS Equipment has been relocated to the TST room.
25 January 2005 CXC Status Report/CUC Page 3
25 January 2005 CXC Status Report/CUC Page 4
25 January 2005 CXC Status Report/CUC Page 5
Present 7 th Floor Layout
ACIS
25 January 2005 CXC Status Report/CUC Page 6
Proposed
7 th Floor Modifications
25 January 2005 CXC Status Report/CUC Page 7
Program Level Status 6/30/04 – 1/25/05
• Spacecraft
– Continues to operate extremely well overall
– OBC patch for SCS 101 and SCS 31. Modify 101 to contain all CPE patches; modify 31 to call 101 during eclipse ops, 8/23. Improved eclipse safemode transition.
– Helium Channel replacement patch, 9/1, for use of HRC anti-coincidence shield data in place of EPHIN as radiation detector. 6 cases of EPHIN rail voltage anomaly due to high temperatures however no indication of performance degradation; plan to budget ~6 rail voltage drops per year.
– Conducted ACA dark current calibration 9/9 and 12/24 – shows expected trend in warm pixel increase
– Nominal ’04 summer and ’05 winter eclipse seasons, nominal Lunar
Eclipse, 11/12
– Radiation events during ’04 eclipse season resulted in contingency commanding and 3 Normal Sun Mode (NSM) recoveries.
– Uneventful Leonids passage 11/19
– Anomalies: Propulsion line cooling, EPHIN rail voltage, unexpected NSM transition
25 January 2005 CXC Status Report/CUC Page 8
Program Level Status 6/30/04 – 1/25/05
• Mission Planning
– Thermal heating and constraints starting to impact mission planning
– 10 SCS 107 runs due to high radiation events (includes major event last week)
– 7 load interrupt TOOs:
Date
07/05/04
08/14/04
Target
AXP 1048-5937
GRB 040812
Request
1 day
3 days
08/31/04
09/13/04
10/06/04
10/06/04
12/13/04
XRF 040825
GRB 040912
GRB 041006
SGR 1806-20
BL 0520+675
3 days
3 days
3 days
3 days
1 day
25 January 2005 CXC Status Report/CUC Page 9
Program Level Status 6/30/04 – 1/25/05
• Science Instruments and Calibration
– Operating extremely well overall
– ACIS bakeout decision postponed in Sept due to safety concern over use of abort heaters, and simulation questions over contaminant volatility
– HRC anticoincidence shield rates show acceptable correlation with high energy EPHIN channel. Antico rates exceeded proposed threshold for prior radiation safing event during mission, i.e., a safe EPHIN alternative
– 2004 Calibration Review held 10/25-10/26
• OCC
– Linux Migration initial config. 10/4, test started 12/1, to ops 3-4/05
– DSN unexpected commanding, 9/11
Date
07/23/04
12/06/04
12/06/04
25 January 2005
Version
OFLS 11.0
ONLS 3.10.6
OFLS 11.3
CXC Status Report/CUC
Change
Linux port
Linux port; test fixes
Linux port
Page 10
Program Level Status 6/30/04 – 1/25/05
• Data Processing
– Automatic processing is current; data delivery time averaged <4 days
– Planning underway for Re-processing #3
• CXCDS
Date
07/07/04
11/29/04
12/14/04
12/15/03
Version
CIAO 3.1
CXCDS 7.4
CXCDS 7.5
CIAO 3.2
Change
Tools, data model, infrastructure
Automated V&V, MTA DB, AGASC 1.6
Cycle 7 support
Tool updates (e.g., mkacisrmf
), bug fixes
– CalDB 2.28 released 8/11, 2.29 on 11/29, and 3.0 on 12/15
25 January 2005 CXC Status Report/CUC Page 11
Program Level Status 6/30/04 – 1/25/05
• GO and Fellows Program, CDO
– Cycle 6 stage 2 cost review held 10/20, results sent to observers 11/1
– Cycle 6 EPO review held 10/20, results announced 11/16
– Cycle 7 CfP released on schedule 12/15
– Cycle 8 Fellows review held 1/19
– Other: Galaxies workshop 7/7, Fellows Symposium 10/13
• Education and Public Outreach
– 14 Chandra press releases and 7 additional image releases made
25 January 2005 CXC Status Report/CUC Page 12
Mission Metrics
MUPS Fuel Usage
25 January 2005 CXC Status Report/CUC Page 13
Mission Metrics (con’t)
25 January 2005 CXC Status Report/CUC Page 14
Mission Metrics (con’t)
Scheduled Observing Efficiency
Scheduled Observations
Month
Jan-04
Feb-04
Mar-04
Apr-04
May-04
Jun-04
Jul-04
Aug-04
Sep-04
Oct-04
Nov-04
Dec-04
25 January 2005
Seconds in month
(ks)
2678.4
2505.6
2678.4
2592.0
2678.4
2592.0
2678.4
2678.4
2592.0
2678.4
2592.0
2678.4
Scheduled Observing Time
(ks)
1700.3
1807.6
1727.7
1767.3
1896.3
1769.7
1687.7
1718.9
1640.8
1827.3
1439.6
1796.1
CXC Status Report/CUC
Scheduled Observing
Efficiency
0.63
0.72
0.65
0.68
0.71
0.68
0.63
0.64
0.63
0.68
0.56
0.67
Page 15
Mission Metrics (con’t)
Observing Efficiency
0.80
0.75
0.70
0.65
0.60
0.55
0.50
0.45
0.40
Jan-04 Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04
25 January 2005 CXC Status Report/CUC Page 16
Month
Jan-04
Feb-04
Mar-04
Apr-04
Data Delivery Effectiveness
As of middle of following month
Number
Deliv
Number
Outstanding
Number
Deliv
As of 1/13/05
Number
Outstanding
65
59
53
36
Number of Obs
Days to Data Delivery
Min
1
1
0
0
Avg
6
5
3
4
Max
19
13
39
18
May-04
Jun-04
Jul-04
Aug-04
Sep-04
Oct-04
Nov-04
Dec-04
25 January 2005
50
66
52
53
50
44
36
73
1
1
0
0
0
1
1
0
4
3
3
4
5
5
5
2
65
59
53
36
23
27
10
13
12
22
12
7
50
66
52
53
50
44
36
73
CXC Status Report/CUC
0
0
0
0
0
0
0
0
0
0
0
0
50
66
52
53
50
44
36
73
65
59
53
36
0
0
0
0
0
0
0
0
0
0
0
0
Page 17
Apr-04
May-04
Jun-04
Jul-04
Aug-04
Sep-04
Oct-04
Nov-04
Dec-04
Month of Data
Delivery
No. Grants
(1)
Chandra Grant Awards
As of middle of following month
No. Grants
Awarded
No.
Outstan ding
Avg days to award (2) *
No.
Grants
Award ed
No.
Outstand ing
As of 1/12/05
Outstanding Awards
Proposal no, Comments
Grants to Non-Federal Institutions
Jan-04 54
Feb-04
Mar-04
14
23
35
12
15
19
2
8
40
35
15
54
14
22
10
4
31
11
4
15
13
12
10
2
0
22
7
3
0
4
5
3
8
4
9
8
10
12
6
6
1
22 n/a
25
18
10
16
19 n/a
38
9
4
22
11
4
15
13
12
9
0
0
1 5700535 – PI changed institution, req cancelled. Reissued in Sep. 04.
0
0
0
0
0
1 5300202
1 5200622
0
9 6200274, 6200742, 6400243,
6400892, 6500974, 6610143,
6700116, 6700990 (A&B)
* Grant awards delayed due to SAO conversion to new Institute-wide financial software system.
25 January 2005 CXC Status Report/CUC Page 18
Chandra Grant Awards
Month of Data
Delivery
No. Grants
(1)
As of middle of following month
No. Grants
Awarded
No.
Outstan ding
Avg days to award
(2) *
No.
Grants
Award ed
No.
Outstan ding
As of 1/12/05
Outstanding Awards
Proposal no, Comments
Grants to Federal Institutions
Jan-04 6
Feb-04
Mar-04
3
1
Apr-04
May-04
Jun-04
1
1
2
1
2
1
0
1
0
5
1
0
1
0
2
21
24
7 n/a
7 n/a
6
3
1
1
1
2
Jul-04
Aug-04
Sep-04
Oct-04
0
3
1
0
0
0
0
0
0
3
1
0 n/a n/a n/a n/a
0
3
1
0
0
0
0
0
Nov-04
Dec-04
0
0
0
0
0
0 n/a n/a
0
0
0
0
(1)Number of grants eligible for award, for which data were delivered to the observer in the month
(2)Average days from data delivery to grant award to observer.
0
0
0
0
0
0
25 January 2005 CXC Status Report/CUC Page 19
Grant Award Efficiency
125
100
75
50
25
0
CXC GO Data Distribution (# Of Days from Data Distribution to Award )
July 1, 2004 through October 31, 2004
SAO Days to Award SAO Outstanding Awards MSFC Outstanding Awards
25 January 2005 CXC Status Report/CUC Page 20