CXC Manager’s Status Report

Chandra Users’ Committee Meeting

Roger J. Brissenden

25 January 2005

Topics

• Program Level Status

– Program Management

– Spacecraft

– Mission Planning

– Science Instruments and Calibration

– OCC

– Data Processing

– CXCDS

– CDO

– Education and Outreach

• Mission Metrics

• Chandra Grant Awards

25 January 2005 CXC Status Report/CUC Page 2

Program Level Status 6/30/04 – 1/25/05

• Program Management

– Successfully passed the 5 year milestone on July 23, 2004!

– CXC remained within budget for FY04 and expect FY05 costs to track to POP04 plan. HRC, ACIS & HETG PI subcontracts moved under SAO, 1 Oct 04.

– Staffing: Martin Elvis resigned as Lead for Science Data System

Planning, Jonathon McDowell appointed new Lead with Mike

Wise (MIT) as Deputy.

– Tom Aldcroft certified as 3 rd Chandra Flight Director (replaces

Rob Cameron).

– Facilities: Draper Labs moving ahead with new Hill building attachment. ~1500 sf floor space to be lost to 7 th floor including the conference room and 5 offices. ACIS room to be sacrificed to allow for new conference room to be built. ACIS Equipment has been relocated to the TST room.

25 January 2005 CXC Status Report/CUC Page 3

25 January 2005 CXC Status Report/CUC Page 4

25 January 2005 CXC Status Report/CUC Page 5

Present 7 th Floor Layout

ACIS

25 January 2005 CXC Status Report/CUC Page 6

Proposed

7 th Floor Modifications

25 January 2005 CXC Status Report/CUC Page 7

Program Level Status 6/30/04 – 1/25/05

• Spacecraft

– Continues to operate extremely well overall

– OBC patch for SCS 101 and SCS 31. Modify 101 to contain all CPE patches; modify 31 to call 101 during eclipse ops, 8/23. Improved eclipse safemode transition.

– Helium Channel replacement patch, 9/1, for use of HRC anti-coincidence shield data in place of EPHIN as radiation detector. 6 cases of EPHIN rail voltage anomaly due to high temperatures however no indication of performance degradation; plan to budget ~6 rail voltage drops per year.

– Conducted ACA dark current calibration 9/9 and 12/24 – shows expected trend in warm pixel increase

– Nominal ’04 summer and ’05 winter eclipse seasons, nominal Lunar

Eclipse, 11/12

– Radiation events during ’04 eclipse season resulted in contingency commanding and 3 Normal Sun Mode (NSM) recoveries.

– Uneventful Leonids passage 11/19

– Anomalies: Propulsion line cooling, EPHIN rail voltage, unexpected NSM transition

25 January 2005 CXC Status Report/CUC Page 8

Program Level Status 6/30/04 – 1/25/05

• Mission Planning

– Thermal heating and constraints starting to impact mission planning

– 10 SCS 107 runs due to high radiation events (includes major event last week)

– 7 load interrupt TOOs:

Date

07/05/04

08/14/04

Target

AXP 1048-5937

GRB 040812

Request

1 day

3 days

08/31/04

09/13/04

10/06/04

10/06/04

12/13/04

XRF 040825

GRB 040912

GRB 041006

SGR 1806-20

BL 0520+675

3 days

3 days

3 days

3 days

1 day

25 January 2005 CXC Status Report/CUC Page 9

Program Level Status 6/30/04 – 1/25/05

• Science Instruments and Calibration

– Operating extremely well overall

– ACIS bakeout decision postponed in Sept due to safety concern over use of abort heaters, and simulation questions over contaminant volatility

– HRC anticoincidence shield rates show acceptable correlation with high energy EPHIN channel. Antico rates exceeded proposed threshold for prior radiation safing event during mission, i.e., a safe EPHIN alternative

– 2004 Calibration Review held 10/25-10/26

• OCC

– Linux Migration initial config. 10/4, test started 12/1, to ops 3-4/05

– DSN unexpected commanding, 9/11

Date

07/23/04

12/06/04

12/06/04

25 January 2005

Version

OFLS 11.0

ONLS 3.10.6

OFLS 11.3

CXC Status Report/CUC

Change

Linux port

Linux port; test fixes

Linux port

Page 10

Program Level Status 6/30/04 – 1/25/05

• Data Processing

– Automatic processing is current; data delivery time averaged <4 days

– Planning underway for Re-processing #3

• CXCDS

Date

07/07/04

11/29/04

12/14/04

12/15/03

Version

CIAO 3.1

CXCDS 7.4

CXCDS 7.5

CIAO 3.2

Change

Tools, data model, infrastructure

Automated V&V, MTA DB, AGASC 1.6

Cycle 7 support

Tool updates (e.g., mkacisrmf

), bug fixes

– CalDB 2.28 released 8/11, 2.29 on 11/29, and 3.0 on 12/15

25 January 2005 CXC Status Report/CUC Page 11

Program Level Status 6/30/04 – 1/25/05

• GO and Fellows Program, CDO

– Cycle 6 stage 2 cost review held 10/20, results sent to observers 11/1

– Cycle 6 EPO review held 10/20, results announced 11/16

– Cycle 7 CfP released on schedule 12/15

– Cycle 8 Fellows review held 1/19

– Other: Galaxies workshop 7/7, Fellows Symposium 10/13

• Education and Public Outreach

– 14 Chandra press releases and 7 additional image releases made

25 January 2005 CXC Status Report/CUC Page 12

Mission Metrics

MUPS Fuel Usage

25 January 2005 CXC Status Report/CUC Page 13

Mission Metrics (con’t)

25 January 2005 CXC Status Report/CUC Page 14

Mission Metrics (con’t)

Scheduled Observing Efficiency

Scheduled Observations

Month

Jan-04

Feb-04

Mar-04

Apr-04

May-04

Jun-04

Jul-04

Aug-04

Sep-04

Oct-04

Nov-04

Dec-04

25 January 2005

Seconds in month

(ks)

2678.4

2505.6

2678.4

2592.0

2678.4

2592.0

2678.4

2678.4

2592.0

2678.4

2592.0

2678.4

Scheduled Observing Time

(ks)

1700.3

1807.6

1727.7

1767.3

1896.3

1769.7

1687.7

1718.9

1640.8

1827.3

1439.6

1796.1

CXC Status Report/CUC

Scheduled Observing

Efficiency

0.63

0.72

0.65

0.68

0.71

0.68

0.63

0.64

0.63

0.68

0.56

0.67

Page 15

Mission Metrics (con’t)

Observing Efficiency

0.80

0.75

0.70

0.65

0.60

0.55

0.50

0.45

0.40

Jan-04 Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04

25 January 2005 CXC Status Report/CUC Page 16

Month

Jan-04

Feb-04

Mar-04

Apr-04

Data Delivery Effectiveness

As of middle of following month

Number

Deliv

Number

Outstanding

Number

Deliv

As of 1/13/05

Number

Outstanding

65

59

53

36

Number of Obs

Days to Data Delivery

Min

1

1

0

0

Avg

6

5

3

4

Max

19

13

39

18

May-04

Jun-04

Jul-04

Aug-04

Sep-04

Oct-04

Nov-04

Dec-04

25 January 2005

50

66

52

53

50

44

36

73

1

1

0

0

0

1

1

0

4

3

3

4

5

5

5

2

65

59

53

36

23

27

10

13

12

22

12

7

50

66

52

53

50

44

36

73

CXC Status Report/CUC

0

0

0

0

0

0

0

0

0

0

0

0

50

66

52

53

50

44

36

73

65

59

53

36

0

0

0

0

0

0

0

0

0

0

0

0

Page 17

Apr-04

May-04

Jun-04

Jul-04

Aug-04

Sep-04

Oct-04

Nov-04

Dec-04

Month of Data

Delivery

No. Grants

(1)

Chandra Grant Awards

As of middle of following month

No. Grants

Awarded

No.

Outstan ding

Avg days to award (2) *

No.

Grants

Award ed

No.

Outstand ing

As of 1/12/05

Outstanding Awards

Proposal no, Comments

Grants to Non-Federal Institutions

Jan-04 54

Feb-04

Mar-04

14

23

35

12

15

19

2

8

40

35

15

54

14

22

10

4

31

11

4

15

13

12

10

2

0

22

7

3

0

4

5

3

8

4

9

8

10

12

6

6

1

22 n/a

25

18

10

16

19 n/a

38

9

4

22

11

4

15

13

12

9

0

0

1 5700535 – PI changed institution, req cancelled. Reissued in Sep. 04.

0

0

0

0

0

1 5300202

1 5200622

0

9 6200274, 6200742, 6400243,

6400892, 6500974, 6610143,

6700116, 6700990 (A&B)

* Grant awards delayed due to SAO conversion to new Institute-wide financial software system.

25 January 2005 CXC Status Report/CUC Page 18

Chandra Grant Awards

Month of Data

Delivery

No. Grants

(1)

As of middle of following month

No. Grants

Awarded

No.

Outstan ding

Avg days to award

(2) *

No.

Grants

Award ed

No.

Outstan ding

As of 1/12/05

Outstanding Awards

Proposal no, Comments

Grants to Federal Institutions

Jan-04 6

Feb-04

Mar-04

3

1

Apr-04

May-04

Jun-04

1

1

2

1

2

1

0

1

0

5

1

0

1

0

2

21

24

7 n/a

7 n/a

6

3

1

1

1

2

Jul-04

Aug-04

Sep-04

Oct-04

0

3

1

0

0

0

0

0

0

3

1

0 n/a n/a n/a n/a

0

3

1

0

0

0

0

0

Nov-04

Dec-04

0

0

0

0

0

0 n/a n/a

0

0

0

0

(1)Number of grants eligible for award, for which data were delivered to the observer in the month

(2)Average days from data delivery to grant award to observer.

0

0

0

0

0

0

25 January 2005 CXC Status Report/CUC Page 19

Grant Award Efficiency

125

100

75

50

25

0

CXC GO Data Distribution (# Of Days from Data Distribution to Award )

July 1, 2004 through October 31, 2004

SAO Days to Award SAO Outstanding Awards MSFC Outstanding Awards

25 January 2005 CXC Status Report/CUC Page 20