FAC Presentation 02-08-2012

advertisement
Bond Construction Update
Facilities Advisory Committee
Long Beach Community College District
February 8, 2012
EDUCATE  ENGAGE  EMPOWER
1
Agenda

Current Construction Projects







Upcoming Construction Projects




LAC Building A – Student Services Retrofit
LAC Building I (Bookstore)
LAC Master Landscape
LAC Stadium Parking Lot Lights and Veterans Stadium Lights
PCC MDAB (Multi-Disciplinary Academic Building)
PCC Building CC Retrofit
LAC Math Technology Building
PCC Building GG
LAC Building C Retrofit
Q&A
2
Current Construction Projects
LAC Building A – Student Services Retrofit
Measure E 2008




Considerable progress since last update
Exterior envelope & roof sheeting being installed
Structural walls on new addition in progress
End of construction anticipated Fall of 2012
3
Current Construction Projects
LAC Building I - Measure E 2008



Building construction complete, casework in progress
Punch list items and fire alarm almost complete
Move in planned February 2012
4
Current Construction Projects
LAC Building I - Measure E 2008



Exterior Landscape has started
Landscape includes privacy wall and dense planting
Project expected to be complete in March 2012
5
Current Construction Projects
LAC Master Landscape - Measure E 2008





Phase 1, South
of Bldg A will
bid Spring 2012
Construction to
start in summer
2012
Passive Storm
water retention
system
Low water use
Plants and trees
Pedestrian
pathway
alignment
6
Current Construction Projects
LAC Master Landscape - Measure E 2008





Phase 2, North
of Bldg A will
bid Spring 2013
Construction to
start in summer
2013
Active Storm
water retention
system
Low water use
Plants and trees
Pedestrian
pathway
alignment
7
Current Construction Projects
Stadium Parking Lot Lights and Stadium Lighting
Measure E 2008


Stadium parking lot lights

Construction completed 1/6/2012

All old fixtures removed, bases demoed and asphalt patched

Energy efficient lights and late night feature
Stadium lighting retrofit

Awaiting final DSA approval
8
Current Construction Projects
PCC MDAB
(Multi-Disciplinary Academic Building)
Measure E 2008




MDAB building remodel project
Phase 1 of 2 currently under construction
Exterior envelope currently being constructed
Roof Membrane 100% complete
9
Current Construction Projects
PCC MDAB
(Multi-Disciplinary Academic Building)
Measure E 2008



Interior walls under construction
HVAC and Mechanical being installed
Phase 1 Project to be completed Summer 2012
10
Upcoming Construction Projects
PCC Building CC Retrofit - Measure E 2008




Building CC Fitness Center, offices and restrooms
Demolition and Hazmat removal mostly complete
Duration of project approximately 12 months
Anticipated end of construction Fall 2012
11
Upcoming Construction Projects
LAC Math Technology Building – Measure E 2008

Will house Math and Culinary Arts instructional program as well as
Reprographics




Final 3 Design Build Entities (DBE) presented their proposals
DBE with best proposal has been selected
Anticipate awarding at the February Board meeting
Anticipated start of construction 2013
12
Upcoming Construction Projects
PCC Building GG - Measure E 2008





Design Build delivery method
Request for Qualifications (RFQ) have been received and under review
16 Design Build Entities (DBE) short listed to 5
Building to house Health Services, EOPS, DSPS, Financial Aid, Cashier, A&R,
and Counseling
13
Estimated start of construction December 2013
Upcoming Construction Projects
LAC Building C Retrofit - Measure E 2008



Hired Architect to do design work
Program phase is currently ongoing
Work includes modernization of structure, classrooms spaces, and
office areas
14
liberal arts
Liberal Arts Campus
Site Plan
pacific coast
Pacific Coast Campus
Site Plan
QUESTIONS
&
ANSWERS
EDUCATE  ENGAGE  EMPOWER
17