Agenda

Completed Construction Projects


Current Construction Projects







LAC Building A – Student Services Retrofit
LAC Building I (Landscape)
LAC Master Landscape
LAC Veterans Stadium Lights
PCC MDAB (Multi-Disciplinary Academic Building)
PCC Building CC Retrofit
Upcoming Construction Projects




LAC Building I (Bookstore)
LAC Math Technology Building
PCC Building GG
LAC Building C Retrofit
Q&A
2
Completed Construction Projects
LAC Building I - Measure E 2008



Building construction complete
Move in complete
Bookstore is open for business
3
Current Construction Projects
LAC Building A – Student Services Retrofit
Measure E 2008




Progress on sheeting the roof
Interior wall framing in progress
Subfloor and utility installation in progress
Estimated completion date late fall 2012
4
Current Construction Projects
LAC Building A – Student Services Retrofit
Measure E 2008


Structural walls complete on new addition
Roof structure to follow
5
Current Construction Projects
LAC Building I Landscape - Measure E 2008



Exterior Landscape has started
Privacy wall started, planting to follow
Project expected to be complete in May 2012
6
Current Construction Projects
LAC Master Landscape - Measure E 2008





Phase 1, South
of Building A
Bid opening
date 5/22/2012
Construction to
start in summer
2012
Passive Storm
water retention
system
Low water use
Plants and trees
Pedestrian
pathway
alignment
7
Current Construction Projects
LAC Master Landscape - Measure E 2008





Phase 2, North
of Building A
will bid Spring
2013
Construction to
start in summer
2013
Active Storm
water retention
system
Low water use
Plants and trees
Pedestrian
pathway
alignment
8
Current Construction Projects
Veteran’s Stadium Lighting

Measure E 2008
Stadium lighting retrofit

Awaiting final DSA approval

Construction includes demo of old fixtures and installation of energy
efficient fixtures
9
Current Construction Projects
PCC MDAB
(Multi-Disciplinary Academic Building)
Measure E 2008




MDAB building remodel project
Phase 1 of 2 currently under construction
Exterior envelope 90% constructed
Roof Membrane 100% complete
10
Current Construction Projects
PCC MDAB
(Multi-Disciplinary Academic Building)
Measure E 2008



South side exterior curtain wall complete
Electrical distribution transformer complete
Phase 1 Project to be completed Summer 2012
11
Upcoming Construction Projects
PCC Building CC Retrofit - Measure E 2008




Building CC Fitness Center, offices and restrooms
Demolition complete, exterior walls in progress
Duration of project approximately 12 months
Anticipated end of construction Fall 2012
12
Upcoming Construction Projects
LAC Math Technology Building – Measure E 2008

Math and Culinary Arts instructional program as well as Reprographics


Contract awarded to Harper/Sillman Design Build Team
Currently in design development phase (DD)

Construction documents to DSA Fall of 2012

Anticipated start of construction 2013
13
Upcoming Construction Projects
PCC Building GG - Measure E 2008




16 Design Build Entities (DBE) short listed to 5
Interviews with 5 short listed DBE teams complete in January
3 Teams selected for proposals, Balfour Beatty, C.W. Driver, Bernards
Estimated start of construction December 2013
14
Upcoming Construction Projects
LAC Building C Retrofit - Measure E 2008



Hired Architect to do design work
Program phase is currently ongoing
Work includes modernization of structure, classrooms spaces, and
office areas
15
liberal arts
Liberal Arts Campus
Site Plan
pacific coast
Pacific Coast Campus
Site Plan
QUESTIONS
&
ANSWERS
EDUCATE  ENGAGE  EMPOWER
18