Roof Plans - 4/7/14

advertisement
SEAM STRIP / FORMFLASH
AROUND ENTIRE PERIMETER
OF EACH EXHAUST FAN (8
TOTAL).
#1
4
EXTEND REPAIR UNDER
EXISTING LCC CAP AT
BOTH ENDS OF BUILDING.
RESEAL LCC CAP.
EXHAUST
FAN
EXHAUST
FAN
EXHAUST
FAN
EXISTING ROOF TOP
UNIT. PROVIDE NEW
FLASHING AROUND
STRUCTURAL PIPE
SUPPORTS.
EXHAUST
FAN
EXHAUST
FAN
EXHAUST
FAN
EXHAUST
FAN
EXHAUST
FAN
EXISTING WALK-OFF
MATS. RE-ADHERE ALL
MATS TO EPDM.
EXTEND REPAIR UNDER
EXISTING LCC CAP AT
BOTH ENDS OF BUILDING.
RESEAL LCC CAP.
EXISTING ACCESS LADDER.
RE-ADHERE EXISTING BOOT
AND SEAM SEAL OVER FLAT
SECTION OF EXISTING PIPE
FLASHING. REPAIR SHALL
BE CIRCULAR AND SHINGLE
LAPPED. (TYPICAL FOR EACH
SUPPORT POST).
2
EXISTING VENT PIPE
(TYP). REFLASH PER
PIPE FLASHING
DETAIL ON SHEET
RP-2.
NOT TO SCALE
SEAM STRIP / FORMFLASH ALL EXISTING SEAMS, TJOINTS AND ALL PREVIOUSLY PATCHED AREAS IN TOTO
BETWEEN THE WALK-OFF PADS FOR THE ENTIRE
LENGTH OF THE BARREL ROOF – SEE REPAIR DETAILS
ON SHEET RP-3).
FALL PROTECTION SYSTEM TO BE
PURCHASED BY OWNER AND INSTALLED BY
ROOFING CONTRACTOR. ROOFING
CONTRACTOR TO FLASH ALL ANCHORS FOR A
WATERTIGHT INSTALLATION. REFER TO
SHEETS RP-11 TO RP-18
CUT OUT EIFS. INSTALL
NEW LCC FLASHING AND
COUNTERFLASHING TO
COVER BASE OF LADDER
ANCHORS. CAULK AND
PROVIDE WATERTIGHT
SEAL AT LADDER
BRACKETS.
**NOTE: CAREFULLY RELEASE AND BEND
UP
EXISTING LCC COUNTERFLASHING
TO INSTALL NEW EPDM.
CAREFULLY
BEND DOWN FLASHING UPON
COMPLETION OF EPDM.
CAREFULLY RELEASE AND BEND UP
EXISTING LCC COUNTERFLASHING TO
INSTALL NEW EPDM. CAREFULLY BEND
DOWN FLASHING UPON COMPLETION OF
EPDM.
**
NEW
REMOVE EXISTING EPDM.
MAINTAIN EXISTING LCC CAP
INPLACE. MODIFY VERTICAL
FASCIA AS REQUIRED TO ACCEPT
NEW FASCIA COVER. (REFER TO
SECTION 00200 SCOPE OF WORK
FOR ALTERNATE #1
REQUIREMENTS).
EXISTING DRAIN TO
REMAIN (SEE NOTE 5).
CUT OUT EIFS. INSTALL
NEW LCC FLASHING AND
COUNTERFLASHING TO
COVER BASE OF LADDER
ANCHORS. CAULK AND
PROVIDE WATERTIGHT
SEAL AT LADDER
BRACKETS.
NEW FLASHING AT NE ROOF LADDER
3
CLEAN A MINIMUM 10" SECTION OF THE IN-SERVICE
MEMBRANE, CENTERED OVER THE EXISTING SEAM STEP-OFF,
AS OUTLINED IN THE ATTACHED SPECIFICATION "CLEANING
OF IN-SERVICE MEMBRANE".
FIRESTONE SEAM REPAIR DETAILS
SEAM STRIP IN WITH 6" QUICKSEAM TAPE
FORMFLASH TARGET PATCHES OVER TAPE
JOINTS AND INTERSECTIONS
6" QUICKSEAM TAPE
6" FORMFLASH
BUTT JOINT
EXISTING SEAM EDGE
5.
6.
7.
8.
AFTER THE ADHESIVE HAS FLASHED OFF INSTALL THE
FIRESTONE 6" QUICK SEAM BATTEN COVER INTO THE
ADHESIVE FILM CENTERING THE STRIP OVER THE EDGE OF
THE SEAM.
WITH 3" SILICONE ROLLERS, ROLL THE NEWLY SPLICED PIECE
TWICE; FIRST ACROSS (OR PERPENDICULAR TO) THE MATED
SURFACE, THEN SECOND ALONG THE LENGTH OF THE
SPLICED EDGE.
AT ALL T-JOINTS (TAPE TO TAPE, TAPE TO FORMFLASH AND
TAPE TO EPDM) AND AT TAPE ENDS A FORMFLASH PATCH
MUST BE INSTALLED EXTENDING A MINIMUM OF 3" ON EACH
SIDE OF THE T-JOINT.
AFTER ADHESIVE HAS CURED A MINIMUM OF FOUR HOURS,
INSTALL EDGE TREATMENT OF SA-1065 & LAP SEALANT PER
THE ATTACHED SPECIFICATION TITLED "APPLICATION OF
SPLICE ADHESIVE AND LAP SEALANT" TO THE ENTIRE
FORMFLASH PATCH. LAP SEALANT IS NOT REQUIRED ALONG
BATTEN COVER EDGES.
TAPE
MEMBRANE
FORMFLASH
BASE FLASHING
= NEW SPLICE ADHESIVE
= EXISTING SPLICE ADHESIVE
NOTE: ALL T-JOINTS AND LAP SPLICES ARE TO HAVE
A FORMFLASH PATCH APPLIED OVER THE TRANSITION
IN THE TAPE, EXTENDING THREE INCHES FROM THE
TRANSITION IN ALL DIRECTIONS.
TAPE
BUTT JOINT
TAPE
OLD PATCH (REMOVED)
NOTE: FORMFLASH MUST BE SIZED TO PROVIDE MINIMUM 3”
SPLICE OUTSIDEJOINT OR OLD PATCH. SPLICE ADHESIVE
AND LAP SEALANT MUST BE APPLIED TO ENTIRE FORMFLASH
PATCH AND 3” ONTO QUICKSEAM TAPE.
161 CROSS STREET
4.
APPLY THE SPLICE ADHESIVE TO THE RECEIVING SURFACE A
MINIMUM 4" ON EACH SIDE OF THE EXISTING SEAM STEP-OFF
AS OUTLINED IN THE ATTACHED SPECIFICATION FOR THE
"APPLICATION OF SPLICE ADHESIVE AND LAP SEALANT”. DO
NOT APPLY SPLICE ADHESIVE TO THE QUICK SEAM BATTEN
COVER.
MAJOR MAINTENANCE FY15
3.
BACON FIELD HOUSE ROOF REPAIRS
2.
IN THE EVENT THAT THERE ARE ANY OBSTRUCTIONS TO
HINDER THIS REPAIR EXECUTION I.E.: WALK PADS, LIGHTNING
PROTECTION CABLES, ETC. REMOVE OR MOVE THE ITEM TO
THE SIDE AND CONTINUE WITH THE REPAIR UNINTERRUPTED.
UPON COMPLETION OF THE REPAIR REPLACE OR REPOSITION
THE OBSTACLE TO IT’S ORIGINAL POSITION. BE SURE TO
REMOVE ANY FIELD PATCHES THAT OCCUR IN THE SPLICE
AREA TO BE REPAIRED. WHEN REMOVING EXISTING
PATCHES, A RIDGE OF LAP SEAL WILL REMAIN, THIS MUST
BE REMOVED OR ADDRESSED AS A T-JOINT. IF NOT
REMOVED, STRIP-IN LARGE PATCHES AND OVERLAY SMALL
PATCHES WITH FORMFLASH.
FREEMAN ATHLETIC CENTER
1.
WESLEYAN
THE REPAIR OF FIELD SEAMS WITH 6" QUICK SEAM BATTEN
COVER
UNIVERSITY
Construction Services
170 Long Lane
Middletown, CT 06457
EXECUTION #1
DATE: 3/28/14
REVISIONS
ENSURE THAT THE ROOF IS LEFT WATERTIGHT AT THE END
OF EACH WORKING DAY.
RP-3
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
UNIVERSITY
Construction Services
170 Long Lane
Middletown, CT 06457
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
WESLEYAN
SEAM STRIP / FORMFLASH ALL
EXISTING SEAMS, T-JOINTS AND
ALL PREVIOUSLY PATCHED AREAS
IN TOTO BETWEEN THE WALKOFF PADS FOR THE ENTIRE
LENGTH OF THE BARREL ROOF –
SEE REPAIR DETAILS ON SHEET
RP-3).
DATE: 3/28/14
REVISIONS
EXISTING WALK-OFF MATS. READHERE ALL MATS TO EPDM.
TOP OF BARREL ROOF
RP-4
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT
REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS).
SHEET 1 OF ??
DATE: 3/28/14
REVISIONS
SEAM STRIP / FORMFLASH
AROUND ENTIRE PERIMETER OF
EACH EXHAUST FAN (8 TOTAL).
TYPICAL EXHAUST FAN
RP-5
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
BACON FIELD HOUSE ROOF REPAIRS
UNIVERSITY
Construction Services
170 Long Lane
Middletown, CT 06457
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
WESLEYAN
RE-ADHERE EXISTING BOOT AND SEAM SEAL
OVER FLAT SECTION OF EXISTING PIPE
FLASHING. REPAIR SHALL BE CIRCULAR AND
SHINGLE LAPPED. (TYPICAL FOR EACH SUPPORT
POST).
DATE: 3/28/14
REVISIONS
ACCESS LADDER TO BARREL ROOF
RP-6
SHEET 1 OF ??
DATE: 3/28/14
REVISIONS
RP-7
EXISTING CONDITION PHOTOS
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
DATE: 3/28/14
REVISIONS
RP-8
EXISTING CONDITION PHOTOS
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
DATE: 3/28/14
REVISIONS
RP-9
EXISTING CONDITION PHOTOS
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
DATE: 3/28/14
REVISIONS
RP-10
ALTERNATE – SOUTH LOWER ROOF
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
FALL PROTECTION LAYOUT PLAN FROM FIXFAST
DATE: 3/28/14
REVISIONS
RP-11
SHEET 1 OF ??
DATE: 3/28/14
REVISIONS
RP-12
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
DATE: 3/28/14
REVISIONS
RP-13
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
DATE: 3/28/14
REVISIONS
RP-14
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
PROVIDED & INSTALLED BY
ROOFING CONTRACTOR
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
-
DATE: 3/28/14
REVISIONS
RP-15
SHEET 1 OF ??
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
DATE: 3/28/14
REVISIONS
RP-16
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
DATE: 3/28/14
REVISIONS
RP-17
SHEET 1 OF ??
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
BACON FIELD HOUSE ROOF REPAIRS
FREEMAN ATHLETIC CENTER
161 CROSS STREET
MAJOR MAINTENANCE FY15
UNIVERSITY
WESLEYAN
Construction Services
170 Long Lane
Middletown, CT 06457
FALL PROTECTION SYSTEM COMPONENTS
DATE: 3/28/14
REVISIONS
RP-18
SHEET 1 OF ??
Download