SEAM STRIP / FORMFLASH AROUND ENTIRE PERIMETER OF EACH EXHAUST FAN (8 TOTAL). #1 4 EXTEND REPAIR UNDER EXISTING LCC CAP AT BOTH ENDS OF BUILDING. RESEAL LCC CAP. EXHAUST FAN EXHAUST FAN EXHAUST FAN EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXHAUST FAN EXISTING WALK-OFF MATS. RE-ADHERE ALL MATS TO EPDM. EXTEND REPAIR UNDER EXISTING LCC CAP AT BOTH ENDS OF BUILDING. RESEAL LCC CAP. EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT SECTION OF EXISTING PIPE FLASHING. REPAIR SHALL BE CIRCULAR AND SHINGLE LAPPED. (TYPICAL FOR EACH SUPPORT POST). 2 EXISTING VENT PIPE (TYP). REFLASH PER PIPE FLASHING DETAIL ON SHEET RP-2. NOT TO SCALE SEAM STRIP / FORMFLASH ALL EXISTING SEAMS, TJOINTS AND ALL PREVIOUSLY PATCHED AREAS IN TOTO BETWEEN THE WALK-OFF PADS FOR THE ENTIRE LENGTH OF THE BARREL ROOF – SEE REPAIR DETAILS ON SHEET RP-3). FALL PROTECTION SYSTEM TO BE PURCHASED BY OWNER AND INSTALLED BY ROOFING CONTRACTOR. ROOFING CONTRACTOR TO FLASH ALL ANCHORS FOR A WATERTIGHT INSTALLATION. REFER TO SHEETS RP-11 TO RP-18 CUT OUT EIFS. INSTALL NEW LCC FLASHING AND COUNTERFLASHING TO COVER BASE OF LADDER ANCHORS. CAULK AND PROVIDE WATERTIGHT SEAL AT LADDER BRACKETS. **NOTE: CAREFULLY RELEASE AND BEND UP EXISTING LCC COUNTERFLASHING TO INSTALL NEW EPDM. CAREFULLY BEND DOWN FLASHING UPON COMPLETION OF EPDM. CAREFULLY RELEASE AND BEND UP EXISTING LCC COUNTERFLASHING TO INSTALL NEW EPDM. CAREFULLY BEND DOWN FLASHING UPON COMPLETION OF EPDM. ** NEW REMOVE EXISTING EPDM. MAINTAIN EXISTING LCC CAP INPLACE. MODIFY VERTICAL FASCIA AS REQUIRED TO ACCEPT NEW FASCIA COVER. (REFER TO SECTION 00200 SCOPE OF WORK FOR ALTERNATE #1 REQUIREMENTS). EXISTING DRAIN TO REMAIN (SEE NOTE 5). CUT OUT EIFS. INSTALL NEW LCC FLASHING AND COUNTERFLASHING TO COVER BASE OF LADDER ANCHORS. CAULK AND PROVIDE WATERTIGHT SEAL AT LADDER BRACKETS. NEW FLASHING AT NE ROOF LADDER 3 CLEAN A MINIMUM 10" SECTION OF THE IN-SERVICE MEMBRANE, CENTERED OVER THE EXISTING SEAM STEP-OFF, AS OUTLINED IN THE ATTACHED SPECIFICATION "CLEANING OF IN-SERVICE MEMBRANE". FIRESTONE SEAM REPAIR DETAILS SEAM STRIP IN WITH 6" QUICKSEAM TAPE FORMFLASH TARGET PATCHES OVER TAPE JOINTS AND INTERSECTIONS 6" QUICKSEAM TAPE 6" FORMFLASH BUTT JOINT EXISTING SEAM EDGE 5. 6. 7. 8. AFTER THE ADHESIVE HAS FLASHED OFF INSTALL THE FIRESTONE 6" QUICK SEAM BATTEN COVER INTO THE ADHESIVE FILM CENTERING THE STRIP OVER THE EDGE OF THE SEAM. WITH 3" SILICONE ROLLERS, ROLL THE NEWLY SPLICED PIECE TWICE; FIRST ACROSS (OR PERPENDICULAR TO) THE MATED SURFACE, THEN SECOND ALONG THE LENGTH OF THE SPLICED EDGE. AT ALL T-JOINTS (TAPE TO TAPE, TAPE TO FORMFLASH AND TAPE TO EPDM) AND AT TAPE ENDS A FORMFLASH PATCH MUST BE INSTALLED EXTENDING A MINIMUM OF 3" ON EACH SIDE OF THE T-JOINT. AFTER ADHESIVE HAS CURED A MINIMUM OF FOUR HOURS, INSTALL EDGE TREATMENT OF SA-1065 & LAP SEALANT PER THE ATTACHED SPECIFICATION TITLED "APPLICATION OF SPLICE ADHESIVE AND LAP SEALANT" TO THE ENTIRE FORMFLASH PATCH. LAP SEALANT IS NOT REQUIRED ALONG BATTEN COVER EDGES. TAPE MEMBRANE FORMFLASH BASE FLASHING = NEW SPLICE ADHESIVE = EXISTING SPLICE ADHESIVE NOTE: ALL T-JOINTS AND LAP SPLICES ARE TO HAVE A FORMFLASH PATCH APPLIED OVER THE TRANSITION IN THE TAPE, EXTENDING THREE INCHES FROM THE TRANSITION IN ALL DIRECTIONS. TAPE BUTT JOINT TAPE OLD PATCH (REMOVED) NOTE: FORMFLASH MUST BE SIZED TO PROVIDE MINIMUM 3” SPLICE OUTSIDEJOINT OR OLD PATCH. SPLICE ADHESIVE AND LAP SEALANT MUST BE APPLIED TO ENTIRE FORMFLASH PATCH AND 3” ONTO QUICKSEAM TAPE. 161 CROSS STREET 4. APPLY THE SPLICE ADHESIVE TO THE RECEIVING SURFACE A MINIMUM 4" ON EACH SIDE OF THE EXISTING SEAM STEP-OFF AS OUTLINED IN THE ATTACHED SPECIFICATION FOR THE "APPLICATION OF SPLICE ADHESIVE AND LAP SEALANT”. DO NOT APPLY SPLICE ADHESIVE TO THE QUICK SEAM BATTEN COVER. MAJOR MAINTENANCE FY15 3. BACON FIELD HOUSE ROOF REPAIRS 2. IN THE EVENT THAT THERE ARE ANY OBSTRUCTIONS TO HINDER THIS REPAIR EXECUTION I.E.: WALK PADS, LIGHTNING PROTECTION CABLES, ETC. REMOVE OR MOVE THE ITEM TO THE SIDE AND CONTINUE WITH THE REPAIR UNINTERRUPTED. UPON COMPLETION OF THE REPAIR REPLACE OR REPOSITION THE OBSTACLE TO IT’S ORIGINAL POSITION. BE SURE TO REMOVE ANY FIELD PATCHES THAT OCCUR IN THE SPLICE AREA TO BE REPAIRED. WHEN REMOVING EXISTING PATCHES, A RIDGE OF LAP SEAL WILL REMAIN, THIS MUST BE REMOVED OR ADDRESSED AS A T-JOINT. IF NOT REMOVED, STRIP-IN LARGE PATCHES AND OVERLAY SMALL PATCHES WITH FORMFLASH. FREEMAN ATHLETIC CENTER 1. WESLEYAN THE REPAIR OF FIELD SEAMS WITH 6" QUICK SEAM BATTEN COVER UNIVERSITY Construction Services 170 Long Lane Middletown, CT 06457 EXECUTION #1 DATE: 3/28/14 REVISIONS ENSURE THAT THE ROOF IS LEFT WATERTIGHT AT THE END OF EACH WORKING DAY. RP-3 SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS UNIVERSITY Construction Services 170 Long Lane Middletown, CT 06457 FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 WESLEYAN SEAM STRIP / FORMFLASH ALL EXISTING SEAMS, T-JOINTS AND ALL PREVIOUSLY PATCHED AREAS IN TOTO BETWEEN THE WALKOFF PADS FOR THE ENTIRE LENGTH OF THE BARREL ROOF – SEE REPAIR DETAILS ON SHEET RP-3). DATE: 3/28/14 REVISIONS EXISTING WALK-OFF MATS. READHERE ALL MATS TO EPDM. TOP OF BARREL ROOF RP-4 NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SHEET 1 OF ?? DATE: 3/28/14 REVISIONS SEAM STRIP / FORMFLASH AROUND ENTIRE PERIMETER OF EACH EXHAUST FAN (8 TOTAL). TYPICAL EXHAUST FAN RP-5 SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 BACON FIELD HOUSE ROOF REPAIRS UNIVERSITY Construction Services 170 Long Lane Middletown, CT 06457 FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 WESLEYAN RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT SECTION OF EXISTING PIPE FLASHING. REPAIR SHALL BE CIRCULAR AND SHINGLE LAPPED. (TYPICAL FOR EACH SUPPORT POST). DATE: 3/28/14 REVISIONS ACCESS LADDER TO BARREL ROOF RP-6 SHEET 1 OF ?? DATE: 3/28/14 REVISIONS RP-7 EXISTING CONDITION PHOTOS SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 DATE: 3/28/14 REVISIONS RP-8 EXISTING CONDITION PHOTOS SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 DATE: 3/28/14 REVISIONS RP-9 EXISTING CONDITION PHOTOS SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 DATE: 3/28/14 REVISIONS RP-10 ALTERNATE – SOUTH LOWER ROOF SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 FALL PROTECTION LAYOUT PLAN FROM FIXFAST DATE: 3/28/14 REVISIONS RP-11 SHEET 1 OF ?? DATE: 3/28/14 REVISIONS RP-12 SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 DATE: 3/28/14 REVISIONS RP-13 SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 DATE: 3/28/14 REVISIONS RP-14 SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 PROVIDED & INSTALLED BY ROOFING CONTRACTOR BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 - DATE: 3/28/14 REVISIONS RP-15 SHEET 1 OF ?? UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 DATE: 3/28/14 REVISIONS RP-16 SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 DATE: 3/28/14 REVISIONS RP-17 SHEET 1 OF ?? BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 BACON FIELD HOUSE ROOF REPAIRS FREEMAN ATHLETIC CENTER 161 CROSS STREET MAJOR MAINTENANCE FY15 UNIVERSITY WESLEYAN Construction Services 170 Long Lane Middletown, CT 06457 FALL PROTECTION SYSTEM COMPONENTS DATE: 3/28/14 REVISIONS RP-18 SHEET 1 OF ??