WESLEYAN \\ U N I V E R S I T Y Facilities 170 Long Lan e M i d d l e t o wn , C o n n e c t i c u t 0 6 4 5 7 (860) 685-3476 FAX (860) 685-3101 ADDENDUM #2 Date: March 24, 2015 To: Bidders of Record Project: Bid Packages 4, 14, 15 Annual Major Maintenance FY 16 SPECIAL NOTE: Addendum #1 information shall supersede the information contained in the Contract Documents This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated December 20, 2014 and related addenda and clarifications. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. PreBid Meeting Minutes & Site Walks; 3/9/15 Bid / Construction Schedule Bids due: March 30, 2015 @ 1:00PM Selection of successful bidders: April 7, 2015 Construction Start Date: May 26, 2015 Project Completion Date: Reference Proposal Form and http://www.wesleyan.edu/construction/majormaint/FY_16/FY_16.html Housing Opens/Students Arrive on campus: August 14, 2015 All bedroom hardware shall be revised to Arrow ML 13 SR 26D 306 281, Keyway AR 1. All Interior locks to be standard-duty cylindrical 2. Interior locks to be Arrow ML 13 SR 26D 306 281, 121/124. No Substitute. Meets 3. All cylinders must be manufactured by “KABA”. 4. Provide extended Curved lip strikes as required. BID PACKAGE #4: 35 Home Avenue – Interior / Exterior Renovations 1. Abatement contractor shall to demolish all walls in both bathrooms on second floor. General contractor to remove demolition of walls from his proposal. 53AB Home Avenue – Interior / Exterior Renovations 1. Reference clarification photo sheets P-5-14, P-5-15 & P-5-16 dated March 24, 2015. 2. Photos show: a. Existing 200 amp panel located in the garage. b. North & east side bathroom walls showing available access for rough-in work. c. Concrete floor in garage at base of proposed CMU wall. 3. Contractor to insulate exposed walls of basement level bathroom inside storage area. Major Maintenance FY16 Project Number 2016000000 ADDENDUM # 2 Page 1 3/24/15 BID PACKAGE #14: 40 Home Avenue – Exterior Painting / Storm Window Installation 1. Q: The 2 Large Windows on the front and left Elevation cannot be made in Cottage Style Double Hung. Can these be provided as equal top and bottom sash? A: Furnish and install fixed storm windows for these two windows. Major Maintenance FY16 Project Number 2016000000 ADDENDUM # 2 Page 2 3/24/15