DRAFT February 23, 2005 Business Process: Budget Building and Loading for Unrestricted Funds Budget Building – DRAFT 6/28/2016 Business Process Description Each campus is required to build annual budgets for Unrestricted Funds. These funds include educational & general (fund 00), auxiliary enterprises (fund 03), and designated (fund 10). This budget building may be accomplished with the assistance of a developed report or can be developed using Journal Entries (on-line or EXCEL). The developed report will display relevant Chartfields and 4 years of financial data. The report is laid out in the format of an EXCEL Journal Entry such that it can be copied into an EXCEL Journal Entry and edited and posted to PeopleSoft GL. This budget building process will apply to Revenue Accounts and Non-Compensation Expense Accounts. For Funds 00, 03, 12, and 22, Compensation Accounts will be budgeted using Position Management which is described in a separate Business Process. For all other funds, including Fund 10, Compensation may be budgeted directly in the GL. Key Assumptions The reader is familiar with PeopleSoft GL Chartfields and their use. The reader is familiar with Business Process “Journal Entry (Online) – Enter” and/or “Journal Entry (Excel) – Enter/Copy.” “Chartfield Combination” when used below refers to a combination of Business Unit, Department, Fund, Program, Project, Operating Unit, Account, and Class. A unique Chartfield Combination will have a different combination of the eight chartfields. Report Layout The following shows the layout of the developed report. Included are 2 years of historical actuals, current year year-to-date actuals, current year base and current budgets, and next year budget. UNIVERSITY OF MAINE SYSTEM FY2006 UNRESTRICTED E&G(00)/AUXILIARY ENTERPRISE(03)/DESIGNATED(10) BUDGET PREPARATION FUTURE BUDGET FOR FISCAL YEAR 2006 SORTED BY BU, FUND, OPUNIT, DEPT, PROG, PROJECT, ACCOUNT, CLASS BU DEPT DEPT DESCR FUND PROG DESCR PROJ OPUNIT ACCOUNT ACCOUNT DESCR CLASS SCENARIO OFT: 2/22/2005 C:\PeopleSoft\Financial Reporting\122-12Budget Building.xls Page 2 of 4 FY2003 ANNUAL ACTUAL FY2004 ANNUAL ACTUAL FY2005 Y-T-D ACTUAL FY2005 BASE BUDGET FY2005 CURRENT BUDGET FY2006 FY2006 PROJECTED PROJECTED BUDGET VS FY05 BASE Budget Building – DRAFT 6/28/2016 This is a report by Chartfield Combination for the unrestricted funds of educational & general (fund 00), auxiliary enterprises (fund 03), and designated (fund 10). The report shows revenue first and expense second. The report will be run for the next Fiscal Year. The next Fiscal Year refers to year in which the Future Budget is being prepared. The Base and Current Budgets displayed are for the previous Fiscal Year. Prior to preparing future budgets for next year, Period 1 for the next fiscal year must be open. The report should have the following options: Run for a specified Fund or for all Unrestricted Funds. Run for a specified Business Unit or for all Business Units. Run for a specified node on the UMS_DEPT_ORG Tree or the UMS_DEPT_F Tree. Run for a specified Operating Unit. Run for a node on the UMS_ACCTROLLUP Tree. The report should provide a subtotal when the DEPTID changes and should provide a total for the Business Unit. For ease in reading, it might be better to run the report for the REEVNUE node on the UMS_ACCTROLLUP tree separately from the EXPENSE node on the UMS_ACCTROLLUP tree. Security Requirements Each Business Unit should be able to run this report only for their Business Unit. Future Budgets in PeopleSoft General Ledger 1. In PeopleSoft, there are three ledgers for budgets, BASEBUD, BUDGET, and FUTBUD. These budget ledgers are stored in the LEDGER_BUDG table. 2. The FUTBUD Ledger has associated with it Scenarios. There are three Scenarios currently defined. A Business Unit can use these Scenarios for modeling the next year’s budget. a. BLANK that represents the final Scenario that will be moved to the BASEBUD and BUDGET ledgers. BLANK refers to “ “ and not the word “BLANK”. b. 1 (description = Scenario 1) c. 2 (description = Scenario 2) Page 3 of 4 Budget Building – DRAFT 6/28/2016 3. The FUTBUD with a Scenario of BLANK will later be transferred to the BASEBUD and BUDGET ledgers using an Allocation process. 4. Budget journal entries for Salaries, Wages and Benefits Accounts in Funds 00, 03, 12, and 22 will be generated from the Position Management system. Compensation budget entries for these funds should not be entered directly to the General Ledger. Scenarios provide a way to do budget modeling. The final future budget must be created in the FUTBUD ledger with a Scenario of BLANK. It might be advisable to avoid the use of Scenarios for FY2006 until there is a better understanding of how they can be used. Journal Entries for Future Budgets in PeopleSoft General Ledger 1. Journal entries are used to update the General Ledger for budgets. The Ledger Group entered on the Journal Entry Header Page will determine which budget is updated. Use the FUTBUD ledger group on the journal entry header to update Future Budgets. 2. For Journal Entries to create FY2006 future budgets, use a Journal Date of 07/01/2005 to direct the future budget entries to the Period 1 of FY2006. 3. Using the developed Budget Building Report, the report can be downloaded into a spreadsheet, future budget figures can be entered into the FY2006 Projected Budget column, and the appropriate columns and rows can be copied into an EXCEL Journal Entry Template for processing into PeopleSoft. The EXCEL Journal Template must be prepared for receiving the copied information by inserting enough blank rows to receive the data. Also, when copying to an EXCEL Journal Template, delete any extraneous information such as subtotals and historical columns. 4. Once the FUTBUD has been updated, the Budget Building Report can be run again, and the entered FUTBUD figures will display on the report. 5. When making changes to FUTBUD, journal entries are processed that either add to or subtract from the figures that are already in place. There is no facility to replace figures with revised figures. If an entire posted batch is found to be incorrect, then the batch can be unposted. Page 4 of 4