Robert Bennett, EI Project Details ◦ Design-Build Project Delivery Method ◦ Twin Structures 1700 feet long each ◦ Spread Footing and Micro-Pile Foundations ◦ Cast-in-place balanced cantilever segmental superstructure ◦ Smaller pre-stressed concrete beam bridge ◦ Total Project Cost: $113,000,000.00 Project Team ◦ Owner: Virginia Department of Transportation ◦ Design Build Firm: Bizzack Construction LLC – Prime Contractor CJ Mahan Const. Co. – Bridge Sub-Contractor Stantec - EOR Jansen Spaans Engineering Inc – EOR VSL, Inc – PT and Form Traveler Supplier Doka – Segmental Form Supplier ◦ Inspection & Contract Management: Amec Engineering – Quality Control AMT Engineering – Quality Assurance RS&H – CEI Oversight Project Details ◦ Maximum height over Grassy Creek: 265 feet Tallest Bridge in Virginia Longest Span: 489 feet Width of Each Bridge: 43 feet Each Bridge carries 2 lanes of traffic West portion of the project ends at the Kentucky State Line. ◦ Connector to future developments ◦ ◦ ◦ ◦ Structure Details ◦ Length– 1700’ ◦ Height265’ ◦ Longest Span- 489’ Material Quantities ◦ Concrete– 16,000 C.Y. ◦ Reinforcing Steel2.6 M lbs. ◦ Post-Tensioning Strand- 150 Miles Micro-Piles Micro-Piles Cast-in-Place Balanced Cantilever Segmental Bridge Protections ◦ Plastic PT Duct ◦ CRR Steel ◦ Mechanical Duct Couplers ◦ Heat Shrink ◦ Epoxy Coated Tie Wire Concrete •High Strength 8,000 psi for superstructure •Mass Concrete •Low Permeability Concrete Max 1,500 coulombs ( A5 Special) Max 2,500 coulombs ( A4 General) Corrosion Resistant Rebar Low Carbon/Chromium Long-Term Durability Epoxy Coated Bar Supports 75 ksi tensile strength Concrete Approved 75 concrete mix designs with compressive strengths from (1500-8000 psi) Achieved High early strength to accommodate casting and erection schedule Utilized concrete admixtures: Superplasticizers HRWR, Entrained-Air, Retarders, and Micro-silica Concrete Concrete Strength Avg Approved 75 concrete mix designs with compressive strengths from 14000 (1500-8000 psi) Comp. Strength 12000 10000 (Comp. Achieved High early strength toLog. Strength) 8000 PSIaccommodate casting and erection 6000 Last 10 Average schedule 4000 2000 4,000 in 24 hrs 10,200 in 28 days Utilized concrete admixtures: 0 Superplasticizers HRWR, 0 10 20 30 Entrained-Air, Retarders, and Days Micro-silica Excavation ◦ Over 2.5 Million CY ◦ Cross Section Cut 160’ ◦ Day & Night Shifts Location of Buchanan Co. Virginia Massive Transportation Improvement Plan for the Appalachian Region Help boost commerce and tourism for the region 460 Connector will connect this region to the Kentucky border Site Conditions Appalachian Mountain Region 400 feet of elevation differential Unstable terrain Treacherous in Changing Weather Conditions On-Site Weather Station Remote Project Location Buchanan, Dickenson County VA, Pike County, KY Population Density: 63 / Sq. Mile Nearest Town – Grundy, VA Population: 1,100 30-40 minutes from project Labor Force Small Local Labor Force Lack of Housing for workers Extra Costs to Contractor Long Commutes Communications Internet Service Limited Telephone Service Limited or No Cell Service Material Deliveries Concrete Plant on Site Delivery Service Careful Planning No Overnight Deliveries Segmental Bridge Specifications Issues Nationwide with Segmental Bridge Durability Modified Segmental Specifications Developed for this Project Addition of a Mock up test requirement Mock up test Developed Written Specification Virginia Research Council C.J. Mahan Constructed & performed grouting FHWA Participation Segmental Bridge Specifications Because of the results of this Mock-up test, specification and material changes are being made on a national basis! Project Webcam http://oxblue.com/open/bizzack/vdotus460connector