CPPP Stakeholder Meeting
Associated Electric Cooperative Inc.
Springfield, Missouri
November 18, 2010
CPPP Actual Area
Agenda
•
•
•
•
•
•
•
Introduction
AECI Planning Overview
TVA Planning Update
EKPC Planning Update
BREC Planning Update
Potential Regional Project
Inter-Regional Planning Update
o EIPC
o SIRPP
o AECI – SPP Joint Planning
o FERC/NERC/EPRI/DOE Updates
• General Discussion
Introduction
• FERC Order 890 requires non-jurisdictional
entities to participate in a regional planning
process.
• To meet this requirement EKPC, BREC, TVA and
AECI formed CPPP.
• BREC evaluating options.
AECI Planning Overview
AECI service
area
Member owned and controlled
• Three tiered system
• AECI delivers power to
6 regional G&Ts
• G&Ts serve 51
Distribution Coops
• Dist Coops serve
850,000 meters
AECI/Member G&T cooperatives’
Transmission Statistics
• Miles of line – Approximately 9,500 (69 kv and
higher)
• Substations - 750
• Integrated Network
– 174 Interconnections
– 21 Interconnection Agreements
AECI uses a mix of generating resources
GAS/OIL
peaking
655 MW
Essex - 107 MW
Nodaway - 182 MW
Holden - 321 MW
Unionville - 45 MW
GAS
combined-cycle
1,603 2,143 MW
St. Francis - 501 MW Chouteau - 522 1,062 MW
Dell - 580 MW
COAL
2,619 MW
Thomas Hill 1,153 MW
HYDROELECTRIC
478 MW
New Madrid 1,200 MW
GRDA Unit 2 198 MW
WIND GENERATION
307 MW
Chamois 68 MW
AECI TRANSMISSION PLANNING PROCESS
• Electric Load Forecast Study (ELFS) conducted
in even numbered years
• Coordinated Long-Range Member G&T System
Plan conducted in odd numbered years
2009-2019 AECI Long Range Plan
Project Update
‘09- ‘19 AECI LRP Project Update
(CONTINUED)
• Since January AECI Board has passed 27 issue
papers related to EHV/Primary System
Improvements
• Approx. $250 M of EHV/Primary System
currently in some phase of construction
• Approx. $120 M of this allocated for Chouteau 2
generation and additional 345 kV capacity
between Oklahoma and Missouri
2011-2021 Coordinated Long-Range
Member System Plan Details
1. October ’10 – Develop NT (years 1 or 2) & LT
(9 to 10) loadflow cases from LTSG
2. November ’10 – Incorporate Electric Load
Forecast Study results into loadflow cases
3. January ’11 – Identify problems/send
preliminary results
Coordinated Long-Range LRP
(Continued)
4. February ’11 – Hold stakeholder meetings
5. August ’11 – Solutions – present to
stakeholders
6. September '11 – Final Report
7. October '11 - Member G&T Board Approvals
8. December '11 – AECI Board Approval
Questions?
AECI-SPP Joint Planning
AECI-SPP Joint Planning
•
•
•
•
•
•
•
•
Various Working Groups (TWG, ESWG, MDWG, etc.)
STEP
ITP 20
ITP 10
ITP Near Term Assessment – Not sure if it has a name
Aggregate Studies
Generation Interconnection Affected System
Special Study/Coordination as needed to address
localized issues
• Twice yearly meetings addressing Operational Planning topics
Questions?