CPPP Stakeholder Meeting Associated Electric Cooperative Inc. Springfield, Missouri November 18, 2010 CPPP Actual Area Agenda • • • • • • • Introduction AECI Planning Overview TVA Planning Update EKPC Planning Update BREC Planning Update Potential Regional Project Inter-Regional Planning Update o EIPC o SIRPP o AECI – SPP Joint Planning o FERC/NERC/EPRI/DOE Updates • General Discussion Introduction • FERC Order 890 requires non-jurisdictional entities to participate in a regional planning process. • To meet this requirement EKPC, BREC, TVA and AECI formed CPPP. • BREC evaluating options. AECI Planning Overview AECI service area Member owned and controlled • Three tiered system • AECI delivers power to 6 regional G&Ts • G&Ts serve 51 Distribution Coops • Dist Coops serve 850,000 meters AECI/Member G&T cooperatives’ Transmission Statistics • Miles of line – Approximately 9,500 (69 kv and higher) • Substations - 750 • Integrated Network – 174 Interconnections – 21 Interconnection Agreements AECI uses a mix of generating resources GAS/OIL peaking 655 MW Essex - 107 MW Nodaway - 182 MW Holden - 321 MW Unionville - 45 MW GAS combined-cycle 1,603 2,143 MW St. Francis - 501 MW Chouteau - 522 1,062 MW Dell - 580 MW COAL 2,619 MW Thomas Hill 1,153 MW HYDROELECTRIC 478 MW New Madrid 1,200 MW GRDA Unit 2 198 MW WIND GENERATION 307 MW Chamois 68 MW AECI TRANSMISSION PLANNING PROCESS • Electric Load Forecast Study (ELFS) conducted in even numbered years • Coordinated Long-Range Member G&T System Plan conducted in odd numbered years 2009-2019 AECI Long Range Plan Project Update ‘09- ‘19 AECI LRP Project Update (CONTINUED) • Since January AECI Board has passed 27 issue papers related to EHV/Primary System Improvements • Approx. $250 M of EHV/Primary System currently in some phase of construction • Approx. $120 M of this allocated for Chouteau 2 generation and additional 345 kV capacity between Oklahoma and Missouri 2011-2021 Coordinated Long-Range Member System Plan Details 1. October ’10 – Develop NT (years 1 or 2) & LT (9 to 10) loadflow cases from LTSG 2. November ’10 – Incorporate Electric Load Forecast Study results into loadflow cases 3. January ’11 – Identify problems/send preliminary results Coordinated Long-Range LRP (Continued) 4. February ’11 – Hold stakeholder meetings 5. August ’11 – Solutions – present to stakeholders 6. September '11 – Final Report 7. October '11 - Member G&T Board Approvals 8. December '11 – AECI Board Approval Questions? AECI-SPP Joint Planning AECI-SPP Joint Planning • • • • • • • • Various Working Groups (TWG, ESWG, MDWG, etc.) STEP ITP 20 ITP 10 ITP Near Term Assessment – Not sure if it has a name Aggregate Studies Generation Interconnection Affected System Special Study/Coordination as needed to address localized issues • Twice yearly meetings addressing Operational Planning topics Questions?