179 Ab Wahid, R. (2010). Beyond Certification: The Maintenance of Iso... Malaysian Service Organisations.

advertisement
179
REFERENCES
Ab Wahid, R. (2010). Beyond Certification: The Maintenance of Iso 9000 in
Malaysian Service Organisations.
Ab Wahid, R., & Corner, J. (2009). Critical Success Factors and Problems in Iso
9000 Maintenance. International Journal of Quality & Reliability
Management, 26(9), 881-893.
Ab Wahid, R., & Corner, J. (2011). Critical Success Factors and Improvements in
Iso 9000 Maintenance. Business Management Quarterly Review, 2(2), 1-13.
Abbasi, M., Shirazi, M. A., & Aryanezjad, M. B. (2012). Determination of
Manufacturing Strategy Using Interpretive Structural Modeling. African
Journal of Business Management, 6(3), 881-887.
Abdul-Aziz, A.-R. (2002). The Realities of Applying Total Quality Management in
the Construction Industry. [General review]. Structural Survey, 20(2), 88-96.
Abdul-Rahman, H. (1996). Some Observations on the Management of Quality
among Construction Professionals in the Uk. Construction Management &
Economics, 14(6), 485-495.
Abdullah, M. N. (2005). A Case Study on Quality Management System in
Construction Project: Master of Engineering (Construction), Universiti
Teknologi Malaysia. Skudai, Malaysia.
Achanga, P., Shehab, E., Roy, R., & Nelder, G. (2006). Critical Success Factors for
Lean Implementation within Smes. Journal of Manufacturing Technology
Management, 17(4), 460-471.
Agarwal, A., Shankar, R., & Tiwari, M. K. (2007). Modeling Agility of Supply
Chain. Industrial Marketing Management, 36(4), 443-457.
Ahmad, H., Francis, A., & Zairi, M. (2007). Business Process Reengineering:
Critical Success Factors in Higher Education. Business Process Management
Journal, 13(3), 451-469.
180
Antony, J., Leung, K., Knowles, G., & Gosh, S. (2002). Critical Success Factors of
Tqm Implementation in Hong Kong Industries. International Journal of
Quality & Reliability Management, 19(5), 551-566.
Arbuckle, J. L. (2007). Amostm 16 User's Guide. Chicago: SPSS.
Arditi, D., & Gunaydin, H. M. (1997). Total Quality Management in the
Construction Process. International Journal of Project Management, 15(4),
235-243.
Asif, M., Fisscher, O. A. M., de Bruijn, E. J., & Pagell, M. (2010). An Examination
of Strategies Employed for the Integration of Management Systems. The
TQM Journal, 22(6), 648-669.
Atkinson, R. (1999). Project Management: Cost, Time and Quality, Two Best
Guesses and a Phenomenon, Its Time to Accept Other Success Criteria.
International Journal of Project Management, 17(6), 337-342.
Au, J. C. W., & Yu, W. W. M. (1999). Quality Management for an Infrastructure
Construction Project in Hong Kong. [Research paper]. Logistics Information
Management, 12(4), 309-314.
Bagozzi, R. P., & Yi, Y. (1988). On the Evaluation of Structural Equation Models.
Journal of the academy of marketing science, 16(1), 74-94.
Baidoun, S. (2004). The Implementation of Tqm Philosophy in Palestinian
Organization: A Proposed Non-Prescriptive Generic Framework. The TQM
Magazine, 16(3), 174-185.
Barima, O., & Rowlinson, S. M. (2010). Critical, Manifest Variables in Virtual
Construction Project Value Delivery. Engineering, Construction and
Architectural Management, 17(2), 197-209.
Barrett, P. (2000). Systems and Relationships for Construction Quality. [Research
paper]. International Journal of Quality & Reliability Management, 17(4/5),
377-392.
Barrett, P., & Grover, R. (1998). Quality Assurance and the Surveying Professional
Volume 1-Quality Management and Surveyors; a Strategic Reassessment.
Battikha, M. G. (2003). Quality Management Practice in Highway Construction.
[Conceptual Paper]. International Journal of Quality & Reliability
Management, 20(5), 532-550.
Beatham, S., Anumba, C., Thorpe, T., & Hedges, I. (2004). Kpis: A Critical
Appraisal of Their Use in Construction. [General review]. Benchmarking: An
181
International Journal, 11(1), 93-117.
Bi, K. X., Ma, H. Z., & Li, W. H. (2012). Interpretive Structural Modeling of
Critical Success Factors for Implementing Green Process Innovation in
Manufacturing Enterprises. Advanced Materials Research, 361, 1026-1029.
Black, S. A., & Porter, L. J. (1996). Identification of the Critical Factors of Tqm.
Decision Sciences, 27(1), 1-21.
Bolanos, R., Fontela, E., Nenclares, A., & Pastor, P. (2005). Using Interpretive
Structural Modelling in Strategic Decision-Making Groups. Management
Decision, 43(6), 877-895.
Bradley, J. (2008). Management Based Critical Success Factors in the
Implementation of Enterprise Resource Planning Systems. International
Journal of Accounting Information Systems, 9(3), 175-200.
Brewer, G., & Gajendran, T. (2009 ). Emerging Ict Trends in Construction Project
Teams: A Delphi Study. Journal of Information Technology in Construction,
March.
Bryde, D. J., & Robinson, L. (2007). The Relationship between Total Quality
Management and the Focus of Project Management Practices. [Research
paper]. The TQM Magazine, 19(1), 50-61.
Bubshait, A. A. (1994). Owner Involvement in Project Quality. [doi: 10.1016/02637863(94)90018-3]. International Journal of Project Management, 12(2),
115-117.
Bubshait, A. A., & Al-Musaid, A. A. (1992). Owner Involvement in Construction
Projects in Saudi Arabia. Journal of Management in Engineering, 8(2), 176185.
Bubshait, A. A., & Al Atiq, T. H. (1999). Iso 9000 Quality Standards in
Construction. Journal of Management in Engineering, 15(6), 41-46.
Butler, J. (2002). Construction Quality Stinks. Engineering News Record.
Byrne, B. M. (2010). Structural Equation Modeling with Amos: Basic Concepts,
Applications, and Programming (Second ed.): Routledge Taylor & Francis
Group.
Carl, W., & Yadira, C. H. (1990). Quality Management Practice in Capital Projects.
American Association of Cost Engineers, Q4(1).
Chan, A. P. C., & Tam, C. M. (2000). Factors Affecting the Quality of Building
Projects in Hong Kong. [Case study]. International Journal of Quality &
182
Reliability Management, 17(4/5), 423-442.
Chan, A. P. C., Wong, F. K. W., & Lam, P. T. I. (2006). Assessing Quality
Relationships in Public Housing: An Empirical Study. [Research paper].
International Journal of Quality & Reliability Management, 23(8), 909-927.
Chan, D. W. M., Chan, A. P. C., Lam, P. T. I., & Wong, J. M. W. (2010).
Identifying the Critical Success Factors for Target Cost Contracts in the
Construction Industry. Journal of Facilities Management, 8(3), 179-201.
Chileshe, N., & Haupt, T. C. (2005). Modelling Critical Success Factors of
Construction Project Management (Cpm). Journal of Engineering, Design
and Technology, 3(2), 140-154.
Chin, K. S., Chan, B. L., & Lam, P. K. (2008). Identifying and Prioritizing Critical
Success Factors for Coopetition Strategy. Industrial Management & Data
Systems, 108(4), 437-454.
Chin, K. S., & Choi, T. W. (2003). Construction in Hong Kong: Success Factors for
Iso9000 Implementation. JOURNAL OF CONSTRUCTION ENGINEERING
AND MANAGEMENT, 129, 599-599.
Chini, A. R., & Valdez, H. E. (2003). Iso 9000 and the U.S. Construction Industry.
[Technical paper]. Journal of Management in Engineering, 19(2), 69-77.
Cianfrani, C. A., Tsiakals, J. J., & West, J. (2009). Iso 9001: 2008 Explained: Asq
Pr.
CIDB. (2007). Annual Report. Kuala Lumpur: Construction Industry Development
Board Malaysia.
CIDB. (2009). Annual Report. Kuala Lumpur: Construction Industry Development
Board Malaysia.
Coronado, R. B., & Antony, J. (2002). Critical Success Factors for the Successful
Implementation of Six Sigma Projects in Organisations. The TQM Magazine,
14(2), 92-99.
Crosby, P. B. (1995). Quality without Tears: The Art of Hassle-Free Management:
McGraw-Hill Professional.
Deshmukh, S. G. (2010). Modelling the Success Factors for National R&D
Organizations: A Case of India. Journal of Modelling in Management, 5(2),
158-175.
Din, S., Abd-Hamid, Z., & Bryde, D. J. (2010). Iso 9000 Certification and
Construction Project Performance: The Malaysian Experience. International
183
Journal of Project Management.
Djebarni, R., & Eltigani, H. (1996). Achieving Quality and Productivity in the
House Building Sector. Property Management, 14(1), 39-45.
Douglas, A., Coleman, S., & Oddy, R. (2003). The Case for Iso 9000. [Research
paper]. The TQM Magazine, 15(5), 316-324.
Faisal, M. N., Banwet, D. K., & Shankar, R. (2007). Information Risks Management
in Supply Chains: An Assessment and Mitigation Framework. Journal of
Enterprise Information Management, 20(6), 677-699.
Faulkner, A. J., Hudson, J., & Barrett, P. S. (2000). Achieving Exemplary Quality in
the Construction Professions. [General review]. Structural Survey, 18(4),
155-162.
Feigenbaum, A. V. (1991). Total Quality Control. New York: McGraw-Hill, 1991,
3rd ed./rev. 40th anniversary ed., 1.
Fellows, R., & Liu, A. (2008). Research Methods for Construction: Blackwell Pub.
Finney, S., & Corbett, M. (2007). Erp Implementation: A Compilation and Analysis
of Critical Success Factors. Business Process Management Journal, 13(3),
329-347.
Fisher, N., & Yin, S. L. (1992). Information Management in a Contractor: A Model
of the Flow of Project Data: Telford.
Fotopoulos, C., Kafetzopoulos, D., & Gotzamani, K. (2011). Critical Factors for
Effective Implementation of the Haccp System: A Pareto Analysis. British
Food Journal, 113(5), 578-597.
Fotopoulos, C. V., & Psomas, E. L. (2010). The Structural Relationships between
Tqm Factors and Organizational Performance. The TQM Journal, 22(5),
539-552.
Frödell, M., Josephson, P. E., & Lindahl, G. (2008). Swedish Construction Clients'
Views on Project Success and Measuring Performance. Journal of
Engineering, Design and Technology, 6(1), 21-32.
Garson, G. D. (2011). Structural Equation Modelling: Statnotes from North Carolina
State University, Public Administration Program
Gefen, D., Straub, D. W., & Boudreau, M. C. (2000). Structural Equation Modeling
and Regression: Guidelines for Research Practice.
Gibson, G. E., & Hamilton, M. R. (1994). Analysis of Pre-Project Planning Effort
and Success Variables for Capital Facility Projects: Institute, University of
184
Texas at Austin Construction Industry.
Gieskes, J. F. B., & André, M. (2000). Infrastructure under Construction:
Continuous
Improvement
and
Learning
in
Projects.
Integrated
Manufacturing Systems, 11(3), 188-198.
Giles, R. (1997). Iso 9000 Perspective for the Construction Industry in the Uk.
Training for Quality, 5(4), 178-181.
Gosselin, P. (1994). Quality Plan for a Building Site – a Must. Paper presented at
the Quality Management in Building and Construction: Proceedings of
Eureka Conference, Hamar/Lillehammer.
Hair, J. F., Black, W. C., Babin, B. J., Anderson, R. E., & Tatham, R. L. (2006).
Multivariate Data Analysis: Prentice Hall, Upper Saddle River, NJ.
Hajjar, D., & AbouRizk, S. M. (2000). Integrating Document Management with
Project and Company Data. Journal of Computing in Civil Engineering,
14(1), 70-77.
Harary, F. (1969). Graph Theory: Addison-Wesley, Reading, MA.
Hassan, T. M. (1996). Simulating Information Flow to Assist Building Design
Management. Unpublished Unpublished PhD Thesis, Loughborough
University Technology, Loughborough, UK.
Haupt, T. C., & Whiteman, D. E. (2004). Inhibiting Factors of Implementing Total
Quality Management on Construction Sites. [Conceptual Paper]. The TQM
Magazine, 16(3), 166-173.
Hodgson, G. J. (1999). Highways Agency Design and Build Conditions of Contract.
Proceedings of the Institution of Civil Engineers-Transport, 135(1), 17-28.
Hoonakker, P., Carayon, P., & Loushine, T. (2010). Barriers and Benefits of Quality
Management in the Construction Industry: An Empirical Study. Total
Quality Management & Business Excellence, 21(9), 953-969.
Hoyle, D. (2007). Quality Management Essentials: Butterworth-Heinemann.
Hoyle, D. (2009). Iso 9000 Quality Systems Handbook (6th. ed.): ButterworthHeinemann.
Huang, T. (2010). Dynamic Quality Management in Complex Construction Projects.
Paper presented at the Proceedings of the 2010 Industrial Engineering
Research Conference.
Idoro, G. I. (2010). Influence of Quality Performance on Clients' Patronage of
Indigenous and Expatriate Construction Contractors in Nigeria. [Article].
185
Journal of Civil Engineering and Management, 16(1), 65-73.
Ika, L. A., Diallo, A., & Thuillier, D. (2011). Critical Success Factors for World
Bank Projects: An Empirical Investigation. International Journal of Project
Management.
Jaafari, A. (1996). Human Factors in the Australian Construction Industry: Towards
Total Quality Management. Australian Journal of Management, 21(2), 159159.
Jaafari,
A.
(2000).
Construction
Business
Competitiveness
and
Global
Benchmarking. Journal of Management in Engineering, 16(6), 43-53.
Jaafari, A., & Schub, A. (1990). Surviving Failures: Lessons from Field Study.
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT,
116(1), 68-86.
Jawahar, L. N. (1997). A Generic Model for Effective Implementation of
Empowerment in Construction Contractor Organisations. University of
Wolverhampton
Jha, K. N., & Iyer, K. C. (2006). Critical Factors Affecting Quality Performance in
Construction Projects. Total Quality Management and Business Excellence,
17(9), 1155-1170.
Jöreskog, K. G., & Sörbom, D. (1989). Lisrel 7: A Guide to the Program and
Applications.
Kant, R., & Singh, M. D. (2008). Knowledge Management Implementation:
Modeling the Barriers. Journal of Information and Knowledge Management,
7(4), 291-305.
Kaplan, R. S., & Norton, D. P. (1996). Using the Balanced Scorecard as a Strategic
Management System. Harvard Business Review, 74(1), 75-85.
Kärnä, S. (2004). Analysing Customer Satisfaction and Quality in Construction–the
Case of Public and Private Customers. Nordic journal of surveying and real
estate research, 2(0).
Karuppusami, G., & Gandhinathan, R. (2006). Pareto Analysis of Critical Success
Factors of Total Quality Management: A Literature Review and Analysis.
The TQM Magazine, 18(4), 372-385.
Khanna, H. K., Sharma, D. D., & Laroiya, S. C. (2011). Identifying and Ranking
Critical Success Factors for Implementation of Total Quality Management in
the Indian Manufacturing Industry Using Topsis. Asian Journal on Quality,
186
12(1), 124-138.
Kim, D. Y., Kumar, V., & Kumar, U. (2011). A Performance Realization
Framework for Implementing Iso 9000. International Journal of Quality &
Reliability Management, 28(4), 383-404.
Kline, R. B. (2010). Principles and Practice of Structural Equation Modeling: The
Guilford Press.
Kost, W. L. (2000). Creating the Quality Culture. "Moving to the Right on the
Quality Spectrum". Paper presented at the Quality Beyond 2000: Challenges
and Opportunities; First Gulf International Quality Conference, Exhibition
and Workshop.
Lam, S. Y. W., & Tang, C. H. W. (2002). Role of Surveyors under Iso 9000 in the
Construction Industry. Journal of Surveying Engineering, 128(4), 187-199.
Ledbetter, W. B. (1994). Quality Performance on Successful Project. Journal of
Construction Engineering and Management-Asce, 120(1), 34-46.
Leech, N. L., Barrett, K. C., & Morgan, G. A. (2005). Spss for Intermediate
Statistics: Use and Interpretation: Lawrence Erlbaum Assoc Inc.
Lin, C.-I., & Jang, W.-Y. (2008). Successful Iso 9000 Implementation in Taiwan:
How Can We Achieve It, and What Does It Mean? [Research paper].
International Journal of Productivity and Performance Management, 57(8),
600-622.
Lindahl, G., & Ryd, N. (2007). Clients' Goals and the Construction Project
Management Process. [Research paper]. Facilities, 25(3/4), 147-156.
Loehlin, J. C. (1998). Latent Variable Models: An Introduction to Factor, Path, and
Structural Analysis: Lawrence Erlbaum Associates Publishers.
Love, P. E. D., Edwards, D. J., & Sohal, A. (2004). Total Quality Management in
Australian Contracting Organisations: Pre-Conditions for Successful
Implementation.
[Research
Paper].
Engineering,
Construction
and
Architectural Management, 11(3), 189-198.
Ludwig-Becker, M. (1999). Quality Management Principles as Top Team
Performance Practices Iso 9000 Criteria Re-Interpreted. Team Performance
Management, 5(7), 207-211.
Mandal, A., & Deshmukh, S. G. (1994). Vendor Selection Using Interpretive
Structural Modelling (Ism). International Journal of Operations &
Production Management, 14(6), 52-59.
187
McAdam, R., & Canning, N. (2001). Iso in the Service Sector: Perceptions of Small
Professional Firms. [Research paper]. Managing Service Quality, 11(2), 8092.
McCabe, S. (1996). Creating Excellence in Construction Companies: Uk
Contractors’ Experiences of Quality Initiatives. The TQM Magazine, 8(6),
14-19.
Miles, M. B., & Huberman, A. M. (1994). Qualitative Data Analysis: An Expanded
Source Book (2nd. ed.). Thousand Oaks, CA: Sage.
Minchin, R. E., Henriquez, N. R., King, A. M., & Lewis, D. W. (2010). Owners
Respond: Preferences for Task Performance, Delivery Systems, and Quality
Management. Journal of Construction Engineering and Management-Asce,
136(3), 283-293.
Mohammed, A. H., & Abdullah, M. N. (2006). Quality Management System in
Construction. Paper presented at the International Conference on
Construction Industry 2006.
Mohammed, A. H., Abdullah, M. N., & Fuad, A. (2000a). Implementing Quality
Management System: The Level of Understanding and Capability of the
Construction Project Team. Paper presented at the Quality Beyond 2000:
Challenges and Opportunities; First Gulf International Quality Conference,
Exhibition and Workshop.
Mohammed, A. H., Abdullah, M. N., King, T. H., Ayop, M. H., & Sudin, M. N.
(2000b, 13 - 15 September 2000). Iso 9000 Critical Quality Elements for a
Construction Project Team. Paper presented at the Proceedings of the 4th.
Asia Pacific Structural Engineering & Construction Conference, Kuala
Lumpur.
Mohammed, A. H., Nesan, L. J., & Abdullah, M. N. (2006). An Application Model
for the Effective Implementation of a Project Quality Plan. Malaysian
Journal of Real Estate, 1(1), 75-86.
Mohd-Majid, K. (1990). Kaedah Penyelidikan Pendidikan. Kuala Lumpur: Dewan
Bahasa & Pustaka.
Motwani, J., Kumar, A., & Cheng, C. H. (1996). A Roadmap to Implementing Iso
9000. International Journal of Quality & Reliability Management, 13(1), 7283.
Netto, A. M., Low, S. P., & Lo, A. L. (1997). Legal Implications of Iso 9000 Qms in
188
Standard Forms of Building Contract. Training for Quality, 5(4), 169-177.
Ng, S. T. (2005). Performance of Engineering Consultants in Iso 9000-Based
Quality
Management
Systems
Implementation.
[Research
paper].
Engineering, Construction and Architectural Management, 12(6), 519-532.
Nycyk, M. (2008). Records Management Practices in Construction Industries:
Australian Perspectives. [Research paper]. Records Management Journal,
18(2), 140-149.
Oladapo, A. A. (2006). The Impact of Ict on Professional Practice in the Nigerian
Construction Industry. The Electronic Journal of Information Systems in
Developing Countries, Vol 24.
Orwig, R. A., & Brennan, L. L. (2000). An Integrated View of Project and Quality
Management for Project-Based Organizations. International Journal of
Quality & Reliability Management, 17(4/5), 351-363.
Pearsall, J., & Hanks, P. (1998). The New Oxford Dictionary of English: Clarendon
press Oxford.
Pheng, L. S., & Hong, S. H. (2005). Strategic Quality Management for the
Construction Industry. [Research paper]. The TQM Magazine, 17(1), 35-53.
Pheng, L. S., & Hwa, G. K. (1994). Construction Quality Assurance: Problems of
Implementation at Infancy Stage in Singapore. International Journal of
Quality & Reliability Management, 11(1), 22-37.
Pheng, L. S., & Ke-Wei, P. (1996). A Framework for Implementing Tqm in
Construction. The TQM Magazine, 8(5), 39-46.
Pheng, L. S., Kee, T. B., & Leng, A. A. A. (1999). Effectiveness of Iso 9000 in
Raising Construction Quality Standards: Some Empirical Evidence Using
Conquas Scores. Structural Survey, 17(2), 89-108.
Pheng, L. S., & Omar, H. F. (1997). The Effective Maintenance of Quality
Management Systems in the Construction Industry. [Research paper].
International Journal of Quality & Reliability Management, 14(8), 768-790.
Pheng, L. S., & Teo, J. A. (2004). Implementing Total Quality Management in
Construction Firms. Journal of Management in Engineering, 20(1), 8-15.
Poksinska, B., Eklund, J. A. E., & Dahlgaard, J. J. (2006). Iso 9001: 2000 in Small
Organisations: Lost Opportunities, Benefits and Influencing Factors.
International Journal of Quality & Reliability Management, 23(5), 490-512.
Psomas, E. L., Fotopoulos, C. V., & Kafetzopoulos, D. P. (2010). Critical Factors
189
for Effective Implementation of Iso 9001 in Sme Service Companies.
Managing Service Quality, 20(5), 440-457.
Quesada, H., & Gazo, R. (2007). Methodology for Determining Key Internal
Business Processes Based on Critical Success Factors: A Case Study in
Furniture Industry. Business Process Management Journal, 13(1), 5-20.
Ries, R., Needy, K. L., Bansal, A., & Turan, F. K. (2010 ). Quality Management
Systems in the Capital Facilities Delivery Industry: Analysis of Best
Practices in Leadership and Third-Party Paper presented at the Construction
Research Congress 2010.
Rockart, J. F. (1979). Chief Executives Define Their Own Data Needs. Harvard
Business Review, 57(2), 81-81.
Rockart, J. F., & Bullen, C. V. (1981). A Primer on Critical Success Factors. Center
for Information Systems Research, Working Paper, 1220-1281.
Sage, A. P. (1977). Interpretive Structural Modelling: Methodology for Large Scale
Systems. New York: McGraw-Hill.
Salaheldin, S. I. (2009a). Critical Success Factors for Tqm Implementation and
Their Impact on Performance of Smes. International Journal of Productivity
and Performance Management, 58(3), 215-237.
Salaheldin, S. I. (2009b). Problems, Success Factors and Benefits of Qcs
Implementation: A Case of Qasco. The TQM Journal, 21(1), 87-100.
Santos, A., & Powell, J. A. (2001). Assessing the Level of Teamwork in Brazilian
and
English
Construction
Sites.
[Research
paper].
Leadership
&
Organization Development Journal, 22(4), 166-174.
Santos, A., Powell, J. A., & Formoso, C. T. (2000). Setting Stretch Targets for
Driving Continuous Improvement in Construction: Analysis of Brazilian and
Uk Practices. [Research paper]. Work Study, 49(2), 50-58.
Schreiber, J. B., Nora, A., Stage, F. K., Barlow, E. A., & King, J. (2006). Reporting
Structural Equation Modeling and Confirmatory Factor Analysis Results: A
Review. The Journal of Educational Research, 99(6), 323-338.
Seetharaman, A., Sreenivasan, J., & Boon, L. P. (2006). Critical Success Factors of
Total Quality Management. Quality and Quantity, 40(5), 675-695.
Senaratne, S., & Sexton, M. G. (2009). Role of Knowledge in Managing
Construction Project Change. [Research paper]. Engineering, Construction
and Architectural Management, 16(2), 186 - 200.
190
Serpell, A. (1999). Integrating Quality Systems in Construction Projects: The
Chilean Case. International Journal of Project Management, 17(5), 317-322.
Serpell, A., & Ferrada, X. (2007). A Competency-Based Model for Construction
Supervisors in Developing Countries. [Case study]. Personnel Review, 36(4),
585-602.
Shammas-Toma, M., Seymour, D., & Clark, L. (1998). Obstacles to Implementing
Total Quality Management in the Uk Construction Industry. Construction
Management and Economics, 16(2), 177-192.
Simon, H. A. (1969). The Sciences of the Artificial. Massachusetts Institute of
Technology.
Singh, R. K. (2011). Analyzing the Interaction of Factors for Success of Total
Quality Management in Smes. Asian Journal on Quality, 12(1), 6-19.
Singh, R. K., Garg, S. K., Deshmukh, S. G., & Kumar, M. (2007). Modelling of
Critical Success Factors for Implementation of Amts. Journal of Modelling
in Management, 2(3), 232-250.
SIRIM, M. (1994). Ms Iso 8402:1994 Quality Management Systems – Vocabulary.
SIRIM, M. (2008). Ms Iso 9001:2008 Quality Management Systems – Requirements
Sjoholt, O. (1995). From Quality Assurance to Improvement Management. Oslo:
Norwegian Building Research Institute.
Smith, D., & Langfield-Smith, K. (2004). Structural Equation Modeling in
Management Accounting Research: Critical Analysis and Opportunities.
Journal of Accounting Literature, 23(1), 49-86.
Smith, S. E., Rubin, R. A., Burns, W. C., & Wilson, W. W. (1975). Contractual
Relationships in Construction. Journal of the Construction Division, 101(4),
907-921.
Soliman, F., Clegg, S., & Tantoush, T. (2001). Critical Success Factors for
Integration of Cad/Cam Systems with Erp Systems. International Journal of
Operations & Production Management, 21(5/6), 609-629.
Stebbing, L. (1990). Quality Management in the Service Industry: Ellis Horwood
West Sussex, UK.
Sullivan, K. T. (2010). Quality Management Programs in the Construction Industry:
A Best Value Comparison to Other Methodologies. [Case Study]. Journal of
Management in Engineering, Accepted Manuscript.
Sypsomos, M. G. (1997). Beyond Project Controls–the Quality Improvement
191
Approach. Transactions of AACE International, 1074–7397.
Talib, F., Rahman, Z., & Qureshi, M. N. (2011). Analysis of Interaction among the
Barriers to Total Quality Management Implementation Using Interpretive
Structural Modeling Approach. Benchmarking: An International Journal,
18(4), 563-587.
Tam, C. M., Deng, Z. M., Zeng, S. X., & Ho, C. S. (2000a). Performance
Assessment Scoring System of Public Housing Construction for Quality
Improvement in Hong Kong. International Journal of Quality & Reliability
Management, 17(4/5), 467-478.
Tam, C. M., Deng, Z. M., Zeng, S. X., & Ho, C. S. (2000b). Quest for Continuous
Quality Improvement for Public Housing Construction in Hong Kong.
Construction Management and Economics, 18(4), 437-446.
Tamimi, N., Gershon, M., & Currall, S. C. (1995). Assessing the Psychometric
Properties of Deming's 14 Principles. Quality Management Journal, 2(3), 3852.
Tang, S. L., & Kam, C. W. (1999). A Survey of Iso 9001 Implementation in
Engineering Consultancies in Hong Kong. International Journal of Quality
& Reliability Management, 16(6), 562-574.
Tang, S. L., Lu, M., & Chan, Y. L. (2003). Achieving Client Satisfaction for
Engineering Consulting Firms. Journal of Management in Engineering,
19(4), 166-172.
Tang, W. Z., Qiang, M. S., Duffield, C. F., Young, D. M., & Lu, Y. M. (2009).
Enhancing Total Quality Management by Partnering in Construction.
[Article]. Journal of Professional Issues in Engineering Education and
Practice, 135(4), 129-141.
Thakkar, J., Deshmukh, S. G., Gupta, A. D., & Shankar, R. (2006). Development of
a Balanced Scorecard: An Integrated Approach of Interpretive Structural
Modeling (Ism) and Analytic Network Process (Anp). International Journal
of Productivity and Performance Management, 56(1), 25-59.
Toakley, A. R., & Marosszeky, M. (2003). Towards Total Project Quality – a
Review of Research Needs. [Research Paper]. Engineering, Construction
and Architectural Management, 10(3), 219-228.
Tseng, M. L., & Lin, Y. H. Modeling a Hierarchical Structure of Municipal Solid
Waste Management Using Interpretive Structural Modeling.
192
Vakola, M., & Wilson, I. E. (2004). The Challenge of Virtual Organisation: Critical
Success Factors in Dealing with Constant Change. Team Performance
Management, 10(5/6), 112-120.
van der Zouwen, J., Dijkstra, W., & Smit, J. H. (2004). Studying RespondentInterviewer Interaction: The Relationship between Interviewing Style,
Interviewer Behavior, and Response Behavior. Hoboken, NJ, USA: John
Wiley & Sons, Inc.
Warfield, J. N. (1976). Societal Systems: Planning. Policy and Complexity, 490.
Wennerstrom, G. (2004). Achieving Excellence in Canadian Construction.
Willis, T. H. W. a. W. D. (1996). A Quality Performance Management System for
Industrial Construction Engineering Projects. International Journal of
Quality & Reliability Management, 13(9), 38-48.
Wolf, C., & Hurtado, Y. C. (1990). Quality Management Practice in Capital
Projects. Trans. Am. Assoc. Cost Eng.
Yin, R. K. (2009). Case Study Research: Design and Methods (Vol. 5): Sage
Publications, Inc.
Yin, R. K. (2011). Applications of Case Study Research (Vol. 34): Sage
Publications, Inc.
Yusof, S. R. M., & Aspinwall, E. (1999). Critical Success Factors for Total Quality
Management Implementation in Small and Medium Enterprises. Total
Quality Management, 10(4-5), 803-809.
Zainudin, A. (2012). A Handbook on Structural Equation Modeling: Center of
Graduate Studies, Universiti Teknologi MARA Kelantan.
Zeng, S. X., Lou, G. X., & Tam, V. W. Y. (2007). Managing Information Flows for
Quality Improvement of Projects. Measuring Business Excellence, 11(3), 3040.
Zheng, C. A., Li, L., Mo, Z. S., & Yun, C. (2004). "Reasonable Quality" Of
Superhighway Construction Projects. Beijing: Baiwanzhuang Xichenggu.
Zwikael, O. (2008). Top Management Involvement in Project Management:
Exclusive Support Practices for Different Project Scenarios. International
Journal of Managing Projects in Business, 1(3), 387-403.
Download