179 REFERENCES Ab Wahid, R. (2010). Beyond Certification: The Maintenance of Iso 9000 in Malaysian Service Organisations. Ab Wahid, R., & Corner, J. (2009). Critical Success Factors and Problems in Iso 9000 Maintenance. International Journal of Quality & Reliability Management, 26(9), 881-893. Ab Wahid, R., & Corner, J. (2011). Critical Success Factors and Improvements in Iso 9000 Maintenance. Business Management Quarterly Review, 2(2), 1-13. Abbasi, M., Shirazi, M. A., & Aryanezjad, M. B. (2012). Determination of Manufacturing Strategy Using Interpretive Structural Modeling. African Journal of Business Management, 6(3), 881-887. Abdul-Aziz, A.-R. (2002). The Realities of Applying Total Quality Management in the Construction Industry. [General review]. Structural Survey, 20(2), 88-96. Abdul-Rahman, H. (1996). Some Observations on the Management of Quality among Construction Professionals in the Uk. Construction Management & Economics, 14(6), 485-495. Abdullah, M. N. (2005). A Case Study on Quality Management System in Construction Project: Master of Engineering (Construction), Universiti Teknologi Malaysia. Skudai, Malaysia. Achanga, P., Shehab, E., Roy, R., & Nelder, G. (2006). Critical Success Factors for Lean Implementation within Smes. Journal of Manufacturing Technology Management, 17(4), 460-471. Agarwal, A., Shankar, R., & Tiwari, M. K. (2007). Modeling Agility of Supply Chain. Industrial Marketing Management, 36(4), 443-457. Ahmad, H., Francis, A., & Zairi, M. (2007). Business Process Reengineering: Critical Success Factors in Higher Education. Business Process Management Journal, 13(3), 451-469. 180 Antony, J., Leung, K., Knowles, G., & Gosh, S. (2002). Critical Success Factors of Tqm Implementation in Hong Kong Industries. International Journal of Quality & Reliability Management, 19(5), 551-566. Arbuckle, J. L. (2007). Amostm 16 User's Guide. Chicago: SPSS. Arditi, D., & Gunaydin, H. M. (1997). Total Quality Management in the Construction Process. International Journal of Project Management, 15(4), 235-243. Asif, M., Fisscher, O. A. M., de Bruijn, E. J., & Pagell, M. (2010). An Examination of Strategies Employed for the Integration of Management Systems. The TQM Journal, 22(6), 648-669. Atkinson, R. (1999). Project Management: Cost, Time and Quality, Two Best Guesses and a Phenomenon, Its Time to Accept Other Success Criteria. International Journal of Project Management, 17(6), 337-342. Au, J. C. W., & Yu, W. W. M. (1999). Quality Management for an Infrastructure Construction Project in Hong Kong. [Research paper]. Logistics Information Management, 12(4), 309-314. Bagozzi, R. P., & Yi, Y. (1988). On the Evaluation of Structural Equation Models. Journal of the academy of marketing science, 16(1), 74-94. Baidoun, S. (2004). The Implementation of Tqm Philosophy in Palestinian Organization: A Proposed Non-Prescriptive Generic Framework. The TQM Magazine, 16(3), 174-185. Barima, O., & Rowlinson, S. M. (2010). Critical, Manifest Variables in Virtual Construction Project Value Delivery. Engineering, Construction and Architectural Management, 17(2), 197-209. Barrett, P. (2000). Systems and Relationships for Construction Quality. [Research paper]. International Journal of Quality & Reliability Management, 17(4/5), 377-392. Barrett, P., & Grover, R. (1998). Quality Assurance and the Surveying Professional Volume 1-Quality Management and Surveyors; a Strategic Reassessment. Battikha, M. G. (2003). Quality Management Practice in Highway Construction. [Conceptual Paper]. International Journal of Quality & Reliability Management, 20(5), 532-550. Beatham, S., Anumba, C., Thorpe, T., & Hedges, I. (2004). Kpis: A Critical Appraisal of Their Use in Construction. [General review]. Benchmarking: An 181 International Journal, 11(1), 93-117. Bi, K. X., Ma, H. Z., & Li, W. H. (2012). Interpretive Structural Modeling of Critical Success Factors for Implementing Green Process Innovation in Manufacturing Enterprises. Advanced Materials Research, 361, 1026-1029. Black, S. A., & Porter, L. J. (1996). Identification of the Critical Factors of Tqm. Decision Sciences, 27(1), 1-21. Bolanos, R., Fontela, E., Nenclares, A., & Pastor, P. (2005). Using Interpretive Structural Modelling in Strategic Decision-Making Groups. Management Decision, 43(6), 877-895. Bradley, J. (2008). Management Based Critical Success Factors in the Implementation of Enterprise Resource Planning Systems. International Journal of Accounting Information Systems, 9(3), 175-200. Brewer, G., & Gajendran, T. (2009 ). Emerging Ict Trends in Construction Project Teams: A Delphi Study. Journal of Information Technology in Construction, March. Bryde, D. J., & Robinson, L. (2007). The Relationship between Total Quality Management and the Focus of Project Management Practices. [Research paper]. The TQM Magazine, 19(1), 50-61. Bubshait, A. A. (1994). Owner Involvement in Project Quality. [doi: 10.1016/02637863(94)90018-3]. International Journal of Project Management, 12(2), 115-117. Bubshait, A. A., & Al-Musaid, A. A. (1992). Owner Involvement in Construction Projects in Saudi Arabia. Journal of Management in Engineering, 8(2), 176185. Bubshait, A. A., & Al Atiq, T. H. (1999). Iso 9000 Quality Standards in Construction. Journal of Management in Engineering, 15(6), 41-46. Butler, J. (2002). Construction Quality Stinks. Engineering News Record. Byrne, B. M. (2010). Structural Equation Modeling with Amos: Basic Concepts, Applications, and Programming (Second ed.): Routledge Taylor & Francis Group. Carl, W., & Yadira, C. H. (1990). Quality Management Practice in Capital Projects. American Association of Cost Engineers, Q4(1). Chan, A. P. C., & Tam, C. M. (2000). Factors Affecting the Quality of Building Projects in Hong Kong. [Case study]. International Journal of Quality & 182 Reliability Management, 17(4/5), 423-442. Chan, A. P. C., Wong, F. K. W., & Lam, P. T. I. (2006). Assessing Quality Relationships in Public Housing: An Empirical Study. [Research paper]. International Journal of Quality & Reliability Management, 23(8), 909-927. Chan, D. W. M., Chan, A. P. C., Lam, P. T. I., & Wong, J. M. W. (2010). Identifying the Critical Success Factors for Target Cost Contracts in the Construction Industry. Journal of Facilities Management, 8(3), 179-201. Chileshe, N., & Haupt, T. C. (2005). Modelling Critical Success Factors of Construction Project Management (Cpm). Journal of Engineering, Design and Technology, 3(2), 140-154. Chin, K. S., Chan, B. L., & Lam, P. K. (2008). Identifying and Prioritizing Critical Success Factors for Coopetition Strategy. Industrial Management & Data Systems, 108(4), 437-454. Chin, K. S., & Choi, T. W. (2003). Construction in Hong Kong: Success Factors for Iso9000 Implementation. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 129, 599-599. Chini, A. R., & Valdez, H. E. (2003). Iso 9000 and the U.S. Construction Industry. [Technical paper]. Journal of Management in Engineering, 19(2), 69-77. Cianfrani, C. A., Tsiakals, J. J., & West, J. (2009). Iso 9001: 2008 Explained: Asq Pr. CIDB. (2007). Annual Report. Kuala Lumpur: Construction Industry Development Board Malaysia. CIDB. (2009). Annual Report. Kuala Lumpur: Construction Industry Development Board Malaysia. Coronado, R. B., & Antony, J. (2002). Critical Success Factors for the Successful Implementation of Six Sigma Projects in Organisations. The TQM Magazine, 14(2), 92-99. Crosby, P. B. (1995). Quality without Tears: The Art of Hassle-Free Management: McGraw-Hill Professional. Deshmukh, S. G. (2010). Modelling the Success Factors for National R&D Organizations: A Case of India. Journal of Modelling in Management, 5(2), 158-175. Din, S., Abd-Hamid, Z., & Bryde, D. J. (2010). Iso 9000 Certification and Construction Project Performance: The Malaysian Experience. International 183 Journal of Project Management. Djebarni, R., & Eltigani, H. (1996). Achieving Quality and Productivity in the House Building Sector. Property Management, 14(1), 39-45. Douglas, A., Coleman, S., & Oddy, R. (2003). The Case for Iso 9000. [Research paper]. The TQM Magazine, 15(5), 316-324. Faisal, M. N., Banwet, D. K., & Shankar, R. (2007). Information Risks Management in Supply Chains: An Assessment and Mitigation Framework. Journal of Enterprise Information Management, 20(6), 677-699. Faulkner, A. J., Hudson, J., & Barrett, P. S. (2000). Achieving Exemplary Quality in the Construction Professions. [General review]. Structural Survey, 18(4), 155-162. Feigenbaum, A. V. (1991). Total Quality Control. New York: McGraw-Hill, 1991, 3rd ed./rev. 40th anniversary ed., 1. Fellows, R., & Liu, A. (2008). Research Methods for Construction: Blackwell Pub. Finney, S., & Corbett, M. (2007). Erp Implementation: A Compilation and Analysis of Critical Success Factors. Business Process Management Journal, 13(3), 329-347. Fisher, N., & Yin, S. L. (1992). Information Management in a Contractor: A Model of the Flow of Project Data: Telford. Fotopoulos, C., Kafetzopoulos, D., & Gotzamani, K. (2011). Critical Factors for Effective Implementation of the Haccp System: A Pareto Analysis. British Food Journal, 113(5), 578-597. Fotopoulos, C. V., & Psomas, E. L. (2010). The Structural Relationships between Tqm Factors and Organizational Performance. The TQM Journal, 22(5), 539-552. Frödell, M., Josephson, P. E., & Lindahl, G. (2008). Swedish Construction Clients' Views on Project Success and Measuring Performance. Journal of Engineering, Design and Technology, 6(1), 21-32. Garson, G. D. (2011). Structural Equation Modelling: Statnotes from North Carolina State University, Public Administration Program Gefen, D., Straub, D. W., & Boudreau, M. C. (2000). Structural Equation Modeling and Regression: Guidelines for Research Practice. Gibson, G. E., & Hamilton, M. R. (1994). Analysis of Pre-Project Planning Effort and Success Variables for Capital Facility Projects: Institute, University of 184 Texas at Austin Construction Industry. Gieskes, J. F. B., & André, M. (2000). Infrastructure under Construction: Continuous Improvement and Learning in Projects. Integrated Manufacturing Systems, 11(3), 188-198. Giles, R. (1997). Iso 9000 Perspective for the Construction Industry in the Uk. Training for Quality, 5(4), 178-181. Gosselin, P. (1994). Quality Plan for a Building Site – a Must. Paper presented at the Quality Management in Building and Construction: Proceedings of Eureka Conference, Hamar/Lillehammer. Hair, J. F., Black, W. C., Babin, B. J., Anderson, R. E., & Tatham, R. L. (2006). Multivariate Data Analysis: Prentice Hall, Upper Saddle River, NJ. Hajjar, D., & AbouRizk, S. M. (2000). Integrating Document Management with Project and Company Data. Journal of Computing in Civil Engineering, 14(1), 70-77. Harary, F. (1969). Graph Theory: Addison-Wesley, Reading, MA. Hassan, T. M. (1996). Simulating Information Flow to Assist Building Design Management. Unpublished Unpublished PhD Thesis, Loughborough University Technology, Loughborough, UK. Haupt, T. C., & Whiteman, D. E. (2004). Inhibiting Factors of Implementing Total Quality Management on Construction Sites. [Conceptual Paper]. The TQM Magazine, 16(3), 166-173. Hodgson, G. J. (1999). Highways Agency Design and Build Conditions of Contract. Proceedings of the Institution of Civil Engineers-Transport, 135(1), 17-28. Hoonakker, P., Carayon, P., & Loushine, T. (2010). Barriers and Benefits of Quality Management in the Construction Industry: An Empirical Study. Total Quality Management & Business Excellence, 21(9), 953-969. Hoyle, D. (2007). Quality Management Essentials: Butterworth-Heinemann. Hoyle, D. (2009). Iso 9000 Quality Systems Handbook (6th. ed.): ButterworthHeinemann. Huang, T. (2010). Dynamic Quality Management in Complex Construction Projects. Paper presented at the Proceedings of the 2010 Industrial Engineering Research Conference. Idoro, G. I. (2010). Influence of Quality Performance on Clients' Patronage of Indigenous and Expatriate Construction Contractors in Nigeria. [Article]. 185 Journal of Civil Engineering and Management, 16(1), 65-73. Ika, L. A., Diallo, A., & Thuillier, D. (2011). Critical Success Factors for World Bank Projects: An Empirical Investigation. International Journal of Project Management. Jaafari, A. (1996). Human Factors in the Australian Construction Industry: Towards Total Quality Management. Australian Journal of Management, 21(2), 159159. Jaafari, A. (2000). Construction Business Competitiveness and Global Benchmarking. Journal of Management in Engineering, 16(6), 43-53. Jaafari, A., & Schub, A. (1990). Surviving Failures: Lessons from Field Study. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 116(1), 68-86. Jawahar, L. N. (1997). A Generic Model for Effective Implementation of Empowerment in Construction Contractor Organisations. University of Wolverhampton Jha, K. N., & Iyer, K. C. (2006). Critical Factors Affecting Quality Performance in Construction Projects. Total Quality Management and Business Excellence, 17(9), 1155-1170. Jöreskog, K. G., & Sörbom, D. (1989). Lisrel 7: A Guide to the Program and Applications. Kant, R., & Singh, M. D. (2008). Knowledge Management Implementation: Modeling the Barriers. Journal of Information and Knowledge Management, 7(4), 291-305. Kaplan, R. S., & Norton, D. P. (1996). Using the Balanced Scorecard as a Strategic Management System. Harvard Business Review, 74(1), 75-85. Kärnä, S. (2004). Analysing Customer Satisfaction and Quality in Construction–the Case of Public and Private Customers. Nordic journal of surveying and real estate research, 2(0). Karuppusami, G., & Gandhinathan, R. (2006). Pareto Analysis of Critical Success Factors of Total Quality Management: A Literature Review and Analysis. The TQM Magazine, 18(4), 372-385. Khanna, H. K., Sharma, D. D., & Laroiya, S. C. (2011). Identifying and Ranking Critical Success Factors for Implementation of Total Quality Management in the Indian Manufacturing Industry Using Topsis. Asian Journal on Quality, 186 12(1), 124-138. Kim, D. Y., Kumar, V., & Kumar, U. (2011). A Performance Realization Framework for Implementing Iso 9000. International Journal of Quality & Reliability Management, 28(4), 383-404. Kline, R. B. (2010). Principles and Practice of Structural Equation Modeling: The Guilford Press. Kost, W. L. (2000). Creating the Quality Culture. "Moving to the Right on the Quality Spectrum". Paper presented at the Quality Beyond 2000: Challenges and Opportunities; First Gulf International Quality Conference, Exhibition and Workshop. Lam, S. Y. W., & Tang, C. H. W. (2002). Role of Surveyors under Iso 9000 in the Construction Industry. Journal of Surveying Engineering, 128(4), 187-199. Ledbetter, W. B. (1994). Quality Performance on Successful Project. Journal of Construction Engineering and Management-Asce, 120(1), 34-46. Leech, N. L., Barrett, K. C., & Morgan, G. A. (2005). Spss for Intermediate Statistics: Use and Interpretation: Lawrence Erlbaum Assoc Inc. Lin, C.-I., & Jang, W.-Y. (2008). Successful Iso 9000 Implementation in Taiwan: How Can We Achieve It, and What Does It Mean? [Research paper]. International Journal of Productivity and Performance Management, 57(8), 600-622. Lindahl, G., & Ryd, N. (2007). Clients' Goals and the Construction Project Management Process. [Research paper]. Facilities, 25(3/4), 147-156. Loehlin, J. C. (1998). Latent Variable Models: An Introduction to Factor, Path, and Structural Analysis: Lawrence Erlbaum Associates Publishers. Love, P. E. D., Edwards, D. J., & Sohal, A. (2004). Total Quality Management in Australian Contracting Organisations: Pre-Conditions for Successful Implementation. [Research Paper]. Engineering, Construction and Architectural Management, 11(3), 189-198. Ludwig-Becker, M. (1999). Quality Management Principles as Top Team Performance Practices Iso 9000 Criteria Re-Interpreted. Team Performance Management, 5(7), 207-211. Mandal, A., & Deshmukh, S. G. (1994). Vendor Selection Using Interpretive Structural Modelling (Ism). International Journal of Operations & Production Management, 14(6), 52-59. 187 McAdam, R., & Canning, N. (2001). Iso in the Service Sector: Perceptions of Small Professional Firms. [Research paper]. Managing Service Quality, 11(2), 8092. McCabe, S. (1996). Creating Excellence in Construction Companies: Uk Contractors’ Experiences of Quality Initiatives. The TQM Magazine, 8(6), 14-19. Miles, M. B., & Huberman, A. M. (1994). Qualitative Data Analysis: An Expanded Source Book (2nd. ed.). Thousand Oaks, CA: Sage. Minchin, R. E., Henriquez, N. R., King, A. M., & Lewis, D. W. (2010). Owners Respond: Preferences for Task Performance, Delivery Systems, and Quality Management. Journal of Construction Engineering and Management-Asce, 136(3), 283-293. Mohammed, A. H., & Abdullah, M. N. (2006). Quality Management System in Construction. Paper presented at the International Conference on Construction Industry 2006. Mohammed, A. H., Abdullah, M. N., & Fuad, A. (2000a). Implementing Quality Management System: The Level of Understanding and Capability of the Construction Project Team. Paper presented at the Quality Beyond 2000: Challenges and Opportunities; First Gulf International Quality Conference, Exhibition and Workshop. Mohammed, A. H., Abdullah, M. N., King, T. H., Ayop, M. H., & Sudin, M. N. (2000b, 13 - 15 September 2000). Iso 9000 Critical Quality Elements for a Construction Project Team. Paper presented at the Proceedings of the 4th. Asia Pacific Structural Engineering & Construction Conference, Kuala Lumpur. Mohammed, A. H., Nesan, L. J., & Abdullah, M. N. (2006). An Application Model for the Effective Implementation of a Project Quality Plan. Malaysian Journal of Real Estate, 1(1), 75-86. Mohd-Majid, K. (1990). Kaedah Penyelidikan Pendidikan. Kuala Lumpur: Dewan Bahasa & Pustaka. Motwani, J., Kumar, A., & Cheng, C. H. (1996). A Roadmap to Implementing Iso 9000. International Journal of Quality & Reliability Management, 13(1), 7283. Netto, A. M., Low, S. P., & Lo, A. L. (1997). Legal Implications of Iso 9000 Qms in 188 Standard Forms of Building Contract. Training for Quality, 5(4), 169-177. Ng, S. T. (2005). Performance of Engineering Consultants in Iso 9000-Based Quality Management Systems Implementation. [Research paper]. Engineering, Construction and Architectural Management, 12(6), 519-532. Nycyk, M. (2008). Records Management Practices in Construction Industries: Australian Perspectives. [Research paper]. Records Management Journal, 18(2), 140-149. Oladapo, A. A. (2006). The Impact of Ict on Professional Practice in the Nigerian Construction Industry. The Electronic Journal of Information Systems in Developing Countries, Vol 24. Orwig, R. A., & Brennan, L. L. (2000). An Integrated View of Project and Quality Management for Project-Based Organizations. International Journal of Quality & Reliability Management, 17(4/5), 351-363. Pearsall, J., & Hanks, P. (1998). The New Oxford Dictionary of English: Clarendon press Oxford. Pheng, L. S., & Hong, S. H. (2005). Strategic Quality Management for the Construction Industry. [Research paper]. The TQM Magazine, 17(1), 35-53. Pheng, L. S., & Hwa, G. K. (1994). Construction Quality Assurance: Problems of Implementation at Infancy Stage in Singapore. International Journal of Quality & Reliability Management, 11(1), 22-37. Pheng, L. S., & Ke-Wei, P. (1996). A Framework for Implementing Tqm in Construction. The TQM Magazine, 8(5), 39-46. Pheng, L. S., Kee, T. B., & Leng, A. A. A. (1999). Effectiveness of Iso 9000 in Raising Construction Quality Standards: Some Empirical Evidence Using Conquas Scores. Structural Survey, 17(2), 89-108. Pheng, L. S., & Omar, H. F. (1997). The Effective Maintenance of Quality Management Systems in the Construction Industry. [Research paper]. International Journal of Quality & Reliability Management, 14(8), 768-790. Pheng, L. S., & Teo, J. A. (2004). Implementing Total Quality Management in Construction Firms. Journal of Management in Engineering, 20(1), 8-15. Poksinska, B., Eklund, J. A. E., & Dahlgaard, J. J. (2006). Iso 9001: 2000 in Small Organisations: Lost Opportunities, Benefits and Influencing Factors. International Journal of Quality & Reliability Management, 23(5), 490-512. Psomas, E. L., Fotopoulos, C. V., & Kafetzopoulos, D. P. (2010). Critical Factors 189 for Effective Implementation of Iso 9001 in Sme Service Companies. Managing Service Quality, 20(5), 440-457. Quesada, H., & Gazo, R. (2007). Methodology for Determining Key Internal Business Processes Based on Critical Success Factors: A Case Study in Furniture Industry. Business Process Management Journal, 13(1), 5-20. Ries, R., Needy, K. L., Bansal, A., & Turan, F. K. (2010 ). Quality Management Systems in the Capital Facilities Delivery Industry: Analysis of Best Practices in Leadership and Third-Party Paper presented at the Construction Research Congress 2010. Rockart, J. F. (1979). Chief Executives Define Their Own Data Needs. Harvard Business Review, 57(2), 81-81. Rockart, J. F., & Bullen, C. V. (1981). A Primer on Critical Success Factors. Center for Information Systems Research, Working Paper, 1220-1281. Sage, A. P. (1977). Interpretive Structural Modelling: Methodology for Large Scale Systems. New York: McGraw-Hill. Salaheldin, S. I. (2009a). Critical Success Factors for Tqm Implementation and Their Impact on Performance of Smes. International Journal of Productivity and Performance Management, 58(3), 215-237. Salaheldin, S. I. (2009b). Problems, Success Factors and Benefits of Qcs Implementation: A Case of Qasco. The TQM Journal, 21(1), 87-100. Santos, A., & Powell, J. A. (2001). Assessing the Level of Teamwork in Brazilian and English Construction Sites. [Research paper]. Leadership & Organization Development Journal, 22(4), 166-174. Santos, A., Powell, J. A., & Formoso, C. T. (2000). Setting Stretch Targets for Driving Continuous Improvement in Construction: Analysis of Brazilian and Uk Practices. [Research paper]. Work Study, 49(2), 50-58. Schreiber, J. B., Nora, A., Stage, F. K., Barlow, E. A., & King, J. (2006). Reporting Structural Equation Modeling and Confirmatory Factor Analysis Results: A Review. The Journal of Educational Research, 99(6), 323-338. Seetharaman, A., Sreenivasan, J., & Boon, L. P. (2006). Critical Success Factors of Total Quality Management. Quality and Quantity, 40(5), 675-695. Senaratne, S., & Sexton, M. G. (2009). Role of Knowledge in Managing Construction Project Change. [Research paper]. Engineering, Construction and Architectural Management, 16(2), 186 - 200. 190 Serpell, A. (1999). Integrating Quality Systems in Construction Projects: The Chilean Case. International Journal of Project Management, 17(5), 317-322. Serpell, A., & Ferrada, X. (2007). A Competency-Based Model for Construction Supervisors in Developing Countries. [Case study]. Personnel Review, 36(4), 585-602. Shammas-Toma, M., Seymour, D., & Clark, L. (1998). Obstacles to Implementing Total Quality Management in the Uk Construction Industry. Construction Management and Economics, 16(2), 177-192. Simon, H. A. (1969). The Sciences of the Artificial. Massachusetts Institute of Technology. Singh, R. K. (2011). Analyzing the Interaction of Factors for Success of Total Quality Management in Smes. Asian Journal on Quality, 12(1), 6-19. Singh, R. K., Garg, S. K., Deshmukh, S. G., & Kumar, M. (2007). Modelling of Critical Success Factors for Implementation of Amts. Journal of Modelling in Management, 2(3), 232-250. SIRIM, M. (1994). Ms Iso 8402:1994 Quality Management Systems – Vocabulary. SIRIM, M. (2008). Ms Iso 9001:2008 Quality Management Systems – Requirements Sjoholt, O. (1995). From Quality Assurance to Improvement Management. Oslo: Norwegian Building Research Institute. Smith, D., & Langfield-Smith, K. (2004). Structural Equation Modeling in Management Accounting Research: Critical Analysis and Opportunities. Journal of Accounting Literature, 23(1), 49-86. Smith, S. E., Rubin, R. A., Burns, W. C., & Wilson, W. W. (1975). Contractual Relationships in Construction. Journal of the Construction Division, 101(4), 907-921. Soliman, F., Clegg, S., & Tantoush, T. (2001). Critical Success Factors for Integration of Cad/Cam Systems with Erp Systems. International Journal of Operations & Production Management, 21(5/6), 609-629. Stebbing, L. (1990). Quality Management in the Service Industry: Ellis Horwood West Sussex, UK. Sullivan, K. T. (2010). Quality Management Programs in the Construction Industry: A Best Value Comparison to Other Methodologies. [Case Study]. Journal of Management in Engineering, Accepted Manuscript. Sypsomos, M. G. (1997). Beyond Project Controls–the Quality Improvement 191 Approach. Transactions of AACE International, 1074–7397. Talib, F., Rahman, Z., & Qureshi, M. N. (2011). Analysis of Interaction among the Barriers to Total Quality Management Implementation Using Interpretive Structural Modeling Approach. Benchmarking: An International Journal, 18(4), 563-587. Tam, C. M., Deng, Z. M., Zeng, S. X., & Ho, C. S. (2000a). Performance Assessment Scoring System of Public Housing Construction for Quality Improvement in Hong Kong. International Journal of Quality & Reliability Management, 17(4/5), 467-478. Tam, C. M., Deng, Z. M., Zeng, S. X., & Ho, C. S. (2000b). Quest for Continuous Quality Improvement for Public Housing Construction in Hong Kong. Construction Management and Economics, 18(4), 437-446. Tamimi, N., Gershon, M., & Currall, S. C. (1995). Assessing the Psychometric Properties of Deming's 14 Principles. Quality Management Journal, 2(3), 3852. Tang, S. L., & Kam, C. W. (1999). A Survey of Iso 9001 Implementation in Engineering Consultancies in Hong Kong. International Journal of Quality & Reliability Management, 16(6), 562-574. Tang, S. L., Lu, M., & Chan, Y. L. (2003). Achieving Client Satisfaction for Engineering Consulting Firms. Journal of Management in Engineering, 19(4), 166-172. Tang, W. Z., Qiang, M. S., Duffield, C. F., Young, D. M., & Lu, Y. M. (2009). Enhancing Total Quality Management by Partnering in Construction. [Article]. Journal of Professional Issues in Engineering Education and Practice, 135(4), 129-141. Thakkar, J., Deshmukh, S. G., Gupta, A. D., & Shankar, R. (2006). Development of a Balanced Scorecard: An Integrated Approach of Interpretive Structural Modeling (Ism) and Analytic Network Process (Anp). International Journal of Productivity and Performance Management, 56(1), 25-59. Toakley, A. R., & Marosszeky, M. (2003). Towards Total Project Quality – a Review of Research Needs. [Research Paper]. Engineering, Construction and Architectural Management, 10(3), 219-228. Tseng, M. L., & Lin, Y. H. Modeling a Hierarchical Structure of Municipal Solid Waste Management Using Interpretive Structural Modeling. 192 Vakola, M., & Wilson, I. E. (2004). The Challenge of Virtual Organisation: Critical Success Factors in Dealing with Constant Change. Team Performance Management, 10(5/6), 112-120. van der Zouwen, J., Dijkstra, W., & Smit, J. H. (2004). Studying RespondentInterviewer Interaction: The Relationship between Interviewing Style, Interviewer Behavior, and Response Behavior. Hoboken, NJ, USA: John Wiley & Sons, Inc. Warfield, J. N. (1976). Societal Systems: Planning. Policy and Complexity, 490. Wennerstrom, G. (2004). Achieving Excellence in Canadian Construction. Willis, T. H. W. a. W. D. (1996). A Quality Performance Management System for Industrial Construction Engineering Projects. International Journal of Quality & Reliability Management, 13(9), 38-48. Wolf, C., & Hurtado, Y. C. (1990). Quality Management Practice in Capital Projects. Trans. Am. Assoc. Cost Eng. Yin, R. K. (2009). Case Study Research: Design and Methods (Vol. 5): Sage Publications, Inc. Yin, R. K. (2011). Applications of Case Study Research (Vol. 34): Sage Publications, Inc. Yusof, S. R. M., & Aspinwall, E. (1999). Critical Success Factors for Total Quality Management Implementation in Small and Medium Enterprises. Total Quality Management, 10(4-5), 803-809. Zainudin, A. (2012). A Handbook on Structural Equation Modeling: Center of Graduate Studies, Universiti Teknologi MARA Kelantan. Zeng, S. X., Lou, G. X., & Tam, V. W. Y. (2007). Managing Information Flows for Quality Improvement of Projects. Measuring Business Excellence, 11(3), 3040. Zheng, C. A., Li, L., Mo, Z. S., & Yun, C. (2004). "Reasonable Quality" Of Superhighway Construction Projects. Beijing: Baiwanzhuang Xichenggu. Zwikael, O. (2008). Top Management Involvement in Project Management: Exclusive Support Practices for Different Project Scenarios. International Journal of Managing Projects in Business, 1(3), 387-403.