MASSACHUSETTS INSTITUTE OF TECHNOLOGY HAYSTACK OBSERVATORY WESTFORD, MASSACHUSETTS 01886 Telephone: Fax: 978-692-4764 781-981-0590 22 November 2002 TO: Distribution FROM: Alan R. Whitney SUBJECT: 20 November 2002 e-VLBI telecon summary Attendees: Lee Foster, Kevin Kranacs, Bill Wildes – GSFC Tom Lehman - ISI Lorraine Prior – MIT Lincoln Labs Kevin Dudevoir, Hans Hinteregger, Joe Salah, Alan Whitney – Haystack Observatory This telecon is one of an ongoing series of telecons to prepare for gigabit/sec e-VLBI demonstrations between NASA GSFC and MIT Haystack Observatory using a combination of network facilities including all or part of Glownet, Bossnet, ISI-E, SuperNet, Max and GSFC/HECN. ACTION ITEMS ARE HIGHLIGHTED IN RED. Status Reports The attached figures of the e-VLBI path have been updated to reflect current status and are pretty much self-explanatory. The following status updates were reported: − New fiber is in place and operating between ISI-E and Eckington, as Tom reported to everyone by e-mail. − Lorraine and Tom reported that there are still problems trying to bring Bossnet back up to OC-48. Tom suggested that some loopback testing with Sonet gear is being planned to isolate the problem. − Tom reported that Abilene connection at ISI-E should be in place in a couple of weeks. Connection will be into ISI-E Juniper M40 (G10 on diagram). Kevin will send Haystack, Hawaii and Germany IP information to Tom in support of the Abilene connection at ISI-E. − Alan reported that agreement has been made with MAX to connect USNO to MAX via George Washington University and that project is moving ahead. Agreement with NASA to support e-VLBI as a sponsored project needs to be reached. − Alan and Hans reported that the efforts to connect Kokee Park, Kauai, Hawaii and Wettzell, Germany to Haystack are continuing, hopefully beginning to bear fruit within the next month or so. − Tom reported ISI is submitting proposal to NASA CAN for further development of high-datarate real-time data over shared network in collaboration with Haystack Observatory and minutes21.doc 11/22/2002 1 NASA. e-VLBI is a major application that would benefit from this work. The proposal is due 26 Nov 02 with decisions to be announced late Feb 03. Direct-transfer e-VLBI experiment Alan reported that a successful direct-transfer e-VLBLI experiment was conducted on 24 Oct, just two hours before Verizon pulled the plug on the ISI-E to Eckington connection! Due to operational constraints at Westford, which was involved in scheduled observations at the time, GGAO had to piggyback onto the Westford operating at the same 256 Mbps mode. A direct real-time transfer of data was made from GGAO to Haystack at 256 Mbps (actually, 288 Mbps with parity overhead) where it was recorded on disk. Correlation with the Westford data produced normal fringes. There was a lot of scrambling done on a very short fuse to make this experiment happen and much thanks is due to everyone involved. Report Outline The goal for the first draft of the final report has been moved to Monday, 9 Dec 2002. Please send your contributions to Alan, who will act as editor and prodder. Executive Summary - Alan Introduction - Alan What is VLBI? - Alan Why e-VLBI? - Alan Goals of the 1-Gbps e-VLBI Demonstration - Alan Elements of the 1-Gbps Demonstration Mark 5 VLBI Data System – Alan Westford connection - Alan Glownet/Bossnet – Steve/Lorraine/Peter ISI-E/Max – Tom/Jerry GSFC Networks – Pat/Bill F./Paul/Kevin K./Dan Haystack/GGAO – Kevin D./Alan/Bill W. Testing and Performance – Tom/Bill F./Kevin K./Kevin D. Results of e-VLBI Demonstration – Alan Recommendations for further work/Future Directions in e-VLBI - All Summary - Alan Next telecon Next telecon is scheduled for Wed, 18 December 2002 at 2 pm EDT. Bill Wildes, GSFC xc: Steve Bernstein, LL Dan Magorian, UMCP Jim Calvin, LL Tom Lehman, ISI Lorraine Prior, LL Jerry Sobieski, Max Leslie Weiner, LL Richard Crowley, Haystack Herbert Durbeck, GSFC Kevin Dudevoir, Haystack Bill Fink, GSFC Hans Hinteregger, Haystack Lee Foster, GSFC Arthur Niell, Haystack Pat Gary, GSFC Joe Salah, Haystack Chuck Kodak, GSFC Kevin Kranacs, GSFC Paul Lang, GSFC Aruna Muppalla, GSFC minutes21.doc 11/22/2002 2 Req’d during data acq A0 Mk5 Cntl Cmptr A1 Westford Antenna Millstone RPE Bldg (Lorraine) Mark 5 A2 SX 1 Summit 1i GigE SX Westford LAN Mark 5 Dedicated no scheduling A2A Alpine A4 3804 Haystack Correlator Internet B1 Haystack LAN Mark 5 SX 28-1A B2 GigE B5 B2A 14 SX 28-1A RJ-45 13 2 B4A 1 Mark 5 B3A Mark 5 LL C2 Dedicated no scheduling B1A Corr Cntl Cmptr (Shared with LL on scheduled basis) C3 16 Summit WDM GigE 5i 15 B6 Cisco 1500 GigE RJ-45 B11 B3 Test WS Req’d during data processing B4 Congress St Boston (~50 km) Amp D3 WDM E6 E3 GigE E2 E4A Test WS GlowNet Alpine 3804 E4 GigE Test WS Bossnet (Peter/Steve) ISI-E Scheduling on Bossnet calendar GigE Juniper M20 1310 E7 E8 GigE E5 (~100 km) D1 Shared with MIT traffic Cisco 1500 E1 D2 Lincoln Lab (Lorraine/Steve/Jim) Schedule to be coordinated with LL 3l (2 GigE + 1 OC-48) Dell Poweredge 2500 (’evlibhay’) GlowNet E5A GigE 8 A3 A1A Schedule to be coordinated with LL C1 MIT Campus WDM F1 E9 Other users (no control) To be upgraded to OC-48 155x Amp Amp F2 Bossnet currently running GigE pending investigation and repair (’superglide’) (’evlbill’) From ISI-E Dell Poweredge 500SC (provided by Haystack) Figure 1: e-VLBI Path - Haystack to ISI-E evlbi011.cdr 02 Oct 02 ISI-E (Tom) Test WS Scheduling on Bossnet calendar Test WS G5 G7B G2 G6B ponder OC-48 Summit 5i G4 G6C Switch GigE G3 H5 H2 GigE H4 G11 OC-48 Borrowed OC-48 interface - may not be able to keep H3 Juniper M160 DREN GigE H8 GigE H9 Primary e-VLBI path J3 Test WS? J2 Other users ( no control) Cisco 4912 Switch GigE Summit 5i H10 GigE J4 J5 WDM GigE on loan from GSFC H11 2 GigE l’s LuxN J6 J1 Need details Needs configuration H6 MAX/UMCP (Jerry/Dan) No jumbo frames No scheduling; sufficient capacity for e-VLBI OC-48 Juniper M160 Frame relay encapsulation G10 Abilene H7 MAX performance node; need details Test WS? Backup plan Juniper OC-48 M40 G9 H1 G12 GigE GigE Trans- G1 GE (’kame’) G8 OC-48 WDM G6 Summit 5i (’omega’) Tuner Bossnet GE G7 MAX @ ISI-E (Jerry) LX (~14km) GSFC/Bldg 28 (Pat/Paul/Kevin/Bill F.) K4 K1 WDM GigE K2 GigE LX (~7.25km) 1310 K7 Summit 5i K3 K5A K5 G4 Mac with Yellowdog Linux (’clifford’) GGAO/Bldg 201 (Pat/Chuck) Test WS Test WS K6 K6A K5B Cisco 12016 K6B GGAO Antenna Trailer (Bill W./Chuck) GigE Summit L3 GigE L1 5i L5 G4 Mac (’pluto’) Windows PC (’xly’) RJ-45 Test WS L6 Internet L4 L2 Dedicated - no scheduling necessary (~500m) RJ-45 Mark 5 NASA LAN L3A RJ-45 L4A Mark 5 Mark 5 Cntl Cmptr L5 Req’d during data acq evlbi012.cdr Figure 2: e-VLBI Path - ISI-E to GSFC/GGAO 20 Nov 02