Haystack e-VLBI Progress & Plans Chester Ruszczyk 3Rd US VLBI Technical Meeting Arecibo, Puerto Rico November 30th 2007 Network Progress • Bossnet / Glownet upgrade has been completed – Operational November 2007 – Supports up to 10Gbps – Present configuration • Support for 4 antennas (2Gbps) – 3 external antennas – + Westford – 10Gbps Test Point • Between Bossnet & Glownet – For further isolation of problems e-VLBI Projects • VSI-E – Proposed standard for protocol / packet format on the network – e-VLBI Workshop in Bonn • Deadline was proposed at next e-VLBI workshop – June 2008 - China • Community – Thumbs up / Thumbs down – VSI-E Committee restarted • Small tiger team – 7 community members from around the world • Address deficiencies • Additional features to be added – Channel / packet – VSI-E Software tiger team for software library completion • 5 developers e-VLBI Plans • Automation of set up / tear down of dedicated Light paths – Follow work with the Dragon Project • Over Glownet / Bossnet / Dragon networks. – Expected to be completed March 2008 • Burst Mode project – Using Mark5C Layer 2 protocol • Transport from DBE2 to Server (10G Ethernet NIC) – Mark5C emulator » Sender / Receiver application » Preliminary design doc. received 11/30/2007 – Receiver socket interface to main application e-VLBI Plans • Mark5 Operating System – Upgrade to Debian “Etch” • 2.6.18 kernel – Initially for e-VLBI • Take advantage of new network stack. – Bogged down • Jungo / Conduant – Memory Leak – Last telecon Nov. 2007 • Swapped method of transfer – from Amazon to Memory • Expect next release shortly • Project is quantification of performance e-VLBI Trials • Westford / GGAO baseline real-time trial – 2 Gbps aggregate / station – Mark5B’s – Target March 2008 • Westford / GGAO baseline real-time transfer – DBE2 / Mark5C – Target Spring / Summer 2008 • Intensive transfers – 2008 – Westford / NyAlesund / Wetzell – first to Haystack – then to USNO • Fiber Connection established Thank you