MASSACHUSETTS INSTITUTE OF TECHNOLOGY HAYSTACK OBSERVATORY WESTFORD, MASSACHUSETTS 01886 Telephone:978-692-4764 Fax: 781-981-0590 6 March 2002 TO: Distribution FROM: Alan R. Whitney SUBJECT: 4 March 2002 e-VLBI telecon summary Attendees: Lee Foster, Pat Gary, Chuck Kodak, Kevin Kranacs, Bill Wildes – GSFC Tom Lehman, ISI Steve Bernstein, Lorraine Prior – Lincoln Laboratory Richard Crowley, Kevin Dudevoir, Hans Hinteregger, Arthur Niell, Alan Whitney – Haystack Observatory This telecon is one of an ongoing series of telecons to prepare for gigabit/sec e-VLBI demonstrations between NASA GSFC and MIT Haystack Observatory using a combination of network facilities including all or part of Glownet, Bossnet, ISI-E, SuperNet, Max and GSFC/HECN. Status Reports The attached figures of the e-VLBI path have been updated to reflect current status and are pretty much self-explanatory; critical status items are indicated in red. In addition, the following comments are relevant: − Lorraine reported that the Juniper router is now in place at E7 and that connection E6 will be made as soon as administrative details are cleared, including changing IP addresses of the Haystack test machine. Will try to get this all done by end of this week. Glownet usage for eVLBI will be coordinated through Lorraine, who has access to the LL radar schedule; Lorraine will suggest ‘windows of opportunity’. Bossnet scheduling will be done on Bossnet activity calendar at www.ngi-supernet.org. IP-address changes will be coordinated between Kevin D. and Lorraine. − 3rdλ on link D1 still awaiting shipment from Cisco; now scheduled to ship 8 March, but will have no effect on e-VLBI work. − Tom reported that connection G9 is now in place at ISI-E with an OC-48 path from Lincoln Lab. Test workstation G7 is now in place. Kevin will be in touch with Tom to get the necessary details. − Alan will send a query to Jerry asking when MAX plans to place test workstation H5 at ISI-E. − Pat reported that GSFC has loaned MAX/UMCP a Summit 5i box (H10) which will be minutes09.doc 3/8/02 1 connected between H7 and J5 to complete a jumbo-frame-capable path from H7 to J5; final connection of this link will be made with days to a week or so. A test workstation (J1) will likely be moved to H10 as shown in Figure 2. − Pat reported that they have on 2-week loan from Cisco a pair of 10GigE ‘blades’ to add a 10GigE λ to the two existing GigE λ’s on the J6 link between UMCP and GSFC Bldg 28. The link was tested by creating a GigE VLAN between Mac G4 GigE test workstations plugged into Cisco 6509’s at J5 and K1, with the VLAN connected to loop back and forth 8 to 16 times between J5 and K1, creating a traffic multiplier on the 10GigE of the same value. Results showed performance at ~8GigE; a similar test with back-to-back Cisco 6509’swill be done this week to see if there is any change in results. Pat will e-mail results to group. Pat estimates cost of each 10GigE blade is $40-70K, but prices should decline rapidly; Pat will send info on 10GigE blades to Alan. Steve indicated that Jim Calvin has used a similar trick at LL to test 10GigE performance. − The fiber of the K7/L1 link is now installed and has been tested by the installer. Summit 5i switch L2, which is currently at Bldg 28, is ready to be moved to GGAO; should happen very soon. The G4 Mac at K6 is currently being used in 10GigE testing, but will be moved in ~1 week to GGAO for testing. Kevin will coordinate IP addresses, etc with Lee Foster and Bill Fink. − Pat suggests using a performance tool named mrtg (version 2.9), which supports 64-bit counters (earlier versions had only 32-bit counters). − Tom reported that link between ISI-E and LL may be upgraded to 10GigE, possibly sometime this summer. Additional equipment would be need to upgrade path from LL to Haystack. − Tom indicated ISI-E does not have good connectivity to StarTap due to lack of funding; might be possible to connect to Abilene, but only on case-by-case basis for demos; would need funding to make permanent connection. Contacts might be Paul Love or Steve Corbato, both of Internet2. − A Mark 5 system could be ready to send to GGAO in a couple of weeks. − Pat indicated that SAN folks at GSFC note that GigE network nicely matches the speed of existing FibreChannel connections; there is some interest in creating a SAN over IP using the GigE links. Also investigating iSCSI gateway/router technology. GigE Performance Tests Kevin D. is working on crafting a performance test that more closely emulates the e-VLBI application; hope to have something ready to test in a couple of weeks. Scheduling Issues Haystack will coordinate with Steve, Lorraine and the WNS people at LL for use of Glownet. Bossnet activity calendar will be used to schedule Bossnet usage. Action Items Lorraine: Will inform Kevin and Alan when connection E6 is put in place. Pat: Send 10GigE info to Alan. minutes09.doc 3/8/02 2 Kevin: Will coordinate with Lorraine, Tom and Lee to get IP addresses and accounts on test workstations. Next telecon Next telecon will be Monday, 25 March 2002 at 2 pm. xc: minutes09.doc 3/8/02 Steve Bernstein, LL Jim Calvin, LL Lorraine Prior, LL Leslie Weiner, LL Herbert Durbeck, GSFC Lee Foster, GSFC Pat Gary, GSFC Chuck Kodak, GSFC Kevin Kranacs, GSFC Paul Lang, GSFC Aruna Muppalla, GSFC Bill Wildes, GSFC Dan Magorian, UMCP Tom Lehman, ISI Jerry Sobieski, Max Richard Crowley, Haystack Kevin Dudevoir, Haystack Hans Hinteregger, Haystack Arthur Niell, Haystack Joe Salah, Haystack 3 Westford Antenna Millstone RPE Bldg (Lorraine) Dedicated no scheduling GigE WS/ Mark 5 1 A2 A1 Summit 1i GigE 8 Summit A4 5i A3 Dedicated no scheduling 28-1A 14 GigE GigE Dell Poweredge 2500 C3 16 Summit 15 B6 B5 28-1B WDM GigE 5i 13 WS/ Mark 5 GigE B2 B1 B4 GlowNet Amp D3 D2 Lincoln Lab (Lorraine/Steve/Jim) Schedule to be coordinated with LL Connection to be made week of 4 March 02 Cisco 1500 E3 GigE Summit E2 5i E1 E4 Dell Poweredge 500SC (provided by Haystack) E5 Test WS OC-48 E6 (Shared with LL on scheduled basis) Cisco 1500 GigE Congress St Boston B3 WDM LL C2 Haystack Correlator WS/ Mark 5 Schedule to be coordinated with LL C1 To be upgraded from 2l to 3l - awaiting parts from Cisco (2 GigE + 1 OC-48) GlowNet D1 Bossnet (Steve/Jim) ISI-E Scheduling on Bossnet calendar E7 Juniper OC-48 1310 M20 E8 GigE MIT Campus WDM F1 155x Amp Amp F2 E9 Other users (no control) To be upgraded to OC-48 evlbi011.cdr 6 Mar 02 Figure 1: e-VLBI Path - Haystack to ISI-E ISI-E (Tom) Scheduling on Bossnet calendar MAX @ ISI-E (Jerry) Need details Test WS G7 Tuner Bossnet WDM GigE G6 Summit 5i Switch G5 G8 G6 GigE H5 H1 G12 GigE H2 GigE H4 OC-48 Trans- G2 ponder OC-48 G9 G11 Juniper M40 G3 OC-48 Borrowed OC-48 interface - may not be able to keep G10 No jumbo frames H7 Juniper M160 GigE H8 GigE H9 Primary e-VLBI path J3 Test WS? J2 J1 Need details H3 H6 Other users ( no control) Cisco 4912 Switch GigE Summit 5i H10 GigE J5 J4 WDM GigE on loan from GSFC H11 3l now is place 2 GigE plus experimental 10GigE (on loan from Cisco) LuxN J6 To be installed soon LX (~14km) GGAO/Bldg 201 (Pat/Chuck) GSFC/Bldg 28 (Pat/Paul/Kevin/Bill F.) GigE K2 WDM K3 K1 K6 K4 Summit 5i GigE Dedicated - no scheduling necessary LX (~5km) K7 1310 GigE L1 Test WS Temporarily located in Bldg 28 - will be moved to GGAO soon GGAO Antenna Trailer (Bill W./Chuck) Summit 5i L2 K5 Test WS OC-48 Juniper M160 MAX/UMCP (Jerry/Dan) G4 Mac with Yellowdog Linux; need details (Bill Fink) No scheduling; sufficient capacity for e-VLBI Backup plan G1 Will try to schedule either K2 or K3 exclusively for e-VLBI experiment MAX performance node; need details Test WS? GigE L3 WS/ Mark 5 L4 K6A Windows PC (Lee Foster) 1600 ft of fiber now installed To be moved to GGAO Figure 2: e-VLBI Path - ISI-E to GSFC/GGAO Will be replaced with Mark 5 evlbi012.cdr 6 Mar 02