IAQ Check List Building: Seth Paine Elementary School Date: November 17, 2015 IAQ Check List Building Inspection Performed by: Lyle Erstad, Greg Fleming, Paul Kramer Report Compiled by: Lyle Erstad, Greg Fleming; Paul Kramer Check List True False N/A 1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed to keep vents clear at all times. Record locations here: 2. Ground Level Outdoor Inspection (weather permitting) a. Univent air intakes are free of obstructions. If false, record locations here: b. Filters i. Medium efficiency filters are installed in all univents. If false, list locations and create work orders to initiate corrective action. ii. High efficiency filters are installed in the air handling units. If false, list locations and create work orders to initiate correction action. iii. Filters are being changed every six months and the installed date is written on the outer filter casing. If filter is older than 6 months, list locations and create work orders to initiate corrective action. c. Insects, bird nests, or droppings are not evident near outdoor air intakes. If false, indicate locations here: d. Trash dumpsters are located away from doors, windows, and outdoor air intakes. e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings) f. Trucks and buses are not allowed to keep their engines idling near the building. Page 1 of 9 Revised 3/7/2011 AMJ Created 11/2010 IAQ Check List Building: Seth Paine Elementary School Date: November 17, 2015 IAQ Check List Building Inspection Performed by: Lyle Erstad, Greg Fleming, Paul Kramer Report Compiled by: Lyle Erstad, Greg Fleming; Paul Kramer Check List True False N/A g. No evidence of drainage problems exist. Water drains away from the building including roof downspouts. Workorders were written to address clogged gutters. h. Sprinklers do not spray directly toward the building or into outdoor air intakes. i. j. Grass clippings from mowers are directed away from the building air intakes. The landscaper is reminded of this. Clean walk-off mats are present at exterior entrances. 3. Roof (Inspections conducted weather permitting) a. Roofing consultant has not found any issues requiring immediate repair. Most recent roofing inspection date/company: 5-year roofing plan completed 5/25/2010 with C. E. Crowley & Associates. b. There is no evidence of water ponding on the roof. c. Intake ventilation units are operating properly and free of debris. d. All exhaust fans are operating properly and free of debris. e. Air intake dampers are set to allow air flow even at minimum setting. f. Insects, birds, animal nests or droppings are not evident near outdoor air intakes. g. Plumbing stacks and exhaust vents are located away from air intakes. 4. Attic a. There is no evidence of roof or plumbing leaks. Page 2 of 9 Revised 3/7/2011 AMJ Created 11/2010 IAQ Check List Building: Seth Paine Elementary School Date: November 17, 2015 IAQ Check List Building Inspection Performed by: Lyle Erstad, Greg Fleming, Paul Kramer Report Compiled by: Lyle Erstad, Greg Fleming; Paul Kramer Check List True False N/A No Attic b. There is no evidence in attic of insects, birds, animals, or nests. No Attic 5. General Considerations a. Classrooms, offices and/or common areas appear recently cleaned. If examples of poor housekeeping are found, record locations below: b. Only vacuums with HEPA filters are being used. c. All supply and exhaust ventilation units are working properly. d. Occupied space temperatures and relative humidity levels are within the standards listed below. i. Temperature range: Winter temperatures 70-73 degrees. Summer temperatures 74-80 in air-conditioned spaces and 74-85 in non-air-conditioned spaces. Outdoor air temperature: 43.1; 39.4 degrees. Highest temperature – Location: 310; 104; Reading of 75.7; 73.7 degrees. Lowest temperature – Location: 100; 208; Reading of 69.4; 69.4 degrees. ii. Relative humidity range is 30% to 60%. Non-air-conditioned spaces may be higher on rainy or humid summer humid days. All spaces may be less than 30% when the out-door air temperature is less than 32 degrees. Outdoor relative humidity: 73.2; 37.6% Highest relative humidity – Location: 100B; 104; Reading of 47.2; 33.4% Lowest relative humidity – Location: 309E; 204;Reading of 12.3; 28.7% Page 3 of 9 Revised 3/7/2011 AMJ Created 11/2010 IAQ Check List Building: Seth Paine Elementary School Date: November 17, 2015 IAQ Check List Building Inspection Performed by: Lyle Erstad, Greg Fleming, Paul Kramer Report Compiled by: Lyle Erstad, Greg Fleming; Paul Kramer Check List True False N/A Readings not within acceptable standards will result in the creation of a work order, requesting maintenance to address. (Readings are noted on the attached test data sheet) e. Occupied space readings of carbon monoxide (CO) levels are less than 9.0 PPM. Outdoor Air CO Reading: 0 Highest CO Location: 310; Several Rooms Reading: .1; 0 Lowest CO Location: Several Rooms Reading: 0 If the CO level is greater than 9.0 PPM in any space as measured with a handheld device or “leave-in” monitor, the space must be cleared of all occupants and steps taken to correct the problem. The issue will be immediately addressed by maintenance and the Fire Department. (Readings are noted on the attached test data sheet) f. CO2 levels in any occupied space are below threshold limits. i. Perform CO2 check with Gray Wolf or other portable device. Measure four times yearly or more often if needed. Measure only in fully occupied rooms. Reading should be less than 700 PPM plus outside air CO2 PPM. 700 PPM + 389; 428 PPM = 1089; 1050 PPM Assume outside CO2 is 350 if temperature is below 41 degrees and air is not stagnant with no- wind. Record all occupied space CO2 levels on forms provided. Provide the outdoor CO2 level as well as the high and low CO2 extremes below: Outdoor reading: 389; 428 PPM Highest CO2 reading – Location: 102; 104; Reading of 1237; 1104 PPM Lowest CO2 reading – Location: 304; Cafeteria; Reading of 504; 667 PPM Page 4 of 9 Revised 3/7/2011 AMJ Created 11/2010 IAQ Check List Building: Seth Paine Elementary School IAQ Check List Building Inspection Performed by: Lyle Erstad, Greg Fleming, Paul Kramer Date: November 17, 2015 Report Compiled by: Lyle Erstad, Greg Fleming; Paul Kramer Check List True False N/A ii. If reading is above threshold, check univent and air handling dampers to ensure a value is set to provide at least 15 cfm of fresh air intake per student based on average space occupancies. If reading is consistently elevated, then use data logging to monitor CO2 concentrations over time and look for other sources of problems. Work orders were written to address inadequate outside air. iii. CO2 levels were checked three months ago. g. h. i. j. k. l. iv. CO2 levels on “leave-in” devices, where present, where checked. No leave-in devices Offensive odors are not apparent. If false, list problem areas: See Odor/Smell Work Order list. Water damage is not evident. Check for roof leaks, pipe leaks, spills, stained ceiling tiles, etc, visually and with moisture meter. Look for the source of any water leaks and schedule repairs. Discard porous items such as ceiling tiles if wet for more than 24 hours. For carpeting, if less than 9 square feet of wet area, shampoo with germicide and fan dry. For areas greater than 9 square feet, replace carpet with tile in reasonable timeframe. If carpet is over ACM tile, replace during next unoccupied break time (winter break, spring break, summer). If false, record findings and locations here: Mold or mildew growth is not evident. If false, record findings and locations here: All pest management issues are being handled by Integrated Pest Management. See Pest Management Report. No other unresolved concerns or complaints by building personnel are known. If false, list any pending issues not previously mentioned in this report here: Those in the 200 hallway have been expressing concerns over rooms that seem to be cold on a frequent basis. It has to do with the room layout and the sources of heat and fresh air. There are no incomplete HVAC preventative maintenance (PM) work requests. Page 5 of 9 Revised 3/7/2011 AMJ Created 11/2010 IAQ Check List IAQ Check List Building: Seth Paine Elementary School Building Inspection Performed by: Lyle Erstad, Greg Fleming, Paul Kramer Date: November 17, 2015 Report Compiled by: Lyle Erstad, Greg Fleming; Paul Kramer Check List True False N/A If false, list any incomplete HVAC work request here: 6. Bathrooms and General Plumbing a. All locker or restroom exhaust fans are working. Inoperable or malfunctioning fans are listed as follows: Location: Problem: b. All of the following drain-trap maintenance procedures are being conducted according to the frequency indicated. If false, indicate all deviations and locations: i. Water is poured into floor drains once per week (approximately 1 quart of water) or water and a teaspoon of cooking oil poured into the drain once a month. The Custodial staff is reminded of this regularly. ii. Water is poured into sinks at least once per week (about 2 cups of water). iii. Toilets are flushed at least once per week. 7. Lab Chemicals & Maintenance Supplies a. Lab chemicals are used with exhaust fans turned on. b. Lab chemical storage areas have been inspected yearly by ROE and Fire Department. Record last inspection dates below: ROE: 10/2015 LZFD: Yet to be scheduled. c. Flammables are not stored with igniters. d. All chemicals that may react or produce toxic or explosive by-products are separated and maintained in Page 6 of 9 Revised 3/7/2011 AMJ Created 11/2010 IAQ Check List IAQ Check List Building: Seth Paine Elementary School Building Inspection Performed by: Lyle Erstad, Greg Fleming, Paul Kramer Date: November 17, 2015 Report Compiled by: Lyle Erstad, Greg Fleming; Paul Kramer Check List True False N/A approved containers stored in approved storage. (e.g. lockable, with appropriate ventilation). e. Chemical disposal records for all lab chemicals are available for review. f. All cleaning products used in building contain no/low VOC. List any exceptions: g. Increased ventilation is considered when installing new carpets, cleaning upholstered furniture, shampooing carpets, etc. h. Exhaust ventilation systems in chemical and trash storage areas are turned on and functioning properly. i. Portable fuel containers are properly closed. j. Power equipment, like snow blowers and lawn mowers, have been serviced and maintained according to manufacturers’ guidelines. k. Oil based paints are stored in approved storage cabinets. No oil based paint allowed in District. l. Green Cleaning products and processes are used in this building. 8. Combustion Appliances a. Combustion analysis is performed at the start of the heating season on all boilers. Adjustments are made to the burners to correct any abnormalities and improve efficiency. This will be scheduled in December. b. In rooms that contain combustion appliances, there is no evidence of combustion gas or fuel odors. If false, record locations here: Page 7 of 9 Revised 3/7/2011 AMJ Created 11/2010 IAQ Check List IAQ Check List Building: Seth Paine Elementary School Building Inspection Performed by: Lyle Erstad, Greg Fleming, Paul Kramer Date: November 17, 2015 Report Compiled by: Lyle Erstad, Greg Fleming; Paul Kramer Check List True False N/A c. No leaks, disconnections, and/or deterioration were found on exhaust hoods. d. Flue components are clean and free of soot. e. All combustion appliances have flues or exhaust hoods and vent NO2. i. If false, inspect cooking hoods, chemical hoods. Assure that cooking stoves and appliances are correctly installed, used, and maintained according to manufacturers’ specifications. ii. If not vented, ensure that “leave-in” CO monitors are placed in room. Record locations here: NONE iii. CO levels in rooms with combustion appliances are measured and recorded with an IAQ monitor. CO readings outside of normal CO range will result in an immediate response by maintenance to reduce CO level or vacating the room/building, if necessary. Record locations here: Boiler Room 9. Other a. Paint No peeling and/or flaking paint found. If planned building renovation will damage paint or if peeling paint is discovered, lead testing may be necessary. If peeling paint is found, send email to the building Principal and the Facilities Director alerting them of the problem. Staff and teachers need to pick up any flakes of paint to prevent children from being exposed. The Facilities Director will advise the Facilities Coordinator (a Certified Lead Paint Renovator) to test the paint for lead. Lead paint was discontinued in 1978. Buildings built after 1978 are exempt from lead paint testing. If lead is present, required repairs should be done immediately using lead-safe methods and, if necessary, a licensed lead contractor. Location(s) of known peeling paint in building: Page 8 of 9 Revised 3/7/2011 AMJ Created 11/2010 IAQ Check List IAQ Check List Building: Seth Paine Elementary School Building Inspection Performed by: Lyle Erstad, Greg Fleming, Paul Kramer Date: November 17, 2015 Report Compiled by: Lyle Erstad, Greg Fleming; Paul Kramer Check List True False N/A b. The following preventive measures are being taken to reduce lead exposure. i. Play areas and toys are cleaned nightly. ii. Floors are mopped nightly. iii. Dust at least weekly. c. Radon testing is recommended by IEMA every 5 years. Last testing date listed below: Date: 12/16/2011 - 12/19/2011 ; Reading of (Highest) 1.0 pCi/L in Room 104. National concern level: 4.0 pCi/L or above d. The IAQ testing equipment used for this inspection was calibrated and is in good working order. Equipment Used: Gray Wolf Last date of calibration: 1/06/2015 Page 9 of 9 Revised 3/7/2011 AMJ Created 11/2010 Seth Paine Fall 2015 IAQ Data Site Location Seth Paine Outdoor Air Seth Paine 100 Seth Paine 101 Seth Paine 102 Seth Paine 103 Seth Paine 104 Seth Paine 105 Seth Paine 106 Seth Paine 107 Seth Paine 108 Seth Paine 111 Seth Paine 112 Seth Paine 113 Seth Paine 200 Seth Paine 202 Seth Paine 203 Seth Paine 204 Seth Paine 205 Seth Paine 208 Seth Paine 209 Seth Paine 210 Seth Paine 211 Seth Paine 304 Seth Paine 306 Seth Paine 307 Seth Paine 308 Seth Paine 309 Seth Paine 310 Seth Paine 100B Seth Paine 309E Seth Paine 309W Date/Time 11/12/2015 11:00:43 AM 11/12/2015 11:31:37 AM 11/12/2015 12:28:45 PM 11/12/2015 12:32:25 PM 11/12/2015 12:26:10 PM 11/12/2015 12:23:01 PM 11/12/2015 12:12:42 PM 11/12/2015 12:16:47 PM 11/12/2015 12:06:51 PM 11/12/2015 12:09:51 PM 11/12/2015 12:48:13 PM 11/12/2015 12:51:23 PM 11/12/2015 12:43:52 PM 11/12/2015 12:03:19 PM 11/12/2015 1:39:53 PM 11/12/2015 1:42:35 PM 11/12/2015 1:44:43 PM 11/12/2015 11:59:15 AM 11/12/2015 11:42:13 AM 11/12/2015 11:45:01 AM 11/12/2015 11:48:11 AM 11/12/2015 1:47:17 PM 11/12/2015 2:05:00 PM 11/12/2015 2:02:39 PM 11/12/2015 11:51:25 AM 11/12/2015 11:54:00 AM 11/12/2015 2:00:09 PM 11/12/2015 1:55:59 PM 11/12/2015 11:35:10 AM 3/6/2015 12:36:26 PM 3/6/2015 12:34:48 PM °F 43.1 69.4 74.1 73.7 73.9 73.7 71.8 73.1 70.7 71.6 72.6 73.9 74.7 70.2 75.3 74.6 75 70.1 70.3 69.9 70.2 73.5 73.7 75.2 70.3 71 75.1 75.7 69.9 74.5 73.8 % RH C0 ppm CO2 ppm Occupancy 73.2 0 389 46.7 0 796 3 42.9 0 976 18 43.3 0 1237 13 42.9 0 1044 18 43.1 0 1100 16 43.4 0 879 16 45.6 0 902 14 42.9 0 836 13 44.3 0 923 9 34.2 0 624 16 33.3 0 607 13 39.8 0 1048 19 43.4 0 990 23 36.8 0 1055 17 36 0 928 20 38.3 0 1135 22 42.7 0 775 19 45.9 0 1177 24 44.8 0 959 25 44.9 0 926 29 36.4 0 741 2 31.8 0 501 2 32.4 0 644 5 44.6 0 914 23 44.8 0 1148 20 37.4 0 923 3 40.1 0.1 1023 17 47.2 0 791 1 12.3 0 857 4 12.4 0 842 4 Window Yes Note Seth Paine Seth Paine Gymnasium 11/12/2015 12:40:12 PM lounge 11/12/2015 11:37:08 AM 73 71 35.2 47.2 0 0 593 956 21 6 CO2 Formula: 700 + 389 = 1089 Site Location Date/Time Seth Paine Outdoor Air 11/13/2015 10:29:33 AM Seth Paine 102 11/13/2015 12:00:17 PM Seth Paine 104 11/13/2015 11:55:45 AM Seth Paine 201 11/13/2015 11:05:15 AM Seth Paine 204 11/13/2015 12:03:30 PM Seth Paine 208 11/13/2015 11:08:10 AM Seth Paine 301 11/13/2015 11:10:22 AM Seth Paine 303 11/13/2015 11:12:30 AM Seth Paine Seth Paine 308 11/13/2015 11:17:10 AM Cafeteria 11/13/2015 11:00:10 AM CO2 Formula: 700 + 350 = 1050 °F 39.4 73.5 73.7 70.3 72.7 69.4 70.1 70.4 72.8 71.4 % RH C0 ppm CO2 ppm Occupancy 37.6 0 428 33 0 981 18 33.4 0 943 20 29 0 702 3 28.7 0 969 21 30 0 903 20 29.9 0 729 2 30.5 0 825 1 33.1 30.7 0 0 1104 667 16 81 Window Note Will need to check Dampers