Creating an Update for 2012 Board Approved Projects to be scored in 2014 Purpose • “Update” is to bring forth additional documentation that was not available in the original submittal (predesign or schematic design). Furthermore, it is to position your project better to reflect the revised 2014 scoring criteria. • Please review the Strategic Framework closely. 1. Ensure access to an extraordinary education for all Minnesotans: 2. Be the partner of choice to meet Minnesota’s workforce and community needs: 3. Deliver to students, employers, communities and taxpayers the highest value/most affordable option: • Projects might have finer developed understanding due to Schematic Design or increased need due to timing of the project. • Update should be clear, concise and highlight the good changes in the overall project since originally scored – and that reflect the new criteria. • Update submittal can be done in power point and bullets - or in a manner that is easy to read and understand. Do not expect the reader to wade thru many pages; this should be simple to understand what was originally proposed and what is now proposed. Key Elements: (note revisions to the following) 1. Project History Summary • State clearly what was originally proposed and any changes on program reduction or increases (square footage, programs or costs) from the original predesign document from the predesign or original Capital Budget Request to the current status and Capital Budget request. • State the actual as well as the percentage change of square footage, costs or program scope from the original document. • Schedule Adjustments 2. Scope of Work – note any changes: • Vision: increased (or decreased) programs and why • FCI or Space Use changes • Strategic Goals 3. Academic Programs: • Programs effected by revised Predesign or Schematic Design to the current 2012 proposal 4. Building Program and Diagrams • Program summary with square footage • Explain changes and/or additions to the original Predesign document 5. Revised Site and Building Layout/Map • Proposed site or building map • Floor plan (s) or elevations. Intention is not to critique the current plans. It may be good to note highlights of the plan; i.e. additional spaces used for students, or note an particular flexible classroom or lab space, or unique energy efficient item, or note deferred maintenance being removed, etc. 6. Revised Project Schedule Contact: Gregory Ewig (651-201-1775) Gregory Ewig @so.mnscu.edu OR Lisa Jansen (651-201- 1788) lisa.jansen@so.mnscu.edu if we can assist in reviewing the “Update” of your project or clarify any comments or analyze your project to the 2014 scoring. • Construction date changes 7. Revised Project Funding • Cost summary • Previous allocated dollars • Budgeted Inflation Slide 1 Creating an Update for 2012 Board Approved Projects to be scored in 2014 Suggestions on How to Get Started Create your own story. Since the predesign was complete – the campus has added or subtracted programs, investigated workforce issues and kept moving in a dynamic fashion. Tell YOUR story on how your project has developed and increased or decreased with the benefit of further investigation. Predesign is preliminary; design will continue to improve on the predesign and cause changes. State those improvements and changes clearly such as: • Add info on programs; growth, FYE, placement, waiting lists, etc. • Add info from photos; changed conditions • Add info from workforce changes; increases that have made your project more compelling. • Add info on funding if the campus has increased partnerships (be specific – name company or institution and the dollar amount estimated). • Add any drawings; i.e. if revised wetland changed the configuration of the building indicate that change so it is clearly understood. If the Schematic Design creates some exciting byproducts (i.e. increased student gathering spaces or increased seminar rooms due to design) highlight those issues. • Add any photos that help explain the project or the need. • Add any pertinent information that explains the project and its current status. Creating an Update for 2012 Board Approved Projects to be scored in 2014 1. Example of Project History Change Be simple; get the facts across quickly Project Predesign 2012 Capital Budget Schematic Design Request 2014 Capital Budget Request Classroom Renovation $13,500,000 $13,500,000 $12,800,000 $12,800,000 Reduced due to HEAPR funding in 2010 and some program changes Number of classrooms and square footage Predesign 2012 Capital Budget Request Schematic Design 2014 Capital Budget request 18 classrooms and 8 offices and 2 flex spaces - 25,000 sq ft 18 classrooms and 8 offices and 2 flex spaces 25, 000 sq ft 18 classrooms and 8 offices and 2 flex spaces – 25,000 sq ft 18 classrooms, 6 offices, 3 office suites for sharing, 2 flex spaces - 28,000 sq ft 18 classrooms, 6 offices, 3 office suites for sharing, 2 flex spaces – 28,000 sq ft Creating an Update for 2012 Board Approved Projects to be scored in 2014 1. Example of Project History Change Be Simple; get the facts across quickly from previous Board approved document to current document. Note: If there are NO changes; it would help to clarify that. Project Predesign 2012 Capital Budget Schematic Design Request 2014 Capital Budget Request Classroom addition $13,500,000 $13,500,000 $13,500,000 $13,500,000 Number of classrooms and square footage Predesign 2012 Capital Budget Request Schematic Design 2014 Capital Budget request 12 classrooms and 8 offices and 2 flex spaces 12 classrooms and 8 offices and 2 flex spaces 12 classrooms and 8 offices and 2 flex spaces Due to advanced program analysis changed to 10 classrooms, 4 seminar spaces, 2 office suites (for 12) 10 classrooms, 4 seminar spaces, 2 office suites (for 12) Creating an Update for 2012 Board Approved Projects to be scored in 2014 1. Examples of Project History Examples of Scope changes due to revised workforce conditions that can be documented Predesign Program 2012 Capital Schematic Design Budget Request Added classroom and offices for a consolidated program for Allied Health Added classroom and offices for a consolidated program for Allied Health 10,000 sq ft plus 2,000 sq ft renovation 10,000 sq ft plus 2,000 sq ft renovation Due to increase of workforce needs documented by 2010 DEED study of 24% growth in area and additional scholarship and medical equipment funding from medical tech program (added Reconfigured space to include more renovation for bioscience program. Overall funding remained the same; scope change to improve project 9,000 sq ft plus 4,000 sq ft renovation Current Status of Project 2014 Capital Budget Request Classroom addition: cost of overall project remained the same and justification of minor program expansion of square footage reviewed and approved at Schematic Design. Since project was vetted and approved by OOC at SD – changes should be acceptable. Program for Allied Health and bioscience 9,000 sq ft plus 4,000 sq ft renovation Creating Creating an an Amendment Update forfor 2012 2010 Board Board Approved Approved Projects Projects to to be be scored scored in 2014 in 2012 1. Examples of Project History indicating overall change. Project History changes highlighted – keep documentation simple: Bullets assist or simple charts that explain the overall dynamic. Creating an Update for 2012 Board Approved Projects to be scored in 2014 2. Examples of Scope of Work with more verbiage to explain the issues Creating an Update for 2012 Board Approved Projects to be scored in 2014 3. Examples of Academic Program changes in the process – often times these Schematic Design (SD) documents explain the changes were done for the SD presentation. This info should be noted for the 2014 scoring process. Creating an Update for 2012 Board Approved Projects to be scored in 2014 3. Examples of Academic Program changes in the process: • Keep language simple • Bullets or other reasoning assists in explanation • Help explain the project changes and why additional design work has improved the initial program concepts. Creating Creating an an Amendment Update forfor 2012 2010 Board Board Approved Approved Projects Projects to to be be scored scored in 2014 in 2012 4. Examples of Revised Building Program/Diagram Example: Items marked with a red “X” have been eliminated from the program from the original Predesign document. Items with a red circle have been added or modified since the original Predesign document. These modifications are what is submitted for 2014 capital budget . Creating an Update for 2012 Board Approved Projects to be scored in 2014 4. Examples of Revised Building Program/Diagram The space needs for this project, originally defined in the PreDesign phase, have been refined throughout the schematic design phase. Some spaces increased while others decreased, resulting in a net reduction in square footage of 4,900 gross square feet from the approved PreDesign, or a net reduction of 7.9%. These reductions are a combination of reducing the project size to control the project budget, and making project components fit together into an efficient building layout. Creating an Update for 2012 Board Approved Projects to be scored in 2014 4. Examples of Revised Building Program in a matrix form Creating an Update for 2012 Board Approved Projects to be scored in 2014 5. Examples of Revised Site and Building Layout/Map: • Bullets on the left note the major change issues of the project • Space changes noted • Overall budget issue noted • Reason for change is stated - in this case was due to the partner project (YMCA) changing the configuration resulting in the campus needing to change its configuration Creating Creating an an Amendment Update forfor 2012 2010 Board Board Approved Approved Projects Projects to to be be scored scored in 2014 in 2012 6. Examples of Revised Project Schedule Slide 14 Creating an Update for 2012 Board Approved Projects to be scored in 2014 7. Examples of Revised Project Funding Item and Reason for Change Predesign Revision for 2014 Proposal Item New construction costs : original 62,000 sq ft reduced to 42,000 sq ft due to reduction in lab space for widget program $12,500,000 $8,500,000 Site/Infrastructure Costs – increased due to found water main in Schematic Design $ 1,100,000 $1,500,000 Renovation costs: original 10,000 sq ft increased to 25,000 sq ft to accommodate new lab space for widget program $ 2,750,000 $4,000,000 Total with non construction costs and Inflation $21,655,000 $18,750,000 Creating an Update for 2012 Board Approved Projects to be scored in 20124 7. Examples of Revised Project Funding Creating an Update for 2012 Board Approved Projects to be scored in 2014 7. Examples of Revised Project Funding – it is not necessary to do this kind of side by side analysis; but campus may want to if it will explain the changes. IF construction costs are reduced; then campus must prove these costs are reasonable.