Standard Default Programing for iLumin and Greengate Default programing is available for projects with the following iLumin or Greengate panels and devices. iLumin, CKT, CKM, CK2, CK4, LK, wall stations, OCC sensors and outdoor photo cells Default programing is NOT available for the following iLumin or Greengate panels and devices. CK4A, floor controller, partitioning, any and all BMS integration, or EG2* *Appropriate documentation must be submitted for these devices prior to receiving a date for startup. Standard default programing iLumin and Greengate Relays and diming cards: These will correlate with the area names if provided upon arrival. Greengate Wallstations: Each button will be programmed to correlate with the area of lights it’s controlling in the space. iLumin Wallstations/Touchscreens: 100%, 75%, 50%, 25%, Off light level scenes will be programmed to trigger the area of light being controlled in the space. Motion sensors: Each motion sensor will be programmed to correlate with the area of lights it’s controlling in the space. Time Schedules: No time schedules will be implemented. Photocells: Each photocell will be programmed to correlate with the area of lights it’s controlling in the space. Exterior photocells will be programmed to turn all exterior lights on at dusk and off at dawn. If ALL PAPER WORK is submitted CORRECTLY five business days before the start-up, the paper work will take the place of the default programing procedure. Any additional time required due to: System not being completely installed prior to the arrival of the technician. Programming requirements outside the scope of this document. Lack of panel schedules detailing location of landed control channels. Local code requirements not being defined in writing. May result in a return visit and additional charges (standard scheduling procedures apply including a return PO and up 21 days to return). Signature: __________________________________________ Date: _____________________ Transmittal Form Eaton’s Cooper Controls 203 Cooper Circle Peachtree City, GA 30269 Phone: 800-553-3879 Fax: 800-954-7016 ControlTechSupport@Eaton.com From: (Electrical Contractor) RE: Factory Start-Up In accordance with Eaton’s terms and conditions this letter serves as written notification requesting a Field Service Engineer to perform a system start up beginning on the following date: _________________________________ Subject to Technician Availability The control system will be completely installed by the date above. If the installation is not complete at the specified time, I understand that additional expenses may be incurred from Eaton for extra trips to complete system programming. I understand that the requested date is subject to technician availability and is not guaranteed until confirmed by Eaton. Signature: If you have any questions concerning the paperwork, startup, and/or training please call our Technical Support Center at 800-553-3879 and select the option for Technical Assistance. We look forward to working with you on this project. Contact Form --- Please fill out completely. Agent Contact Information: Agent : Agent Contact: Agent Phone#: Site Information: Job Name: Job Address: City/State/Zip: Job PO Number: Contractor Contact Information Contact Name: Phone Number: E-mail Address: Site Contact Name: Site Contact Phone Number: Site Contact E-mail Address: Startup and Training Reference Document Startup and Training includes the following: CHECK SYSTEM HARDWARE: 1. Check-out of inputs and outputs for installation and function. 2. Check-out of network communications. CHECK SYSTEM SOFTWARE: 1. Check-out all computer software functions. 2. Review scheduling and programming parameters. TRAINING: 1. Demonstrate hardware including: function, diagnostic indicators, connections, troubleshooting, and replacement. 2. Instruction on all software functions including keypad or software programming, and system monitoring. 3. Hands on training for system management including functions in #2.