December 2015 Project Status: Charlotte-Mecklenburg Storm Water Services and engineering consultant, WK Dickson & Co., Inc., have finalized the construction plans and begun the bid phase. During this phase, the final design plans will be circulated to qualified contractors for a competitive bidding process. Next Steps: After City Council approval, the construction contract is awarded to the lowest responsible bidder. The bid phase typically lasts 6 to 9 months. For more information: Please contact Adrian Cardenas, Project Manager acardenas@charlottenc.gov 704-336-4682 StormWater.CharMeck.org Meadowridge Storm Drainage Improvement Project Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 Investing in Infrastructure Charlotte has an aging public storm drainage system, much of which is past its useful life. The City repairs, replaces and installs new storm drainage infrastructure when it deteriorates or becomes too small to handle increases in stormwater. Investing in infrastructure protects public safety, guards private property, improves water quality and enhances quality of life. The Meadowridge Storm Drainage Improvement Project goal is to improve the storm drainage infrastructure within the neighborhood, reducing the channel erosion and flooding concerns. For more information: StormWater.CharMeck.org