Hampton Avenue your storm water fees at work

advertisement
Hampton Avenue
s t o r m
d r a i n a g e
i m p r o v e m e n t
p r o j e c t
your storm water fees at work
Dear Resident:
November 9, 2012
Charlotte-Mecklenburg Storm Water Services held
a public meeting on October 11 at Christ Episcopal
Church to present the design alternative for the
Hampton Avenue Storm Drainage Improvement
Project.
Meeting highlights:
• Project Manager Danee McGee discussed the
project process and team responsibilities.
• Cliff Nelson, Project Manager for our design
consultant Baker Engineering, provided
information on existing condition problems,
the design criteria and the preferred alternative
benefits.
•
For more information or detailed meeting minutes, visit
our website: http://stormwater.charmeck.org. Click
on the Storm Water Projects drop down menu in the
green bar, then Active Projects and Hampton Avenue.
If you have any questions, please contact Project
Manager Danee Mcgee at dmcgee@charlottenc.gov or
704-336-4102.
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Hampton Avenue Project Update
HIGHLIGHTS FROM PUBLIC MEETING
Residents broke into smaller groups to review
detailed boards showing the preferred alternative
and its potential impacts on their properties.