Hampton Avenue s t o r m d r a i n a g e i m p r o v e m e n t p r o j e c t your storm water fees at work Dear Resident: November 9, 2012 Charlotte-Mecklenburg Storm Water Services held a public meeting on October 11 at Christ Episcopal Church to present the design alternative for the Hampton Avenue Storm Drainage Improvement Project. Meeting highlights: • Project Manager Danee McGee discussed the project process and team responsibilities. • Cliff Nelson, Project Manager for our design consultant Baker Engineering, provided information on existing condition problems, the design criteria and the preferred alternative benefits. • For more information or detailed meeting minutes, visit our website: http://stormwater.charmeck.org. Click on the Storm Water Projects drop down menu in the green bar, then Active Projects and Hampton Avenue. If you have any questions, please contact Project Manager Danee Mcgee at dmcgee@charlottenc.gov or 704-336-4102. Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 Hampton Avenue Project Update HIGHLIGHTS FROM PUBLIC MEETING Residents broke into smaller groups to review detailed boards showing the preferred alternative and its potential impacts on their properties.